CN213597017U - Foundation pile for civil engineering - Google Patents

Foundation pile for civil engineering Download PDF

Info

Publication number
CN213597017U
CN213597017U CN202021378238.5U CN202021378238U CN213597017U CN 213597017 U CN213597017 U CN 213597017U CN 202021378238 U CN202021378238 U CN 202021378238U CN 213597017 U CN213597017 U CN 213597017U
Authority
CN
China
Prior art keywords
foundation pile
slide
pile body
civil engineering
support ladder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021378238.5U
Other languages
Chinese (zh)
Inventor
陈香凤
徐建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longdong University
Original Assignee
Longdong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longdong University filed Critical Longdong University
Priority to CN202021378238.5U priority Critical patent/CN213597017U/en
Application granted granted Critical
Publication of CN213597017U publication Critical patent/CN213597017U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model belongs to the technical field of civil engineering, especially, be a foundation pile for civil engineering, including the foundation pile body, install first slide above the front surface of foundation pile body, first slide with the foundation pile body passes through last slide rail sliding connection, the front surface of first slide installs the upper plug board, install the third slide below the front surface of foundation pile body; when needs overhaul the cushion cap at foundation pile body top, the staff can scramble the support ladder, then overhaul the cushion cap, when the in-process of overhauing needs the adjustment support ladder the position, can promote the support ladder, make first slide and the third slide that the support ladder is connected respectively under last slide rail and the cooperation of lower slide rail, slide along the lateral wall of foundation pile body, it can to stop the support ladder to remove after sliding to suitable position, can improve the definition around the foundation pile body through the light, when the position of light is adjusted to needs, as long as promote the second slide can.

Description

Foundation pile for civil engineering
Technical Field
The utility model belongs to the technical field of civil engineering, concretely relates to foundation pile that civil engineering used.
Background
The foundation pile is a professional term in building structure, the foundation pile includes pile foundation, pile group basis and single pile foundation, wherein the foundation that the pile foundation comprises pile and the cushion cap of connecting in the pile bolck jointly, if the pile body is whole to bury in soil, cushion cap bottom surface and soil body contact, then be called low cushion cap pile foundation, if pile body upper portion exposes ground and the cushion cap bottom is located above the ground, then be called high cushion cap pile foundation, original foundation pile does not have the climbing equipment when using, mostly operate through outside cat ladder when overhauing the cushion cap at foundation pile top and maintaining, the functionality of foundation pile has been reduced like this, can not bring more facilities for the staff.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a foundation pile that civil engineering used has the characteristics that can make things convenient for the staff to scramble the foundation pile body, overhaul foundation pile body top cushion cap.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a foundation pile for civil engineering, includes the foundation pile body, first slide is installed to the front surface top of foundation pile body, first slide with the foundation pile body is through last slide rail sliding connection, the front surface mounting of first slide has last picture peg, the third slide is installed to the front surface below of foundation pile body, the third slide with the foundation pile body is through slide rail sliding connection down, the front surface mounting of third slide has lower picture peg, lower picture peg with install the support ladder between the last picture peg, wherein the top of support ladder with go up the picture peg and pass through the couple and be connected, the bottom of support ladder with the picture peg passes through the connecting rod and is connected down, the rear surface mounting of foundation pile body has the second slide, the second slide with the foundation pile body passes through last slide rail sliding connection, the rear surface mounting of second slide has the light, the illuminating lamp is electrically connected with an external power supply.
As the utility model discloses a preferred technical scheme of foundation pile that civil engineering used, the shrinkage pool has been seted up to the inside of going up the picture peg, the couple runs through the shrinkage pool.
As the utility model discloses a preferred technical scheme of foundation pile that civil engineering used, the height of support ladder is less than the height of foundation pile body.
As the utility model discloses a preferred technical scheme of foundation pile that civil engineering used, the connecting bolt is still installed to the lateral wall below of connecting rod.
As the utility model discloses a preferred technical scheme of foundation pile that civil engineering used, first slide the structure of third slide is the same.
As the utility model discloses a foundation pile preferred technical scheme that civil engineering used, the cross section radius of going up the slide rail is greater than the cross section radius of foundation pile body.
As the utility model discloses a preferred technical scheme of foundation pile that civil engineering used, the support ladder is the iron member.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the supporting ladder is erected on the outer side wall of the foundation pile, when a bearing platform at the top of the foundation pile body needs to be overhauled, a worker can climb the supporting ladder and then overhaul the bearing platform, when the position of the supporting ladder needs to be adjusted in the overhauling process, another worker can push the supporting ladder, so that a first sliding plate and a third sliding plate connected with the supporting ladder slide along the outer side wall of the foundation pile body under the matching of an upper sliding rail and a lower sliding rail respectively, and the supporting ladder stops moving after sliding to a proper position;
2. the light is installed to the lateral wall at the second slide, can improve the definition around the foundation pile body through the light, when the position of light is adjusted to needs, as long as promote the second slide can, through the position that can adjust the illumination lamp like this.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic top view of the foundation pile body of fig. 1 according to the present invention;
FIG. 3 is an enlarged schematic view of A of FIG. 1 according to the present invention;
in the figure: 1. a foundation pile body; 2. a support ladder; 3. hooking; 4. a first slide plate; 5. an upper slide rail; 6. an upper plug board; 7. a lower slide rail; 8. a second slide plate; 9. concave holes; 10. an illuminating lamp; 11. a connecting rod; 12. a third slide plate; 13. a connecting bolt; 14. and a lower plug board.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides a technical solution: a foundation pile for civil engineering comprises a foundation pile body 1, a first sliding plate 4 is connected to the front surface of the foundation pile body 1, the first sliding plate 4 is connected with the foundation pile body 1 in a sliding mode through an upper sliding rail 5, an upper inserting plate 6 is welded to the front surface of the first sliding plate 4, a third sliding plate 12 is connected to the lower portion of the front surface of the foundation pile body 1, the third sliding plate 12 is connected with the foundation pile body 1 in a sliding mode through a lower sliding rail 7, a lower inserting plate 14 is welded to the front surface of the third sliding plate 12, a supporting ladder 2 is connected between the lower inserting plate 14 and the upper inserting plate 6, the top of the supporting ladder 2 is connected with the upper inserting plate 6 through a hook 3, the bottom of the supporting ladder 2 is connected with the lower inserting plate 14 through a connecting rod 11, a second sliding plate 8 is connected to the rear surface of the foundation pile body 1, the second sliding plate 8 is connected with the foundation pile body 1 in a sliding mode through the upper sliding rail, the illumination lamp 10 is electrically connected to an external power source.
In this embodiment, the model of light 10 is TGD008, installs light 10 at the lateral wall of second slide 8, can improve the definition around the foundation pile body 1 through light 10, when the position of light 10 is adjusted to needs, as long as promote second slide 8 can, through the position that light 10 shines can be adjusted like this.
In this embodiment, can hang the couple 3 at support ladder 2 top at the inside shrinkage pool 9 department of last picture peg 6, support connecting rod 11 of ladder 2 below and insert down picture peg 14 department, through like this can erect the lateral wall at foundation pile body 1 to support ladder 2, when needs overhaul the cushion cap at foundation pile body 1 top, the staff can climb support ladder 2, then overhaul the cushion cap, when the in-process that overhauls needs the position of adjustment support ladder 2, another staff can promote support ladder 2, make first slide 4 and the third slide 12 that support ladder 2 connects respectively under last slide rail 5 and the cooperation of slide rail 7 down, slide along the lateral wall of foundation pile body 1, it can to stop support ladder 2 to remove after sliding to suitable position.
Specifically, a concave hole 9 is formed in the upper inserting plate 6, and the hook 3 penetrates through the concave hole 9.
In this embodiment, make couple 3 run through shrinkage pool 9, when needs installation support ladder 2, as long as insert shrinkage pool 9 department to couple 3 can, when needs are dismantled support ladder 2, as long as couple 3 break away from shrinkage pool 9 department can, through the convenience of increasing installation support ladder 2 like this.
Specifically, the height of the support ladder 2 is smaller than that of the foundation pile body 1.
In this embodiment, the height of the support ladder 2 is smaller than the height of the foundation pile body 1, so that the volume of the support ladder 2 is prevented from being too large, and the production cost of the support ladder 2 is reduced.
Specifically, a connecting bolt 13 is further screwed below the outer side wall of the connecting rod 11.
In this embodiment, a connection bolt 13 is further screwed below the outer side wall of the connection rod 11, and after the connection rod 11 is inserted into the lower insertion plate 14, the connection bolt 13 is screwed to the outer side wall of the connection rod 11, so that the connection rod 11 can be prevented from slipping out of the lower insertion plate 14.
Specifically, the first sliding plate 4 and the third sliding plate 12 have the same structure.
In the present embodiment, the first slide plate 4 and the third slide plate 12 are configured to be the same, and thus the same type of mold can be used to process the first slide plate 4 and the third slide plate 12.
Specifically, the cross-sectional radius of the upper slide rail 5 is larger than that of the foundation pile body 1.
In this embodiment, the cross-sectional radius of the upper slide rail 5 is made larger than the cross-sectional radius of the foundation pile body 1, so that the upper slide rail 5 can be installed on the outer side wall of the foundation pile body 1.
Specifically, the support ladder 2 is an iron member.
In this embodiment, make support ladder 2 be iron component, iron has better sturdiness, avoids when the staff stands on support ladder 2, avoids support ladder 2 to take place the rupture.
The utility model discloses a theory of operation and use flow: after the utility model is installed, the hook 3 at the top of the support ladder 2 can be hung at the concave hole 9 inside the upper inserting plate 6, the connecting rod 11 below the support ladder 2 is inserted into the lower inserting plate 14, the support ladder 2 can be erected on the outer side wall of the foundation pile body 1 through the way, when the bearing platform at the top of the foundation pile body 1 needs to be overhauled, a worker can climb the support ladder 2 and then overhaul the bearing platform, when the position of the support ladder 2 needs to be adjusted in the overhauling process, another worker can push the support ladder 2, so that the first sliding plate 4 and the third sliding plate 12 connected with the support ladder 2 slide along the outer side wall of the foundation pile body 1 under the matching of the upper sliding rail 5 and the lower sliding rail 7 respectively, the support ladder 2 stops moving after sliding to a proper position, the worker can conveniently adjust the position of the support ladder 2 through the way, and the worker can conveniently maintain other positions of the bearing platform, install light 10 at the lateral wall of second slide 8, can improve the definition around the foundation pile body 1 through light 10, when the position of light 10 is adjusted to needs, as long as promote second slide 8 can, through the position that light 10 shines can be adjusted like this.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. A foundation pile for civil engineering, includes foundation pile body (1), its characterized in that: first slide (4) are installed to the front surface top of foundation pile body (1), first slide (4) with foundation pile body (1) is through last slide rail (5) sliding connection, the preceding surface mounting of first slide (4) has last picture peg (6), third slide (12) are installed to the front surface below of foundation pile body (1), third slide (12) with foundation pile body (1) is through slide rail (7) sliding connection down, the preceding surface mounting of third slide (12) has down picture peg (14), down picture peg (14) with install between last picture peg (6) and support ladder (2), wherein the top of support ladder (2) with go up picture peg (6) and connect through couple (3), the bottom of support ladder (2) with picture peg (14) down connect through connecting rod (11), the back surface mounting of foundation pile body (1) has second slide (8), second slide (8) with foundation pile body (1) passes through go up slide rail (5) sliding connection, the rear surface mounting of second slide (8) has light (10), light (10) and external power source electric connection.
2. A foundation pile for civil engineering work according to claim 1, characterized in that: a concave hole (9) is formed in the upper inserting plate (6), and the hook (3) penetrates through the concave hole (9).
3. A foundation pile for civil engineering work according to claim 1, characterized in that: the height of the supporting ladder (2) is smaller than that of the foundation pile body (1).
4. A foundation pile for civil engineering work according to claim 1, characterized in that: and a connecting bolt (13) is further installed below the outer side wall of the connecting rod (11).
5. A foundation pile for civil engineering work according to claim 1, characterized in that: the first sliding plate (4) and the third sliding plate (12) have the same structure.
6. A foundation pile for civil engineering work according to claim 1, characterized in that: the cross section radius of the upper sliding rail (5) is larger than that of the foundation pile body (1).
7. A foundation pile for civil engineering work according to claim 1, characterized in that: the supporting ladder (2) is an iron component.
CN202021378238.5U 2020-07-14 2020-07-14 Foundation pile for civil engineering Active CN213597017U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021378238.5U CN213597017U (en) 2020-07-14 2020-07-14 Foundation pile for civil engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021378238.5U CN213597017U (en) 2020-07-14 2020-07-14 Foundation pile for civil engineering

Publications (1)

Publication Number Publication Date
CN213597017U true CN213597017U (en) 2021-07-02

Family

ID=76583285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021378238.5U Active CN213597017U (en) 2020-07-14 2020-07-14 Foundation pile for civil engineering

Country Status (1)

Country Link
CN (1) CN213597017U (en)

Similar Documents

Publication Publication Date Title
CN213597017U (en) Foundation pile for civil engineering
CN214249416U (en) Stable lamp pole for urban landscape brightening engineering
CN115504364A (en) Split type frock of curtain unit hoist and mount
CN208416441U (en) A kind of Cadge ladder for construction of deep base pit
CN111364789A (en) Combined suspension and protection device for deep foundation pit operation
CN207880681U (en) A kind of integrated photovoltaic street lamp
CN215255982U (en) Climbing ladder for installing and overhauling power cable
CN219120493U (en) Electric lighting lamp installation hanger for factory building
CN217148239U (en) Roof PC board hoisting structure
CN205919200U (en) Ceiling lamp support convenient to install
CN212361931U (en) Intelligent lighting equipment for building convenient to installation
CN218523257U (en) Public occasion led sign
CN218881394U (en) Railing structure convenient to glass installation
CN210698551U (en) Safety belt hanging device for overhauling outdoor mutual inductor
CN217999618U (en) Supporting net convenient to assemble for coal mine supporting
CN219058468U (en) Lifting device for be used for electric power engineering to overhaul
CN215168183U (en) Curtain wall hoisting frame body mounting structure
CN217535268U (en) Lifting device for building engineering
CN219067658U (en) Box-type substation of quick installation
CN218409733U (en) Green environment-friendly lighting device
CN216742622U (en) Novel fixed slot rubber shock absorber block
CN213420396U (en) Monitoring device for smart home
CN212408520U (en) Energy-saving city street lamp for smart city
CN214884732U (en) Glass curtain wall articulates structure
CN219080769U (en) L-shaped adjustable bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant