CN208701674U - A kind of reservoir construction piling machine - Google Patents

A kind of reservoir construction piling machine Download PDF

Info

Publication number
CN208701674U
CN208701674U CN201821191735.7U CN201821191735U CN208701674U CN 208701674 U CN208701674 U CN 208701674U CN 201821191735 U CN201821191735 U CN 201821191735U CN 208701674 U CN208701674 U CN 208701674U
Authority
CN
China
Prior art keywords
job platform
arc
piling machine
shaft
reservoir construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821191735.7U
Other languages
Chinese (zh)
Inventor
武丽娜
李钊
边伟朋
王维
顾维磊
陈�光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Research Institute of Investigation and Design of Water Conservancy and Hydropower
Original Assignee
Hebei Research Institute of Investigation and Design of Water Conservancy and Hydropower
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Research Institute of Investigation and Design of Water Conservancy and Hydropower filed Critical Hebei Research Institute of Investigation and Design of Water Conservancy and Hydropower
Priority to CN201821191735.7U priority Critical patent/CN208701674U/en
Application granted granted Critical
Publication of CN208701674U publication Critical patent/CN208701674U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a kind of reservoir construction piling machines, including job platform;The job platform is equipped with leader and suppresses part.Leader includes the portal frame being located on job platform, sets positioning ring on the gantry and set auxiliary locator on the gantry;Auxiliary locator surrounds the axis circular array of positioning ring;Auxiliary locator includes servo motor, the speed reducer connecting with servo motor, the shaft connecting with speed reducer and the arc positioning plate being located on shaft free end set on the gantry;Suppress part include be fixed on job platform suppress bracket, be fixedly mounted on the hydraulic cylinder suppressed on bracket, with hydraulic cylinder extension bar hinged arc connector and the link slot that is located on arc connector inner wall.

Description

A kind of reservoir construction piling machine
Technical field
The utility model relates to construction equipment fields, and in particular to a kind of reservoir construction piling machine.
Background technique
Piling is to pound timber or stone mar etc. into ground, in order to keep building basis firm.With special-purpose machines and tools by various materials The construction method in foundation soil is squeezed into, is pressed into, shakes or is screwed in the stake of material.
If because above ground structure will be built on the ground, ground will bear very big pressure, it is necessary that ground has Enough renitent intensity, this is often difficult to accomplish, thus just must to bear building ground carry out reinforce or The receiving mode that person improves ground allows most of weight of building to pass to ground by stake so just expecting driving piles on ground Very deep position below face, because the ground of this position is more much bigger than ground ability to bear.
The bottom is by prolonged immersion and precipitating, and intensity decline is obvious, therefore driving depth is higher than ground.Water at present The piling of middle building generallys use hammering method, and the device structure of this method is simple, but that there are device heights is high, needs to construct The problems such as platform area is big.
Utility model content
The utility model is intended to provide a kind of small in size, small reservoir construction piling machine of kinetic equation loss.
The utility model adopts the following technical solution:
A kind of reservoir construction piling machine, including job platform;The job platform is equipped with leader and suppresses portion Point;
The leader includes the portal frame being located on job platform, sets positioning ring on the gantry and be located at gantry Auxiliary locator on frame;
The auxiliary locator surrounds the axis circular array of positioning ring;
The auxiliary locator include set servo motor on the gantry, the speed reducer that is connect with servo motor, with The shaft of speed reducer connection and the arc positioning plate being located on shaft free end;
The shaft is threadedly coupled with positioning ring;
Hole is provided on the job platform;
The axis circular array suppressed part and surround hole.
As further solution: the part of suppressing includes being fixed on job platform to suppress bracket, fixation It is mounted on the hydraulic cylinder suppressed on bracket and the hinged arc connector of hydraulic cylinder extension bar and is located on arc connector inner wall Link slot.
As further solution: the arc positioning plate and shaft are rotatablely connected;
Weight is hung on the bottom surface of the arc positioning plate.
As further solution: the quantity for suppressing part is four.
As further solution: multiple arcs connector is spliced into a round connector.
As further solution: being welded with connecting flange on the job platform;The connecting flange and hole are same The heart;
It further include the positioning sleeve being located on hole and the mounting flange being welded on positioning sleeve outer wall and connection bolt;
The Kong Houyu connecting flange that the connection bolt passes through on connection bolt is threadedly coupled, by positioning sleeve and job platform It links together.
The good effect that the utility model generates is as follows:
The utility model changes the excessively high problem of device height in hammering method, Neng Gouyou by the way of intermediary press Effect reduces device height.
The utility model especially increases leader, can adjust at any time water according to the actual situation during suppressing The inclined degree of mud stake can vertically squeeze into the bottom.It can be adjusted, keep away at any time simultaneously during continuous piling The drawbacks of having exempted from previous shut-down adjustment, can be improved piling efficiency, shorten building time.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the top view of leader;
Fig. 3 is schematic diagram of internal structure;
Fig. 4 is the connection schematic diagram of arc connector and stake;
Wherein: 1 job platform, 21 portal frames, 22 positioning rings, 31 servo motors, 32 speed reducers, 33 shafts, 34 arcs are fixed Bracket, 52 hydraulic cylinders, 53 arc connectors, 54 link slots, 6 weights, 71 connecting flanges, 72 positioning sleeves, 73 peaces are suppressed in position plate, 51 Fill flange, 74 connection bolts.
Specific embodiment
The utility model is further described below with reference to Fig. 1-4.
The utility model adopts the following technical solution:
A kind of reservoir construction piling machine, including job platform 1;The job platform 1 is equipped with leader and suppresses Part;
The leader includes the portal frame 21 being located on job platform 1,22 and of positioning ring being located on portal frame 21 The auxiliary locator being located on portal frame 21;
The auxiliary locator surrounds the axis circular array of positioning ring 22;
The auxiliary locator includes the servo motor 31 being located on portal frame 21, the deceleration connecting with servo motor 31 Machine 32, the shaft 33 being connect with speed reducer 32 and the arc positioning plate 34 being located on 33 free end of shaft;
The shaft 33 is threadedly coupled with positioning ring 22;
Hole is provided on the job platform 1;
The axis circular array suppressed part and surround hole.
As further solution: the part of suppressing includes being fixed on suppressing bracket 51, consolidating on job platform 1 Dingan County is mounted in the hydraulic cylinder 52 suppressed on bracket 51 and the hinged arc connector 53 of 52 telescopic rod of hydraulic cylinder and is located at arc company Link slot 54 on 53 inner wall of fitting.
As further solution: the arc positioning plate 34 is rotatablely connected with shaft 33;
Weight 6 is hung on the bottom surface of the arc positioning plate 34.
As further solution: the quantity for suppressing part is four.
As further solution: multiple arcs connector 53 is spliced into a round connector.
As further solution: being welded with connecting flange 71 on the job platform 1;The connecting flange 71 with Hole is concentric;
It further include the positioning sleeve 72 being located on hole and the mounting flange 73 being welded on 72 outer wall of positioning sleeve and connection bolt 74;
The Kong Houyu connecting flange 71 that the connection bolt 74 passes through on connection bolt 74 is threadedly coupled, by 72 He of positioning sleeve Job platform 1 links together.
The utility model is described further and is explained below with reference to the actual course of work.
Pontoon pile driving plant does not have power device, needs to be drawn to operating position using tractor tug.
When work, the tower crane on tractor tug slings stake, and sling height requires stake bottom to be higher than the positioning ring on portal frame 21 22.After slinging, stake is moved to the top of positioning ring 22 and is transferred, stake passes through continue after positioning ring 22 and positioning sleeve 72 under Side stops after contacting with the bottom.
Then servo motor 31 acts, and carries out to stake tentatively fixed.Specific process are as follows: servo motor 31 rotates, and passes through Speed reducer 32 drives shaft 33 to rotate, and shaft 33 is threadedly coupled with the positioning ring 22 on portal frame 21, to close stake when rotation Direction is mobile, stops after touch when being located at arc positioning plate 34 thereon with staking.Arc positioning plate 34 and shaft 33 are rotatablely connected, It does not rotate while shaft 33 moves forward, while the weight 6 hung on arc positioning plate 34 avoids energy by gravity Its enough rotation, fits to it in stake.
Portal frame 21 is equipped with sliding rail, and sliding rail is equipped with the mounting plate being slidably connected with it, servo motor 31 and speed reducer 32 all fix on a mounting board, and during shaft 33 rotates, servo motor 31 and speed reducer 32 can be moved with it.
After tentatively fixing, the hydraulic cylinder 52 suppressed on bracket 51 starts to act, and arc connector 53 is shifted onto the appearance of stake On face.Multiple arcs connector 53 is spliced into a complete round connector, and stake is wrapped up.On 53 inner wall of arc connector Link slot 54 links together with the protrusion on stake outer surface.
Then multiple hydraulic cylinders 52 act, and stake is suppressed into riverbed.The outer surface of stake is equipped with multiple groups protrusion, and every group convex It the distance between rises and to be slightly less than the stroke of hydraulic cylinder 52.
During piling, four servo motors 31 are rotated forward or are inverted according to the inclined degree of stake, are adjusted to it, will Stake it is vertical squeeze into riverbed.
Positioning sleeve 72 on job platform 1 is matched with stake, and the stake for squeezing into different size needs replacing the positioning of different inner diameters Set.
Need to install a diesel-driven generator and hydraulic station, hydraulic station driving hydraulic cylinder 52, diesel generation on job platform 1 Machine provides power to hydraulic station and servo motor 31.
Finally it should be noted that above embodiments are only to illustrate the technical solution of the utility model, rather than its limitations, Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art should understand that, It can still modify to technical solution documented by previous embodiment, or be equal to part of technical characteristic Replacement, and these are modified or replaceed, the utility model embodiment technical solution that it does not separate the essence of the corresponding technical solution Spirit and scope.

Claims (6)

1. a kind of reservoir construction piling machine, including job platform (1);Draw it is characterized by: the job platform (1) is equipped with It leads part and suppresses part;
The leader includes the portal frame (21) being located on job platform (1), the positioning ring being located on portal frame (21) (22) and the auxiliary locator that is located on portal frame (21);
The auxiliary locator surrounds the axis circular array of positioning ring (22);
The auxiliary locator includes the servo motor (31) being located on portal frame (21), subtracts with what servo motor (31) was connect Fast machine (32), the shaft (33) being connect with speed reducer (32) and the arc positioning plate (34) being located on shaft (33) free end;
The shaft (33) is threadedly coupled with positioning ring (22);
Hole is provided on the job platform (1);
The axis circular array suppressed part and surround hole.
2. a kind of reservoir construction piling machine according to claim 1, it is characterised in that: the part of suppressing includes fixing Suppressing bracket (51), being fixedly mounted on hydraulic cylinder (52) and the hydraulic cylinder suppressed on bracket (51) on job platform (1) (52) the hinged arc connector of telescopic rod (53) and the link slot (54) being located on arc connector (53) inner wall.
3. a kind of reservoir construction piling machine according to claim 1, it is characterised in that: the arc positioning plate (34) with Shaft (33) rotation connection;
Weight (6) are hung on the bottom surface of the arc positioning plate (34).
4. a kind of reservoir construction piling machine according to claim 1, it is characterised in that: the quantity for suppressing part is Four.
5. a kind of reservoir construction piling machine according to claim 2, it is characterised in that: multiple arcs connector (53) is spelled It is connected into a round connector.
6. a kind of reservoir construction piling machine according to claim 1, it is characterised in that: welded on the job platform (1) It is connected to connecting flange (71);The connecting flange (71) and Kong Tongxin;
It further include the positioning sleeve (72) being located on hole and the mounting flange (73) being welded on positioning sleeve (72) outer wall and connection spiral shell Bolt (74);
Connection bolt (74) passes through the Kong Houyu connecting flange (71) in connection bolt (74) and is threadedly coupled, by positioning sleeve (72) it links together with job platform (1).
CN201821191735.7U 2018-07-26 2018-07-26 A kind of reservoir construction piling machine Active CN208701674U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821191735.7U CN208701674U (en) 2018-07-26 2018-07-26 A kind of reservoir construction piling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821191735.7U CN208701674U (en) 2018-07-26 2018-07-26 A kind of reservoir construction piling machine

Publications (1)

Publication Number Publication Date
CN208701674U true CN208701674U (en) 2019-04-05

Family

ID=65939356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821191735.7U Active CN208701674U (en) 2018-07-26 2018-07-26 A kind of reservoir construction piling machine

Country Status (1)

Country Link
CN (1) CN208701674U (en)

Similar Documents

Publication Publication Date Title
CN102659015A (en) Lifting machine tool for impellers of offshore wind turbines
CN210286476U (en) Marine large-scale wind power blade hoist
CN107268669A (en) Piling jacket construction method, rear piling jacket construction component, jacket of driving piles afterwards afterwards
CN208701674U (en) A kind of reservoir construction piling machine
CN109252809B (en) 10KV power transmission line foundation excavation device
CN214532784U (en) Lifting anchoring slope protection drilling machine
CN110937522B (en) Crane auxiliary hoisting system and hoisting method thereof
CN209989816U (en) Tight mechanism in top of steady pile platform device of pile
CN204661163U (en) A kind of Multifunction transformer sleeve pipe lifting support
CN207160049U (en) Piling jacket construction component, jacket of driving piles afterwards afterwards
CN216551923U (en) Piling mechanism for civil engineering
CN207709609U (en) A kind of vertical bilateral bending stage apparatus
CN211444812U (en) Diesel generating set convenient to maintenance operation
CN209824762U (en) Novel turning device for dung leaking plate
CN201502059U (en) Pile-forming machine for multidirectional soil cement or cement mortar core mixing pile
CN211614690U (en) Welding device convenient for angle adjustment and used for excavator oil tank
CN212336021U (en) Portable pile driver for constructional engineering
CN210857941U (en) Lifting device for housing construction
CN211368705U (en) Portable pile driver on water
CN101672033A (en) Multidirectional cement or cement mortar cored churning piling machinery
CN216108486U (en) Piling equipment for ocean engineering
CN109371965A (en) A kind of precise positioning pile sinking stable platform stake and its installation method
CN204778332U (en) Guan yiyun instrument is grabbed to hydraulic pressure
CN211950357U (en) Pile-driving drilling machine capable of efficiently replacing drill bit
CN206829134U (en) A kind of vehicular piling machine