CN208618467U - A kind of basement bottom board launching stress adjustment structure - Google Patents
A kind of basement bottom board launching stress adjustment structure Download PDFInfo
- Publication number
- CN208618467U CN208618467U CN201821253445.0U CN201821253445U CN208618467U CN 208618467 U CN208618467 U CN 208618467U CN 201821253445 U CN201821253445 U CN 201821253445U CN 208618467 U CN208618467 U CN 208618467U
- Authority
- CN
- China
- Prior art keywords
- basement
- catch pit
- water string
- bottom board
- spring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model belongs to building engineering field, and in particular, to one kind is used for basement bottom board launching stress adjustment structure.Basement bottom board launching stress adjustment structure, comprising: catch pit, catch pit are with certain length and width, deep recessed concrete structure;Catch pit has bottom plate, and rubble permeable structure layer is arranged under catch pit bottom plate, hydraulic pressure apparatus for adjusting force is arranged on catch pit bottom plate, adjustably descends room bottom plate launching stress by hydraulic pressure apparatus for adjusting force.Basement floor launching stress is controlled by way of controlling hydraulic pressure apparatus for adjusting force inner spring pulling force and is being rationally designed in range by the utility model, and then the purpose realized and reduce basement bottom board thickness, reduce basement anti-floating pile quantity, basement civil engineering construction cost is reduced, the basement civil construction period is accelerated;Meanwhile basement bottom board protuberance, cracking, the appearance of the burst accidents such as basement column inclination, cracking caused by capable of effectively avoiding the appearance of operation stage basement from transfiniting because of water pressure.
Description
Technical field
The utility model belongs to building engineering field, and in particular, to one kind is adjusted for basement bottom board launching stress
Structure.
Background technique
As city continues to develop, aboveground space tends to be saturated, this builds the nowadays city that is developed into of the underground space
If one of emphasis.The building basement number of plies starts to develop to more layers from common 1~2 layer.Building basement is being designed, is being built
Make, run in each stage can not the perfect problem got around be underground water.
Currently, underground water mainly passes through " anti-", " row ", " thin " three kinds of modes are handled, wherein based on " anti-" is in a manner of this
It leads.However, groundwater pressure increases as the basement number of plies increases, to resist the groundwater pressure continued to increase, need to pass through
Increase the modes such as basement bottom board thickness, increase basement uplift pile quantity and realizes that economy is very poor.On the other hand, building fortune
Battalion's stage such as heavy rain or long-term rainy season, level of ground water are more than design hydrostatic water table, basement bottom board protuberance, cracking, ground occur
The burst accidents such as lower room column inclination, cracking are more and more.
Utility model content
To reduce basement bottom board and pile foundation civil engineering construction cost, while effectively operation stage being avoided basement water occur
The caused burst accident that transfinites is pressed, the utility model provides a kind of for basement bottom board launching stress adjustment structure.
To achieve the above object, the utility model uses following technical scheme:
Basement bottom board launching stress adjustment structure, comprising: catch pit, catch pit are with certain length and width, deep recessed
Concrete structure;Catch pit has bottom plate, and rubble permeable structure layer is arranged under catch pit bottom plate, and rubble permeable structure layer is laid with model
It encloses for entire catch pit plane projection range, in which: hydraulic pressure apparatus for adjusting force is set on catch pit bottom plate, is adjusted by water pressure
Device adjusts basement bottom board launching stress.
Preferably, hydraulic pressure apparatus for adjusting force, comprising: water string, water string top cover, fabric filtration layer, spring, spring
Fixed transverse rod, nut, screw rod;Water string is vertically embedded in catch pit base plate plane center, water string end face suitable for reading in advance
It is higher by catch pit backplate surface;Fabric filtration is placed in water string, and positioned at the bottom of water string, spring fixed transverse rod is solid
Due to, away from 1/4 height and position of bottom, lower spring end is connected to spring fixed transverse rod, spring upper end connecting screw in water string,
Screw rod passes through water string top cover and connect with nut, and water string top cover is closely connected in water string end suitable for reading by spring tension
Face.
Preferably, the end face water string Xia Kou is concordant with catch pit bottom plate bottom surface, and spring fixed transverse rod is fixed on waterproof jacket
Away from 1/4 height and position of bottom in pipe.
Compared with the existing technology, the utility model has the following beneficial effects: passing through bullet in control hydraulic pressure apparatus for adjusting force
Basement floor launching stress is controlled and is being rationally designed in range by the mode of spring pulling force, and then is realized and reduced basement bottom board thickness
Degree, the purpose for reducing basement anti-floating pile quantity reduce basement civil engineering construction cost, accelerate the basement civil construction period;
Meanwhile basement bottom board protuberance, cracking, basement caused by capable of effectively avoiding the appearance of operation stage basement from transfiniting because of water pressure
The appearance of the burst accidents such as column inclination, cracking.
Detailed description of the invention
Fig. 1 is the floor map for basement bottom board launching stress adjustment structure;
Fig. 2 is the diagrammatic cross-section for basement bottom board launching stress adjustment structure;
In figure: 1, catch pit, 2, water string top cover, 3, water string, 4, nut, 5, spring, 6, spring fixed transverse rod,
7, fabric filtration layer, 8, rubble permeable structure layer, 9, screw rod.
Specific embodiment
As shown in Figure 1 and Figure 2, basement bottom board launching stress adjustment structure, comprising: catch pit 1, catch pit 1 are with one
Determine length and width, deep recessed concrete structure;Catch pit 1 has bottom plate, and rubble permeable structure layer 8 is arranged under 1 bottom plate of catch pit,
It is entire catch pit plane projection range that rubble permeable structure layer 8, which is laid with range, and rubble permeable structure layer 8 forms water-permeable passage;
Hydraulic pressure apparatus for adjusting force is set on 1 bottom plate of catch pit, room bottom plate launching stress is adjustably descended by hydraulic pressure apparatus for adjusting force.
Hydraulic pressure apparatus for adjusting force, comprising: water string 3, water string top cover 2, fabric filtration layer 7, spring 5, spring are solid
Determine cross bar 6, nut 4, screw rod 9;Water string 3 is vertically embedded in 1 base plate plane center of catch pit, the lower mouth of water string 3 in advance
End face is concordant with 1 bottom plate bottom surface of catch pit, and the end face suitable for reading of water string 3 is higher by catch pit backplate surface;Fabric filtration layer 7 is placed in
In water string 3, positioned at the bottom of water string 3, fabric filtration layer 7 prevents silt loss under basement bottom board, and spring is fixed
Cross bar 6 is fixed in water string away from 1/4 height and position of bottom, and 5 lower end of spring is connected to spring fixed transverse rod 6,5 upper end of spring
Connecting screw 9, screw rod 9 pass through water string top cover 2 connect with nut 4, water string top cover 2 pass through 5 pulling force of spring it is closely connected in
The end face suitable for reading of water string 3.
In hydraulic pressure apparatus for adjusting force nut adjust spring pre-stretched amount Δ, by spring rate K can obtain spring pretension P=
K·Δ.When basement bottom board launching stress F > P/A (A is water string basal area), the elongation of hydraulic pressure apparatus for adjusting force spring,
That is water string top cover is jacked up by ground water pressure.Therefore underground water at the top of water string by overflowing, hydraulic pressure under basement bottom board
Power can be adjusted to F≤P/A.
The utility model is further described below with reference to embodiment, but not as the foundation to the utility model.
Embodiment one.Certain double-deck basement, buries H=8.8m, conventional design anti-floating head h=8.3m, intends adjusting anti-floating water
Head h1=6.3m, hydraulic pressure reduce (8.3-6.3)/8.3=24%.
Basement bottom board launching stress adjustment structure, comprising the following steps:
A, permeable structure layer is set under basement water collection pit bottom plate, and techonosphere is made of 150mm thickness metalling.
B, the pre-buried hydraulic pressure apparatus for adjusting force of basement water collection pit bottom plate, hydraulic pressure apparatus for adjusting force is by water string, guard tube
Top cover, fabric filtration layer, spring, spring fixed transverse rod, nut and screw rod composition.Water string radius R=50mm, spring rate
COEFFICIENT K=25KN/m.
C, according to design anti-floating head h1 calculating basement bottom board launching stress, (γ is water capacity weight, takes 10KN/m3) F=
γ·h=10X6.3=63KPa。
D, hydraulic pressure apparatus for adjusting force spring pre-stretched amount Δ (mm) is calculated according to basement bottom board launching stress: water string
Cross-sectional area A=π R2=3.14X0.052=7.85X10-3m2, spring pretension P=FA=63X7.85X10-3=0.50KN, bullet
Spring pre-stretched amount Δ=P/K=0.50/25=0.02m=20mm.
E, hydraulic pressure apparatus for adjusting force nut is rotated to spring pre-stretched amount Δ=20mm.It is more than to hydraulic pressure under basement bottom board
When limiting design value F=63KPa, waterproof bushing cap will jack up spilling water by ground water pressure in hydraulic pressure apparatus for adjusting force, be reached by spilling water
Pressure release effect, and then adjust hydraulic pressure under basement bottom board and be no more than 63KPa.
Claims (3)
1. a kind of basement bottom board launching stress adjustment structure, comprising: catch pit, catch pit are under certain length and width, depth
Recessed concrete structure;Catch pit has bottom plate, and rubble permeable structure layer is arranged under catch pit bottom plate, and rubble permeable structure layer is laid with
Range is entire catch pit plane projection range, it is characterised in that: hydraulic pressure apparatus for adjusting force is arranged on catch pit bottom plate, passes through water
Pressure-regulating device adjusts basement bottom board launching stress.
2. basement bottom board launching stress adjustment structure according to claim 1, it is characterised in that: water pressure adjusts dress
It sets, comprising: water string, water string top cover, fabric filtration layer, spring, spring fixed transverse rod, nut, screw rod;Water string
It is vertically embedded in catch pit base plate plane center in advance, water string end face suitable for reading is higher by catch pit backplate surface;Fabric filtration
It is placed in water string, positioned at the bottom of water string, spring fixed transverse rod is fixed in water string away from 1/4 height of bottom
Position, lower spring end are connected to spring fixed transverse rod, spring upper end connecting screw, and screw rod passes through water string top cover and nut connects
It connects, water string top cover is closely connected in water string end face suitable for reading by spring tension.
3. basement bottom board launching stress adjustment structure according to claim 2, it is characterised in that: mouth end under water string
Face is concordant with catch pit bottom plate bottom surface, and spring fixed transverse rod is fixed in water string away from 1/4 height and position of bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821253445.0U CN208618467U (en) | 2018-08-06 | 2018-08-06 | A kind of basement bottom board launching stress adjustment structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821253445.0U CN208618467U (en) | 2018-08-06 | 2018-08-06 | A kind of basement bottom board launching stress adjustment structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208618467U true CN208618467U (en) | 2019-03-19 |
Family
ID=65708926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821253445.0U Active CN208618467U (en) | 2018-08-06 | 2018-08-06 | A kind of basement bottom board launching stress adjustment structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208618467U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115359713A (en) * | 2022-06-02 | 2022-11-18 | 安徽省建筑科学研究设计院 | Underground water buoyancy model system |
-
2018
- 2018-08-06 CN CN201821253445.0U patent/CN208618467U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115359713A (en) * | 2022-06-02 | 2022-11-18 | 安徽省建筑科学研究设计院 | Underground water buoyancy model system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105863287B (en) | Frame structure building jacks increasing layer and shock isolation method | |
CN102519860A (en) | Impermeability test method for asphalt concrete with impermeable function | |
US20160265184A1 (en) | Soil improvement foundation isolation and load spreading systems and methods | |
CN109138011B (en) | Foundation reinforcing and deviation rectifying method for existing building | |
CN105350511B (en) | A kind of embankment capsule bar, water storage embankment and the method for carrying out water piling prepressing | |
CN101806055B (en) | Vacuum pre-pressed joint rigid pile composite foundation reinforcing method | |
CN108035376A (en) | A kind of resistance to deformation suitable for goaf place Wind turbines can rectify a deviation basis and its construction method | |
CN208618467U (en) | A kind of basement bottom board launching stress adjustment structure | |
CN100363564C (en) | Pile tip displacement regulating device | |
WO2021072941A1 (en) | Method for replacing and reinforcing coastal silt soft soil foundation by performing two-time dynamic rubble compaction | |
CN108252290A (en) | The soft thick soil treatment structures and methods of high-strength water-permeable fiber concrete pipe rubble core stake | |
CN101967832B (en) | Method for treating bottom structure of building in substation | |
CN107877667A (en) | A kind of extra quality water-permeable brick base-material laying method | |
CN205348206U (en) | Caisson cutting edge props up and establishes structure | |
EP2362090A2 (en) | Adjustable spread foundation, preferably separated, for offshore wind farms | |
CN209775994U (en) | High strength sculpture structure | |
CN109214070B (en) | Method for leveling pile foundation of main skirt connected high-rise building | |
CN208056088U (en) | A kind of resistance to deformation suitable for goaf place Wind turbines can rectify a deviation basis | |
CN202850062U (en) | Water buoyant control device for construction or for structures | |
CN102304913A (en) | LCSG (Long-Concrete Short-Gravel) pile and vacuum prepressing combined processing method and device for soft soil foundation | |
CN204645071U (en) | A kind of device utilizing soil bearing capacity between PHC pipe pile | |
CN210766827U (en) | Depressurization well in deep foundation pit | |
CN108442357A (en) | A kind of prestress anchorage cable united drainage plate prepressing device and method for processing foundation | |
CN108930294B (en) | Method for determining uplift amount of low-embankment-base saline soil pile foundation after reinforcement | |
CN202148522U (en) | Soft soil foundation long concrete short gravel (LCSG) pile and vacuum preloading joint treatment device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230228 Address after: 409-419, Floor 4, Martial Arts Hall Building, 168 Yugu Road, Xihu District, Hangzhou City, Zhejiang Province, 310013 (singular) Patentee after: Jiedi Design Group Co.,Ltd. Address before: 361008 unit 901-904, 68 Taidong Road, Siming District, Xiamen City, Fujian Province Patentee before: FUJIAN LVCHENG BUILDING DESIGN Co.,Ltd. |
|