CN208668457U - A kind of rail traffic overlapping assembled integrates the drainage system of prefabricated piping lane - Google Patents
A kind of rail traffic overlapping assembled integrates the drainage system of prefabricated piping lane Download PDFInfo
- Publication number
- CN208668457U CN208668457U CN201820950488.8U CN201820950488U CN208668457U CN 208668457 U CN208668457 U CN 208668457U CN 201820950488 U CN201820950488 U CN 201820950488U CN 208668457 U CN208668457 U CN 208668457U
- Authority
- CN
- China
- Prior art keywords
- collecting
- tank
- piping lane
- suction pump
- overlapping assembled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 240000007594 Oryza sativa Species 0.000 claims description 2
- 235000007164 Oryza sativa Nutrition 0.000 claims description 2
- 235000009566 rice Nutrition 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 26
- 238000009825 accumulation Methods 0.000 abstract description 8
- 239000012535 impurity Substances 0.000 abstract description 8
- 230000000694 effects Effects 0.000 abstract description 5
- 230000009471 action Effects 0.000 abstract description 2
- 239000000284 extract Substances 0.000 abstract 1
- 238000012423 maintenance Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000007788 liquid Substances 0.000 description 3
- 230000007774 longterm Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000003809 water extraction Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000002262 irrigation Effects 0.000 description 1
- 238000003973 irrigation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 239000010802 sludge Substances 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses the drainage systems that a kind of rail traffic overlapping assembled integrates prefabricated piping lane, belong to pipe gallery technical field of drainage, several collecting-tanks 2 that prefabricated 1 bottom of piping lane opens up are integrated including overlapping assembled, suction pump 3 is provided on the inner sidewall of each collecting-tank 2, each 2 top of collecting-tank is divided into pyramidal structure, each collecting-tank 2 is up big and down small structure, and the angle between the bus of pyramidal structure and the bottom surface of pyramidal structure is 3 °~5 °;The utility model carries out Scatter Gather to water using multiple collecting-tanks, is respectively provided with suction pump in each collecting-tank, extracts the water in collecting-tank out using suction pump and discharge overlapping assembled integrates prefabricated piping lane;Even if flowing into impurity in collecting-tank, under the action of suction pump suction, impurity is extracted out by suction pump, and the effect of draining is lost from the accumulation without water.
Description
Technical field
The utility model belongs to pipe gallery technical field of drainage, and in particular to a kind of rail traffic overlapping assembled is integrated
The drainage system of prefabricated piping lane.
Background technique
Phenomena such as due to rainwater reverse irrigation, piping failure, maintenance emptying, pipe gallery internal water accumulation is caused, ponding can seriously flood
Do not have the pipeline in piping lane, if starting a leak on pipeline, water will enter in pipeline to be impregnated with regard to route, so as to cause line short etc.
Problem, and long-term ponding can then hinder the maintenance of pipeline and make leading to for the air capacity reduction and piping lane in piping lane in piping lane
Wind effect is poor.
The drainage system of existing pipe gallery is to open up an inclined gutter in the bottom of piping lane, directly by water
Be discharged into gutter, be mixed into impurity during draining ditch water discharge and impurity in gutter long-term accumulation and cause gutter stifled
Plug loses the effect of draining, eventually leads to piping lane internal water accumulation.
Utility model content
The purpose of this utility model is that the process of the existing draining ditch water discharge of drainage system for above-mentioned pipe gallery
In be mixed into impurity and impurity in gutter long-term accumulation and lead to gutter blocking the problem of losing the effect of draining, this is practical
The novel drainage system that a kind of rail traffic overlapping assembled is provided and integrates prefabricated piping lane.It should be understood that existing synthesis
It is identical that piping lane with overlapping assembled integrates the structure of prefabricated piping lane, only has differences in preparation method.
The technical solution adopted in the utility model is as follows:
A kind of rail traffic overlapping assembled integrates the drainage system of prefabricated piping lane, including overlapping assembled integrates prefabricated pipe
Several collecting-tanks that corridor bottom opens up are provided with suction pump on the inner sidewall of each collecting-tank, part on each collecting-tank
For pyramidal structure, each collecting-tank is up big and down small structure, the folder between the bus of pyramidal structure and the bottom surface of pyramidal structure
Angle is 3 °~5 °.
It further limits, the distance between collecting-tank described in any two is 180~220 meters.
It further limits, the suction pump is to open suction pump certainly.
It further limits, it is 0.6~1.2 that the lower part of each collecting-tank, which is divided into rectangular configuration and the height of lower part,
Rice.
In conclusion by adopting the above-described technical solution, the beneficial effects of the utility model are:
1. carrying out Scatter Gather to water using multiple collecting-tanks, it is respectively provided with suction pump in each collecting-tank, utilizes suction pump
By the water extraction in collecting-tank and discharge overlapping assembled integrates prefabricated piping lane;Even if flowing into impurity in collecting-tank, in suction pump
Under the action of suction, impurity is extracted out by suction pump, and the effect of draining is lost from the accumulation without water, pyramidal structure
Angle between bus and the bottom surface of pyramidal structure is 3 °~5 ° and is convenient for the enough smoothly inflow collecting-tanks of water energy interior and service personnel
In safety walking above.
2. the distance between any two collecting-tank is 180~220 meters, the cost of draining, another party are on the one hand saved
Face allows the water to rapidly enter in collecting-tank and be discharged.
3. sense that the water level in collecting-tank is higher than certain value from the inductor opened in suction pump, the pump startup that draws water is opened certainly
By the water extraction in collecting-tank, when liquid level is lower than certain value, suction pump stopping is opened certainly, electric energy is saved and avoids in collecting-tank
Water level is excessively high and cannot start suction pump in time causes overlapping assembled to integrate prefabricated piping lane internal water accumulation, reduces the operation of manpower.
4. it is 0.6~1.2 meter that the lower part of collecting-tank, which is divided into rectangular configuration and the height of lower part, convenient for bottom of pond portion dirt of catchmenting
The removing of mud and the installation of suction pump and maintenance.
Detailed description of the invention
The utility model will illustrate by example and with reference to the appended drawing,
Fig. 1 is the structural schematic diagram of the utility model;
Wherein: 1- piping lane;2- collecting-tank;3- suction pump.
Specific embodiment
All features disclosed in this specification or disclosed all methods or in the process the step of, in addition to mutually exclusive
Feature and/or step other than, can combine in any way.It elaborates below with reference to Fig. 1 to the utility model.
Embodiment one
The technical solution of the present embodiment are as follows: a kind of rail traffic overlapping assembled integrates the drainage system of prefabricated piping lane, packet
It includes overlapping assembled and integrates several collecting-tanks 2 that prefabricated 1 bottom of piping lane opens up, be provided on the inner sidewall of each collecting-tank 2
Suction pump 3, each 2 top of collecting-tank are divided into pyramidal structure, each collecting-tank 2 is up big and down small structure, pyramidal structure
Angle between bus and the bottom surface of pyramidal structure is 3 °~5 °.The distance between collecting-tank 2 described in any two is 180~
220 meters.The suction pump 3 is to open suction pump certainly.The lower part of each collecting-tank 2 is divided into the height of rectangular configuration and lower part
Degree is 0.6~1.2 meter.
It is flowed into collecting-tank 2 as shown in Figure 1, overlapping assembled integrates the water in prefabricated piping lane, when the liquid of water in collecting-tank 2
After position reach a certain height, the pump startup that draws water is opened certainly, and water in collecting-tank 2 is extracted out and discharge overlapping assembled integrates prefabricated piping lane
1, after the liquid level in collecting-tank 2 is reduced to certain altitude, suction pump stopping is opened certainly, is saved electric energy and is avoided in collecting-tank 2
Water level is excessively high and cannot start suction pump 3 in time causes overlapping assembled to integrate prefabricated 1 internal water accumulation of piping lane, reduces the behaviour of manpower
Make;Scatter Gather is carried out to water using multiple collecting-tanks 2, the angle between the bus of pyramidal structure and the bottom surface of pyramidal structure is
3 °~5 ° convenient for water energy, enough smoothly inflow collecting-tank is interior and service personnel walks in safety above.Any two collecting-tank 2 it
Between distance be 180~220 meters, on the one hand save draining cost, on the other hand allow the water to rapidly enter collecting-tank 2
In and be discharged.It is 0.6~1.2 meter that the lower part of collecting-tank 2, which is divided into rectangular configuration and the height of lower part, is convenient for 2 bottom of collecting-tank
The removing of portion's sludge and the installation and maintenance of suction pump 3.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model
Protection scope within.
Claims (4)
1. the drainage system that a kind of rail traffic overlapping assembled integrates prefabricated piping lane, which is characterized in that including overlapping assembled
Several collecting-tanks (2) that prefabricated piping lane (1) bottom opens up are integrated, are provided with suction pump on the inner sidewall of each collecting-tank (2)
(3), each collecting-tank (2) top is divided into pyramidal structure, each collecting-tank (2) is up big and down small structure, pyramidal structure
Angle between bus and the bottom surface of pyramidal structure is 3 °~5 °.
2. a kind of rail traffic overlapping assembled according to claim 1 integrates the drainage system of prefabricated piping lane, feature
It is, the distance between collecting-tank described in any two (2) is 180~220 meters.
3. a kind of rail traffic overlapping assembled according to claim 1 integrates the drainage system of prefabricated piping lane, feature
It is, the suction pump (3) is to open suction pump certainly.
4. the draining system that a kind of rail traffic overlapping assembled according to claim 1-3 integrates prefabricated piping lane
System, which is characterized in that it is 0.6~1.2 that the lower part of each collecting-tank (2), which is divided into rectangular configuration and the height of lower part,
Rice.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820950488.8U CN208668457U (en) | 2018-06-20 | 2018-06-20 | A kind of rail traffic overlapping assembled integrates the drainage system of prefabricated piping lane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820950488.8U CN208668457U (en) | 2018-06-20 | 2018-06-20 | A kind of rail traffic overlapping assembled integrates the drainage system of prefabricated piping lane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208668457U true CN208668457U (en) | 2019-03-29 |
Family
ID=65824726
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820950488.8U Expired - Fee Related CN208668457U (en) | 2018-06-20 | 2018-06-20 | A kind of rail traffic overlapping assembled integrates the drainage system of prefabricated piping lane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208668457U (en) |
-
2018
- 2018-06-20 CN CN201820950488.8U patent/CN208668457U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638681B (en) | A kind of pipe gallery | |
CN210342154U (en) | Anti-backflow emergency drainage device for underground building | |
CN110552409A (en) | self-starting vacuum water diversion siphon sewage drainage system and control method thereof | |
CN204530462U (en) | Elevated rain gathering system | |
CN205369377U (en) | Automatic abandon class, retaining, overflow integration rainwater collection system | |
CN203878651U (en) | Vertical deep rainwater storage and collection system | |
CN106906892A (en) | It is a kind of embed controllable sewage dam pond drainage pumping plant drought stream and just rain cuts dirty system | |
CN104631313A (en) | Elevated rainwater collection system | |
CN211229222U (en) | High-density built-up area utilizes three-dimensional space's distribution of rain and sewage transformation system | |
CN208668457U (en) | A kind of rail traffic overlapping assembled integrates the drainage system of prefabricated piping lane | |
CN104018548A (en) | Vertical deep-layer rainwater regulation, storage and collection system | |
CN201588294U (en) | Backflow-preventing type drainage structure of circulating water pump room | |
CN208633254U (en) | A kind of full-automatic anti-clogging rain perforaled strainer based on rainwater buoyancy | |
CN218323528U (en) | Roof rainwater drainage system | |
CN205712417U (en) | A kind of rainwater-collecting being applied to pipe gallery is regulated and stored device | |
CN208167944U (en) | It crosses sea, cross river section drainage pumping plant | |
CN107435369A (en) | Storage pond under river course | |
CN113006234A (en) | Multi-stage type urban flood disaster emergency processing method and system | |
CN210117787U (en) | Underground garage drainage system | |
CN206616453U (en) | A kind of highway bridge drainage system | |
CN209227711U (en) | Rainwater cabin and pipe gallery with rainwater cabin | |
CN208634046U (en) | A kind of river water extraction safety device | |
CN207988089U (en) | A kind of rain water collecting system and rainwater recycle recycle equipment | |
CN207331946U (en) | Construction site rainwater comprehensive utilization intelligence dust prevention system | |
CN207277520U (en) | Storage pond under river |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190329 |