CN110206064A - Piping lane support and system - Google Patents
Piping lane support and system Download PDFInfo
- Publication number
- CN110206064A CN110206064A CN201910541794.5A CN201910541794A CN110206064A CN 110206064 A CN110206064 A CN 110206064A CN 201910541794 A CN201910541794 A CN 201910541794A CN 110206064 A CN110206064 A CN 110206064A
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- ear plates
- embedded groove
- horizontal
- connecting piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 claims description 33
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 4
- 238000010276 construction Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 238000005260 corrosion Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- -1 heat Substances 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 229910000679 solder Inorganic materials 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
Description
技术领域technical field
本发明涉及地下综合管廊领域,特别涉及一种管廊支架及系统。The invention relates to the field of underground comprehensive pipe gallery, in particular to a pipe gallery support and system.
背景技术Background technique
综合管廊指建于城市地下用于容纳两类及以上城市工程管线的构筑物及附属设施,主要包括干线综合管廊、支线综合管廊和缆线管廊等。综合管廊容纳的管线包括给水、再生水、热力、燃气、电力和电讯等。Comprehensive pipe gallery refers to the structures and auxiliary facilities built underground to accommodate two or more types of urban engineering pipelines, mainly including main line comprehensive pipe gallery, branch line comprehensive pipe gallery and cable pipe gallery. The pipelines contained in the comprehensive pipe gallery include water supply, recycled water, heat, gas, electricity and telecommunications.
管廊支架系统主要指在综合管廊内沿长度方向间隔设置的若干支撑管线的支架机构,包括槽式埋件和成品支架,成品支架具有用于安装管线的托臂,土建施工阶段即将预埋槽埋设好,便于安装和调节托臂间距。The pipe gallery support system mainly refers to several support mechanisms for supporting pipelines arranged at intervals along the length direction in the comprehensive pipe gallery, including trough-type embedded parts and finished supports. The finished supports have brackets for installing pipelines. The groove is buried well, which is convenient for installation and adjustment of the distance between the bracket arms.
现有的管廊支架系统主要考虑了管线竖向荷载的作用,托臂与预埋槽道之间仅通过上下两个螺栓连接,此种连接方式承受水平荷载的能力欠佳。但各类管线对支架的作用除竖向荷载外还存在水平荷载,尤其是管线固定支座处的水平荷载较大,现有的管廊支架系统无法承受较大的水平荷载。虽然通过在托臂处设置水平斜撑,可大大增加托臂承受水平荷载的能力。但现有在托臂处设置水平斜撑的技术方案还存在诸多缺陷。The existing pipe rack support system mainly considers the effect of the vertical load of the pipeline. The support arm and the embedded channel are only connected by two upper and lower bolts. This connection method has a poor ability to withstand horizontal loads. However, in addition to the vertical load, there are also horizontal loads on the support of various pipelines, especially the horizontal load at the fixed support of the pipeline is relatively large, and the existing pipe rack support system cannot bear large horizontal loads. Although the ability of the support arm to bear horizontal loads can be greatly increased by setting the horizontal diagonal brace at the support arm. However, there are still many defects in the existing technical scheme of setting the horizontal brace at the bracket arm.
首先,传统的预埋铁埋件焊接斜撑的方式埋件位置固定,后期无法调节管线高度和固定支座的位置、无法更换托臂,灵活性较低。First of all, the position of the embedded part is fixed in the traditional way of pre-embedded iron embedded parts welding diagonal braces, and the height of the pipeline and the position of the fixed support cannot be adjusted in the later stage, and the support arm cannot be replaced, so the flexibility is low.
其次,由于管廊环境比较潮湿,预埋铁及焊点处容易生锈腐蚀,增加维护成本。Secondly, due to the relatively humid environment of the pipe gallery, the embedded iron and solder joints are prone to rust and corrosion, which increases maintenance costs.
再次,焊接工序复杂,施工周期长,人工成本较高。Again, the welding process is complicated, the construction period is long, and the labor cost is high.
有鉴于此,本发明人根据多年从事本领域和相关领域的生产设计经验,经过反复试验设计出一种管廊支架及系统,以期解决现有技术存在的问题。In view of this, based on years of experience in production design in this field and related fields, the inventor has designed a pipe gallery support and system through repeated tests, in order to solve the problems existing in the prior art.
发明内容Contents of the invention
本发明的目的在于提供一种管廊支架及系统,能够增加管廊支架其托臂承受水平荷载的能力。The object of the present invention is to provide a pipe gallery support and system, which can increase the ability of the support arm of the pipe gallery support to bear horizontal loads.
为达到上述目的,本发明提出一种管廊支架,其中,所述管廊支架包括托臂和至少一个水平斜撑,所述托臂的一端为用于与预埋槽连接的安装端,所述托臂的另一端为连接端,所述水平斜撑的一端设置有第一连接组件,所述水平斜撑通过所述第一连接组件安装在所述连接端上,所述水平斜撑的另一端设置有用于与另一预埋槽连接的第二连接组件。In order to achieve the above object, the present invention proposes a pipe gallery support, wherein the pipe gallery support includes a support arm and at least one horizontal brace, and one end of the support arm is an installation end for connecting with a pre-embedded groove. The other end of the support arm is a connection end, and one end of the horizontal brace is provided with a first connection component, and the horizontal brace is installed on the connection end through the first connection component. The other end is provided with a second connecting component for connecting with another embedded groove.
如上所述的管廊支架,其中,所述管廊支架包括两个所述水平斜撑,两个所述水平斜撑对称地设置在所述托臂的左右两侧,所述托臂和所述水平斜撑均呈杆状。The above-mentioned pipe gallery support, wherein, the pipe gallery support includes two horizontal diagonal braces, and the two horizontal diagonal braces are symmetrically arranged on the left and right sides of the support arm, and the support arm and the support arm The horizontal braces are all rod-shaped.
如上所述的管廊支架,其中,所述第一连接组件包括第一固定座和第一连接件,所述第一固定座与所述连接端能拆卸地连接,所述第一连接件的一端能够调节角度地与所述第一固定座相连接,所述第一连接件的另一端与所述水平斜撑能拆卸地连接。The above-mentioned pipe gallery bracket, wherein, the first connection assembly includes a first fixing base and a first connecting piece, the first fixing base is detachably connected to the connecting end, and the first connecting piece One end is connected to the first fixing base in an angle-adjustable manner, and the other end of the first connecting member is detachably connected to the horizontal brace.
如上所述的管廊支架,其中,所述第一固定座包括L型板和两个耳板,所述L型板具有水平部和竖直部,所述水平部能拆卸地安装在所述连接端的顶面或底面上,所述竖直部沿所述连接端的侧壁设置,两个所述耳板固接在所述竖直部的外壁上,两个所述耳板上下设置且具有预设间隔,所述第一连接件的端部伸入两个所述耳板之间,所述耳板上安装有竖直设置的锚栓,所述耳板通过所述锚栓与所述第一连接件能拆卸地连接。The pipe gallery support as described above, wherein the first fixing seat includes an L-shaped plate and two ear plates, the L-shaped plate has a horizontal part and a vertical part, and the horizontal part is detachably mounted on the On the top surface or the bottom surface of the connection end, the vertical portion is arranged along the side wall of the connection end, and the two ear plates are fixed on the outer wall of the vertical portion, and the two ear plates are arranged up and down and have Preset intervals, the end of the first connecting piece extends between the two ear plates, the ear plates are installed with vertical anchor bolts, and the ear plates are connected to the anchor bolts through the ear plates. The first connecting piece is detachably connected.
如上所述的管廊支架,其中,所述第一固定座包括L型板和两个耳板,所述L型板具有水平部和竖直部,所述水平部能拆卸地安装在所述连接端的顶面或底面上,所述竖直部沿所述连接端的侧壁设置,两个所述耳板固接在所述竖直部的外壁上,两个所述耳板上下设置且具有预设间隔,所述第一连接件的端部伸入两个所述耳板之间,所述耳板上安装有竖直设置的销轴,所述耳板通过销轴与所述第一连接件铰接。The pipe gallery support as described above, wherein the first fixing seat includes an L-shaped plate and two ear plates, the L-shaped plate has a horizontal part and a vertical part, and the horizontal part is detachably mounted on the On the top surface or the bottom surface of the connection end, the vertical portion is arranged along the side wall of the connection end, and the two ear plates are fixed on the outer wall of the vertical portion, and the two ear plates are arranged up and down and have At a preset interval, the end of the first connecting piece extends between the two ear plates, and a vertical pin is installed on the ear plate, and the ear plate is connected to the first ear plate through the pin shaft. The connector is hinged.
如上所述的管廊支架,其中,所述第二连接组件包括第二连接件和能够安装在预埋槽上的第二固定座,所述第二连接件的一端与所述水平斜撑能拆卸地连接,所述第二连接件的另一端能够调节角度地连接在所述第二固定座上。The above-mentioned pipe gallery bracket, wherein, the second connection assembly includes a second connection piece and a second fixing base that can be installed on the embedded groove, and one end of the second connection piece is connected to the horizontal diagonal brace. It is detachably connected, and the other end of the second connecting piece is connected to the second fixing seat in an angle-adjustable manner.
如上所述的管廊支架,其中,所述第二固定座包括第二安装板和两个耳板,所述第二安装板竖直设置并与所述预埋槽能拆卸地连接,两个所述耳板固接在所述第二安装板上,两个所述耳板上下设置且具有预设间隔,所述第二连接件的端部伸入两个所述耳板之间,所述耳板上安装有竖直设置的锚栓,所述耳板通过所述锚栓与所述第二连接件能拆卸地连接。The pipe gallery support as described above, wherein, the second fixing base includes a second mounting plate and two ear plates, the second mounting plate is vertically arranged and detachably connected with the embedded groove, and the two The ear plates are fixedly connected to the second mounting plate, the two ear plates are arranged up and down with a preset interval, and the end of the second connecting piece extends between the two ear plates, so A vertical anchor bolt is installed on the ear plate, and the ear plate is detachably connected to the second connecting piece through the anchor bolt.
如上所述的管廊支架,其中,所述第二固定座包括第二安装板和两个耳板,所述第二安装板竖直设置并与所述预埋槽能拆卸地连接,两个所述耳板固接在所述第二安装板上,两个所述耳板上下设置且具有预设间隔,所述第二连接件的端部伸入两个所述耳板之间,所述耳板上安装有竖直设置的销轴,所述耳板通过所述销轴与所述第二连接件铰接。The pipe gallery support as described above, wherein, the second fixing base includes a second mounting plate and two ear plates, the second mounting plate is vertically arranged and detachably connected with the embedded groove, and the two The ear plates are fixedly connected to the second mounting plate, the two ear plates are arranged up and down with a preset interval, and the end of the second connecting piece extends between the two ear plates, so A vertically arranged pin shaft is installed on the lug plate, and the lug plate is hinged to the second connecting piece through the pin shaft.
本发明还提出一种管廊支架系统,其中,所述管廊支架系统包括多个预埋槽组和多个如上所述管廊支架,多个所述预埋槽组固设在管廊的内侧壁上且沿水平方向间隔排列,每个所述预埋槽组均包括一个安装预埋槽和至少一个辅助预埋槽,所述安装预埋槽和所述辅助预埋槽均竖直设置且具有预设间隔,每个所述预埋槽组均对应安装有至少一个所述管廊支架,所述管廊支架的所述托臂的安装端固定连接在所述安装预埋槽上,所述水平斜撑的一端通过所述第二连接件连接在所述辅助预埋槽上,所述水平斜撑的另一端通过所述第一连接件连接在所述托臂的连接端。The present invention also proposes a pipe gallery support system, wherein the pipe gallery support system includes a plurality of embedded groove groups and a plurality of pipe gallery supports as described above, and a plurality of the embedded groove groups are fixed on the pipe gallery On the inner wall and arranged at intervals along the horizontal direction, each of the embedded groove groups includes an installation embedded groove and at least one auxiliary embedded groove, and the installation embedded groove and the auxiliary embedded groove are vertically arranged And there is a preset interval, each of the embedded groove groups is correspondingly installed with at least one of the pipe gallery brackets, and the installation ends of the bracket arms of the pipe gallery brackets are fixedly connected to the installation embedded grooves, One end of the horizontal brace is connected to the auxiliary cast-in groove through the second connecting piece, and the other end of the horizontal brace is connected to the connecting end of the support arm through the first connecting piece.
如上所述的一种管廊支架系统,其中,所述预埋槽组对应安装有多个所述管廊支架,多个所述管廊支架沿竖直方向间隔排列。The above-mentioned pipe rack support system, wherein, the embedded groove group is correspondingly installed with a plurality of the pipe rack supports, and the plurality of the pipe rack supports are arranged at intervals along the vertical direction.
与现有技术相比,本发明具有以下特点和优点:Compared with the prior art, the present invention has the following characteristics and advantages:
本发明提出的管廊支架及管廊支架系统,在托臂的基础上增加了水平斜撑,大大增加了托臂的承载能力,尤其增加了托臂承受水平荷载的能力,满足了管线安装时的水平荷载要求。The pipe gallery support and the pipe gallery support system proposed by the present invention add horizontal diagonal braces to the support arm, which greatly increases the bearing capacity of the support arm, especially increases the ability of the support arm to withstand horizontal loads, and meets the needs of pipeline installation. horizontal load requirements.
本发明提出的管廊支架及管廊支架系统,管廊支架中的托臂、水平斜撑、第一连接组件和第二连接组件可以实现标准化生产,一方面可在工厂内进行统一防腐处理,保障了工程质量。The pipe gallery support and pipe gallery support system proposed by the present invention can realize standardized production of the support arms, horizontal braces, first connection components and second connection components in the pipe gallery support. On the one hand, unified anti-corrosion treatment can be carried out in the factory. Guarantee the quality of the project.
本发明提出的管廊支架及管廊支架系统,提高了支架系统的水平承载能力,可供110kV电力电缆、给水,燃气等水平荷载较大的管线使用,统一了综合管廊管线的支架系统,极大地方便了综合管廊的设计、施工和运营。The pipe gallery support and pipe gallery support system proposed by the present invention improve the horizontal bearing capacity of the support system, and can be used for pipelines with large horizontal loads such as 110kV power cables, water supply, and gas, and unify the support system of the comprehensive pipe gallery pipeline. It greatly facilitates the design, construction and operation of the utility tunnel.
附图说明Description of drawings
在此描述的附图仅用于解释目的,而不意图以任何方式来限制本发明公开的范围。另外,图中的各部件的形状和比例尺寸等仅为示意性的,用于帮助对本发明的理解,并不是具体限定本发明各部件的形状和比例尺寸。本领域的技术人员在本发明的教导下,可以根据具体情况选择各种可能的形状和比例尺寸来实施本发明。The drawings described herein are for illustration purposes only and are not intended to limit the scope of the present disclosure in any way. In addition, the shapes and proportional dimensions of the components in the drawings are only schematic and are used to help the understanding of the present invention, and do not specifically limit the shapes and proportional dimensions of the components in the present invention. Under the teaching of the present invention, those skilled in the art can select various possible shapes and proportional dimensions according to specific situations to implement the present invention.
图1为本发明提出的管廊支架的结构示意图;Fig. 1 is the structural representation of the pipe gallery bracket that the present invention proposes;
图2为本发明提出的管廊支架的正视图;Fig. 2 is the front view of the pipe gallery bracket proposed by the present invention;
图3为本发明提出的管廊支架的俯视图;Fig. 3 is the top view of the pipe gallery bracket proposed by the present invention;
图4为本发明提出的第二连接组件的结构示意图;FIG. 4 is a schematic structural diagram of a second connection assembly proposed by the present invention;
图5为本发明提出的第一连接组件的结构示意图。Fig. 5 is a schematic structural diagram of the first connection assembly proposed by the present invention.
附图标记说明:Explanation of reference signs:
10、管廊支架; 11、托臂;10. Pipe gallery bracket; 11. Support arm;
12、水平斜撑; 13、第一连接组件;12. Horizontal diagonal brace; 13. The first connecting component;
131、第一固定座; 132、第一连接件;131. The first fixing seat; 132. The first connecting piece;
133、锚栓; 134、耳板;133. Anchor bolt; 134. Ear plate;
135、安装孔; 136、螺栓;135, mounting holes; 136, bolts;
137、螺栓; 14、第二连接组件;137. Bolts; 14. The second connecting component;
141、第二固定座; 142、第二连接件;141. The second fixing seat; 142. The second connecting piece;
143、锚栓; 144、耳板;143. Anchor bolt; 144. Ear plate;
145、安装孔; 146、螺栓;145, mounting holes; 146, bolts;
147、螺栓; 15、底座;147, bolt; 15, base;
21、安装预埋槽; 22、辅助预埋槽。21. Install the embedded channel; 22. Auxiliary embedded channel.
具体实施方式Detailed ways
结合附图和本发明具体实施方式的描述,能够更加清楚地了解本发明的细节。但是,在此描述的本发明的具体实施方式,仅用于解释本发明的目的,而不能以任何方式理解成是对本发明的限制。在本发明的教导下,技术人员可以构想基于本发明的任意可能的变形,这些都应被视为属于本发明的范围。The details of the present invention can be understood more clearly with reference to the accompanying drawings and the description of specific embodiments of the present invention. However, the specific embodiments of the present invention described here are only for the purpose of explaining the present invention, and should not be construed as limiting the present invention in any way. Under the teaching of the present invention, the skilled person can conceive any possible modification based on the present invention, and these should be regarded as belonging to the scope of the present invention.
如图1至图5所示,本发明提出一种管廊支架10,该管廊支架10包括托臂11和至少一个水平斜撑12,托臂11的一端为用于与预埋槽连接的安装端,托臂11的另一端为连接端,水平斜撑12的两端分别设置有第一连接组件13和第二连接组件14,水平斜撑12通过第一连接组件13安装在连接端上,水平斜撑12的另一端通过第二连接组件14安装在另一预埋槽上。As shown in Figures 1 to 5, the present invention proposes a pipe gallery support 10, the pipe gallery support 10 includes a support arm 11 and at least one horizontal brace 12, one end of the support arm 11 is used to connect with the embedded groove At the installation end, the other end of the support arm 11 is the connection end, and the two ends of the horizontal brace 12 are respectively provided with a first connection assembly 13 and a second connection assembly 14, and the horizontal brace 12 is installed on the connection end through the first connection assembly 13 , the other end of the horizontal brace 12 is installed on another pre-buried groove through the second connection assembly 14 .
本发明还提出一种管廊支架系统,该管廊支架系统包括多个预埋槽组和多个管廊支架10,多个预埋槽组固设在管廊的内侧壁上且沿水平方向间隔排列,每个预埋槽组均包括一个安装预埋槽21和至少一个辅助预埋槽22,安装预埋槽21和辅助预埋槽22均竖直设置且具有预设间隔,每个预埋槽组均对应安装有至少一个管廊支架10,管廊支架10的托臂11的安装端与安装预埋槽21固定连接上,水平斜撑12的一端通过第二连接组件14与辅助预埋槽22铰接,水平斜撑12的另一端通过第一连接组件13与托臂11的连接端铰接。The present invention also proposes a pipe gallery support system, the pipe gallery support system includes a plurality of embedded groove groups and a plurality of pipe gallery supports 10, and the plurality of embedded groove groups are fixed on the inner wall of the pipe gallery and along the horizontal direction Arranged at intervals, each embedded groove group includes an installation embedded groove 21 and at least one auxiliary embedded groove 22, the installation embedded groove 21 and the auxiliary embedded groove 22 are all vertically arranged and have preset intervals, each embedded groove The buried groove groups are equipped with at least one pipe gallery bracket 10 correspondingly, the installation end of the support arm 11 of the pipe gallery bracket 10 is fixedly connected to the installation embedded groove 21, and one end of the horizontal brace 12 is connected to the auxiliary pre-embedded groove through the second connection assembly 14. The buried groove 22 is hinged, and the other end of the horizontal brace 12 is hinged to the connecting end of the support arm 11 through the first connecting component 13 .
本发明提出的管廊支架10及管廊支架系统,在托臂11的基础上增加了水平斜撑12,大大增加了托臂11的承载能力,尤其增加了托臂11承受水平荷载的能力,满足了管线安装时的水平荷载要求。The pipe gallery support 10 and the pipe gallery support system proposed by the present invention add horizontal diagonal braces 12 on the basis of the support arm 11, which greatly increases the bearing capacity of the support arm 11, especially increases the ability of the support arm 11 to withstand horizontal loads, It meets the horizontal load requirements during pipeline installation.
本发明提出的管廊支架10及管廊支架系统,管廊支架10中的托臂11、水平斜撑12、第一连接组件13和第二连接组件14可以实现标准化生产,一方面可在工厂内进行统一防腐处理,保障了工程质量。The pipe gallery support 10 and the pipe gallery support system proposed by the present invention, the support arm 11, the horizontal brace 12, the first connection assembly 13 and the second connection assembly 14 in the pipe gallery support 10 can realize standardized production. A unified anti-corrosion treatment is carried out to ensure the quality of the project.
本发明提出的管廊支架10及管廊支架系统,提高了支架系统的水平承载能力,可供110kV电力电缆、给水,燃气等水平荷载较大的管线使用,统一了综合管廊管线的支架系统,极大地方便了综合管廊的设计、施工和运营。The pipe gallery support 10 and the pipe gallery support system proposed by the present invention improve the horizontal bearing capacity of the support system, can be used for pipelines with large horizontal loads such as 110kV power cables, water supply, and gas, and unify the support system of the comprehensive pipe gallery pipeline , which greatly facilitates the design, construction and operation of the utility tunnel.
本发明提出的管廊支架10及管廊支架系统,能够在不破坏管廊主体结构的前提下,安装方便,易于调整托臂11竖向间距,并易于后期更换托臂11。The pipe gallery support 10 and the pipe gallery support system proposed by the present invention can be easily installed without damaging the main structure of the pipe gallery, easy to adjust the vertical spacing of the support arms 11, and easy to replace the support arms 11 later.
在本发明一个可选的例子中,每个预埋槽组对应安装有多个管廊支架10,多个管廊支架10沿竖直方向间隔排列。In an optional example of the present invention, each embedded groove group is correspondingly installed with a plurality of pipe gallery supports 10, and the plurality of pipe gallery supports 10 are arranged at intervals along the vertical direction.
在本发明一个可选的例子中,管廊支架10包括两个水平斜撑12,两个水平斜撑12对称地设置在托臂11的左右两侧,托臂11和水平斜撑12均呈杆状。In an optional example of the present invention, the pipe gallery support 10 includes two horizontal braces 12, and the two horizontal braces 12 are symmetrically arranged on the left and right sides of the support arm 11, and the support arm 11 and the horizontal brace 12 are both in the shape of rod-shaped.
进一步的,预埋槽组包括有两个辅助预埋槽22,两个辅助预埋槽22分别设置在安装预埋槽21的两侧,两个水平斜撑12分别通过第二连接组件14与对应的辅助预埋槽22相连接。Further, the embedded groove group includes two auxiliary embedded grooves 22, and the two auxiliary embedded grooves 22 are respectively arranged on both sides of the installed embedded groove 21, and the two horizontal braces 12 are respectively connected to the The corresponding auxiliary embedded grooves 22 are connected.
在本发明中,对于已有的管廊及预埋槽,一种方式是可以将现有的预埋槽人为划分为多个预埋槽组,具体的,使相邻的三个预埋槽为一个预埋槽组,使位于中间的预埋槽为安装预埋槽21,两边的预埋槽为辅助预埋槽22,之后进行管廊支架10的安装,这样便可以在不破坏现有管廊已经设置的预埋槽的情况下,快速地实现管廊支架10的安装。对于已有的管廊及预埋槽,另一种方式是在施工时设定现有的预埋槽为安装预埋槽21,并在其两侧增架辅助预埋槽22,进而组成预埋槽组,再将管廊支架10安装到预埋槽组上,其中,安装预埋槽21和辅助预埋槽22的距离d可根据实际工程设计。In the present invention, for the existing pipe gallery and embedded groove, one way is to divide the existing embedded groove artificially into multiple embedded groove groups, specifically, make the three adjacent embedded grooves It is a pre-embedded groove group, so that the embedded groove in the middle is the installation embedded groove 21, and the embedded grooves on both sides are auxiliary embedded grooves 22, and then the pipe gallery bracket 10 is installed, so that it can be installed without damaging the existing In the case of the pre-embedded groove that has been set in the pipe gallery, the installation of the pipe gallery support 10 can be quickly realized. For the existing pipe gallery and embedded channel, another way is to set the existing embedded channel as the installed embedded channel 21 during construction, and add auxiliary embedded channels 22 on both sides to form a pre-embedded channel. The buried groove group, and then install the pipe rack support 10 on the embedded groove group, wherein the distance d between installing the embedded groove 21 and the auxiliary embedded groove 22 can be designed according to the actual project.
在本发明一个可选的例子中,第一连接组件13包括第一固定座131和第一连接件132,第一固定座131能拆卸地连接在连接端,第一连接件132的一端能够调节角度地与第一固定座131连接,第一连接件132的另一端与水平斜撑12的端部能拆卸地连接。In an optional example of the present invention, the first connection assembly 13 includes a first fixing base 131 and a first connecting piece 132, the first fixing base 131 is detachably connected to the connecting end, and one end of the first connecting piece 132 can be adjusted It is angularly connected to the first fixing seat 131 , and the other end of the first connecting piece 132 is detachably connected to the end of the horizontal brace 12 .
在本发明一个可选的例子中,第二连接组件14包括第二连接件142和能够安装在辅助预埋槽22上的第二固定座141,第二连接件142的一端与水平斜撑12的端部能拆卸地连接,第二连接件142的另一端能够调节角度地与第二固定座141连接。In an optional example of the present invention, the second connection assembly 14 includes a second connection piece 142 and a second fixing seat 141 capable of being installed on the auxiliary embedded groove 22, and one end of the second connection piece 142 is connected to the horizontal brace 12 The end of the second connecting member 142 is detachably connected, and the other end of the second connecting member 142 is connected to the second fixing seat 141 in an angle-adjustable manner.
在本发明中,水平斜撑12的一端通过第一连接组件13与托臂11连接,其使得水平斜撑12与托臂11之间夹角的角度可调节,水平斜撑12的另一端通过第二连接组件14与辅助预埋槽22连接,使得水平斜撑12与辅助预埋槽22之间夹角的角度也是可调节的,即使安装预埋槽21和辅助预埋槽22之间的间距不同,水平斜撑12也能进行安装,从而能在不破坏现有管廊已经设置的预埋槽的情况下,快速地进行管廊支架10的安装。In the present invention, one end of the horizontal brace 12 is connected to the support arm 11 through the first connection assembly 13, which makes the angle between the horizontal brace 12 and the support arm 11 adjustable, and the other end of the horizontal brace 12 is passed through The second connection assembly 14 is connected with the auxiliary embedded groove 22, so that the angle between the horizontal brace 12 and the auxiliary embedded groove 22 is also adjustable, even if the installation of the embedded groove 21 and the auxiliary embedded groove 22 With different spacing, horizontal braces 12 can also be installed, so that the pipe gallery support 10 can be quickly installed without destroying the pre-buried grooves already set in the existing pipe gallery.
在一个可选的,第一固定座131包括L型板和两个耳板134,L型板具有水平部和竖直部,水平部能拆卸地安装在连接端的顶面或底面,竖直部沿连接端的侧壁设置,两个耳板134均固接在竖直部的外壁上,两个耳板134上下设置且具有预设间隔,第一连接件132的端部伸入两个耳板134之间,耳板134上设置有销轴,耳板134通过销轴与第一连接件132铰接。这样,第一连接组件13的第一固定座131和第一连接件132可以在0度~180度的范围内任意角度调节。第一连接件132和第一固定座131之间还可以设置有限位件,当第一连接件132和第一固定座131之间调整至适合角度后,利用限位件固定该角度。In one option, the first fixing base 131 includes an L-shaped plate and two ear plates 134, the L-shaped plate has a horizontal part and a vertical part, the horizontal part can be detachably installed on the top or bottom surface of the connecting end, and the vertical part Arranged along the side wall of the connecting end, the two ear plates 134 are fixed on the outer wall of the vertical part, the two ear plates 134 are arranged up and down with a preset interval, and the end of the first connecting piece 132 extends into the two ear plates Between 134 , pin shafts are arranged on the lug plates 134 , and the lug plates 134 are hinged to the first connecting member 132 through the pin shafts. In this way, the first fixing seat 131 and the first connecting piece 132 of the first connecting assembly 13 can be adjusted at any angle within the range of 0°-180°. A limiting member may also be provided between the first connecting member 132 and the first fixing seat 131 , and when the angle between the first connecting member 132 and the first fixing seat 131 is adjusted to a suitable angle, the limiting member is used to fix the angle.
在本发明另一个可选的例子中,第一固定座131包括L型板和两个耳板134,L型板具有水平部和竖直部,水平部能拆卸地安装在连接端的顶面或底面,竖直部沿连接端的侧壁设置,两个耳板134均固接在竖直部的外壁上,两个耳板134上下设置且具有预设间隔,第一连接件132的端部伸入两个耳板134之间,耳板134上设置有锚栓133,耳板134通过锚栓133与第一连接件132能拆卸地连接,安装时,锚栓133未拧紧时,第一连接组件13的第一固定座131和第一连接件132可以在0度~180度的范围内任意角度调节,待角度合适后拧紧锚栓133固定角度即可。In another optional example of the present invention, the first fixing base 131 includes an L-shaped plate and two lug plates 134, the L-shaped plate has a horizontal part and a vertical part, and the horizontal part can be detachably installed on the top surface of the connecting end or The bottom surface, the vertical part is arranged along the side wall of the connecting end, and the two ear plates 134 are all fixedly connected on the outer wall of the vertical part, the two ear plates 134 are arranged up and down and have a preset interval, and the end of the first connecting part 132 extends between the two lugs 134, the lugs 134 are provided with anchors 133, the lugs 134 are detachably connected to the first connector 132 through the anchors 133, when installing, when the anchors 133 are not tightened, the first connection The first fixing seat 131 and the first connecting piece 132 of the component 13 can be adjusted at any angle within the range of 0° to 180°, and the angle can be fixed by tightening the anchor bolt 133 after the angle is suitable.
在一个可选的例子中,L型板的水平部通过螺栓137与连接端连接,具体的,水平部上开设有两处螺纹孔,连接端上对应开设有两个安装孔,每个螺纹孔内均设置有一个螺栓137,螺栓137贯穿螺纹孔和安装孔将L型板和连接端固定连接在一起,安装孔可以是圆孔,也可以是长条孔。同样,第一连接件132也是通过螺栓136与水平斜撑12连接,第一连接件132上开设有两处安装孔135,水平斜撑12上也对应开设有两个安装孔,安装孔135可以是圆孔,也可以是长条孔。安装时,可先将第一连接组件13的第一固定座131和第一连接件132调整到适合的角度及位置后,再拧紧螺栓,实现固定。In an optional example, the horizontal part of the L-shaped plate is connected to the connecting end through bolts 137. Specifically, two threaded holes are opened on the horizontal part, and two mounting holes are correspondingly opened on the connecting end. Each threaded hole A bolt 137 is arranged inside, and the bolt 137 runs through the threaded hole and the installation hole to fix the L-shaped plate and the connection end together. The installation hole can be a round hole or a long hole. Similarly, the first connecting piece 132 is also connected to the horizontal brace 12 through bolts 136. The first connecting piece 132 is provided with two installation holes 135, and the horizontal brace 12 is correspondingly provided with two installation holes. The installation holes 135 can be It is a round hole, and it can also be a long hole. During installation, the first fixing seat 131 and the first connecting member 132 of the first connecting assembly 13 can be adjusted to a suitable angle and position, and then the bolts can be tightened to achieve fixing.
当然,L型板的水平部与连接端之间、第一连接件132与水平斜撑12之间也可以采用本领域技术人员熟悉的其它结构实现连接,例如锚栓连接,在此不进行赘述。Of course, other structures familiar to those skilled in the art can also be used to realize the connection between the horizontal part and the connecting end of the L-shaped plate, and between the first connecting piece 132 and the horizontal brace 12, such as an anchor bolt connection, which will not be repeated here. .
在本发明一个可选的例子中,第二固定座141包括第二安装板和两个耳板144,第二安装板竖直设置并与辅助预埋槽22能拆卸地连接,两个耳板144均固定连接在第二安装板上,两个耳板144上下设置且具有预设间隔,第二连接件142的端部伸入两个耳板144之间,耳板144上设置有销轴,耳板144通过销轴与第二连接件142铰接。这样,第二连接组件14的第二固定座141和第二连接件142可以在0度~180度的范围内任意角度调节。In an optional example of the present invention, the second fixing base 141 includes a second mounting plate and two ear plates 144, the second mounting plate is vertically arranged and detachably connected with the auxiliary embedded groove 22, and the two ear plates 144 are all fixedly connected on the second mounting plate, and the two ear plates 144 are set up and down with a preset interval, and the end of the second connecting piece 142 extends between the two ear plates 144, and the ear plates 144 are provided with pin shafts , the ear plate 144 is hinged to the second connecting member 142 through a pin. In this way, the second fixing seat 141 and the second connecting member 142 of the second connecting assembly 14 can be adjusted at any angle within the range of 0°-180°.
在本发明另一个可选的例子中,第二固定座141包括第二安装板和两个耳板144,第二安装板竖直设置并与辅助预埋槽22能拆卸地连接,两个耳板144均固定连接在第二安装板上,两个耳板144上下设置且具有预设间隔,第二连接件142的端部伸入两个耳板144之间,耳板144上设置有锚栓143,锚栓143贯穿第二连接件142和耳板144,这样耳板144便通过锚栓143与第二连接件142能拆卸地连接,安装时,使锚栓143处于未拧紧的状态,第二固定座141和第二连接件142可以在0度~180度的范围内任意角度调节,待角度合适后拧紧锚栓固定角度即可。In another optional example of the present invention, the second fixing seat 141 includes a second mounting plate and two ear plates 144, the second mounting plate is vertically arranged and detachably connected with the auxiliary embedded groove 22, and the two ear plates The plates 144 are all fixedly connected to the second mounting plate, and the two lug plates 144 are set up and down with a preset interval, and the end of the second connecting piece 142 extends between the two lug plates 144, and the ear plates 144 are provided with anchors Bolt 143, the anchor bolt 143 runs through the second connecting piece 142 and the ear plate 144, so that the ear plate 144 is detachably connected with the second connecting piece 142 through the anchor bolt 143, during installation, the anchor bolt 143 is in an untightened state, The second fixing seat 141 and the second connecting member 142 can be adjusted at any angle within the range of 0° to 180°, and the angle can be fixed by tightening the anchor bolt after the angle is suitable.
在一个可选的例子中,第二安装板通过螺栓147与辅助预埋槽22连接,第二安装板上开设有用于螺栓安装的安装孔;同样,第二连接件142也是通过螺栓146与水平斜撑12连接,第二连接件142和水平斜撑12上分别开设有用于螺栓安装的安装孔,第二连接件142上的安装孔145可以是圆孔,也可以是长条孔。第二连接组件14的安装和固定过程和第一连接组件13相似,在此不进行赘述。In an optional example, the second mounting plate is connected to the auxiliary embedded groove 22 through bolts 147, and the second mounting plate is provided with mounting holes for bolt installation; similarly, the second connecting piece 142 is also connected to the horizontal The diagonal braces 12 are connected, and the second connecting piece 142 and the horizontal diagonal brace 12 are respectively provided with mounting holes for bolt installation. The mounting holes 145 on the second connecting piece 142 can be round holes or elongated holes. The installation and fixing process of the second connection assembly 14 is similar to that of the first connection assembly 13, and will not be repeated here.
当然,第二安装板与辅助预埋槽22之间、第二连接件142与水平斜撑12之间也可以采用本领域技术人员熟悉的其它结构实现连接,例如锚栓连接,在此不进行赘述。Of course, other structures familiar to those skilled in the art can also be used to realize the connection between the second mounting plate and the auxiliary embedded groove 22, between the second connecting piece 142 and the horizontal brace 12, such as an anchor bolt connection, which will not be carried out here. repeat.
在本发明一个可选的例子中,托臂11和水平斜撑12均为C型槽钢(单面槽钢)。In an optional example of the present invention, both the bracket arm 11 and the horizontal brace 12 are C-shaped channel steel (single-sided channel steel).
在本发明一个可选的例子中,托臂11的安装端设置有能与预埋槽连接的底座15,托臂11的连接端通过螺栓与第一连接组件13能拆卸地连接。In an optional example of the present invention, the installation end of the bracket arm 11 is provided with a base 15 that can be connected to the embedded groove, and the connection end of the bracket arm 11 is detachably connected to the first connection assembly 13 through bolts.
在一个可选的例子中,底座15为矩形底座并焊接连接在托臂11的安装端,底座15上同样开设有安装孔,这些安装孔方便与预埋槽通过螺栓连接。当然,底座15的结构及其与托臂11、预埋槽的连接方式也可以采用本领域技术人员熟知的其它现有技术,在此不进行赘述。In an optional example, the base 15 is a rectangular base and is welded to the installation end of the support arm 11, and the base 15 is also provided with installation holes, and these installation holes are convenient to be connected with the pre-embedded groove by bolts. Of course, the structure of the base 15 and its connection with the support arm 11 and the embedded groove can also adopt other existing technologies well known to those skilled in the art, and will not be repeated here.
在本发明中,托臂11和水平斜撑12也可采用冷弯型钢,热轧型钢等制成,可根据实际条件选择不同的型式。In the present invention, the bracket arm 11 and the horizontal brace 12 can also be made of cold-formed steel, hot-rolled steel, etc., and different types can be selected according to actual conditions.
在本发明一个可选的例子中,第一连接组件13和第二连接组件14均由冷轧镀锌板加工生产。In an optional example of the present invention, both the first connection component 13 and the second connection component 14 are produced by processing cold-rolled galvanized sheets.
针对上述各实施方式的详细解释,其目的仅在于对本发明进行解释,以便于能够更好地理解本发明,但是,这些描述不能以任何理由解释成是对本发明的限制,特别是,在不同的实施方式中描述的各个特征也可以相互任意组合,从而组成其他实施方式,除了有明确相反的描述,这些特征应被理解为能够应用于任何一个实施方式中,而并不仅局限于所描述的实施方式。The purpose of the detailed explanations for the above-mentioned embodiments is only to explain the present invention so as to better understand the present invention. However, these descriptions cannot be construed as limiting the present invention for any reason, especially, in different The various features described in the embodiments can also be combined arbitrarily with each other to form other embodiments. Unless there is an explicit description to the contrary, these features should be understood as being applicable to any embodiment and not limited to the described embodiment. Way.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910541794.5A CN110206064A (en) | 2019-06-21 | 2019-06-21 | Piping lane support and system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910541794.5A CN110206064A (en) | 2019-06-21 | 2019-06-21 | Piping lane support and system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110206064A true CN110206064A (en) | 2019-09-06 |
Family
ID=67793865
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910541794.5A Pending CN110206064A (en) | 2019-06-21 | 2019-06-21 | Piping lane support and system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110206064A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112033813A (en) * | 2020-08-17 | 2020-12-04 | 中铁二十二局集团第三工程有限公司 | Comprehensive pipe gallery cable support bearing capacity test method |
| CN112411765A (en) * | 2020-11-10 | 2021-02-26 | 新疆维泰开发建设(集团)股份有限公司 | Anti-displacement construction method for pre-buried groove of finished support |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN207921486U (en) * | 2018-03-14 | 2018-09-28 | 山东天元建设机械有限公司 | A kind of city integrated piping lane heating power heavy type holder |
| CN108758083A (en) * | 2018-06-08 | 2018-11-06 | 中铁十七局集团电气化工程有限公司 | A kind of construction method of the comprehensive suspension and support anti-seismic performance of enhancing |
| CN208618447U (en) * | 2018-06-19 | 2019-03-19 | 郭东良 | A kind of pipe gallery |
| CN208703284U (en) * | 2018-08-09 | 2019-04-05 | 北京雅仕格机电科技有限公司 | A kind of pipe gallery para-seismic support |
| CN210737596U (en) * | 2019-06-21 | 2020-06-12 | 中冶京诚工程技术有限公司 | Piping lane support and system |
-
2019
- 2019-06-21 CN CN201910541794.5A patent/CN110206064A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN207921486U (en) * | 2018-03-14 | 2018-09-28 | 山东天元建设机械有限公司 | A kind of city integrated piping lane heating power heavy type holder |
| CN108758083A (en) * | 2018-06-08 | 2018-11-06 | 中铁十七局集团电气化工程有限公司 | A kind of construction method of the comprehensive suspension and support anti-seismic performance of enhancing |
| CN208618447U (en) * | 2018-06-19 | 2019-03-19 | 郭东良 | A kind of pipe gallery |
| CN208703284U (en) * | 2018-08-09 | 2019-04-05 | 北京雅仕格机电科技有限公司 | A kind of pipe gallery para-seismic support |
| CN210737596U (en) * | 2019-06-21 | 2020-06-12 | 中冶京诚工程技术有限公司 | Piping lane support and system |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112033813A (en) * | 2020-08-17 | 2020-12-04 | 中铁二十二局集团第三工程有限公司 | Comprehensive pipe gallery cable support bearing capacity test method |
| CN112411765A (en) * | 2020-11-10 | 2021-02-26 | 新疆维泰开发建设(集团)股份有限公司 | Anti-displacement construction method for pre-buried groove of finished support |
| CN112411765B (en) * | 2020-11-10 | 2021-06-25 | 新疆维泰开发建设(集团)股份有限公司 | Anti-displacement construction method for pre-buried groove of finished support |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| RU2583170C2 (en) | Structural bearing system for pipeline | |
| US20130099068A1 (en) | Pipe hanger assembly | |
| CN201795174U (en) | Fixing support for erecting and laying ductile iron pipes | |
| CN110450131A (en) | A kind of robot track and installation method for defeated coal inspection | |
| CN110206064A (en) | Piping lane support and system | |
| CN113187953B (en) | Auxiliary construction method for positioning electromechanical pipeline passing through settlement joint | |
| CN109780330A (en) | The fixed bracket of multi-pipeline and its construction method | |
| CN210737596U (en) | Piping lane support and system | |
| CN209604683U (en) | Multi-pipeline fixes bracket | |
| RU120180U1 (en) | SUPPORT OF FIXED PIPELINE | |
| RU64315U1 (en) | ADJUSTABLE PIPELINE SUPPORT | |
| CN207018638U (en) | A kind of mounting fixture for being used to for pipeline to be connected to the dome of i-beam structure | |
| CN210567041U (en) | Vibration-damping and anti-seismic support hanger | |
| CN211772964U (en) | Bridging suspension beam for box culvert first-aid repair | |
| CN114134934A (en) | Assembled pipe gallery support and installation and construction method thereof | |
| CN108457302A (en) | Bolt splices axis bendable full precast assembly open cut cable tunnel | |
| CN111877390A (en) | Large-scale tower crane basis fixing device | |
| CN207959267U (en) | A kind of pipe gallery C-type steel holder | |
| CN2533360Y (en) | Grate type electric cable bridge support | |
| CN110106783B (en) | Cable upper bridge structure and construction method | |
| CN212908898U (en) | Piping lane support with adjustable | |
| CN205013862U (en) | Roofing piping erection support | |
| CN211698329U (en) | Support for installing OPPC optical cable junction box | |
| CN109149488B (en) | Urban railway pipeline arrangement structure and method | |
| CN210529486U (en) | Cable bridge construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190906 |