CN208668215U - A kind of plastic cement race track of stretching resistance - Google Patents

A kind of plastic cement race track of stretching resistance Download PDF

Info

Publication number
CN208668215U
CN208668215U CN201821031809.0U CN201821031809U CN208668215U CN 208668215 U CN208668215 U CN 208668215U CN 201821031809 U CN201821031809 U CN 201821031809U CN 208668215 U CN208668215 U CN 208668215U
Authority
CN
China
Prior art keywords
plastic cement
cement race
race track
stretching resistance
runway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821031809.0U
Other languages
Chinese (zh)
Inventor
赵作凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haihua Sports Industry Co Ltd
Original Assignee
Qingdao Haihua Sports Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haihua Sports Industry Co Ltd filed Critical Qingdao Haihua Sports Industry Co Ltd
Priority to CN201821031809.0U priority Critical patent/CN208668215U/en
Application granted granted Critical
Publication of CN208668215U publication Critical patent/CN208668215U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of plastic cement race tracks of stretching resistance, belong to accommodation at the stadium field, its key points of the technical solution are that including base, priming coat, black particle layer, buffer layer and the runway cover being successively laid with from bottom to top, reinforcing mat is provided in the runway cover, buffer layer and black particle layer, and be connected with each other between reinforcing mat, reinforcing mat is made of flexible wirerope.The utility model solves the problems, such as that plastic cement race track is easy to be hit and be broken or be bent, and by being provided with reinforcing mat in going to, enhances the stretching resistance of runway, has achieved the effect that keep runway not flexible or be broken.

Description

A kind of plastic cement race track of stretching resistance
Technical field
The utility model relates to a kind of plastic cement race tracks, more specifically, it is related to a kind of plastic cement race track of stretching resistance.
Background technique
Plastic cement race track is indispensable critical facility in modern track and field place, compared with traditional soil property runway, tool Have good elasticity, skid resistance, a wearability, shock absorption, place nursing is easy, in bright gay color, it is beautiful and tidy the advantages that.In view of upper Advantage is stated, plastic cement race track comes out to be used by each Track field rapidly soon, and some universities, middle school also widely make in recent years With, as the leisure time of the development of productivity level, the raising of living standards of the people, people is also more and more, sports It is one of people's spare time favorite activity, therefore, sports equipment science, hommization is directly related to the strong of sporter Health.
The prior art can refer to the Chinese utility model patent that Authorization Notice No. is CN205474696U, and the utility model is public A kind of aqueous, environmental protective vapor-permeable type plastic cement race track has been opened, has solved for a long time in rainy weather, evaporate the moisture of base can not, Runway is set to generate bulge phenomenon, its key points of the technical solution are that a kind of aqueous, environmental protective vapor-permeable type plastic cement race track, includes base from top to bottom Layer and surface layer, the base are made of black rubber particle, and the surface layer is made of EPDM material, are successively set below the base Separation layer and water absorption layer are set, the separation layer is equipped with several for the base and the water absorption layer, the separation layer to be isolated Non-uniform limbers, having reached prevents rainy weather moisture from can not evaporate, and so that runway is generated bulge phenomenon, equally in high temperature day Gas, the uniform moisture distribution of water absorption layer, is also to evaporate together in evaporation, evaporation rate is very fast.
But had the disadvantage that in above-mentioned utility model after a period of use, plastic cement race track be easy hit and Fracture or bending, will affect runway normal use, delay the normal training of sportsman.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of plastic cement race track of stretching resistance, It enhances the stretching resistance of plastic cement race track, having reached keeps runway not flexible or disconnected by being provided with reinforcing mat in plastic cement race track The effect split.
To achieve the above object, the utility model provides following technical solution:
A kind of plastic cement race track of stretching resistance, including the base, priming coat, black particle layer, slow being successively laid with from bottom to top Rush layer and runway cover, be provided with reinforcing mat in the runway cover, buffer layer and black particle layer, and reinforcing mat it Between be connected with each other, reinforcing mat is made of flexible wirerope.
By using above scheme, reinforcing mat can increase it with black particle layer, buffer layer and go between surface layer Contact area, steel wire rope sling is flexible, can increase black particle layer, buffer layer and the toughness for going to surface layer, enhance it Stretching resistance, keep black particle layer, buffer layer and runway cover etc. not easy to break when receiving impact or be bent, enhancing run The service life etc. in road.
Preferably, the reinforcing mat includes the lateral reinforcing prop being laterally arranged, the water being vertically located on lateral reinforcing prop Flat reinforcing prop and the vertical reinforcing prop for being fixedly arranged on lateral reinforcing prop and horizontal reinforcement column bottom.
By using above scheme, vertical reinforcing prop plays a supporting role to lateral reinforcing prop and longitudinally reinforced column, and perpendicular The lateral reinforcing prop of upper and lower level and horizontal reinforcing prop are linked together to reinforcing prop, enhance the toughness of reinforcing mat.
Preferably, the base, priming coat, black particle layer, buffer layer and runway cover two sides be provided with bound edge.
By using above scheme, bound edge can be to base, priming coat, black particle layer, buffer layer and runway cover Two sides play a protective role, prevent the damage of edges of runway, making runway is not in the phenomenon that falling.
Preferably, the inner sidewall of the bound edge open up along its length it is fluted.
By using above scheme, when laying, make base, priming coat, black particle layer, buffer layer and runway cover Material is able to enter in groove, to make to connect closer between bound edge and each layer.
Preferably, the both ends of the transverse direction reinforcing prop are plugged in the groove of bound edge inner sidewall.
Reinforcing mat is played when not being laid with black particle layer, buffer layer and runway cover by using above scheme One effect pre-fixed.
Preferably, the runway cover is made of EPDM material.
By using above scheme, EPDM material has resistance to ozone, heat-resisting and ageing-resistant performance, is able to extend runway face The service life of layer.
Preferably, being provided with drainage mechanism on the priming coat.
By using above scheme, since base can be reduced its endurance after bubble, drainage mechanism can be by the rainy day Rainwater discharge, reduce damage of the rainwater to base.
Preferably, the drainage mechanism includes the multiple deflector holes being opened on priming coat and is opened in priming coat bottom Multiple rhones, deflector hole are connected to rhone.
By using above scheme, when rainwater flows to priming coat, rainwater is flowed into primary coat from the deflector hole on priming coat The rhone of layer bottom, is most discharged runway through rhone afterwards, rainwater is made to may not flow into base.
Preferably, the rhone is domed, rhone is arranged along the width direction of priming coat, offers and arranges on bound edge The apopore of sink both ends connection.
By using above scheme, rhone is domed, i.e. the middle part of rhone is higher, makes water in rhone from draining The apopore at slot both ends is discharged.
In conclusion the utility model has the advantages that compared with the prior art
1. being provided with reinforcing mat in runway cover, buffer layer and black particle layer, it is connected with each other, reinforces between reinforcing mat Net can increase black particle layer, buffer layer and the toughness for going to surface layer, enhance their stretching resistance, make black particle layer, Buffer layer and runway cover it is not easy to break when by external impacts or bending, enhance the service life etc. of runway;
2. being provided with drainage mechanism on priming coat, the rainwater of rainy day can be discharged for drainage mechanism, reduce rainwater to base Damage, do not influence the endurance of base.
Detailed description of the invention
Fig. 1 is the axonometric drawing of embodiment;
Fig. 2 is the structural schematic diagram made to highlight reinforcing mat;
Fig. 3 is the portion the A enlarged diagram of Fig. 2;
Fig. 4 is the structural schematic diagram made to highlight drainage mechanism.
Appended drawing reference: 1, base;2, priming coat;3, black particle layer;4, buffer layer;5, runway cover;6, reinforcing mat; 61, lateral reinforcing prop;62, vertical reinforcing prop;63, horizontal reinforcing prop;7, bound edge;71, groove;8, drainage mechanism;81, water conservancy diversion Hole;82, rhone;83, apopore.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing.The wherein identical attached drawing of identical components Label indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down" refer to It is the direction in attached drawing, word " bottom surface " and " top surface ", "inner" and "outside" are referred respectively to towards or away from particular elements geometry The direction at center.
Embodiment: a kind of plastic cement race track of stretching resistance, referring to Fig. 1, including be successively laid with from the bottom to top base 1, primary coat Layer 2, black particle layer 3 and runway cover 5, runway cover 5 are made of EPDM material, with resistance to ozone, heat-resisting and ageing-resistant Performance.
It is equipped with buffer layer 4 between runway cover 5 and black particle layer 3 in order to increase the elasticity of runway referring to Fig. 1, delays Layer 4 is rushed with certain buffer function, when people steps down on runway cover 5, buffer layer 4 can reduce impact force to black particle layer 3 damage.
Referring to fig. 2, the two sides damage of runway in order to prevent, the two sides of runway are provided with bound edge 7, offer in bound edge 7 Groove 71, when laying, the material of each layer enters fixed with bound edge 7 in the groove 71 of bound edge 7, connect each layer with bound edge 7 It is closer.
Referring to figs. 2 and 3, in order to reinforce the stretching resistance of runway, in black particle layer 3, buffer layer 4 and runway cover 5 Width direction along them is uniformly installed with more lateral reinforcing props 61, and lateral reinforcing prop 61 is axially uniformly installed with more along it The junction of horizontal reinforcing prop 63 normal thereto, lateral reinforcing prop 61 and horizontal reinforcing prop 63 is installed with vertical reinforcing prop 62, The lateral reinforcing prop 61 of 62 pairs of vertical reinforcing prop and horizontal reinforcing prop 63 play the role of support, lateral reinforcing prop 61, vertical reinforcement Column 62 and horizontal reinforcing prop 63 form adding for three horizontal directions in black particle layer 3, buffer layer 4 and runway cover 5 Strong net 6, each reinforcing mat 6 are fixed together, make to connect stronger between reinforcing mat 6, reinforcing mat 6 can increase its with Contact area between each layer enhances its support to each layer;The both ends of lateral reinforcing prop 61 are plugged in the groove of 7 inner wall of bound edge In 71, when not being laid with black particle layer 3, buffer layer 4 and runway cover 5, the work pre-fixed is played to reinforcing mat 6 With when being laid with black particle layer 3, buffer layer 4 and when runway cover 5, pour reinforcing mat 6 in black particle layer 3, buffer layer 4 and runway cover 5 inside, reinforcing mat 6 is flexible wirerope.When people steps down on runway cover 5,6 energy of reinforcing mat Enough enhance black particle layer 3, buffer layer 4 and runway cover 5 toughness, enhance their stretching resistance, make black particle layer 3, Buffer layer 4 and runway cover 5 etc. are not easy to break or are bent.
Referring to fig. 4, since base 1 can be reduced its endurance after bubble, damage of the rainy day rainwater to base 1 in order to prevent It is bad, drainage mechanism 8 is provided on priming coat 2.Drainage mechanism 8 includes the multiple deflector holes 81 being opened on priming coat 2 and opens up Multiple rhones 82 in 2 bottom of priming coat, deflector hole 81 are connected to rhone 82, and deflector hole 81 is distributed not on priming coat 2 Uniformly, deflector hole 81 close to 2 two sides of priming coat place distribution comparatively dense, deflector hole 81 priming coat 2 middle part distribution compared with Sparse, rhone 82 is arranged along the width direction of priming coat 2, and rhone 82 is domed, offers on bound edge 7 and 82 liang of rhone Hold the apopore 83 of connection.When rainwater flows to priming coat 2, rainwater is flowed into 2 bottom of priming coat from the deflector hole 81 on priming coat 2 In the rhone 82 in portion, since the middle part of rhone 82 is higher, make the water in rhone 82 easily to both ends overflow, and from rhone The apopore 83 at 82 both ends flows out.
Use principle: it is first that the bound edge 7 of two sides is fixed when being laid with runway, then base 1, priming coat 2 are successively layed in packet In side 7, then reinforcing mat 6 is placed in bound edge 7, the vertical reinforcing prop 62 of 6 bottom of reinforcing mat of the bottom is made to be plugged in primary coat On layer 2, it is plugged in each lateral reinforcing prop 61 in the groove 71 of 7 inner sidewall of bound edge, one is realized to reinforcing mat 6 and is pre-fixed, It is successively laid with upper black particle layer 3, buffer layer 4 and runway cover 5 again.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (8)

1. a kind of plastic cement race track of stretching resistance, including be successively laid with from bottom to top base (1), priming coat (2), black particle layer (3), buffer layer (4) and runway cover (5), it is characterised in that:
It is provided with reinforcing mat (6) in the runway cover (5), buffer layer (4) and black particle layer (3), and reinforcing mat (6) Between be connected with each other, reinforcing mat (6) is made of flexible wirerope.
2. a kind of plastic cement race track of stretching resistance according to claim 1, it is characterised in that: the reinforcing mat (6) includes cross To the lateral reinforcing prop (61) of setting, the horizontal reinforcing prop (63) that is vertically located on lateral reinforcing prop (61) and it is fixedly arranged on cross To the vertical reinforcing prop (62) of reinforcing prop (61) and horizontal reinforcing prop (63) bottom.
3. a kind of plastic cement race track of stretching resistance according to claim 1, it is characterised in that: the base (1), priming coat (2), the two sides of black particle layer (3), buffer layer (4) and runway cover (5) are provided with bound edge (7).
4. a kind of plastic cement race track of stretching resistance according to claim 3, it is characterised in that: the inner sidewall of the bound edge (7) It is even along its length to open up fluted (71).
5. a kind of plastic cement race track of stretching resistance according to claim 1, it is characterised in that: the runway cover (5) is EPDM material is made.
6. a kind of plastic cement race track of stretching resistance according to claim 1, it is characterised in that: be arranged on the priming coat (2) There are drainage mechanism (8).
7. a kind of plastic cement race track of stretching resistance according to claim 6, it is characterised in that: the drainage mechanism (8) includes Multiple deflector holes (81) for being opened on priming coat (2) and the multiple rhones (82) for being opened in priming coat (2) bottom, deflector hole (81) it is connected to rhone (82).
8. a kind of plastic cement race track of stretching resistance according to claim 7, it is characterised in that: the rhone (82) is in arch Shape, rhone (82) are arranged along the width direction of priming coat (2), offer on bound edge (7) and be connected to rhone (82) both ends Apopore (83).
CN201821031809.0U 2018-06-30 2018-06-30 A kind of plastic cement race track of stretching resistance Active CN208668215U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821031809.0U CN208668215U (en) 2018-06-30 2018-06-30 A kind of plastic cement race track of stretching resistance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821031809.0U CN208668215U (en) 2018-06-30 2018-06-30 A kind of plastic cement race track of stretching resistance

Publications (1)

Publication Number Publication Date
CN208668215U true CN208668215U (en) 2019-03-29

Family

ID=65827369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821031809.0U Active CN208668215U (en) 2018-06-30 2018-06-30 A kind of plastic cement race track of stretching resistance

Country Status (1)

Country Link
CN (1) CN208668215U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396896A (en) * 2019-07-05 2019-11-01 杭州宝力体育设施工程有限公司 A kind of environmental protection breathable type plastic cement race track and its construction method
CN110820477A (en) * 2019-11-29 2020-02-21 杭州宝力体育设施工程有限公司 Plastic course that gas permeability is good

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396896A (en) * 2019-07-05 2019-11-01 杭州宝力体育设施工程有限公司 A kind of environmental protection breathable type plastic cement race track and its construction method
CN110396896B (en) * 2019-07-05 2021-08-10 杭州宝力体育设施工程有限公司 Environment-friendly breathable plastic track and construction method thereof
CN110820477A (en) * 2019-11-29 2020-02-21 杭州宝力体育设施工程有限公司 Plastic course that gas permeability is good

Similar Documents

Publication Publication Date Title
CN208668215U (en) A kind of plastic cement race track of stretching resistance
CN208685396U (en) Permeable plastic cement race track
CN203373713U (en) Drainage system for reconstructed and expanded expressway soil slope shallow layer
CN208917629U (en) Plastic cement race track
CN208685626U (en) Anti- slope of highway landslide device
CN208965357U (en) A kind of plastic cement race track
CN208533306U (en) Vapor-permeable type plastic cement race track
CN205476285U (en) Floor is assembled to floated plastic
CN205259028U (en) Skid -proof shake ceramic tile of inhaling
CN211228538U (en) Reinforced structure of road side slope
CN208981339U (en) A kind of highway subgrade soft soil slope ruggedized construction
CN203821233U (en) Firm bridge side guardrail
CN108004873A (en) A kind of good plastic cement race track of effect that seeps water
CN209703225U (en) A kind of draining road structure of town road
CN207597794U (en) A kind of assembled floor-board for court
CN210140746U (en) Water collection type precast concrete pavement
CN207597796U (en) A kind of assembled floor-board for runway
CN110205900B (en) Plastic suspension floor
CN107956279A (en) A kind of good assembled floor-board of non-skid property
CN206971044U (en) A kind of children special-purpose protects terrace
CN206516277U (en) LED display with rain eaves
CN208701454U (en) A kind of aqueous oxygen runway of environmental protection
CN209620058U (en) A kind of draining block structure of rainy season side slope protection
CN219908441U (en) Honeycomb shading rubber runway
CN218756845U (en) Solvent-free polyurethane runway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant