CN110206064A - A kind of piping lane bracket and system - Google Patents
A kind of piping lane bracket and system Download PDFInfo
- Publication number
- CN110206064A CN110206064A CN201910541794.5A CN201910541794A CN110206064A CN 110206064 A CN110206064 A CN 110206064A CN 201910541794 A CN201910541794 A CN 201910541794A CN 110206064 A CN110206064 A CN 110206064A
- Authority
- CN
- China
- Prior art keywords
- piping lane
- built
- groove
- connector
- trailing arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 claims abstract description 32
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 6
- 238000011068 loading method Methods 0.000 abstract description 11
- 238000010276 construction Methods 0.000 description 7
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000000567 combustion gas Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000005260 corrosion Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000013401 experimental design Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- -1 heating power Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000003755 preservative agent Substances 0.000 description 1
- 230000002335 preservative effect Effects 0.000 description 1
- 238000009491 slugging Methods 0.000 description 1
- 229910000679 solder Inorganic materials 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
The present invention proposes a kind of piping lane bracket and system, it is related to underground pipe gallery field, the piping lane bracket includes trailing arm and at least one horizontal bracing, one end of trailing arm is the installation end for connecting with built-in groove, the other end of trailing arm is connecting pin, one end of horizontal bracing is provided with the first connection component, and horizontal bracing is mounted on connecting pin by the first connection component, and the other end of horizontal bracing is provided with the second connection component for connecting with another built-in groove.Piping lane bracket proposed by the present invention and system can increase the ability that its trailing arm of piping lane bracket bears horizontal loading.
Description
Technical field
The present invention relates to underground pipe gallery field, in particular to a kind of piping lane bracket and system.
Background technique
Pipe gallery, which refers to, is built in Urban Underground for accommodating the structures of two classes and the above municipal engineering pipeline and attached setting
It applies, mainly includes main line pipe gallery, branch line pipe gallery and cable piping lane etc..Pipe gallery accommodate pipeline include water supply,
Recycled water, heating power, combustion gas, electric power and telecommunication etc..
Piping lane support system refers mainly to the bracket of several support tube lines spaced along its length in pipe gallery
Mechanism, including slot type embedded part and finished product bracket, finished product bracket have the trailing arm for installing pipeline, and the civil construction stage will be pre-
It buries slot to bury, is easily installed and adjusts trailing arm spacing.
Existing piping lane support system mainly considers the effect of pipeline vertical load, only leads between trailing arm and pre-buried channel flow
Two are bolted above and below crossing, and the ability that such connection type bears horizontal loading is not good enough.But effect of all kinds of pipelines to bracket
There is also the horizontal loading at horizontal loading, especially pipeline hold-down support is larger in addition to vertical load, existing piping lane bracket
The unbearable biggish horizontal loading of system.Although can greatly increase trailing arm by the way that horizontal bracing is arranged at trailing arm and bear water
The ability of flat load.But there is also many defects for the existing technical solution that horizontal bracing is arranged at trailing arm.
Firstly, the mode embedded part position of traditional embedded iron slugging diagonal brace is fixed, the later period can not adjust pipeline height
With the position of hold-down support, trailing arm can not be replaced, flexibility is lower.
Secondly as piping lane environment is moister, get rusty easily corrosion at embedded iron and solder joint, increases maintenance cost.
Again, welding sequence is complicated, long construction period, and cost of labor is higher.
In view of this, the present inventor is according to the production design experience for being engaged in this field and related fields for many years, by repeatedly
Experimental design goes out a kind of piping lane bracket and system, of the existing technology to solve the problems, such as.
Summary of the invention
The purpose of the present invention is to provide a kind of piping lane bracket and systems, can increase its trailing arm receiving level of piping lane bracket
The ability of load.
In order to achieve the above objectives, the present invention proposes a kind of piping lane bracket, wherein the piping lane bracket includes trailing arm and at least
One horizontal bracing, one end of the trailing arm are the installation end for connecting with built-in groove, and the other end of the trailing arm is connection
End, one end of the horizontal bracing are provided with the first connection component, and the horizontal bracing is installed by first connection component
On the connecting pin, the other end of the horizontal bracing is provided with the second connection component for connecting with another built-in groove.
Piping lane bracket as described above, wherein the piping lane bracket includes two horizontal bracings, two levels
Diagonal brace is symmetrically disposed in the left and right sides of the trailing arm, and the trailing arm and the horizontal bracing are in the shape of a rod.
Piping lane bracket as described above, wherein first connection component includes the first fixing seat and the first connector, institute
The first fixing seat is stated to be removedly connected with the connecting pin, one end of first connector with can adjusting angle with it is described
First fixing seat is connected, and the other end and the horizontal bracing of first connector are removedly connected.
Piping lane bracket as described above, wherein first fixing seat includes L-type plate and two otic placodes, the L-type plate tool
There are horizontal part and vertical portion, the horizontal part is removedly mounted on the top surface or bottom surface of the connecting pin, the vertical portion
Side wall along the connecting pin is arranged, and two otic placodes are fixed on the outer wall of the vertical portion, above and below two otic placodes
It is arranged and has preset interval, the end of first connector is protruded between two otic placodes, is equipped on the otic placode
The anchor bolt being vertically arranged, the otic placode are removedly connected by the anchor bolt and first connector.
Piping lane bracket as described above, wherein first fixing seat includes L-type plate and two otic placodes, the L-type plate tool
There are horizontal part and vertical portion, the horizontal part is removedly mounted on the top surface or bottom surface of the connecting pin, the vertical portion
Side wall along the connecting pin is arranged, and two otic placodes are fixed on the outer wall of the vertical portion, above and below two otic placodes
It is arranged and has preset interval, the end of first connector is protruded between two otic placodes, is equipped on the otic placode
The pin shaft being vertically arranged, the otic placode are hinged by pin shaft and first connector.
Piping lane bracket as described above, wherein second connection component includes the second connector and can be mounted on pre-
The second fixing seat on slot is buried, one end and the horizontal bracing of second connector are removedly connected, and described second connects
The other end of fitting is connected in second fixing seat in which can adjust angle.
Piping lane bracket as described above, wherein second fixing seat includes the second mounting plate and two otic placodes, and described the
Two mounting plates are vertically arranged and are removedly connected with the built-in groove, and two otic placodes are fixed in second mounting plate
On, two otic placodes it is setting up and down and have preset interval, the end of second connector protrude into two otic placodes it
Between, the anchor bolt being vertically arranged is installed, the otic placode can be dismantled by the anchor bolt and second connector on the otic placode
Ground connection.
Piping lane bracket as described above, wherein second fixing seat includes the second mounting plate and two otic placodes, and described the
Two mounting plates are vertically arranged and are removedly connected with the built-in groove, and two otic placodes are fixed in second mounting plate
On, two otic placodes it is setting up and down and have preset interval, the end of second connector protrude into two otic placodes it
Between, the pin shaft being vertically arranged is installed, the otic placode is hinged by the pin shaft and second connector on the otic placode.
The present invention also proposes a kind of piping lane support system, wherein the piping lane support system include multiple built-in groove groups and
Multiple piping lane brackets as described above, multiple built-in groove groups are installed on the inner sidewall of piping lane and horizontally spaced row
Column, each built-in groove group include an installation built-in groove and at least one auxiliary built-in groove, the installation built-in groove with
The auxiliary built-in groove is vertically arranged and has preset interval, and each built-in groove group correspondence is equipped at least one institute
Piping lane bracket is stated, the installation end of the trailing arm of the piping lane bracket is fixedly connected on the installation built-in groove, the level
One end of diagonal brace is connected on the auxiliary built-in groove by second connector, and the other end of the horizontal bracing passes through institute
State the connecting pin that the first connector is connected to the trailing arm.
A kind of piping lane support system as described above, wherein the built-in groove group correspondence is equipped with multiple piping lane branch
Frame, multiple piping lane brackets are alternatively arranged along the vertical direction.
Compared with prior art, the invention has the characteristics that and advantage:
Piping lane bracket proposed by the present invention and piping lane support system, increase horizontal bracing, significantly on the basis of trailing arm
The bearing capacity of trailing arm is increased, the ability that trailing arm bears horizontal loading is especially increased, meets level when pipeline installation
Load requirement.
Piping lane bracket proposed by the present invention and piping lane support system, trailing arm, horizontal bracing, the first connection in piping lane bracket
Standardized production may be implemented in component and the second connection component, and unified preservative treatment on the one hand can be carried out in factory, is ensured
Construction quality.
Piping lane bracket proposed by the present invention and piping lane support system, improve the Its ultimate bearing capacity of support system, for
110kV power cable, water supply, the biggish pipeline of the horizontal loadings such as combustion gas use, and have unified the support system of pipe gallery pipeline,
Greatly facilitate the design, construction and operation of pipe gallery.
Detailed description of the invention
Attached drawing described here is only used for task of explanation, and is not intended to limit model disclosed by the invention in any way
It encloses.In addition, shape and proportional sizes of each component in figure etc. are only schematical, it is used to help the understanding of the present invention, and
It is not the specific shape and proportional sizes for limiting each component of the present invention.Those skilled in the art under the teachings of the present invention, can
Implement the present invention to select various possible shapes and proportional sizes as the case may be.
Fig. 1 is the structural schematic diagram of piping lane bracket proposed by the present invention;
Fig. 2 is the front view of piping lane bracket proposed by the present invention;
Fig. 3 is the top view of piping lane bracket proposed by the present invention;
Fig. 4 is the structural schematic diagram of the second connection component proposed by the present invention;
Fig. 5 is the structural schematic diagram of the first connection component proposed by the present invention.
Description of symbols:
10, piping lane bracket;11, trailing arm;
12, horizontal bracing;13, the first connection component;
131, the first fixing seat;132, the first connector;
133, anchor bolt;134, otic placode;
135, mounting hole;136, bolt;
137, bolt;14, the second connection component;
141, the second fixing seat;142, the second connector;
143, anchor bolt;144, otic placode;
145, mounting hole;146, bolt;
147, bolt;15, pedestal;
21, built-in groove is installed;22, built-in groove is assisted.
Specific embodiment
With reference to the drawings and the description of the specific embodiments of the present invention, details of the invention can clearly be understood.But
It is the specific embodiment of invention described herein, purpose for explaining only the invention, and cannot understand in any way
At being limitation of the present invention.Under the teachings of the present invention, technical staff is contemplated that based on any possible change of the invention
Shape, these are regarded as belonging to the scope of the present invention.
As shown in Figures 1 to 5, the present invention proposes a kind of piping lane bracket 10, and the piping lane bracket 10 is including trailing arm 11 and at least
One horizontal bracing 12, one end of trailing arm 11 are the installation end for connecting with built-in groove, and the other end of trailing arm 11 is connecting pin,
The both ends of horizontal bracing 12 are respectively arranged with the first connection component 13 and the second connection component 14, and horizontal bracing 12 connects by first
Connected components 13 are mounted on connecting pin, and the other end of horizontal bracing 12 is mounted on another built-in groove by the second connection component 14
On.
The present invention also proposes a kind of piping lane support system, which includes multiple built-in groove groups and multiple piping lanes
Bracket 10, multiple built-in groove groups are installed on the inner sidewall of piping lane and horizontally spaced arrangement, and each built-in groove group is wrapped
An installation built-in groove 21 and at least one auxiliary built-in groove 22 are included, installation built-in groove 21 and auxiliary built-in groove 22 are vertically arranged
And there is preset interval, each built-in groove group correspondence is equipped at least one piping lane bracket 10, the trailing arm 11 of piping lane bracket 10
Installation end be fixedly connected with installation built-in groove 21, one end of horizontal bracing 12 is pre-buried by the second connection component 14 and auxiliary
Slot 22 is hinged, and the other end of horizontal bracing 12 is hinged by the connecting pin of the first connection component 13 and trailing arm 11.
Piping lane bracket 10 proposed by the present invention and piping lane support system increase horizontal bracing on the basis of trailing arm 11
12, the bearing capacity of trailing arm 11 is considerably increased, the ability that trailing arm 11 bears horizontal loading is especially increased, meets pipeline peace
Horizontal loading requirement when dress.
Piping lane bracket 10 proposed by the present invention and piping lane support system, trailing arm 11, horizontal bracing 12 in piping lane bracket 10,
Standardized production may be implemented in first connection component 13 and the second connection component 14, and unified anti-corrosion on the one hand can be carried out in factory
Processing, has ensured construction quality.
Piping lane bracket 10 proposed by the present invention and piping lane support system, improve the Its ultimate bearing capacity of support system, can
For 110kV power cable, water supply, the biggish pipeline of the horizontal loadings such as combustion gas is used, and has unified the carriage support of pipe gallery pipeline
System, greatly facilitates the design, construction and operation of pipe gallery.
Piping lane bracket 10 proposed by the present invention and piping lane support system, can be in the premise for not destroying piping lane main structure
Under, it is easy for installation, it is easy to adjust the vertical spacing of trailing arm 11, and be easy to later period replacement trailing arm 11.
In an optional example of the invention, each built-in groove group correspondence is equipped with multiple piping lane brackets 10, Duo Geguan
Corridor bracket 10 is alternatively arranged along the vertical direction.
In an optional example of the invention, piping lane bracket 10 includes two horizontal bracings 12, two horizontal bracings 12
It is symmetrically disposed in the left and right sides of trailing arm 11, trailing arm 11 and horizontal bracing 12 are in the shape of a rod.
Further, built-in groove group includes there are two auxiliary built-in groove 22, and two auxiliary built-in grooves 22 are separately positioned on peace
The two sides of built-in groove 21 are filled, two horizontal bracings 12 are connected by the second connection component 14 with corresponding auxiliary built-in groove 22 respectively
It connects.
In the present invention, for existing piping lane and built-in groove, a kind of mode is can artificially to draw existing built-in groove
It is divided into multiple built-in groove groups, specifically, making adjacent three built-in grooves, one built-in groove group, makes to be located in the middle built-in groove
Built-in groove 21 is installed, the built-in groove on both sides is auxiliary built-in groove 22, carries out the installation of piping lane bracket 10 later, in this way can be
In the case where not destroying the built-in groove that existing piping lane has been set, the installation of piping lane bracket 10 is rapidly realized.For existing
Piping lane and built-in groove, another way are to set existing built-in groove in construction to increase to install built-in groove 21, and in its two sides
Frame assists built-in groove 22, and then forms built-in groove group, then piping lane bracket 10 is installed in built-in groove group, wherein installation is pre-buried
The distance d of slot 21 and auxiliary built-in groove 22 can be according to actual engineering design.
In an optional example of the invention, the first connection component 13 includes the first fixing seat 131 and the first connector
132, the first fixing seat 131 is removedly connected in connecting pin, and one end of the first connector 132 is with can adjusting angle with first
Fixing seat 131 connects, and the other end of the first connector 132 and the end of horizontal bracing 12 are removedly connected.
In an optional example of the invention, the second connection component 14 includes the second connector 142 and can be mounted on
The second fixing seat 141 on built-in groove 22 is assisted, one end of the second connector 142 removedly connects with the end of horizontal bracing 12
It connects, the other end of the second connector 142 is connect in which can adjust angle with the second fixing seat 141.
In the present invention, one end of horizontal bracing 12 is connect by the first connection component 13 with trailing arm 11, makes level
The other end of the angle adjustable of angle between diagonal brace 12 and trailing arm 11, horizontal bracing 12 passes through the second connection component 14 and auxiliary
Built-in groove 22 connects, so that the angle of angle is also adjustable between horizontal bracing 12 and auxiliary built-in groove 22, even if installation
Spacing between built-in groove 21 and auxiliary built-in groove 22 is different, and horizontal bracing 12 also can be carried out installation, so as to not destroy now
In the case where the built-in groove for thering is piping lane to be set, the installation of piping lane bracket 10 is rapidly carried out.
Optional at one, the first fixing seat 131 includes L-type plate and two otic placodes 134, and L-type plate has horizontal part and erects
Straight portion, horizontal part are removedly mounted on the top surface or bottom surface of connecting pin, and side wall of the vertical portion along connecting pin is arranged, two otic placodes
134 are fixed on the outer wall of vertical portion, and two otic placodes 134 are setting up and down and have preset interval, the end of the first connector 132
Portion protrudes between two otic placodes 134, and pin shaft is provided on otic placode 134, and otic placode 134 is hinged by pin shaft and the first connector 132.
In this way, the first fixing seat 131 of the first connection component 13 and the first connector 132 can be any in the range of 0 degree~180 degree
Angular adjustment.It is also provided with locating part between first connector 132 and the first fixing seat 131, when 132 He of the first connector
It adjusts between first fixing seat 131 to suitable angle, fixes the angle using locating part.
In another optional example of the invention, the first fixing seat 131 includes L-type plate and two otic placodes 134, L-type plate
With horizontal part and vertical portion, horizontal part is removedly mounted on the top surface or bottom surface of connecting pin, side of the vertical portion along connecting pin
Wall setting, two otic placodes 134 are fixed on the outer wall of vertical portion, and two otic placodes 134 are setting up and down and have preset interval, the
The end of a connection piece 132 is protruded between two otic placodes 134, and anchor bolt 133 is provided on otic placode 134, and otic placode 134 passes through anchor bolt
133 are removedly connected with the first connector 132, and when installation, when anchor bolt 133 is not tightened, the first of the first connection component 13 is solid
Reservation 131 and the first connector 132 any angle can be adjusted in the range of 0 degree~180 degree, tighten anchor after angle is suitable
133 fixed angle of bolt.
In an optional example, the horizontal part of L-type plate is connect by bolt 137 with connecting pin, specifically, horizontal part
On offer threaded hole at two, it is corresponding on connecting pin to open up there are two mounting hole, be provided with a bolt in each threaded hole
137, L-type plate and connecting pin are fixed together by bolt 137 through threaded hole and mounting hole, and mounting hole can be circular hole,
It is also possible to strip hole.Equally, the first connector 132 is also to be connect by bolt 136 with horizontal bracing 12, the first connector
Mounting hole 135 at two are offered on 132, are also corresponded to and are opened up there are two mounting hole in horizontal bracing 12, mounting hole 135 can be circle
Hole is also possible to strip hole.When installation, first the first fixing seat 131 of the first connection component 13 and the first connector 132 can be adjusted
It is whole then to tighten bolt to after suitable angle and position, it realizes and fixes.
Certainly, it can also be adopted between the horizontal part and connecting pin of L-type plate, between the first connector 132 and horizontal bracing 12
Connection, such as anchor bolts are realized with other structures familiar to those skilled in the art, herein without repeating.
In an optional example of the invention, the second fixing seat 141 includes the second mounting plate and two otic placodes 144, the
Two mounting plates are vertically arranged and are removedly connected with auxiliary built-in groove 22, and two otic placodes 144 are fixedly connected in the second installation
On plate, two otic placodes 144 it is setting up and down and have preset interval, the end of the second connector 142 protrude into two otic placodes 144 it
Between, pin shaft is provided on otic placode 144, otic placode 144 is hinged by pin shaft and the second connector 142.In this way, the second connection component 14
The second fixing seat 141 and the second connector 142 can in the range of 0 degree~180 degree any angle adjust.
In another optional example of the invention, the second fixing seat 141 includes the second mounting plate and two otic placodes 144,
Second mounting plate is vertically arranged and is removedly connected with auxiliary built-in groove 22, and two otic placodes 144 are fixedly connected in the second peace
In loading board, two otic placodes 144 it is setting up and down and have preset interval, the end of the second connector 142 protrude into two otic placodes 144 it
Between, anchor bolt 143 is provided on otic placode 144, anchor bolt 143 runs through the second connector 142 and otic placode 144, and such otic placode 144 will pass through
Anchor bolt 143 is removedly connected with the second connector 142, when installation, anchor bolt 143 is made to be in the state that do not tighten, second is fixed
Seat 141 and the second connector 142 any angle can be adjusted in the range of 0 degree~180 degree, tighten anchor bolt after angle is suitable
Fixed angle.
In an optional example, the second mounting plate is connect by bolt 147 with auxiliary built-in groove 22, the second mounting plate
On offer for bolt installation mounting hole;Equally, the second connector 142 is also to be connected by bolt 146 and horizontal bracing 12
It connects, the mounting hole for bolt installation is offered on the second connector 142 and horizontal bracing 12 respectively, on the second connector 142
Mounting hole 145 can be circular hole, be also possible to strip hole.The installation of second connection component 14 and fixation procedure and the first connection
Component 13 is similar, herein without repeating.
It certainly, can also be between the second mounting plate and auxiliary built-in groove 22, between the second connector 142 and horizontal bracing 12
Connection, such as anchor bolts are realized using other structures familiar to those skilled in the art, herein without repeating.
In an optional example of the invention, trailing arm 11 and horizontal bracing 12 are C-shaped channel steel (single side channel steel).
In an optional example of the invention, the installation end of trailing arm 11 is provided with the pedestal 15 that can be connect with built-in groove,
The connecting pin of trailing arm 11 is removedly connected by bolt with the first connection component 13.
In an optional example, pedestal 15 is the installation end of rectangular base and welded connecting in trailing arm 11, pedestal 15
On equally offer mounting hole, these mounting holes are convenient to be bolted with built-in groove.Certainly, the structure of pedestal 15 and its with
Trailing arm 11, built-in groove connection type can also use other prior arts well known to those skilled in the art, herein without
It repeats.
In the present invention, cold-rolled forming section can also be used in trailing arm 11 and horizontal bracing 12, and hot-rolled steel section etc. is made, can be according to reality
Border condition selects different patterns.
In an optional example of the invention, the first connection component 13 and the second connection component 14 are by lvanized cold rolled strip
Processing.
For explaining in detail for the respective embodiments described above, purpose, which is only that, explains the present invention, in order to be able to
More fully understand the present invention, still, these descriptions cannot with any explanation at being limitation of the present invention, in particular,
Each feature described in different embodiments can also mutual any combination, so that other embodiments are formed, in addition to having
Opposite description is specified, these features should be understood to can be applied in any one embodiment, and be not limited merely to
Described embodiment.
Claims (10)
1. a kind of piping lane bracket, which is characterized in that the piping lane bracket includes trailing arm and at least one horizontal bracing, the trailing arm
One end be installation end for being connect with built-in groove, the other end of the trailing arm is connecting pin, one end of the horizontal bracing
It is provided with the first connection component, the horizontal bracing is mounted on the connecting pin by first connection component, the water
The other end of flat diagonal brace is provided with the second connection component for connecting with another built-in groove.
2. piping lane bracket as described in claim 1, which is characterized in that the piping lane bracket includes two horizontal bracings,
Two horizontal bracings are symmetrically disposed in the left and right sides of the trailing arm, and the trailing arm and the horizontal bracing are in bar
Shape.
3. piping lane bracket as described in claim 1, which is characterized in that first connection component includes the first fixing seat and the
A connection piece, first fixing seat are removedly connected with the connecting pin, and one end of first connector can be adjusted
It is connected with first fixing seat to angle, the other end and the horizontal bracing of first connector removedly connect
It connects.
4. piping lane bracket as claimed in claim 3, which is characterized in that first fixing seat includes L-type plate and two otic placodes,
The L-type plate has horizontal part and vertical portion, and the horizontal part is removedly mounted on the top surface or bottom surface of the connecting pin,
Side wall of the vertical portion along the connecting pin is arranged, and two otic placodes are fixed on the outer wall of the vertical portion, two institutes
It is setting up and down and there is preset interval to state otic placode, the end of first connector protrudes between two otic placodes, the ear
The anchor bolt being vertically arranged is installed, the otic placode is removedly connected by the anchor bolt and first connector on plate.
5. piping lane bracket as claimed in claim 3, which is characterized in that first fixing seat includes L-type plate and two otic placodes,
The L-type plate has horizontal part and vertical portion, and the horizontal part is removedly mounted on the top surface or bottom surface of the connecting pin,
Side wall of the vertical portion along the connecting pin is arranged, and two otic placodes are fixed on the outer wall of the vertical portion, two institutes
It is setting up and down and there is preset interval to state otic placode, the end of first connector protrudes between two otic placodes, the ear
The pin shaft being vertically arranged is installed, the otic placode is hinged by pin shaft and first connector on plate.
6. piping lane bracket as described in claim 1, which is characterized in that second connection component includes the second connector and energy
The second fixing seat being enough mounted on built-in groove, one end and the horizontal bracing of second connector are removedly connected,
The other end of second connector is connected in second fixing seat in which can adjust angle.
7. piping lane bracket as claimed in claim 6, which is characterized in that second fixing seat includes the second mounting plate and two
Otic placode, second mounting plate are vertically arranged and are removedly connected with the built-in groove, and two otic placodes are fixed in described
On second mounting plate, two otic placodes are setting up and down and have preset interval, and the end of second connector protrudes into two
Between the otic placode, the anchor bolt being vertically arranged is installed on the otic placode, the otic placode is connected by the anchor bolt and described second
Fitting is removedly connected.
8. piping lane bracket as claimed in claim 6, which is characterized in that second fixing seat includes the second mounting plate and two
Otic placode, second mounting plate are vertically arranged and are removedly connected with the built-in groove, and two otic placodes are fixed in described
On second mounting plate, two otic placodes are setting up and down and have interval, and the end of second connector is protruded into described in two
Between otic placode, the pin shaft being vertically arranged is installed on the otic placode, the otic placode passes through the pin shaft and second connector
Hingedly.
9. a kind of piping lane support system, which is characterized in that the piping lane support system includes multiple built-in groove groups and multiple such as power
Benefit require any one of 1 to 8 described in piping lane bracket, multiple built-in groove groups are installed on the inner sidewall of piping lane and along level
Direction is alternatively arranged, and each built-in groove group includes an installation built-in groove and at least one auxiliary built-in groove, the peace
Dress built-in groove and the auxiliary built-in groove are vertically arranged and have preset interval, and each built-in groove group correspondence is equipped with
At least one described piping lane bracket, the installation end of the trailing arm of the piping lane bracket are fixedly connected on the installation built-in groove
On, one end of the horizontal bracing is connected on the auxiliary built-in groove by second connector, the horizontal bracing
The other end is connected to the connecting pin of the trailing arm by first connector.
10. a kind of piping lane support system as claimed in claim 9, which is characterized in that the built-in groove group correspondence is equipped with more
A piping lane bracket, multiple piping lane brackets are alternatively arranged along the vertical direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910541794.5A CN110206064A (en) | 2019-06-21 | 2019-06-21 | A kind of piping lane bracket and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910541794.5A CN110206064A (en) | 2019-06-21 | 2019-06-21 | A kind of piping lane bracket and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110206064A true CN110206064A (en) | 2019-09-06 |
Family
ID=67793865
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910541794.5A Pending CN110206064A (en) | 2019-06-21 | 2019-06-21 | A kind of piping lane bracket and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110206064A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112033813A (en) * | 2020-08-17 | 2020-12-04 | 中铁二十二局集团第三工程有限公司 | Comprehensive pipe gallery cable support bearing capacity test method |
CN112411765A (en) * | 2020-11-10 | 2021-02-26 | 新疆维泰开发建设(集团)股份有限公司 | Anti-displacement construction method for pre-buried groove of finished support |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN207921486U (en) * | 2018-03-14 | 2018-09-28 | 山东天元建设机械有限公司 | A kind of city integrated piping lane heating power heavy type holder |
CN108758083A (en) * | 2018-06-08 | 2018-11-06 | 中铁十七局集团电气化工程有限公司 | A kind of construction method of the comprehensive suspension and support anti-seismic performance of enhancing |
CN208618447U (en) * | 2018-06-19 | 2019-03-19 | 郭东良 | A kind of pipe gallery |
CN208703284U (en) * | 2018-08-09 | 2019-04-05 | 北京雅仕格机电科技有限公司 | A kind of pipe gallery para-seismic support |
CN210737596U (en) * | 2019-06-21 | 2020-06-12 | 中冶京诚工程技术有限公司 | Piping lane support and system |
-
2019
- 2019-06-21 CN CN201910541794.5A patent/CN110206064A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN207921486U (en) * | 2018-03-14 | 2018-09-28 | 山东天元建设机械有限公司 | A kind of city integrated piping lane heating power heavy type holder |
CN108758083A (en) * | 2018-06-08 | 2018-11-06 | 中铁十七局集团电气化工程有限公司 | A kind of construction method of the comprehensive suspension and support anti-seismic performance of enhancing |
CN208618447U (en) * | 2018-06-19 | 2019-03-19 | 郭东良 | A kind of pipe gallery |
CN208703284U (en) * | 2018-08-09 | 2019-04-05 | 北京雅仕格机电科技有限公司 | A kind of pipe gallery para-seismic support |
CN210737596U (en) * | 2019-06-21 | 2020-06-12 | 中冶京诚工程技术有限公司 | Piping lane support and system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112033813A (en) * | 2020-08-17 | 2020-12-04 | 中铁二十二局集团第三工程有限公司 | Comprehensive pipe gallery cable support bearing capacity test method |
CN112411765A (en) * | 2020-11-10 | 2021-02-26 | 新疆维泰开发建设(集团)股份有限公司 | Anti-displacement construction method for pre-buried groove of finished support |
CN112411765B (en) * | 2020-11-10 | 2021-06-25 | 新疆维泰开发建设(集团)股份有限公司 | Anti-displacement construction method for pre-buried groove of finished support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2759673C (en) | Structural duct bearing system | |
US9422734B1 (en) | System and method for straightening and/or supporting a wall | |
CN110206064A (en) | A kind of piping lane bracket and system | |
US6782668B2 (en) | Roof-screen system | |
CN109780330A (en) | The fixed bracket of multi-pipeline and its construction method | |
CN207621488U (en) | Adjustable limited support auxiliary device | |
CN209604683U (en) | Multi-pipeline fixes bracket | |
CN210286436U (en) | Rain sewage pipe hoist and mount system that slides | |
CN210127662U (en) | Support combination | |
CN210737596U (en) | Piping lane support and system | |
CN211772964U (en) | Bridging suspension beam for box culvert first-aid repair | |
CN205314319U (en) | Metal curtain wall articulates subassembly | |
CN207368589U (en) | A kind of cable installs multilayer adjustable support | |
EP0253150A2 (en) | Wall of pre-cast panels, particulary for earth-retaining and for building liquid-holding tanks | |
CN2533360Y (en) | Grate type electric cable bridge support | |
CN210567041U (en) | Vibration-damping and anti-seismic support hanger | |
CN203383457U (en) | Board mounting system | |
CN111877390A (en) | Large-scale tower crane basis fixing device | |
CN112982934A (en) | But angle of adjustment's basket of flowers I-shaped steel roof beam construction equipment that encorbelments | |
CN219708900U (en) | Arc water supply pipe manufacturing device | |
CN216566611U (en) | Positioning adjustment device for corrugated steel plate connecting angle steel | |
CN110130391A (en) | Isolated footing pre-embedded bolt mounting structure and method | |
CN211455922U (en) | Adjustable short pole holding support for floor antenna | |
CN217711705U (en) | Terrace construction joint side form erects structure | |
CN219930825U (en) | Quick-mounting device for jet flow functional module of gas turbine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |