CN208701437U - A kind of buoyant foundation assembled road - Google Patents

A kind of buoyant foundation assembled road Download PDF

Info

Publication number
CN208701437U
CN208701437U CN201821000842.7U CN201821000842U CN208701437U CN 208701437 U CN208701437 U CN 208701437U CN 201821000842 U CN201821000842 U CN 201821000842U CN 208701437 U CN208701437 U CN 208701437U
Authority
CN
China
Prior art keywords
road
prefabricated
cover board
empty van
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821000842.7U
Other languages
Chinese (zh)
Inventor
李勇
李一勇
潘伟
李增军
刘祥玉
郭炳川
李智璞
冯玉玺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201821000842.7U priority Critical patent/CN208701437U/en
Application granted granted Critical
Publication of CN208701437U publication Critical patent/CN208701437U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model is a kind of buoyant foundation assembled road, including foundation of road bed and cover board road surface, foundation of road bed includes the brace foundation that several groups are distributed along road direction parallel equidistant, every group of brace foundation includes two groups of empty van supports, greenbelt gap is equipped between two groups of empty van supports, every group of empty van support includes the prefabricated empty van that several short sides are closely put, the length of every group of empty van support is equal to the width of one-way road, below prefabricated empty van bottom embedment soft foundation mud face and guarantee that the top surface of all prefabricated empty vans is located on the same horizontal plane, cover board road surface includes the prefabricated cover board of several rectangular parallelepiped structures closely put, prefabricated cover board upper surface is road camber structure and crown slope is not more than 4.0%, the outer side edges of the prefabricated cover board of both sides of the road edge are equipped with kerbstone, gutter is equipped with inside kerbstone, kerbstone side is run through There is priming hole.The fabricated form of the utility model, meets the concept of green construction;Suitable for soft foundation mud face.

Description

A kind of buoyant foundation assembled road
Technical field
The technical field built the utility model relates to soft foundation mud face temporary road more particularly to a kind of buoyant foundation Assembled road.
Background technique
Construction site temporary road generally uses concrete road surface at present, first carries out compacting leveling to road foundation, repaves Equipped with soil padding, finally carried out using the concrete of some strength with road roller compacting cast-in-place.Individual road surfaces can also use and pad Layer top is laid with the mode that solid concrete brick is subject to the coarse sand cementation of fissures.Using conventional method carry out temporary road be laid with process compared with More, curing time is longer, and needs after Practical Completion to carry out road to abolish, and extends the duration, increases construction site cleaning Expense.
And it is bigger to be laid with temporary road difficulty for soft foundation mud face, existing road bearing plate using muti-piece plank or Person's steel plate is formed by connecting, however when passing through from these road bearing plates, the sludge under road bearing plate is easy to splash out from gap, Also it is easy recess.
Summary of the invention
The utility model aims to solve the problem that the deficiencies in the prior art, and provides a kind of buoyant foundation assembled road.
In order to achieve the above object, the utility model adopts the following technical solutions:
A kind of buoyant foundation assembled road, including foundation of road bed and cover board road surface, the cover board road surface are located at the road The upper surface on base basis, the foundation of road bed include the brace foundation that several groups are distributed along road direction parallel equidistant, every group of branch Support group plinth includes the support of two groups of empty vans, and the straight lines of two groups of empty vans support compositions is perpendicular to road direction, between two groups of empty vans supports Equipped with greenbelt gap, every group of empty van support includes the prefabricated empty van that several short sides are closely put, and the prefabricated empty van is to have The length of the rectangular parallelepiped structure of bottom uncovered and inner hollow, the support of every group of empty van is equal to the width of one-way road, the prefabricated sky Below bottom portion embedment soft foundation mud face and guarantee that the top surface of all prefabricated empty vans is located on the same horizontal plane, the cover board Road surface includes the prefabricated cover board of several rectangular parallelepiped structures closely put, and the prefabricated cover board is erected at adjacent two along road direction On the prefabricated empty van of group brace foundation, the prefabricated cover board upper surface is road camber structure, the preform lid perpendicular to road direction The crown slope of plate circuit arch structure is not more than 4.0%, and the outer side edges of the prefabricated cover board of both sides of the road edge are equipped with vertical road Kerb, the kerbstone inside are equipped with the gutter of hollow structure, and the kerbstone runs through to have and draw towards the side of pavement of road Water hole, the intermediate position in kerbstone outside are equipped with street lamp mounting base.
The length of the prefabricated empty van is 1-4 times of preform lid board width.
The preform lid intralamellar part, which runs through, several cylindrical holes, the direction of the cylindrical hole and the preform lid The long side and road direction of plate are parallel.
Prefabricated empty van upper surface of the empty van support towards greenbelt gap, which extends to be equipped with, strengthens supporting table.
The two sides of prefabricated cover board among road on the greenbelt gap of position also are provided with the internal kerbstone for having gutter.
The priming hole is semicircle pore structure.
The prefabricated empty van and prefabricated cover board are reinforced concrete structure.
The beneficial effects of the utility model are: it for foundation of road bed, prefabricated cover board is road that the utility model, which uses prefabricated empty van, The form in face, prefabricated method speed of application is fast, does not need piling Ground Treatment, accelerates construction speed, fabricated shape Formula meets the concept of green construction;Suitable for soft foundation mud face, prefabricated cover board is completely disengaged with original ground, only leans on prefabricated sky Case provides bearing capacity, the bearing capacity that not only there is prefabricated empty van local width range to provide, at the same the soil body around empty van because Side load effect provides upward buoyancy also for empty van, provides the bearing capacity of structure.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of prefabricated empty van in the utility model;
Fig. 3 is the structural schematic diagram of the prefabricated empty van among the utility model road below the greenbelt gap of position;
Fig. 4 is the structural schematic diagram of prefabricated cover board in the utility model;
Fig. 5 is the structural schematic diagram of the prefabricated cover board in the utility model both sides of the road edge;
Fig. 6 is the structural schematic diagram of the prefabricated cover board among the utility model road on the greenbelt gap of position;
In figure: the prefabricated empty van of 1-;The prefabricated cover board of 2-;3- strengthens supporting table;4- cylindrical hole;5- kerbstone;6- street lamp Mounting base;7- soft foundation mud face;The gutter 8-;9- priming hole;
It is described in detail below with reference to the embodiments of the present invention referring to attached drawing.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples:
As shown in Figures 1 to 6, a kind of buoyant foundation assembled road, including foundation of road bed and cover board road surface, the cover board Road surface is located at the upper surface of the foundation of road bed, and the foundation of road bed includes the branch that several groups are distributed along road direction parallel equidistant Support group plinth, every group of brace foundation include two groups of empty vans supports, and the straight lines of two groups of empty vans support compositions is perpendicular to road direction, and two groups Greenbelt gap is equipped between empty van support, every group of empty van support includes the prefabricated empty van 1 that several short sides are closely put, described Prefabricated empty van 1 is the rectangular parallelepiped structure for having bottom uncovered and inner hollow, and the length of every group of empty van support is equal to the width of one-way road The top surface of degree, prefabricated 1 bottom of empty van, 7 or less the soft foundation mud face of embedment and all prefabricated empty vans 1 of guarantee is located at same On horizontal plane, the cover board road surface includes the prefabricated cover board 2 of several rectangular parallelepiped structures closely put, prefabricated 2 edge of cover board Road direction is erected on the prefabricated empty van 1 of two adjacent groups brace foundation, and prefabricated 2 upper surface of cover board is perpendicular to road direction Crown slope for road camber structure, the prefabricated 2 road camber structure of cover board is not more than 4.0%, the preform lid of both sides of the road edge The outer side edges of plate 2 are equipped with vertical kerbstone 5, and the gutter 8 of hollow structure, the kerbstone 5 are equipped with inside the kerbstone 5 Through there is priming hole 9, the intermediate position in 5 outside of kerbstone is equipped with street lamp mounting base 6 for side towards pavement of road.
The length of the prefabricated empty van 1 is 1-4 times of prefabricated 2 width of cover board.
Through there is several cylindrical holes 4 inside the prefabricated cover board 2, the direction of the cylindrical hole 4 with it is described pre- The long side and road direction of cover board 2 processed are parallel.
Prefabricated empty van 1 upper surface of the empty van support towards greenbelt gap, which extends to be equipped with, strengthens supporting table 3.
The two sides of prefabricated cover board 2 among road on the greenbelt gap of position also are provided with the internal kerbstone for having gutter 8 5。
The priming hole 9 is semicircle pore structure.
The prefabricated empty van 1 and prefabricated cover board 2 are reinforced concrete structure.
The construction method of above-mentioned buoyant foundation assembled road, specific steps are as follows:
S1, installation requirement, road width require to produce several prefabricated empty vans 1 and prefabricated cover board in factory process 2;
S2, the two prefabricated formation of empty vans 1, one group of empty van support, two prefabricated empty vans 1 are closely put along road width direction Short side side where face be close to, the two prefabricated 1 bottoms of empty van are then embedded to 7 or less soft foundation mud face;According to this again Another set empty van is arranged in prefabricated 1 long side direction of empty van to support, there are greenbelt gap between the support of two groups of empty vans, Two groups of empty van supports collectively form one group of brace foundation;Finally, being embedded with several groups branch along road pavement direction parallel equidistant Support group plinth forms foundation of road bed;
S3, prefabricated cover board 2 is erected on the prefabricated empty van 1 of two groups of adjacent brace foundations along road direction, preform lid It closely puts to form cover board road surface between plate 2.
The utility model uses prefabricated empty van 1 for foundation of road bed, the form that prefabricated cover board 2 is road surface, prefabricated method Speed of application is fast, does not need piling Ground Treatment, accelerates construction speed, fabricated form meets the concept of green construction; Suitable for soft foundation mud face 7, prefabricated cover board 2 is completely disengaged with original ground, only provides bearing capacity by prefabricated empty van 1, prefabricated The bearing capacity that empty van 1 is not only provided with local width range, while the soil body around prefabricated empty van 1 is because side load effect is also pre- Empty van 1 processed provides upward buoyancy, provides the bearing capacity of structure.The prefabricated empty van 1 in bottom is along road width direction close cloth side by side It sets, prefabricated 1 quantity of empty van can be increased according to Pavement Design width, prefabricated 2 side of being disposed thereon of cover board, is not in have a lot of social connections along road The problem of degree direction amount of deflection becomes larger.
The utility model is exemplarily described above in conjunction with attached drawing, it is clear that the utility model specific implementation not by The limitation of aforesaid way, if the method concept of the utility model and the various improvement of technical solution progress are used, or without Improvement directly applies to other occasions, both is within the protection scope of the present invention.

Claims (7)

1. a kind of buoyant foundation assembled road, which is characterized in that including foundation of road bed and cover board road surface, the cover board road surface position In the upper surface of the foundation of road bed, the foundation of road bed includes the branch support group that several groups are distributed along road direction parallel equidistant Plinth, every group of brace foundation include two groups of empty van supports, and the straight line of two groups of empty van support compositions is perpendicular to road direction, two groups of empty vans Greenbelt gap is equipped between support, every group of empty van support includes the prefabricated empty van (1) that several short sides are closely put, described pre- Empty van (1) processed is the rectangular parallelepiped structure for having bottom uncovered and inner hollow, and the length of every group of empty van support is equal to the width of one-way road Degree, prefabricated empty van (1) bottom embedment soft foundation mud face (7) is below and the top surface of all prefabricated empty vans (1) of guarantee is located at On the same horizontal plane, the cover board road surface includes the prefabricated cover board (2) of several rectangular parallelepiped structures closely put, described prefabricated Cover board (2) is along the prefabricated empty van (1) that road direction is erected at two adjacent groups brace foundation, prefabricated cover board (2) upper surface It is road camber structure perpendicular to road direction, the crown slope of prefabricated cover board (2) the road camber structure is not more than 4.0%, road two The outer side edges of prefabricated cover board (2) at side edge are equipped with vertical kerbstone (5), are equipped with hollow knot inside the kerbstone (5) The gutter (8) of structure, side of the kerbstone (5) towards pavement of road is through having priming hole (9), and the kerbstone (5) is outside Position is equipped with street lamp mounting base (6) among side.
2. a kind of buoyant foundation assembled road according to claim 1, which is characterized in that the prefabricated empty van (1) Length is 1-4 times of prefabricated cover board (2) width.
3. a kind of buoyant foundation assembled road according to claim 2, which is characterized in that in the prefabricated cover board (2) Portion, which is run through, to be had several cylindrical holes (4), the long side and road in the direction of the cylindrical hole (4) and the prefabricated cover board (2) Road direction is parallel.
4. a kind of buoyant foundation assembled road according to claim 3, which is characterized in that the empty van support is towards green Change prefabricated empty van (1) upper surface with gap to extend equipped with reinforcing supporting table (3).
5. a kind of buoyant foundation assembled road according to claim 4, which is characterized in that position greenbelt among road The two sides of prefabricated cover board (2) on gap also are provided with the kerbstone (5) that there are gutter (8) in inside.
6. a kind of buoyant foundation assembled road according to claim 5, which is characterized in that the priming hole (9) is half Borehole structure.
7. a kind of buoyant foundation assembled road according to claim 6, which is characterized in that the prefabricated empty van (1) and Prefabricated cover board (2) is reinforced concrete structure.
CN201821000842.7U 2018-06-27 2018-06-27 A kind of buoyant foundation assembled road Active CN208701437U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821000842.7U CN208701437U (en) 2018-06-27 2018-06-27 A kind of buoyant foundation assembled road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821000842.7U CN208701437U (en) 2018-06-27 2018-06-27 A kind of buoyant foundation assembled road

Publications (1)

Publication Number Publication Date
CN208701437U true CN208701437U (en) 2019-04-05

Family

ID=65937351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821000842.7U Active CN208701437U (en) 2018-06-27 2018-06-27 A kind of buoyant foundation assembled road

Country Status (1)

Country Link
CN (1) CN208701437U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113481771A (en) * 2021-08-05 2021-10-08 常熟市第二市政路桥建设工程有限公司 Permanent-temporary combined construction structure for municipal road and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113481771A (en) * 2021-08-05 2021-10-08 常熟市第二市政路桥建设工程有限公司 Permanent-temporary combined construction structure for municipal road and construction method thereof

Similar Documents

Publication Publication Date Title
CN202787055U (en) Pier fixed connection structure of steel structure overhead bridge
CN208701437U (en) A kind of buoyant foundation assembled road
CN202627166U (en) Novel water-discharging ecological zone for town road
CN205152971U (en) Composite pile foundation pile is offended and disobey with rude remarks and is shaken damping adjustment device
CN202830952U (en) Novel soft soil foundation structure
CN205934699U (en) Main arch circle support structure of arched bridge structure
CN202187253U (en) Roadbed structure of high-speed railway on unsaturated soil foundation in flat area
CN206428547U (en) A kind of road for having enough to meet the need quick-assembling
CN104746507B (en) A kind of construction refuse regenerated draining CFG pile foundation and construction method thereof
CN206457837U (en) A kind of assembled type base for power transmission line iron tower
CN205934688U (en) Arch bridge structure
CN206815279U (en) A kind of assembled high-rise pile cap revetment structure
CN101550690B (en) Triangular concrete thin-wall folded plate pile and preparation method thereof
CN205368919U (en) Highway soft soil foundation treatment pile extension structure
CN206376270U (en) Prefabricated assembled ground
CN201411684Y (en) Triangular concrete thin-walled folded sheet pile
CN205387721U (en) Highway retaining wall reinforced structure
CN205444180U (en) Pilework suitable for areas formerly flooded by huanghe river
CN209066378U (en) A kind of road slope slope protection vibration-isolation building block structure
CN216839552U (en) Empty box retaining wall structure combined with pipe gallery
CN212128693U (en) Landscape pool granite sightseeing way node structure
CN217601625U (en) Wall type construction drainage ditch structure
CN205206029U (en) Ground plate structure of view roofing and pavement foundation structure who is used for this view roofing
CN204940031U (en) A kind ofly be close to the road structure that bridge pier platform is convenient to rapid construction
CN217557529U (en) Toilet caisson waterproof construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant