CN208618609U - A kind of energy-saving heat preserving lightweight aggregate partition wall - Google Patents
A kind of energy-saving heat preserving lightweight aggregate partition wall Download PDFInfo
- Publication number
- CN208618609U CN208618609U CN201821213813.9U CN201821213813U CN208618609U CN 208618609 U CN208618609 U CN 208618609U CN 201821213813 U CN201821213813 U CN 201821213813U CN 208618609 U CN208618609 U CN 208618609U
- Authority
- CN
- China
- Prior art keywords
- partition
- energy
- heat preserving
- saving heat
- partition wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a kind of energy-saving heat preserving lightweight aggregate partition walls, including first partition and second partition, open circles are formed at the lateral connection of the first partition and second partition, the inside of the open circles is through having to wearing screw rod, steel back spinulose tree fern is installed at the lateral connection of the first partition and the second partition, the first partition and the quantity of second partition are multiple, combination with one another is installed together, the first partition and second partition it is vertical on junction card have U-shaped card, it installs and since the device combines using the former secondary structure blockwork of cast-in-place light aggregate concrete partition wall construction technology replacement, so that the flexibility of device assembly adapts to the different sizes of building partition, avoid the waste of material of traditional wooden model cutting, the time interval that building block group is built and top is built is also avoided at the same time, cast-in-place partition wall, which can reach, to be exempted to smear Grey condition directly does putty metope using this construction technology, effectively shortens construction period, save the cost.
Description
Technical field
The utility model relates to building field, specially a kind of energy-saving heat preserving lightweight aggregate partition wall.
Background technique
Gradually increase this status with current middle-high building, original secondary structure building construction duration is slow, vertical
The problems such as transportation cost is high, labour cost is high gradually exposes.In this context, it is built using light aggregate concrete instead of secondary structure
Block masonry more and more applies in all kinds of buildings and civil engineering, light aggregate concrete have lightweight, it is high-strength, heat preservation, it is resistance to
Fire, the features such as shock resistance is good, and deformation performance is good.The demand of China's light aggregate concrete engineering has been no longer limited to superelevation
Layer, has also obtained certain application in civilian middle high building, and light aggregate concrete also develops diversified forms in recent years,
But plate is wasted using mold is poured made of traditional plate inside the building, while brick causing metope out-of-flatness also
Needing to plaster again could Puttying.
Utility model content
In view of the deficienciess of the prior art, the utility model aim is to provide a kind of energy-saving heat preserving lightweight aggregate partition wall, with
Solve the problems mentioned above in the background art.
To achieve the goals above, the utility model is achieved through the following technical solutions: a kind of energy-saving heat preserving is light
Aggregate partition wall, the second partition including first partition and the first partition plug connection;The first partition and second partition
It is equipped with connecting column, support bar, connecting hole, the connecting hole and the connecting column grafting, the lower surface of the first partition is set
There is arc groove, and when the upper surface of second partition is equipped with link slot, the first partition and the second partition grafting, it is described
Arc groove and the link slot constitute an open circles, through having to wearing bolt, the first partition and second in open circles
Steel back spinulose tree fern is equipped at the lateral connection of partition, the steel back spinulose tree fern by being fixed in first partition and second partition to wearing bolt,
In addition in the consistent first partition of two block structures, vertically junction passes through the U-shaped card that is equipped with and is connected together.
Optimal technical scheme as the utility model: the steel back spinulose tree fern is equipped with waist through hole.
Optimal technical scheme as the utility model: the quantity of the first partition and the second partition be it is multiple simultaneously
It adopts made of plastic, and splices and combines into a hollow batardeau each other, and pass through the sprue being equipped in hollow batardeau and pour
Light aggregate concrete is built, and it is aggregate ordinary portland cement as inorganic binder that light aggregate concrete, which is used using water quenching ore-rock,
Flyash makees admixture, and premixing forms.
By adopting the above technical scheme, the beneficial effects of the utility model are: the device is installed using Combined splice, so that
The device tradition concrete block masonry wall is compared with construction speed is fast, Forming Quality is good, exempts from the advantages such as plastering;With traditional blockwork
Body is compared, and natural subsidence is negligible, also avoids the requirement for needing tiltedly to build at the top of traditional blockwork, the construction of quickening
Progress;Problem is filled for the gap between cast-in-place partition wall and former masonry panel, material is in addition filled and selects insulation board, outside uses
Anticracking grout carries out receipts face, it is ensured that wall quality and perception, the step of saving wall plastering.
Detailed description of the invention
The main body connection schematic diagram of Fig. 1 the utility model;
Fig. 2 is the structural schematic diagram of any two pieces of partitions;
Fig. 3 is steel back spinulose tree fern structural schematic diagram;
Fig. 4 is U-shaped card schematic diagram.
In figure: 1, first partition;2, connecting column;3, support bar;4, arc groove;5, connecting hole;6, link slot;7, second every
Plate;9, sprue;10, U-shaped card;11, steel back spinulose tree fern;12, to wearing bolt;13, waist through hole.
Specific embodiment
The embodiments of the present invention are described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning
Same or similar element or element with the same or similar functions are indicated to same or similar label eventually.Below by ginseng
The embodiment for examining attached drawing description is exemplary, it is intended to for explaining the utility model, and should not be understood as to the utility model
Limitation.In the description of the present invention, it should be understood that the orientation of the instructions such as term " on ", "lower", "front", "rear"
Or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description the utility model and simplification is retouched
It states, rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation,
Therefore it should not be understood as limiting the present invention.In the present invention unless specifically defined or limited otherwise, term
The terms such as " installation ", " connected ", " connection ", " fixation " shall be understood in a broad sense, for example, it may be being fixedly connected, being also possible to can
Dismantling connection, or it is integral;It can be mechanical connection, be also possible to be electrically connected or can communicate with each other;It can be directly connected,
The connection inside two elements or the interaction relationship of two elements can also be can be indirectly connected through an intermediary.
For the ordinary skill in the art, above-mentioned term in the present invention specific can be understood as the case may be
Meaning.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of energy-saving heat preserving lightweight aggregate partition wall, including the
One partition 1, the second partition 7 with 1 plug connection of first partition;The first partition 1 and second partition 7 are equipped with connection
Column 2, support bar 3, connecting hole 5, the connecting hole 5 and 2 grafting of connecting column, the lower surface of the first partition 1 are equipped with circle
Arc slot 4, and it is equipped with link slot 6 in the upper surface of second partition 7, when the first partition 1 is with 7 grafting of second partition, institute
It states arc groove 4 and the link slot 6 and constitutes an open circles, through having to wearing bolt 12, the first partition 1 in open circles
With steel back spinulose tree fern 11 is equipped at the lateral connection of second partition 7, the steel back spinulose tree fern 11 is by being fixed on first partition 1 to wearing bolt 12
On second partition 7, in addition in the consistent first partition 1 of two block structures, vertically junction passes through the card of U-shaped card 10 being equipped with
Close connection.
Wherein: the steel back spinulose tree fern 11 is equipped with waist through hole 13.
Wherein: the quantity of the first partition 1 and the second partition 7 is multiple and adopts made of plastic, and phase each other
A hollow batardeau is mutually spliced and combined into, and passes through the sprue 9 being equipped in hollow batardeau and pours light aggregate concrete, and light collection
To use using water quenching ore-rock be aggregate ordinary portland cement as inorganic binder to material concrete, and flyash makees admixture, premixing and
Using at light aggregate concrete partition wall using water quenching ore-rock is aggregate ordinary portland cement as inorganic binder, and flyash adds
Expect, made of premixing.It takes leave of the gist of a document of Qin brick and Han tile in accordance with national development green building material, is raised with energy saving reduction
Dirt reduces cost, accelerates construction progress, reducing artificial, raising wall quality as target.Materials for wall uses lightweight aggregate coagulation
Soil, it is interior to match framework of steel reinforcement, primary concreting molding.Not only guaranteed the flatness of metope, but improve the globality of wall, sound-proofing and
The characteristics of shock strength, complies fully with the development trend of materials for wall, especially prominent lightweight, energy-saving and environmental protection.
Combine manufactured wall using the device also has the advantages that, to be as follows: relative to lightweight wall and brick wall
The working principle of the utility model is: 1) template is marched into the arena and is checked and accepted
The cast-in-place light aggregate concrete partition wall construction of this project uses plastic formwork system, copes with template of marching into the arena before wall construction
Quality is checked, it is ensured that template surface is smooth, without losing fangle, avoids influencing wall Forming Quality.
2) wall line setting
Building partition position is determined according to construction drawing, and then determines door-window opening, constructional column position, after position is determining again
Comparison construction drawing ensures that wall, door-window opening, constructional column position are errorless.Position checking determines that errorless Hou Bao relevant unit carries out
It checks and accepts, next procedure construction can be carried out after acceptance(check).
3) reinforcing bar binding, hydropower installation
Wall and the binding of door-window opening reinforcing bar can be carried out after the acceptance(check) of wall position, reinforcing bar and main body are reserved wall and drawn
Knot muscle and constructional column carry out binding overlap joint, and the need of local reinforcing bar missing carry out bar planting.
After the completion of tie with reinforcing bar, hydropower installation should be inserted into time, carry out the set aside pre-embedded of hydroelectric line, it is ensured that wire box
Position is accurate, firmly installs.
4) template installation, reinforcing adjustment
The binding of wall steel bar skeleton is completed, the completion of hydroelectric line set aside pre-embedded can carry out after reporting relevant unit's acceptance(check)
Wall form installation.
Building partition template construction uses multiple first partitions and second partition and its size can be according to wall height and length
Spend it is any carry out assembling adjustment, material cutting waste caused by avoiding conventional template due to off size suitable, first partition and
Second partition is convenient to assemble and disassemble greatly to accelerate construction speed.
5) concreting
This engineering partition wall concrete uses light aggregate concrete, and aggregate main component is water quenching ore-rock, light-weight aggregate coagulation
The use of soil also enhances partition wall intensity while reducing building partition bulk density, and concrete is carried out from the special reserved opening of template
It pours, casting process is convenient and efficient, carries out closure filling using extruded sheet with original structure beam, board bottom portion gap at the top of wall, uses
Mortar receipts face eliminates the oblique block process that tradition builds top.
The embodiments of the present invention is explained in detail in conjunction with attached drawing above, but the utility model is not limited to be retouched
The embodiment stated.For a person skilled in the art, right in the case where not departing from the utility model principle and spirit
These embodiments carry out a variety of change, modification, replacement and modification, still fall in the protection scope of the utility model.
Claims (3)
1. a kind of energy-saving heat preserving lightweight aggregate partition wall, it is characterised in that: including first partition (1) and the first partition (1) grafting
The second partition (7) of connection;The first partition (1) and second partition (7) are equipped with connecting column (2), support bar (3), connection
The lower surface of hole (5), the connecting hole (5) and the connecting column (2) grafting, the first partition (1) is equipped with arc groove (4),
And when the upper surface of second partition (7) is equipped with link slot (6), and the first partition (1) is with the second partition (7) grafting,
The arc groove (4) and the link slot (6) constitute an open circles, described through having to wearing bolt (12) in open circles
Steel back spinulose tree fern (11) is equipped at the lateral connection of first partition (1) and second partition (7), the steel back spinulose tree fern (11) is by wearing bolt
(12) be fixed in first partition (1) and second partition (7), in addition the consistent first partition of two block structures (1) vertically
Junction passes through the U-shaped card (10) being equipped with and is connected together.
2. a kind of energy-saving heat preserving lightweight aggregate partition wall according to claim 1, it is characterised in that: set on the steel back spinulose tree fern (11)
There are waist through hole (13).
3. a kind of energy-saving heat preserving lightweight aggregate partition wall according to claim 1, it is characterised in that: the first partition (1) with
The quantity of the second partition (7) is multiple and adopts made of plastic, and splices and combines into a hollow batardeau each other, and
Pass through the sprue (9) being equipped in hollow batardeau and pour light aggregate concrete, and light aggregate concrete uses and is with water quenching ore-rock
Aggregate ordinary portland cement is inorganic binder, and flyash makees admixture, and premixing forms.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821213813.9U CN208618609U (en) | 2018-07-27 | 2018-07-27 | A kind of energy-saving heat preserving lightweight aggregate partition wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821213813.9U CN208618609U (en) | 2018-07-27 | 2018-07-27 | A kind of energy-saving heat preserving lightweight aggregate partition wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208618609U true CN208618609U (en) | 2019-03-19 |
Family
ID=65707934
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821213813.9U Expired - Fee Related CN208618609U (en) | 2018-07-27 | 2018-07-27 | A kind of energy-saving heat preserving lightweight aggregate partition wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208618609U (en) |
-
2018
- 2018-07-27 CN CN201821213813.9U patent/CN208618609U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206859453U (en) | A kind of modified insulated wall light steel skeleton | |
CN104712079B (en) | The assembled polypropylene fibre sludge ceramsite concrete wall and its construction method connected based on mat surface | |
CN103590486B (en) | Anti-seismic energy saving three-dimensional mortise and tenon joint net fixing one-piece cast building structure and construction method | |
CN106193340B (en) | The construction method of cast-in-place prestressing without bondn ultralong floor combined type reinforcing strip anti-cracking structure | |
CN102433958A (en) | Prefabricated wall board construction member | |
CN104675012B (en) | The assembled polypropylene fibre sludge ceramsite concrete wall and its construction method connected based on horse tooth trough | |
CN108277895A (en) | A kind of composite heat preserving external wall system and construction method | |
CN105507452B (en) | A kind of light concrete built-in heat insulation decorating integrative wall and its construction method | |
CN208618609U (en) | A kind of energy-saving heat preserving lightweight aggregate partition wall | |
CN209163167U (en) | A kind of precast floor slab connecting node construction | |
CN110016992A (en) | A kind of assembled primary-secondary beam mounting structure and installation method | |
CN206319404U (en) | A kind of building precast exterior sheathing | |
CN207959532U (en) | A kind of structure that wallboard is connect with coupling beam | |
CN207998940U (en) | A kind of composite heat preserving external wall system | |
CN108301553A (en) | A kind of precast concrete board wall and preparation method thereof | |
CN208395991U (en) | The U-shaped integral prefabricated window member that floats, assembled float window joint structure | |
CN106592814A (en) | Integrally cast demolding-free self-thermal insulation wall and construction method thereof | |
CN209384442U (en) | A kind of double-layered precast facade structure of basement | |
CN209323766U (en) | A kind of combined baffle wall plate and its mounting structure | |
CN208830582U (en) | A kind of secondary structure PCization construction masonry | |
CN208121961U (en) | A kind of assembling frame corner node structure | |
CN202644555U (en) | Prefabricated slab for flat-plate-type raft board framework | |
CN211621994U (en) | Joint filling structure for concrete prefabricated slab | |
CN104963442A (en) | Hollow ribbon board, ribbed slab with hollow ribbon boards and construction formwork system with hollow ribbon boards | |
CN205663095U (en) | Precast concrete composite floor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190319 |