CN208702173U - Fabricated construction conversion layer reinforcement location rectifier - Google Patents

Fabricated construction conversion layer reinforcement location rectifier Download PDF

Info

Publication number
CN208702173U
CN208702173U CN201821447814.XU CN201821447814U CN208702173U CN 208702173 U CN208702173 U CN 208702173U CN 201821447814 U CN201821447814 U CN 201821447814U CN 208702173 U CN208702173 U CN 208702173U
Authority
CN
China
Prior art keywords
positioning plate
reinforcing bar
conversion layer
square steel
steel tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821447814.XU
Other languages
Chinese (zh)
Inventor
伍孝波
刘合平
林顺志
徐翙
胡海闯
梁永国
牛胜利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban and Rural Construction Group Co Ltd
Original Assignee
Beijing Urban and Rural Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban and Rural Construction Group Co Ltd filed Critical Beijing Urban and Rural Construction Group Co Ltd
Priority to CN201821447814.XU priority Critical patent/CN208702173U/en
Application granted granted Critical
Publication of CN208702173U publication Critical patent/CN208702173U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a kind of fabricated construction conversion layer reinforcement location rectifiers comprising: the first square steel tube, the second square steel tube, middle part joint steel pipe and bar reinforcement positioning device;Mounting hole corresponding to position with the first reinforcing bar group reinforcing bar is set on the first square steel tube;Mounting hole corresponding to position with the second reinforcing bar group reinforcing bar is set on the second square steel tube;Middle part joint steel pipe one end is connect with first party steel-pipe welding, and the other end is connect with second party steel-pipe welding;Space between the first square steel tube and the second square steel tube forms concrete discharging frame, pours blanking for concrete;Bar reinforcement positioning device is fixed in mounting hole, for positioning to conversion layer reinforcing bar, conversion layer reinforcing bar is made to keep vertical direction.Above-mentioned rectifier carries out construction and greatly facilitates concrete discharging, ensure that concreting speed, reduces the waste of concrete.Meanwhile the problem of effectively preventing out of plumb after reserved Ribbed Bar corrects.

Description

Fabricated construction conversion layer reinforcement location rectifier
Technical field
The utility model belongs to fabricated construction technical field of construction equipment, converts more particularly to a kind of fabricated construction Layer reinforcement location rectifier.
Background technique
As architectural industrialization develops, fabricated construction is widely used, wherein " conversion layer " reinforcement location corrects It is the technology for most generally, being also most difficult to support in fabricated construction application and holding.So-called " conversion layer " refers to below the layer using cast-in-place Structure reserves Ribbed Bar, reserves metallic sheath letter using component more than the layer, by the metal sleeve insertion band rib steel in component Muscle simultaneously injects grouting material mixture, condenses hardening by mixture and forms the whole company to realize mounting structure and cast-in-place structural It connects.It is in current assembled architecture with most wide that this method being in the milk with sleeve, which carries out cast-in-place structural and the conversion of assembling structure, General measure.
How all metallic sheath letters in each component to be fully inserted into every Ribbed Bar reserved in cast-in-place structural It is the key link in construction, if every or a certain reinforcement location is inaccurate following problems easily occurs: component can not be installed In place;Construction personnel cuts off structure reinforcing bars privately and causes architecture quality hidden danger, causes a large amount of work holdup of construction personnel, claim for eot, If replacement component causes increased costs and claim for eot.
Utility model content
The purpose of the utility model is to provide a kind of fabricated construction conversion layer reinforcement location rectifiers, to solve conversion layer Reinforcement location corrects the technical issues of constructional difficulties.
The technical solution that the utility model solves above-mentioned technical problem is as follows: a kind of fabricated construction conversion layer reinforcement location Rectifier, the conversion layer reinforcing bar include the first aligned reinforcing bar group and the second aligned reinforcing bar group;Correction Instrument includes: the first square steel tube, the second square steel tube, middle part joint steel pipe and bar reinforcement positioning device;It is arranged on first square steel tube Mounting hole corresponding to position with the first reinforcing bar group reinforcing bar;Position with the second reinforcing bar group reinforcing bar is set on second square steel tube Set corresponding mounting hole;Middle part joint steel pipe one end is connect with first party steel-pipe welding, the other end and the second square steel tube It is welded to connect;It is parallel to each other between adjacent middle part joint steel pipe;Space shape between the first square steel tube and the second square steel tube At concrete discharging frame, blanking is poured for concrete;The bar reinforcement positioning device is fixed in the mounting hole, for pair Conversion layer reinforcing bar is positioned, and conversion layer reinforcing bar is made to keep vertical direction.
The utility model fabricated construction conversion layer reinforcement location rectifier as described above, further, the middle part connects Connecing steel pipe includes end steel pipe and middle part steel pipe, and the end steel pipe is connected to the end of the first square steel tube and the second square steel tube Portion, middle part square steel tube are connected to the middle part of the first square steel tube and the second square steel tube.
The utility model fabricated construction conversion layer reinforcement location rectifier as described above, further, the reinforcing bar are fixed Position device is round tube, and the internal diameter of the round tube is 1~4mm bigger than conversion layer reinforcing bar outer diameter, and the length of the round tube is greater than square steel tube Height.
The utility model fabricated construction conversion layer reinforcement location rectifier as described above, further, the reinforcing bar are fixed Position device includes positioning pipe, the first positioning plate, the second positioning plate and positioning plate locking member, and first positioning plate and second position Plate is hinged on the upper end of positioning pipe;Semicircular location hole, the location hole is arranged in first positioning plate and the second positioning plate center Diameter it is equal with the outer diameter of conversion layer reinforcing bar, the positioning plate locking member be used for the first positioning plate and second positioning plate closing When the two position is locked.
The utility model fabricated construction conversion layer reinforcement location rectifier as described above, further, the positioning pipe Including tube body and mounting base, the circular hole of the mounting base setting vertical direction, mounting base is fixedly connected on the tube body upper end Outer wall;First positioning plate and the second positioning plate include positioning plate ontology, pinboard and fixed plate, the positioning plate ontology For semicircular structure, in the center setting location hole of positioning plate ontology, pinboard is arranged in positioning plate ontology one end, and pinboard is set Set hinge hole;The other end of positioning plate ontology is arranged in fixed plate;First positioning plate and the second positioning plate are mounted on by bolt In mounting base.
Construction is carried out using rectifier and greatly facilitates concrete discharging, between the first square steel tube and the second square steel tube Space formed concrete discharging frame, pour blanking for concrete, substantially increase concrete injection open area, ensure that Concreting speed reduces the waste of concrete, improves work efficiency, and has evaded the wind that concrete is not poured just initial set Danger, improves construction quality and quality.
Meanwhile the problem of effectively preventing out of plumb after reserved Ribbed Bar corrects, reinforcing bar rectifier are linear correction, both It corrects reserved Ribbed Bar position and corrects verticality again, guarantee that position is accurate, reinforcing bar does not deviate, and greatly reduces reinforcing bar position It sets and perpendicularity deviation, the strong metal sleeve that ensure that in component is inserted into the accuracy rate of single Ribbed Bar.
Detailed description of the invention
By made detailed description in conjunction with the following drawings, the above-mentioned and/or otherwise advantage of the utility model will It becomes more apparent upon and is easier to understand, these attached drawings are only schematical, are not intended to limit the utility model, in which:
Fig. 1 is a kind of fabricated construction conversion layer reinforcement location rectifier schematic diagram of embodiment;
Fig. 2 is a kind of bar reinforcement positioning device opening state schematic diagram of embodiment of the utility model;
Fig. 3 is a kind of bar reinforcement positioning device off status schematic diagram of embodiment of the utility model;
Fig. 4 is a kind of positioning pipe schematic diagram of embodiment of the utility model;
Fig. 5 is a kind of the first positioning plate schematic diagram of embodiment of the utility model.
In attached drawing, parts list represented by the reference numerals are as follows:
1, the first square steel tube, the 2, second square steel tube, 3, middle part joint steel pipe, 4, bar reinforcement positioning device, 5, conversion layer reinforcing bar, 41, positioning pipe, the 42, first positioning plate, the 43, second positioning plate, 44, bolt, 410, tube body, 412, mounting base, 414, circular hole, 420, positioning plate ontology, 422, pinboard, 424, fixed plate, 426, location hole, 428, hinge hole.
Specific embodiment
Hereinafter, the reality of the fabricated construction conversion layer reinforcement location rectifier of the utility model is described with reference to the accompanying drawings Apply example.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model Design, be it is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art can also be public based on the claim of this application book and specification institute For the content opened using obvious other technical solutions, these technical solutions include using doing to the embodiment recorded herein The technical solution of any obvious substitutions and modifications out.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each section Shape and its correlation.It note that for the ease of clearly showing the structure of each component of the utility model embodiment, respectively It is not drawn according to identical ratio between attached drawing.Identical reference marker is for indicating identical part.
Fig. 1 shows a kind of fabricated construction conversion layer reinforcement location rectifier of embodiment of the utility model, conversion layer steel Muscle 5 includes the first aligned reinforcing bar group and the second aligned reinforcing bar group;Rectifier include: the first square steel tube 1, Second square steel tube 2, middle part joint steel pipe 3 and bar reinforcement positioning device 4;It is arranged on first square steel tube 1 and the first reinforcing bar group reinforcing bar Mounting hole corresponding to position;Mounting hole corresponding to position with the second reinforcing bar group reinforcing bar is set on the second square steel tube 2;Middle part 3 one end of joint steel pipe and the first square steel tube 1 are welded to connect, and the other end and the second square steel tube 2 are welded to connect;Adjacent middle part connection It is parallel to each other between steel pipe 3;Space between the first square steel tube 1 and the second square steel tube 2 forms concrete discharging frame, for mixing Solidifying soil pours blanking;Bar reinforcement positioning device 4 is fixed in mounting hole, for positioning to conversion layer reinforcing bar 5, makes conversion layer Reinforcing bar 5 keeps vertical direction.
In a kind of preferred fabricated construction conversion layer reinforcement location rectifier embodiment, as shown in Figure 1, middle part connects Steel pipe 3 includes end steel pipe and middle part steel pipe, and end steel pipe is connected to the end of the first square steel tube 1 and the second square steel tube 2, Middle part square steel tube is connected to the middle part of the first square steel tube 1 and the second square steel tube 2.
The technique constructed using the rectifier of above-described embodiment is the following steps are included: wall steel bar binding → wall mould Plate correction → reinforcement placing school position instrument → correction reinforcing bar → fixed steel bars school position instrument → concreting → taking-up reinforcing bar school position instrument → form removable → superimposed sheet lifting, in place, correction → template, reinforcement construction → reinforcement placing school position instrument → floorslab concrete pour Build → take out the position instrument → vertical member lifting → device to hole → correction of reinforcing bar school.
Construction is carried out using the rectifier of above-described embodiment to have the advantages that and greatly facilitate concrete discharging, Space between first square steel tube and the second square steel tube forms concrete discharging frame and mentions significantly for the blanking that pours of concrete High concrete injects open area, ensure that concreting speed, reduces the waste of concrete, improve work efficiency, Evade the risk that concrete is not poured just initial set, improves construction quality and quality.
In the first specific fabricated construction conversion layer reinforcement location rectifier embodiment, bar reinforcement positioning device 4 is The internal diameter of round tube, round tube is 1~4mm bigger than 5 outer diameter of conversion layer reinforcing bar, and the length of round tube is greater than the height of square steel tube.
The rectifier of above-described embodiment effectively prevents the problem of out of plumb after reserved Ribbed Bar corrects, reinforcing bar rectifier It for threadiness correction, had not only corrected reserved Ribbed Bar position but also had corrected verticality, and guaranteed that position was accurate, reinforcing bar does not deviate, greatly Reinforcement location and perpendicularity deviation are reduced greatly, the strong metal sleeve that ensure that in component is inserted into the standard of single Ribbed Bar True rate.
In second of specific fabricated construction conversion layer reinforcement location rectifier embodiment, as shown in Figures 2 and 3, Bar reinforcement positioning device 4 includes positioning pipe 41, the first positioning plate 42, the second positioning plate 43 and positioning plate locking member, the first positioning plate 42 and second positioning plate 43 be hinged on the upper end of positioning pipe 41;First positioning plate 42 and the 43 center setting of the second positioning plate are semicircle Location hole 426, the diameter of location hole 426 is equal with the outer diameter of conversion layer reinforcing bar 5, positioning plate locking member be used for first positioning Plate 42 and the second positioning plate 43 lock the two position when being closed.As shown in figure 4, positioning pipe 41 includes tube body 410 and mounting base 412, the circular hole 414 of vertical direction is arranged in mounting base 412, and mounting base 412 is fixedly connected on the outer wall of 410 upper end of tube body;Such as Fig. 5 Shown, the first positioning plate 42 and the second positioning plate 43 include positioning plate ontology 420, pinboard 422 and fixed plate 424, positioning Plate ontology 420 is semicircular structure, and in the center setting location hole 426 of positioning plate ontology 420, the setting of pinboard 422 is being positioned Hinge hole 428 is arranged in 420 one end of plate ontology, pinboard 422;The other end of positioning plate ontology 420 is arranged in fixed plate 424;The One positioning plate 42 and the second positioning plate 43 are mounted in mounting base 412 by bolt 44.
The conversion layer reinforcement location rectifier of the utility model above-described embodiment is when in use first by by conversion layer steel The positioning pipe that muscle is inserted into corresponding position realizes coarse positioning, is then shut off the first positioning plate and the second positioning plate, and utilize positioning plate Locking member is locked;The first positioning plate and the second positioning plate are opened when needing to take out reinforcing bar school position instrument, is lifted then up. To realizing quick, convenient removal reinforcing bar rectifier, avoid secondary causing reinforcement displacement or bending.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and other feature combination, and those skilled in the art are also Other combinations between each technical characteristic can be carried out according to the purpose of invention, be subject to the purpose for realizing the utility model.

Claims (5)

1. a kind of fabricated construction conversion layer reinforcement location rectifier, the conversion layer reinforcing bar includes the first aligned steel Muscle group and the second aligned reinforcing bar group;It is characterized in that, rectifier includes: the first square steel tube, the second square steel tube, middle part Joint steel pipe and bar reinforcement positioning device;Installation corresponding to position with the first reinforcing bar group reinforcing bar is set on first square steel tube Hole;Mounting hole corresponding to position with the second reinforcing bar group reinforcing bar is set on second square steel tube;The middle part joint steel pipe One end is connect with first party steel-pipe welding, and the other end is connect with second party steel-pipe welding;Phase between adjacent middle part joint steel pipe It is mutually parallel;Space between the first square steel tube and the second square steel tube forms concrete discharging frame, under the pouring for concrete Material;The bar reinforcement positioning device is fixed in the mounting hole, for positioning to conversion layer reinforcing bar, protects conversion layer reinforcing bar Hold vertical direction.
2. fabricated construction conversion layer reinforcement location rectifier according to claim 1, which is characterized in that the middle part connects Connecing steel pipe includes end steel pipe and middle part steel pipe, and the end steel pipe is connected to the end of the first square steel tube and the second square steel tube Portion, middle part square steel tube are connected to the middle part of the first square steel tube and the second square steel tube.
3. fabricated construction conversion layer reinforcement location rectifier according to claim 1 or 2, which is characterized in that the steel Muscle positioning device is round tube, and the internal diameter of the round tube is 1~4mm bigger than conversion layer reinforcing bar outer diameter, and the length of the round tube is greater than side The height of steel pipe.
4. fabricated construction conversion layer reinforcement location rectifier according to claim 1 or 2, which is characterized in that the steel Muscle positioning device includes positioning pipe, the first positioning plate, the second positioning plate and positioning plate locking member, first positioning plate and second Positioning plate is hinged on the upper end of positioning pipe;Semicircular location hole is arranged in first positioning plate and the second positioning plate center, described fixed The diameter in position hole is equal with the outer diameter of conversion layer reinforcing bar, and the positioning plate locking member is used in the first positioning plate and the second positioning plate The two position is locked when closure.
5. fabricated construction conversion layer reinforcement location rectifier according to claim 4, which is characterized in that the positioning pipe Including tube body and mounting base, the circular hole of the mounting base setting vertical direction, mounting base is fixedly connected on the tube body upper end Outer wall;First positioning plate and the second positioning plate include positioning plate ontology, pinboard and fixed plate, the positioning plate ontology For semicircular structure, in the center setting location hole of positioning plate ontology, pinboard is arranged in positioning plate ontology one end, and pinboard is set Set hinge hole;The other end of positioning plate ontology is arranged in fixed plate;First positioning plate and the second positioning plate are mounted on by bolt In mounting base.
CN201821447814.XU 2018-09-05 2018-09-05 Fabricated construction conversion layer reinforcement location rectifier Active CN208702173U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821447814.XU CN208702173U (en) 2018-09-05 2018-09-05 Fabricated construction conversion layer reinforcement location rectifier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821447814.XU CN208702173U (en) 2018-09-05 2018-09-05 Fabricated construction conversion layer reinforcement location rectifier

Publications (1)

Publication Number Publication Date
CN208702173U true CN208702173U (en) 2019-04-05

Family

ID=65946113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821447814.XU Active CN208702173U (en) 2018-09-05 2018-09-05 Fabricated construction conversion layer reinforcement location rectifier

Country Status (1)

Country Link
CN (1) CN208702173U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110629936A (en) * 2019-08-14 2019-12-31 四川嘉翔建筑工程有限公司 Construction method based on dowel bar construction structure
CN110732099A (en) * 2019-11-11 2020-01-31 沈阳促晋科技有限公司 escape device for balcony hole
CN111496126A (en) * 2020-03-28 2020-08-07 北京建工一建工程建设有限公司 Reserved steel bar correction equipment and correction method
CN117418700A (en) * 2023-11-20 2024-01-19 中哲国际工程设计有限公司 Positioning and reinforcing system and method for reserved steel bars of cast-in-situ connection layer of assembled building

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110629936A (en) * 2019-08-14 2019-12-31 四川嘉翔建筑工程有限公司 Construction method based on dowel bar construction structure
CN110629936B (en) * 2019-08-14 2022-06-10 中城嘉翔建工集团有限公司 Construction method based on dowel bar construction structure
CN110732099A (en) * 2019-11-11 2020-01-31 沈阳促晋科技有限公司 escape device for balcony hole
CN111496126A (en) * 2020-03-28 2020-08-07 北京建工一建工程建设有限公司 Reserved steel bar correction equipment and correction method
CN117418700A (en) * 2023-11-20 2024-01-19 中哲国际工程设计有限公司 Positioning and reinforcing system and method for reserved steel bars of cast-in-situ connection layer of assembled building

Similar Documents

Publication Publication Date Title
CN208702173U (en) Fabricated construction conversion layer reinforcement location rectifier
CN206245599U (en) A kind of steel core concrete column embedded column base
CN208251372U (en) A kind of assembled steel reinforced concrete shear force wall
CN110205929A (en) A kind of precast concrete assembly guardrail and installation method
CN110258857A (en) A kind of assembled modularization lightweight steel construction wall connecting construction and its construction method
CN207480855U (en) Combined steel structure pedestal acting on precast beam
CN215241723U (en) Prefabricated wallboard preformed hole frock
CN207244837U (en) Bean column node connects system and assembled wallboard
CN208395866U (en) A kind of Base isolation system jump storehouse construction parting structure
CN211473595U (en) Reinforcing apparatus of single-pipe tower
CN210395400U (en) Prestressed hollow pile connecting structure
CN209723014U (en) A kind of sinking well protection wall digging foundation for desert region iron tower of power transmission line
CN206707030U (en) A kind of eccentric joint of cross steel concrete column and steel framed concrete beam
CN208105887U (en) A kind of auxiliary concrete filled steel tube pours device
CN207314164U (en) For adjusting the device of anchor hole positioning
CN219931610U (en) Device for installing embedded sleeve in large-size concrete structure
CN218027696U (en) Pile top concrete over-irrigation auxiliary positioning device
CN215168077U (en) Template reinforcing apparatus is accepted to aluminum alloy for construction
CN201747389U (en) Support steel arch frame structure for excavation of upper half part of tunnel
CN209682562U (en) The positioning device of the connection reinforcing bar of reusable prefabricated components
CN217204104U (en) H-shaped steel support pile with lock catch
CN213571908U (en) Cast-in-situ bored pile penetrating underground civil air defense structure
CN110158627A (en) A kind of basis in prefabricated transformer substation power distribution unit building and construction method
CN217078718U (en) Rapid lengthening system for cast-in-place pile