CN208718294U - Assembled ground system - Google Patents

Assembled ground system Download PDF

Info

Publication number
CN208718294U
CN208718294U CN201821371676.1U CN201821371676U CN208718294U CN 208718294 U CN208718294 U CN 208718294U CN 201821371676 U CN201821371676 U CN 201821371676U CN 208718294 U CN208718294 U CN 208718294U
Authority
CN
China
Prior art keywords
insulating layer
balance
layer
carrying bolt
several
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821371676.1U
Other languages
Chinese (zh)
Inventor
刘志强
王洋
苗磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Construction Investment Decoration Industry Co ltd
Shanxi Construction Investment Group Decoration Co ltd
Shanxi Lvjian Zhupin Technology Co ltd
Original Assignee
Shanxi Jian Ding Decoration Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jian Ding Decoration Industry Co Ltd filed Critical Shanxi Jian Ding Decoration Industry Co Ltd
Priority to CN201821371676.1U priority Critical patent/CN208718294U/en
Application granted granted Critical
Publication of CN208718294U publication Critical patent/CN208718294U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to building ground construction field, solve existing deficiency when pipeline is constructed with ground construction, provide a kind of floor heating of assembled ground, including to it is lower and on insulating layer, thermal insulation layer, balance layer and finish coat, insulating layer is close to tiling and is set on mattess, and being evenly distributed in the upper surface for insulating layer is provided with several card slots for being used to install floor heating pipe;The balance layer is spliced by several rectangle balance plates, several supporting and regulating devices are installed at the splicing seams between balance plate, supporting and regulating device includes the carrying bolt and screw socket for being inserted into screwing type and being cooperatively connected, carrying bolt is vertically arranged, lower section passes through insulating layer and is fixed in mattess, and adjacent balance plate contact, which is supported between the top and adjacent balance plate of carrying bolt, passes through adhesive tape sealing.Using this method construct in set the ground of pipeline and no longer need to carry out levelling plastering processing, form of construction work more standardizes, and is conducive to control construction quality and construction period and later period maintenance.

Description

Assembled ground system
Technical field
The utility model belongs to building ground construction field, and in particular to a kind of assembled ground system.
Background technique
As country advocates hard-cover room energetically, it is desirable that remove blank, basis finishing also gradually tends to standardize, and basis dress Floor heating construction in repairing has a wet construction and dry construction two ways, carries out Self-leveling firstly the need of to ground when wet construction Processing, then could be laid with insulating layer, floor heating pipe on levelling structural floor, then fill concrete and be smeared again with mortar It is flat.It arranges, leads mainly by artificial technology since flatness requirement of the wet construction to structural floor is higher, and when laying floor heating pipe It causes construction efficiency low, is also unfavorable for standardizing.Therefore, dry construction is gradually used, such as 2014108510534 disclosure of Chinese patent Earth module, ground system and its water-heating type ground heating system, realize to a certain extent floor heating modularization standardization installation, But its structure grillage uses galvanized steel plain sheet one-pass molding, and cost is excessively high, is unsuitable for promoting the use of;Meanwhile the use of structure grillage It is both ends support, intermediate overhead mounting means, there are problems that deformation in later period use process.
In addition to considering floor heating pipe problem, the construction for considering the pipelines such as water pipe, spool simultaneously is also needed, realizes the mark of a variety of pipelines Standardization construction, facilitates the later period to overhaul.
Summary of the invention
The utility model is to solve pipeline existing deficiency when constructing with ground construction, and then with providing a kind of assembled Plane system.
The utility model adopts the following technical solution:
A kind of assembled ground system, including to it is lower and on insulating layer, thermal insulation layer, balance layer and finish coat, insulating layer It is close to tiling to be set on mattess, being evenly distributed in the upper surface for insulating layer is provided with several card slots for being used to install floor heating pipe;It is described Balance layer is spliced by several rectangle balance plates, and several supporting and regulating devices are equipped at the splicing seams between balance plate, Supporting and regulating device includes the carrying bolt and screw socket for being inserted into screwing type and being cooperatively connected, and carrying bolt is vertically arranged, lower section Be fixed in mattess across insulating layer, the contact of adjacent balance plate be supported in the top of carrying bolt and adjacent balance plate it Between pass through adhesive tape sealing.
The insulating layer is closely spliced by several rectangle insulation boards, and the bottom surface of insulation board is provided with several water power pipes Slot, the diameter of tube seat is according to the water pipe and spool specifications design of architectural design, it is ensured that water power pipe etc. can be smooth in corresponding tube seat Installation.
The screw socket length is not less than heat preservation plate thickness.
The insulation board is polystyrene foam insulation board or polystyrene extruded plastic insulation board.The thickness base area of insulation board The diameter integrated determination of heating coil, spool and water pipe etc. makes the thickness of insulation board be enough to open up corresponding notch and meet building to apply Bearing capacity code requirement in work.
The balance plate is calcium silicate board or carbon crystal plate.
The carrying bolt and screw socket top surface are equipped with rubber mat.
The work progress of assembled ground system is as follows:
Several insulation boards of standard specification are laid on the mattess for pouring completion, while will preset by the first step Water pipe and fulgurite be caught in the tube seat of insulation board lower surface and make corresponding pipeline label, prevent from playing support in subsequent wear and adjusting dress Pipeline is damaged when setting;
Default floor heating pipe holding is set in insulation board, and is laid with thermal insulation layer on insulation board, and mark by second step;
Supporting and regulating device is squeezed into after insulation board and thermal insulation layer and is fixed in mattess by third step;
The leveling of several balance plates is supported in the carrying bolt top of supporting and regulating device by the 4th step, it is naughty after balance Pass through adhesive tape sealing between plate.Three supporting and regulating devices are at least arranged in vertical or horizontal splicing seams between balance plate, i.e., respectively At least there are three support stress points for the splicing edge of balance plate, while also should be uniformly distributed by equal ranks or plum blossom-shaped in the centre of balance plate Supporting and regulating device is set, guarantees the enough stress of balance plate and stress equalization.
Traditional pipeline wet construction has been carried out modularized processing by the utility model, is completed in concrete structure pouring Afterwards, earth module can be carried out assembled, it is no longer necessary to carry out levelling plastering processing, form of construction work more standardizes, and is conducive to control Construction quality processed and construction period, while utilizing later period maintenance and inspection;Surface balance plate can be finely tuned by carrying bolt it is levelling, no Need to make concrete leveling again, and subsequent floor file process can carry out directly on balance plate;It is equipped with ground The insulation board of the pipelines such as heating coil is that the component for being directly layed on the concrete poured, and playing carrying is concrete structure Layer, carrying bolt and balance plate will not directly press to pipeline in use process, can effectively ensure that pipeline safety in utilization and Stability.
Detailed description of the invention
Fig. 1 is the connecting node figure of earth module;
Fig. 2 is the structural schematic diagram of insulation board;
Fig. 3,4 be carrying bolt structural schematic diagram;
In figure: 1- mattess, 2- insulation board, 3- thermal insulation board, 4- balance plate, 5- floor heating pipe, 6- screw socket, 7- glue Pad one, 8- rubber mat two, 9- adhesive tape, 10- carrying bolt, 11- card slot.
Specific embodiment
In conjunction with attached drawing, specific embodiment of the present utility model is described further:
Assembled ground system as shown in Figure 1, including to it is lower and on insulating layer, thermal insulation layer, balance layer and finish coat, Insulating layer is close to tiling and is set on mattess, and being evenly distributed in the upper surface for insulating layer is provided with several cards for being used to install floor heating pipe Slot;The balance layer is spliced by several rectangle balance plates, and several supports are equipped at the splicing seams between balance plate and are adjusted Regulating device, supporting and regulating device include the carrying bolt and screw socket for being inserted into screwing type and being cooperatively connected, and carrying bolt is vertically set Set, lower section passes through insulating layer and is fixed in mattess, the contact of adjacent balance plate is supported in the top of carrying bolt and adjacent Pass through adhesive tape sealing between balance plate.
When construction, the insulation board of standard size dimensions is layed on the mattess for pouring completion first, and by phase The spool and water pipe answered correspond to holding and are installed in the tube seat of insulation board lower surface;The pipelines such as floor heating pipe are spread by design requirement again It is laid with thermal insulation layer in the card slot of insulation board upper surface, and above the insulation board of installation end conduit, then will be equipped with sleeve Carrying bolt pass through insulation board and thermal insulation layer and squeeze into the mattess for pouring completion, then by the corresponding paving of the balance plate on surface layer Above insulating layer, before being laid with balance plate, by adjusting carrying bolt, the top surface of all carrying bolts is adjusted to same level Line guarantees the surface smoothness of balance plate after being laid with, then the later period in the finish coats such as floor tile or timber floor, is not required to look for again It is flat, it can directly construct.
The structure of carrying bolt is as shown in Figure 3,4, according to the different splicing node demands of balance layer, supports nut plate Structure size is different, for example, the support nut board size is sufficiently large, and guaranteeing should when for support at " ten " word splicing seams Plate can form stable support to four blocks of adjacent plates, be typically designed and be square, and side length is 50mm or so;And for edge When, square plate is also used, side length is 20mm or so;When being used to support " one " word splicing seams, then it is designed as rectangle, generally 20*50mm or so.
Wherein, the material of without specific instruction, structure etc. are the prior art in the utility model.

Claims (6)

1. a kind of assembled ground system, it is characterised in that: including to it is lower and on insulating layer, thermal insulation layer, balance layer and facing Layer, insulating layer are close to tiling and are set on mattess (1), and being evenly distributed in the upper surface of insulating layer is provided with several for installing floor heating pipe (5) card slot (11);The balance layer is spliced by several rectangle balance plates (4), at the splicing seams between balance plate (4) Several supporting and regulating devices are installed, supporting and regulating device includes the carrying bolt (10) and screw for being inserted into screwing type and being cooperatively connected Sleeve (6), carrying bolt (10) is vertically arranged, lower section passes through insulating layer and is fixed in mattess (1), adjacent balance plate (4) contact is supported between the top and adjacent balance plate (4) of carrying bolt (10) is sealed by adhesive tape (9).
2. assembled ground system according to claim 1, it is characterised in that: the insulating layer is kept the temperature by several rectangles Plate (2) is closely spliced, and the bottom surface of insulation board (2) is provided with several water power tube seats.
3. assembled ground system according to claim 2, it is characterised in that: screw socket (6) length is not less than Insulation board (2) thickness.
4. assembled ground system according to claim 3, it is characterised in that: the insulation board (2) is polystyrene bubble Foam insulation board or polystyrene extruded plastic insulation board.
5. assembled ground system according to claim 4, it is characterised in that: the balance plate (4) be calcium silicate board or Carbon crystal plate.
6. assembled ground system according to claim 5, it is characterised in that: the carrying bolt (10) and screw socket (6) top surface is equipped with rubber mat.
CN201821371676.1U 2018-08-24 2018-08-24 Assembled ground system Active CN208718294U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821371676.1U CN208718294U (en) 2018-08-24 2018-08-24 Assembled ground system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821371676.1U CN208718294U (en) 2018-08-24 2018-08-24 Assembled ground system

Publications (1)

Publication Number Publication Date
CN208718294U true CN208718294U (en) 2019-04-09

Family

ID=65979253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821371676.1U Active CN208718294U (en) 2018-08-24 2018-08-24 Assembled ground system

Country Status (1)

Country Link
CN (1) CN208718294U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108775130A (en) * 2018-08-24 2018-11-09 山西建投装饰产业有限公司 Assembled ground system
CN113587183A (en) * 2021-09-30 2021-11-02 南通蓝铭冷暖设备有限公司 Wall embedded floor heating air conditioner

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108775130A (en) * 2018-08-24 2018-11-09 山西建投装饰产业有限公司 Assembled ground system
CN113587183A (en) * 2021-09-30 2021-11-02 南通蓝铭冷暖设备有限公司 Wall embedded floor heating air conditioner
CN113587183B (en) * 2021-09-30 2021-12-14 南通蓝铭冷暖设备有限公司 Embedded floor heating air conditioner of wall

Similar Documents

Publication Publication Date Title
CN108775130A (en) Assembled ground system
CN208718294U (en) Assembled ground system
CA2201617A1 (en) A method of installing a floor heating apparatus
CN104676705A (en) Floor heating module, floor system and water heating type floor heating system
CN110409756B (en) Low-cost floor thermal insulation and sound insulation system and installation method thereof
CN112878622A (en) Fabricated overhead heat-insulating and sound-insulating brick system and construction method
CN218972750U (en) Assembled floor heating and floor decoration system
CN207004065U (en) A kind of piping shaft reserves thimble assembly
CN111152339B (en) PC component production mold table and manufacturing method thereof
CN201024584Y (en) Water heating ground heat pipeline pavement template
CN111255191A (en) Semi-pre-pasted ceramic tile and paving method thereof
CN203961077U (en) The cladding system of open clay plate curtain wall
US9453647B2 (en) Floor with radiant heat and method of construction
CN216196782U (en) Single-layer multi-loop water cooling system for super-thick large-volume concrete
KR100416316B1 (en) A floor system of access-floor type using a glass-ondol and the construction method of it
CN211007511U (en) Prefabricated ditch slot type floor ground heat preservation sound insulation system
CN205777313U (en) Locking-type floor tile lays framework
CN212295485U (en) Floor overhead module
CN211007488U (en) Indoor ground overhead structure
CN210858015U (en) Supporting device for adjusting verticality of single-sided template
CN220816787U (en) Pre-buried base water supply pipe hanger
CN207727618U (en) Basement contignation template system for pit top-down
CN220814476U (en) Assembled steel bar truss disassembly-free heat preservation bottom die floor support plate structure
CN214575361U (en) Assembled overhead heat-insulating and sound-insulating brick system
CN210563183U (en) Dry-method floor heating system for overhead ground

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230420

Address after: Room 1016, 10th Floor, No. 8 Xinhua Road, Taiyuan Tanghuai Park, Shanxi Comprehensive Reform Demonstration Zone, Taiyuan City, Shanxi Province, 030000

Patentee after: SHANXI CONSTRUCTION INVESTMENT DECORATION INDUSTRY Co.,Ltd.

Patentee after: SHANXI CONSTRUCTION INVESTMENT GROUP DECORATION Co.,Ltd.

Patentee after: Shanxi Lvjian Zhupin Technology Co.,Ltd.

Address before: Room 1016, 10th Floor, No. 8 Xinhua Road, Tanghuai Park, Taiyuan City, Shanxi Province, 030032

Patentee before: SHANXI CONSTRUCTION INVESTMENT DECORATION INDUSTRY Co.,Ltd.

TR01 Transfer of patent right