CN208633513U - A kind of processing unit that creeping formwork climbs - Google Patents

A kind of processing unit that creeping formwork climbs Download PDF

Info

Publication number
CN208633513U
CN208633513U CN201820730030.1U CN201820730030U CN208633513U CN 208633513 U CN208633513 U CN 208633513U CN 201820730030 U CN201820730030 U CN 201820730030U CN 208633513 U CN208633513 U CN 208633513U
Authority
CN
China
Prior art keywords
guide rail
processing unit
segment
frame body
creeping formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820730030.1U
Other languages
Chinese (zh)
Inventor
蔡仁杰
梅军
刘重刚
文斌
王昌裕
柳细才
徐亮
姜勇
陈未明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN201820730030.1U priority Critical patent/CN208633513U/en
Application granted granted Critical
Publication of CN208633513U publication Critical patent/CN208633513U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of processing unit that creeping formwork climbs, including guide rail, frame body and the first guide rail, frame body bottom is installed in first segment and second section junction by guide rail, first segment and second section form step surface, a backing plate is installed between step surface and guide rail, the top of frame body is connected by swing rod structure with the first guide rail, and the first guide rail is installed in second section.The processing unit that a kind of creeping formwork of the utility model climbs, by the way that backing plate is arranged between the first segment and second section for forming step surface, the end face drop formed between first segment and second section is supplemented using backing plate, the top of frame body is connected by cooperation using swing rod structure with the first guide rail, so that erection of frames is in a vertical plane, the whole uniform force for guaranteeing frame body keeps it more steady reliable during climbing.

Description

A kind of processing unit that creeping formwork climbs
Technical field
The utility model relates to climbing apparatus, more particularly, to a kind of processing unit that creeping formwork climbs.
Background technique
Currently, general plate uses hydraulic climbing formwork system in high-rise or Super High Core Walls Structure construction.Creeping formwork, which has, saves mould Plate, easy, the easy to operate, safety of installation, speed of application be fast, the low plurality of advantages of labour's investment.For variable cross-section core When heart tube construction, due on the alien invasion no longer same plane of bilevel wall, so that lifting rail, which can be in, to incline Ramp-like state does not meet the requirement of construction safety so that creeping formwork frame body is correspondingly also at heeling condition.
Existing common practices is that the ruggedized construction protruded out is arranged in the wall part inside contracted, so that on upper layer and lower layer wall Fixed lifting rail is in plumbness, so that it is guaranteed that creeping formwork frame body vertically with the stable state of horizontal direction, Ensure the safety of construction.
But construction protrude out ruggedized construction when, it is to be ensured that the intensity of ruggedized construction, which is enough firm support connection, climbs and leads Rail increases the working procedure of creeping formwork process so the working procedure of ruggedized construction is relatively complicated, when abolishing ruggedized construction also compared with For trouble, and then it also will affect the construction period.At the same time, due to high-rise or super high-rise building, the alien invasion of usual cavity Therefore drops etc. for different drops, need to install different ruggedized construction, lead to its increased costs, and the duration lengthens.
Utility model content
It is simple, light and convenient for the processing unit that the creeping formwork that uses of manufacture climbs that the utility model provides a kind of structure, with Reach and solves existing alien invasion construction processes of the climbing apparatus to variable cross-section technical problem at high cost.
One aspect according to the present utility model provides a kind of processing unit that creeping formwork climbs, including guide rail, frame body and One guide rail, the frame body bottom are installed in first segment and second section junction by the guide rail, the first segment with The second section forms step surface, and a backing plate is installed between the step surface and the guide rail, and the top of the frame body is logical It crosses swing rod structure to be connected with first guide rail, first guide rail is installed in the second section.
On the basis of above scheme preferably, the backing plate is made of multiple assemblys, and it is in wedge that the assembly, which includes, The first plate body and the second plate body of shape, first plate body are matched with second plate body.
On the basis of above scheme preferably, an end face of the assembly is equipped with card slot, the other end of the assembly Face is equipped with the protrusion cooperated with the card slot, is connect with the male cooperation by the card slot in one between the assembly Body.
On the basis of above scheme preferably, a tail support plate is also installed between the first segment and the guide rail.
On the basis of above scheme preferably, built-in fitting is equipped in the first segment and the second section.
On the basis of above scheme preferably, the guide rail bottom is installed with bracket, and the bracket is connected with the built-in fitting.
The processing unit that a kind of creeping formwork of the utility model climbs, by the first segment and the second section for forming step surface Backing plate is set between section, the end face drop formed between first segment and second section is supplemented using backing plate, cooperation uses swing rod The top of frame body is connected by structure with the first guide rail, so that erection of frames guarantees the entirety of frame body in a vertical plane Uniform force keeps it more steady reliable during climbing.
At the same time, in order to adapt to high-rise alien invasion different drops, backing plate is designed to by the utility model The structure that multiple assemblys are constituted, in use, can increase or reduce the number of assembly according to drop size, to meet The section drop requirement of different alien invasions.
Detailed description of the invention
Fig. 1 is the structure chart for the processing unit that the creeping formwork of the utility model climbs.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Embodiment is not intended to limit the scope of the present invention for illustrating the utility model.
Refering to Figure 1, the utility model provides a kind of processing unit that creeping formwork climbs, including guide rail 10, frame body 20 and first guide rail 1110,20 bottom of frame body is installed in first segment 21 and 22 junction of second section by guide rail 10, and first Segment 21 and second section 22 form step surface 23, and a backing plate 30, the top of frame body 20 are installed between step surface 23 and guide rail 10 Portion is connected by swing rod structure with the first guide rail 1110, and the first guide rail 1110 is installed in second section 22.
The processing unit that a kind of creeping formwork of the utility model climbs, by the first segment 21 and for forming step surface 23 Backing plate 30 is set between two segments 22, supplements the end face formed between first segment 21 and second section 22 using backing plate 30 and falls Difference, the top of frame body 20 is connected by cooperation using swing rod structure with the first guide rail 1110, so that frame body 20 is mounted on one In vertical plane, guarantee the whole uniform force of frame body 20, keeps it more steady reliable during climbing.
At the same time, in order to adapt to high-rise alien invasion different drops, the utility model designs backing plate 30 At the structure that multiple assemblys are constituted, and assembly includes wedge shaped the first plate body and the second plate body, the first plate body and Two plate bodys match.In use, can increase or reduce the number of assembly, according to drop size to meet different alien invasions Section drop requirement.
Further, an end face of the utility model assembly is equipped with card slot, the other end of assembly be equipped with The protrusion of card slot cooperation, it is in integrated for connect with male cooperation by card slot between assembly, i.e., in use, utilizes card slot The mutual splicing of assembly can be achieved with the cooperation of protrusion.
In order to guarantee the bonding strength between guide rail 10 and first segment 21, the utility model also first segment 21 with lead A tail support plate 31 is also installed between rail 10, the support using tail support plate 31 to 10 tail portion of guide rail makes guide rail 10 It is more uniformly stressed, improves its service life.
As shown in Figure 1, being equipped with built-in fitting 32 in the first segment 21 and the second section 22 of the utility model, and leading 10 bottom of rail is installed with bracket 33, and bracket 33 is connected with built-in fitting 32.I.e. using being installed in first segment 21 and second section 22 Built-in fitting 32 guide rail 10 and first segment 21 and second section are effectively increased by the combination of bracket 33 and built-in fitting 32 22 bonding strength.
Finally, the present processes are only preferable embodiment, it is not intended to limit the protection scope of the utility model. Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should be included in this reality Within novel protection scope.

Claims (6)

1. a kind of processing unit that creeping formwork climbs, which is characterized in that including guide rail, frame body and the first guide rail, the frame body bottom It is installed in first segment and second section junction by the guide rail, the first segment and the second section form step Face, is installed with a backing plate between the step surface and the guide rail, the top of the frame body passes through swing rod structure and described first Guide rail is connected, and first guide rail is installed in the second section.
2. a kind of processing unit that creeping formwork climbs as described in claim 1, which is characterized in that the backing plate is by multiple assemblys It is constituted, and the assembly includes wedge shaped the first plate body and the second plate body, first plate body and second plate body It matches.
3. a kind of processing unit that creeping formwork climbs as claimed in claim 2, which is characterized in that on an end face of the assembly Equipped with card slot, the other end of the assembly is equipped with the protrusion cooperated with the card slot, passes through institute between the assembly Card slot is stated to be connect with the male cooperation in one.
4. a kind of processing unit that creeping formwork climbs as described in claim 1, which is characterized in that the first segment is led with described A tail support plate is also installed between rail.
5. a kind of processing unit that creeping formwork climbs as described in claim 1, which is characterized in that the first segment and described the Built-in fitting is equipped in two segments.
6. a kind of processing unit that creeping formwork climbs as claimed in claim 5, which is characterized in that the guide rail bottom is installed with ox Leg, the bracket are connected with the built-in fitting.
CN201820730030.1U 2018-05-16 2018-05-16 A kind of processing unit that creeping formwork climbs Active CN208633513U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820730030.1U CN208633513U (en) 2018-05-16 2018-05-16 A kind of processing unit that creeping formwork climbs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820730030.1U CN208633513U (en) 2018-05-16 2018-05-16 A kind of processing unit that creeping formwork climbs

Publications (1)

Publication Number Publication Date
CN208633513U true CN208633513U (en) 2019-03-22

Family

ID=65733021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820730030.1U Active CN208633513U (en) 2018-05-16 2018-05-16 A kind of processing unit that creeping formwork climbs

Country Status (1)

Country Link
CN (1) CN208633513U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663767A (en) * 2020-06-28 2020-09-15 浙江铠甲建筑科技有限公司 Hydraulic climbing system for light template
CN112942107A (en) * 2021-01-13 2021-06-11 中铁七局集团武汉工程有限公司 Hydraulic creeping formwork construction process in cable tower construction process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663767A (en) * 2020-06-28 2020-09-15 浙江铠甲建筑科技有限公司 Hydraulic climbing system for light template
CN112942107A (en) * 2021-01-13 2021-06-11 中铁七局集团武汉工程有限公司 Hydraulic creeping formwork construction process in cable tower construction process
CN112942107B (en) * 2021-01-13 2023-02-17 中铁七局集团武汉工程有限公司 Hydraulic creeping formwork construction process in cable tower construction process

Similar Documents

Publication Publication Date Title
CN208633513U (en) A kind of processing unit that creeping formwork climbs
Manea et al. Nanozymes: gold-nanoparticle-based transphosphorylation catalysts
CN108708546A (en) It is attached to the construction elevator wall-attached frame mounting platform and method of steel platform mould bases
CN204958044U (en) No pit car frame and no pit villa elevator
CN219458594U (en) Mine power cable suspension device
CN202380721U (en) Hydraulic self-elevating climbing system
CN110359696A (en) A kind of adjustable attachment type raise scaffold and its tiltedly climb method
CN205873733U (en) Hoist frame that climbs
CN102889096A (en) Telescopic reversed loader pedestrian passage bridge
CN207526050U (en) Elevator is installed in a kind of metal self-supporting integration additional
CN208501699U (en) A kind of Metro Deep Excavation support end head bracket structure
CN211473632U (en) Outdoor railing capable of adjusting angle
CN210048427U (en) Escalator braking device
CN207420003U (en) A kind of new scaffold Tiebar structure for civil construction project
CN204251144U (en) Compound type building hoist in a kind of bridge tower chamber
CN208918573U (en) A kind of tunnel ventilation air exhausting device
CN206887820U (en) A kind of rack stake and banister for banister
CN219912954U (en) Intelligent street lamp structure of array projection
CN207488783U (en) A kind of environmental monitoring system
CN213597017U (en) Foundation pile for civil engineering
CN214616314U (en) Tower crane is with cat ladder convenient to installation
CN109235802A (en) A kind of connection structure of pillar of stair and stair
CN204632255U (en) A kind of cable warning board
CN210482981U (en) Stable lifting device for climbing frame
CN210135841U (en) Telescopic camouflage net supporting rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant