CN208703284U - A kind of pipe gallery para-seismic support - Google Patents

A kind of pipe gallery para-seismic support Download PDF

Info

Publication number
CN208703284U
CN208703284U CN201821279539.5U CN201821279539U CN208703284U CN 208703284 U CN208703284 U CN 208703284U CN 201821279539 U CN201821279539 U CN 201821279539U CN 208703284 U CN208703284 U CN 208703284U
Authority
CN
China
Prior art keywords
trailing arm
inner bead
channel steel
plate
fashioned iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821279539.5U
Other languages
Chinese (zh)
Other versions
CN208703284U8 (en
Inventor
马军
轩境泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Arshcoo Mechanical And Electrical Technology Co ltd
Original Assignee
Beijing Arshcoo Mechanical And Electrical Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Arshcoo Mechanical And Electrical Technology Co ltd filed Critical Beijing Arshcoo Mechanical And Electrical Technology Co ltd
Priority to CN201821279539.5U priority Critical patent/CN208703284U8/en
Publication of CN208703284U publication Critical patent/CN208703284U/en
Application granted granted Critical
Publication of CN208703284U8 publication Critical patent/CN208703284U8/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Disclose a kind of pipe gallery para-seismic support, including inner bead fashioned iron trailing arm, two channel steels, wherein, inner bead fashioned iron trailing arm is arranged perpendicular to piping lane side wall, channel steel one end is connected to the rigid trailing arm of inner bead type, the other end is connected to piping lane side wall, and two channel steels are symmetrical arranged, and the line between inner bead fashioned iron trailing arm and two channel steels and the junction of piping lane is parallel to the length direction of piping lane.The link position for the longitudinal seismic support being made of channel steel is not take up pipeline installation space in inner bead fashioned iron trailing arm two sides.

Description

A kind of pipe gallery para-seismic support
Technical field
The utility model relates to build electromechanical engineering Aseismic Design field, and it is comprehensive more particularly, to a kind of underground Piping lane para-seismic support.
Background technique
Currently, destroying in order to be effective against earthquake bring, building electromechanical engineering pipeline need to be used with equipment by adding Gu the antidetonation suspension and support of sunpender, lateral seismic support, longitudinal seismic support, antidetonation connector composition, by the way that oblique antidetonation is arranged The horizontal seismic force that coming earthquake opportunity electric pipe system is born is transmitted on structural body, effectively improves by the mode of support The shock absorbing of suspension and support and damping effect, prevent electromechanical equipment from falling off and causing secondary disaster.
In above-mentioned antidetonation hanger system, longitudinal seismic support is mainly used for resistance level perpendicular to cross-section of pipeline Seismic force along pipeline axial direction component, so pipe clamp used in seismic support is required securely to connect with pipeline, it is axial can be greatly Restriction conduit displacement;Lateral seismic support is parallel to cross-section of pipeline, is mainly used for resisting the cross component force of horizontal seismic force, only Antihunt action can be played by needing the radial displacement of restriction conduit.In underground pipe gallery, most pipelines are spread along piping lane side wall If itself having been provided with certain lateral shock resistance using taking root in the overhanging type finished product bracket trailing arm support of side wall, therefore It only need to additionally carry out longitudinal antidetonation protection.Existing trailing arm longitudinal direction seismic support is connected to above trailing arm in notch, and stress is not Surely, connection is inconvenient and occupies the space of pipeline placement.
Utility model content
For the above the deficiencies in the prior art, the purpose of this utility model is intended to propose a kind of new longitudinal bracing connection Mode promotes piping lane gut line longitudinal direction shock resistance, and is not take up Pipe installing space, and safety coefficient is high, easy for installation, simple Fast.
The utility model provides a kind of pipe gallery para-seismic support, which is characterized in that including inner bead fashioned iron trailing arm, Two channel steels, wherein the inner bead fashioned iron trailing arm is arranged perpendicular to piping lane side wall, and described channel steel one end is connected to the curls inward The rigid trailing arm of side type, the other end is connected to piping lane side wall, and two channel steels are symmetrical arranged, the inner bead fashioned iron trailing arm and two Line between a channel steel and the junction of the piping lane is parallel to the length direction of the piping lane.
In some embodiments, the channel steel is connected to the inner bead fashioned iron trailing arm, the company by connecting elements Connection member includes the first plate and the second plate for being extended to form by first plate, and first plate and second plate are vertical, institute The side that the first plate connects the rigid trailing arm of inner bead type is stated, second plate connects channel steel.
In some embodiments, the channel steel end is provided with fixation kit, and the fixation kit is for hinged described The end of channel steel and second plate.
In some embodiments, the fixation kit includes the first assembly and connection described second for connecting the channel steel Second component of plate is fixedly connected between the first assembly and second component.
In some embodiments, the first assembly and second component are vertically arranged, and second component has The second binding face to fit with second plate,
And after second binding face and second plate fitting, the through-hole shape on second plate and second component The pin hole passed through at supply and marketing.
In some embodiments, further include screw, the first screw hole, the end of the channel steel are provided in the first assembly Portion is also equipped with channel steel screw hole, and the screw passes through first screw hole and the channel steel screw hole, by the first assembly and institute The end for stating channel steel is fixed.
In some embodiments, multiple be evenly arranged is provided on two sides of the inner bead fashioned iron trailing arm First plate in trailing arm hole, two connecting elements connecting respectively with the channel steel is connected in described by the trailing arm hole On two sides of crimping fashioned iron trailing arm.
In some embodiments, the first mounting hole, two first installations are provided on two first plates Hole is attached to respectively on the trailing arm hole of two sides of the inner bead fashioned iron trailing arm, by pin or screw pass through the first mounting hole and The trailing arm hole makes two first plates symmetrically be fixed on the two sides of the inner bead fashioned iron trailing arm.
In some embodiments, the rigid trailing arm of inner bead type is fixed on the piping lane by anchoring or pre-buried mode In the concrete of side wall.
In some embodiments, the channel steel is fixed on the coagulation of the piping lane side wall by anchoring or pre-buried mode In soil.
The utility model has the beneficial effects that compared with the prior art, the connection of longitudinal seismic support of the utility model Position is not take up pipeline installation space in inner bead fashioned iron trailing arm two sides, and the novel earthquake-proof supporting structure is simple, saves material Material, it is easy for installation.
Detailed description of the invention
According to described in detail below, the various feature and advantage of the disclosure will become aobvious and easy for those skilled in the art See.It can be briefly described as follows with the attached drawing of detailed description:
Fig. 1 is a kind of schematic diagram of pipe gallery para-seismic support of the preferred embodiment of the utility model;
Fig. 2 is a kind of inner bead fashioned iron trailing arm of pipe gallery para-seismic support of the preferred embodiment of the utility model Structural schematic diagram;
Fig. 3 is a kind of inner bead fashioned iron trailing arm of pipe gallery para-seismic support of the preferred embodiment of the utility model Side schematic view.
Specific embodiment
The following describe embodiment of the disclosure.It should be appreciated, however, that the disclosed embodiments are only example, and Other embodiments can take various alternative forms.The drawings are not necessarily drawn to scale;Certain functions may be exaggerated or minimum Change the details to show particular elements.Therefore, specific structure and function details disclosed herein are not necessarily to be construed as restrictive, And it is merely possible to the representative basis for instructing those skilled in the art to use the utility model in various ways.Such as ability Domain ordinarily skilled artisan will understand that, the various features with reference to shown or described by any one attached drawing can be with one or more Feature shown in other accompanying drawings is combined to produce the embodiment for not being explicitly illustrated or describing.The group of shown feature is combined into typical case Using providing representative embodiment.However, the various combinations and modification of the feature consistent with the introduction of the disclosure are to Mr. Yu A little specific applications or embodiment may be desired.
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with specific embodiment, and reference The utility model embodiment is further described in attached drawing.In the accompanying drawings, identical appended drawing reference indicates identical element. Moreover, some or all of these elements can change.
The utility model details a kind of pipe gallery para-seismic support, as shown in Figure 1, the para-seismic support includes inner bead 1, two channel steel 2 of fashioned iron trailing arm.Wherein, inner bead fashioned iron trailing arm 1 is arranged perpendicular to piping lane side wall, and 2 one end of channel steel is connected to interior The rigid trailing arm 1 of crimping type, the other end are connected to piping lane side wall, and two channel steels 2 are symmetrical arranged, inner bead fashioned iron trailing arm 1 and two Line between channel steel 2 and the junction of piping lane is parallel to the length direction of piping lane.Inner bead fashioned iron trailing arm 1 is used as load-bearing branch Support, for bearing pipeline gravity laod, determines the installation site of pipeline.
In some embodiments, channel steel 2 is connected to inner bead fashioned iron trailing arm 1 by connecting elements 3, wherein connecting elements 3 Including the first plate (not shown) and the second plate extended to form by the first plate, the first plate and the second plate are vertical, in the connection of the first plate The side of the rigid trailing arm 1 of crimping type, the second plate connect channel steel 2.In the embodiment shown in fig. 1,2 end of channel steel is provided with fixed group Part 4, end and second plate of the fixation kit 4 for hinged channel steel 2.
In some embodiments, fixation kit 4 includes second group of the second plate of first assembly and connection of connection channel steel 2 Part is fixedly connected between first assembly and the second component.First assembly and the second component are vertically arranged, and the second component has and the The second binding face that two plates fit, and after the second binding face and the fitting of the second plate, the through-hole shape on the second plate and the second component The pin hole passed through at supply and marketing.The first screw hole, the end of channel steel 2 are provided in the embodiment shown in Fig. 1, in first assembly It is provided with channel steel screw hole, screw passes through the first screw hole and channel steel screw hole, so that the end of first assembly and channel steel be fixed.By This, channel steel 2 is connect by fixation kit 4 with connecting elements 3, to be connected to inner bead fashioned iron trailing arm 1.Channel steel 2 and connection structure Longitudinal seismic support that part 3 forms is located at the two sides of inner bead fashioned iron trailing arm 1, and main application is to resist the longitudinal direction of horizontal seismic force Component.
Fig. 2 shows the structures of the AB-41 type inner bead fashioned iron trailing arm 1 of preferred embodiment according to the present utility model to show It is intended to, as shown, multiple trailing arm holes being evenly arranged are provided on two sides of inner bead fashioned iron trailing arm 1 and bottom surface, End is equipped with mounting hole.Fig. 3 is the side schematic view of inner bead fashioned iron trailing arm 1, it can be seen that its two sides has alignment and size Identical trailing arm hole.
In some embodiments, the first mounting hole, two first installations are provided on the first plate of two connecting elements 3 Hole is attached to respectively on the trailing arm hole of two side same positions of inner bead fashioned iron trailing arm 1, i.e., including the first plate of connecting elements 3 After the two-side alignment of crimping fashioned iron trailing arm 1, passing through the first mounting hole and trailing arm hole by pin or screw keeps two the first plates symmetrical Ground is fixed on the two sides of inner bead fashioned iron trailing arm 1.In the embodiment shown in fig. 1, inner bead fashioned iron trailing arm is passed through through screw rod 5 Connecting elements 3 is fixed to two sides of inner bead fashioned iron trailing arm 1 by 1 two sides trailing arm hole by way of nut tightening On.
In some embodiments, inner bead fashioned iron trailing arm 1 is fixed on the mixed of piping lane side wall by anchoring or pre-buried mode In solidifying soil.In the embodiment shown in fig. 1, clod wash type groove steel 7 is embedded in concrete pipe gallery side wall, fastener 6 passes through curls inward Pre-buried clod wash type groove steel 7 in concrete after the mounting hole of 1 end of side fashioned iron trailing arm fixed to piping lane side wall, thus by involute Side fashioned iron trailing arm 1 is fixed on concrete side wall.
In some embodiments, channel steel 2 is fixed in the concrete of piping lane side wall by anchoring or pre-buried mode.According to The preferred embodiment of the utility model, as shown in Figure 1, channel steel 2 uses 41*41*2.0C type groove steel, in concrete pipe gallery side wall It is embedded with 41*41*2.0C type-clod wash type groove steel 7.Channel steel 2 is by connecting elements and fixation kit (with connecting elements 3 and admittedly It is same or like to determine component 4), via fastener 6 be connected to 41*41*2.0C type-clod wash type groove steel 7 in concrete, To channel steel 2 is fixed in the concrete of piping lane side wall.
From above-described embodiment as can be seen that the longitudinal bracing link position of the utility model is the two of inner bead fashioned iron trailing arm Side is not take up pipeline installation space;And the novel earthquake-proof supporting structure is simple, saves material, safety coefficient is high, installation side Just, and piping lane gut line longitudinal direction shock resistance is improved.
Above-mentioned " preferably " embodiment is the possibility example of embodiment, and just to be clearly understood that the principle of the present invention And it proposes.Without departing substantially from the spirit and principle of technique described herein, above-described embodiment can be made many variations and Modification.All modifications are intended to be included in the scope of the present disclosure and are protected by claim.

Claims (10)

1. a kind of pipe gallery para-seismic support, which is characterized in that including inner bead fashioned iron trailing arm, two channel steels, wherein described Inner bead fashioned iron trailing arm is arranged perpendicular to piping lane side wall, and described channel steel one end is connected to the rigid trailing arm of inner bead type, the other end It is connected to piping lane side wall, and two channel steels are symmetrical arranged, the inner bead fashioned iron trailing arm and two channel steels and the piping lane Junction between line be parallel to the length direction of the piping lane.
2. bracket according to claim 1, which is characterized in that the channel steel is connected to the inner bead by connecting elements Fashioned iron trailing arm, the connecting elements include the first plate and the second plate for being extended to form by first plate, first plate and institute State that the second plate is vertical, first plate connects the side of the rigid trailing arm of inner bead type, and second plate connects channel steel.
3. bracket according to claim 2, which is characterized in that the channel steel end is provided with fixation kit, the fixation Component is used for the hingedly end of the channel steel and second plate.
4. bracket according to claim 3, which is characterized in that the fixation kit includes first group for connecting the channel steel Part and the second component for connecting second plate, are fixedly connected between the first assembly and second component.
5. bracket according to claim 4, which is characterized in that the first assembly and second component are vertically arranged, Second component has the second binding face to fit with second plate,
And after second binding face and second plate fitting, the through-hole on second plate and second component, which is formed, to be supplied Sell across pin hole.
6. bracket according to claim 4, which is characterized in that further include screw, be provided with first in the first assembly Screw hole, the end of the channel steel are also equipped with channel steel screw hole, and the screw passes through first screw hole and the channel steel screw hole, will The end of the first assembly and the channel steel is fixed.
7. bracket according to claim 2, which is characterized in that be respectively provided on two sides of the inner bead fashioned iron trailing arm There are multiple trailing arm holes being evenly arranged, first plate of two connecting elements connecting respectively with the channel steel passes through the support Arm aperture is connected on two sides of the inner bead fashioned iron trailing arm.
8. bracket according to claim 7, which is characterized in that it is provided with the first mounting hole on two first plates, Two first mounting holes are attached to respectively on the trailing arm hole of two sides of the inner bead fashioned iron trailing arm, pass through pin or screw Two first plates are made symmetrically to be fixed on the inner bead fashioned iron trailing arm across first mounting hole and the trailing arm hole Two sides.
9. bracket according to claim 1, which is characterized in that the rigid trailing arm of inner bead type passes through anchoring or pre-buried side Formula is fixed in the concrete of the piping lane side wall.
10. bracket according to claim 1, which is characterized in that the channel steel is fixed on by anchoring or pre-buried mode In the concrete of the piping lane side wall.
CN201821279539.5U 2018-08-09 2018-08-09 A kind of pipe gallery para-seismic support Active CN208703284U8 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821279539.5U CN208703284U8 (en) 2018-08-09 2018-08-09 A kind of pipe gallery para-seismic support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821279539.5U CN208703284U8 (en) 2018-08-09 2018-08-09 A kind of pipe gallery para-seismic support

Publications (2)

Publication Number Publication Date
CN208703284U true CN208703284U (en) 2019-04-05
CN208703284U8 CN208703284U8 (en) 2019-06-21

Family

ID=65941169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821279539.5U Active CN208703284U8 (en) 2018-08-09 2018-08-09 A kind of pipe gallery para-seismic support

Country Status (1)

Country Link
CN (1) CN208703284U8 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206064A (en) * 2019-06-21 2019-09-06 中冶京诚工程技术有限公司 A kind of piping lane bracket and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206064A (en) * 2019-06-21 2019-09-06 中冶京诚工程技术有限公司 A kind of piping lane bracket and system

Also Published As

Publication number Publication date
CN208703284U8 (en) 2019-06-21

Similar Documents

Publication Publication Date Title
CN111255950B (en) Pipe connection structure and antidetonation support that antidetonation support was used
CN106969208A (en) A kind of gate antidetonation suspension and support
US3570794A (en) Sway brace for piping
CN104165799A (en) Anchoring counterforce device for roller compacted concrete in-situ shear test
CN208703284U (en) A kind of pipe gallery para-seismic support
CN204850474U (en) Concrete feeding pump line fixing system
CN107013753A (en) A kind of antidetonation vibration isolation support
KR20230113252A (en) Sway Brace Device For Buildings Like Pipe
CN212536960U (en) Comprehensive anti-shock-absorbing support and hanger
CN205577153U (en) Installation node of wallboard connecting piece and wallboard
CN209398933U (en) Pipeline load-bearing connector and bracket
CN209180506U (en) A kind of oil-gas pipeline fixing device for installing
CN208605733U (en) A kind of fire safe type antidetonation suspension and support
CN205896419U (en) Secondary suspends pipeline square steel chain union piece of vertically combatting earthquake in midair
CN207435906U (en) For the bracket of bridge construction
CN209754566U (en) Box steel fastening device with axial clamping function
KR100726755B1 (en) Construction member for support of drainage
CN208733618U (en) A kind of anchor structure of ground-connecting-wall and main structure
KR20190007137A (en) Cast-in-place anchor structures for installing facilities on concrete
CN202108430U (en) Well-cementing high-pressure line fixing and protecting device
CN205530714U (en) Installation node of wallboard connecting piece and wallboard
CN205479753U (en) Pipeline combination gallows
CN208793418U (en) A kind of screw rod connector and para-seismic support
CN214889391U (en) Anti-seismic support hanger
CN215596567U (en) Force transmission fixing device for large-diameter pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CU01 Correction of utility model patent
CU01 Correction of utility model patent

Correction item: Patentee|Address

Correct: Guangdong Yashige Technology Group Co., Ltd.|519080 Room 908, 9th Floor, Building No. 8B, Gangle Road, Tangjiawan Town, Zhuhai High-tech Zone, Guangdong Province

False: Beijing Yashi lattice Electromechanical Technology Co Ltd|100055 Floor 11, 1108, Building 27, Nanbinhe Road, Xicheng District, Beijing

Number: 14-02

Volume: 35

Correction item: Patentee|Address

Correct: Guangdong Yashige Technology Group Co., Ltd.|519080 Room 908, 9th Floor, Building No. 8B, Gangle Road, Tangjiawan Town, Zhuhai High-tech Zone, Guangdong Province

False: Beijing Yashi lattice Electromechanical Technology Co Ltd|100055 Floor 11, 1108, Building 27, Nanbinhe Road, Xicheng District, Beijing

Number: 14-02

Page: The title page

Volume: 35