CN208618401U - The windproof anchorage element of movable plank house - Google Patents

The windproof anchorage element of movable plank house Download PDF

Info

Publication number
CN208618401U
CN208618401U CN201820871373.XU CN201820871373U CN208618401U CN 208618401 U CN208618401 U CN 208618401U CN 201820871373 U CN201820871373 U CN 201820871373U CN 208618401 U CN208618401 U CN 208618401U
Authority
CN
China
Prior art keywords
connector
windproof
screw hole
screw rod
movable plank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820871373.XU
Other languages
Chinese (zh)
Inventor
朱良
杨宗祥
陈云周
张晶
何永金
李荣新
刘志扩
李洁
段镝
李选锋
田志学
谢汝菊
高阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Jian Jian Construction Machinery Co Ltd
Original Assignee
Yunnan Jian Jian Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Jian Jian Construction Machinery Co Ltd filed Critical Yunnan Jian Jian Construction Machinery Co Ltd
Priority to CN201820871373.XU priority Critical patent/CN208618401U/en
Application granted granted Critical
Publication of CN208618401U publication Critical patent/CN208618401U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

A kind of windproof anchorage element of movable plank house, it is characterized in that, it includes pre-buried swivel nut part, screw rod part, first connector and the second connector, one end of the screw rod part is threadedly coupled with the swivel nut part, the other end of the screw rod part is removably fastenedly connected with first connector, second connector is connect with the first connector pairing, installation space is formed between it, when use, the installation space formed between first connector and the second connector can be used for connecting steel wire ropes, being threadedly coupled between the screw rod part and the swivel nut part can be used for adjusting the degrees of tensions of the wirerope.The windproof anchorage element of the movable plank house of the utility model can be with multi-purpose content, it not only can directly be attached with wirerope and tension is adjusted to wirerope, but also the dismounting of wirerope can be facilitated, and it can also be used in daily anchor connection, it is with structure novel, connection is reliable, convenient and practical feature.

Description

The windproof anchorage element of movable plank house
[technical field]
The utility model relates to movable plank house field, in particular to the windproof anchorage element of a kind of movable plank house.
[background technique]
Movable plank house is one kind using light steel as skeleton, is combined into using color steel metal panel, fire prevention quartzite plate as Sandwich materials Material is enclosed, fire prevention, heat preservation, heat-insulated, environmentally friendly temporary building are integrated.Components of prefabricated house is connected using high-strength bolt It connects, can conveniently carry out assembly and disassembly, realize the universal standardization of temporary building, be widely used in building The civilian placement room such as the provisional office in building site, dormitory, field work, earthquake relief work.Movable plank house leads to when coming into operation It often needs to establish the emergency preplans such as radix saposhnikoviae, flood control, rain and snow disaster, it, should be using reliable before storm, flood, sleet arrive Reinforcement measure.For southern area, wind and rain weather is more, it is often necessary to windproof reinforcing is carried out, it is living when wind and rain arrives to ensure The overall security in movable plate room.Existing radix saposhnikoviae reinforcement measure, is usually added in such a way that steel pipe+steel cable combines Gu: in board house roofing, criss-cross steel pipe is set and is protected with forming steel pipe grid beam, in board house four corners position and side Face is then reinforced using earth anchor and ground rollering junction --- drawknot reinforcing is carried out using wirerope, one end of wirerope and ground anchor connect It connects, the other end of wirerope is connect with movable plank house.When steel wire rope drawknot, it is necessary to tense wirerope, industry routine way is Tension is adjusted using flower basket bolt.When installation, one end of wirerope is connect with movable plank house, the other end and flower of wirerope Basket is bolted, and the other end of flower basket bolt is connect with ground anchor, is then tensed wirerope by adjusting flower basket bolt.The gaily decorated basket Bolt usually has O-shaped and two kinds of specifications of c-type as a kind of standard configuration part.O-shaped and c-type refers to the bail at flower basket bolt both ends Shape, O-shaped bail are used to be fixedly connected, and connection is reliable, but its disassembly for being unfavorable for both ends attachment;The bail of c-type is used It is detachably connected, the disassembly of both ends attachment can be facilitated, but its connection reliability is not so good as o-ring hook.Carrying out steel wire Restrict drawknot when, wirerope connect more convenient with flower basket bolt, using steel cable clamp, just can easily be connected to wirerope In the c-type or o-ring hook of flower basket bolt.And the anchoring piece on flower basket bolt and ground, then it needs according to circumstances to carry out installation company It connects, it is generally the case that it quick and easy can not link together.Therefore, the mode that this drawknot is reinforced, although can be flexible Adjusting wirerope elasticity, but its there are still certain problem need further improve.
[utility model content]
The purpose of the utility model is to solve the above problems and to provide a kind of novel, can directly be connect with wirerope, and can be right The windproof anchorage element of the movable plank house of tension is adjusted in wirerope.
To achieve the above object, the utility model provides a kind of windproof anchorage element of movable plank house, which is characterized in that It includes pre-buried swivel nut part, screw rod part, the first connector and the second connector, one end of the screw rod part and the swivel nut part Be threadedly coupled, the other end of the screw rod part is removably fastenedly connected with first connector, second connector and First connector pairing connection, between be formed with installation space, in use, first connector and the second connector Between the installation space that is formed can be used for connecting steel wire ropes, the threaded connection between the screw rod part and the swivel nut part can be used for Adjust the degrees of tensions of the wirerope.
The swivel nut part includes the main part being in the form of a column, and is equipped on the main part one or more axially extending along its Internal thread hole, the both ends along its length of the main part be respectively equipped with molding first web portion in conjunction and Second web portion, first web portion and the second web portion parallel interval, protrusion is formed in the main body respectively The outer circumferential walls in portion.
The internal thread hole is blind hole.
The screw rod part includes that integrated molding or the threaded shank being fixedly connected and head, the head are connected to the screw rod The one end in portion is equipped with external screw thread in the threaded shank, is equipped in the end face of the free end on the head for connecting described the First screw hole of a connection piece.
The head is in the blocks of hexangle type.
First connector is plate body, is equipped at the middle part of first connector corresponding with first screw hole The second screw hole, be symmetrically arranged with third screw hole in the two sides of second screw hole.
Second connector includes integrally formed arch, the first engaging lug and the second engaging lug, first connection Ear and the second engaging lug are connected to the opposite both ends in the arch, on first engaging lug and the second engaging lug respectively Equipped with the 4th screw hole, position is corresponding with the third screw hole respectively.
The first fastener, the screw rod part and first connector are connected at first screw hole and the second screw hole It is removably fastened together by first fastener;It is tight that second is connected at the third screw hole and the 4th screw hole Firmware, first connector are removably fastened together with second connector by second fastener.
The favorable attributes of the utility model are, efficiently solve the above problem.Existing anchorage element is usually By screw pre-buried in ground, then in the extension end of screw rod set loading nut to connect other component, thus it can not be displaced It adjusts, and the utility model is that swivel nut part is embedded in advance in ground, screw rod part is threadedly coupled with swivel nut part, so that screw rod part can To carry out displacement adjusting, so that entire anchorage element can be used for directly adjusting the degrees of tensions of wirerope.The work of the utility model The windproof anchorage element in movable plate room, can not only play the anchorage effect of traditional anchorage element, but also may also function as the gaily decorated basket The adjustment effect of bolt, when drawknot wirerope, without being additionally attached using flower basket bolt, dual-use material can be significantly simple Change installation procedure, it has strong practicality.Further, since the screw rod part is threadedly connected in swivel nut part, thus It conveniently can also retract out, when building site is completed, when needing to dismount all temporary buildings, can directly screw out the screw rod part And make ground without protrusion, internal built-in fitting is taken out without diging up concrete at this, compared to traditional anchoring Component is easier to dismount and does not destroy completed ground.On the other hand, the weather anchor of the movable plank house of the utility model Gu being fastenedly connected between the first connector and the second connector of component by the second fastener, not only connection is reliable, And be easy to dismount, separation can be facilitated and take out wirerope, thus its secure connection that can have both played O-shaped flower basket bolt Effect, and the easy-to-dismount of c-type flower basket bolt can be played the role of.The windproof anchorage element of the movable plank house of the utility model can With multi-purpose content, it not only can be directly attached with wirerope and tension is adjusted to wirerope, but also steel can be facilitated The dismounting of cord, and can also be used in daily anchor connection, with structure novel, connection is reliable, convenient and practical feature.
[Detailed description of the invention]
Fig. 1 is the principle schematic diagram of the utility model.
Fig. 2 is the overall structure diagram of the utility model.
Fig. 3 is the structural decomposition diagram of the utility model.
[specific embodiment]
The following example is being explained further and supplementing to the utility model, does not constitute any limit to the utility model System.
As shown in FIG. 1 to 3, the windproof anchorage element of the movable plank house of the utility model, broad outlines are, can It is directly attached with wirerope 10 and tension is adjusted to wirerope 10, but also the dismounting of wirerope 10 can be facilitated, With structure novel, connection is reliable, convenient and practical feature.
Specifically, as shown in FIG. 1 to 3, the windproof anchorage element of the movable plank house of the utility model include swivel nut part 20, Screw rod part 30, the first connector 40, the second connector 50 and fastener.
As shown in FIG. 1 to 3, the swivel nut part 20 is that built-in fitting is embedded in by casting concrete in advance when in use In concrete.The swivel nut part 20 includes integrally formed main part 21, the first web portion 22 and the second web portion 23.Institute It states main part 21 to be in the form of a column, cross-sectional shape can be set as desired, and can be cylindric, rectangular cylindrical, cylindroid Shape etc..In the present embodiment, the main part 21 is preferably cylindric.One or more is equipped on the main part 21 along its axis To the internal thread hole 24 of extension, the internal thread hole 24 is for being threadedly coupled the screw rod part 30.When to avoid casting concrete, mix Solidifying soil enters to the threaded connection in internal thread hole 24 and influencing screw rod part 30, and the internal thread hole 24 is preferably provided to blind hole. The depth and form of thread of the internal thread hole 24 can be set as desired, and can be carried out according to the intensity of anchor connection corresponding Setting.The quantity of the internal thread hole 24 can be set as desired, and in the present embodiment, set in the center of the main part 21 There is an internal thread hole 24.In other embodiments, also several internal thread holes 24 of space set, connect multiple screw rods to facilitate Part 30.First web portion 22 and the second web portion 23 are respectively formed in two along its length of the main part 21 End, protrudes from the outer circumferential walls of the main part 21 and annular in shape respectively.First web portion 22 and the second connecting plate Portion 23 can be used for reinforcing the bonding force between swivel nut part 20 and concrete, avoid swivel nut part 20 under external force by concrete It transfers to and whole device is caused to fail.The size and shape of first web portion 22 and the second web portion 23 can be according to need It wants and is arranged, the present embodiment is not limited.
As shown in FIG. 1 to 3, the screw rod part 30 includes integrated molding or the threaded shank 31 being fixedly connected and head 32. The threaded shank 31 which is provided with the outer spiral shell to match with the internal thread hole 24 for being threadedly coupled with the swivel nut part 20 Line.The length of the threaded shank 31, it is related to the drawknot adjustable range of wirerope 10, it can be set as desired.The head Portion 32 is connected to one end of the threaded shank 31, is used for twisting, and for being attached with first connector 40.It is described The cross sectional dimensions on head 32 is greater than the cross sectional dimensions of the threaded shank 31.The threaded shank 31 is rotated for convenience of twisting, The head 32 should be arranged to be easy to the shape of twisting, and in the present embodiment, the head 32 is in hexagonal blocks.For convenience The first connector 40 is connected, is equipped with the first screw hole 33 in the end face center of the free end on the head 32.First screw hole 33 Depth can be set as desired, in the present embodiment, depth be less than the head 32 height, in this way, it can not be influenced The intensity of threaded shank 31.The size of first screw hole 33 can be set as desired.
As shown in FIG. 1 to 3, first connector 40 is plate body, and second is equipped on first connector 40 Screw hole 41 is used to be attached with the screw rod part 30.It is symmetrically arranged with third screw hole 42 in the two sides of second screw hole 41, It is used to be attached with second connector 50.
As shown in FIG. 1 to 3, second connector 50 includes integrally formed arch 51, the first engaging lug 52 and the Two engaging lugs 53.First engaging lug 52 and the second engaging lug 53 are connected to the opposite both ends in the arch 51, in institute It states and is respectively equipped with the 4th screw hole 54 on the first engaging lug 52 and the second engaging lug 53, be used to carry out with first connector 40 Connection.
In addition, to avoid the corner of the second connector 50 from wearing wirerope 10, the edge of second connector 50 can be into Row round corner treatment, so that the position that the second connector 50 is in contact with wirerope 10 is round and smooth without being prone to wear out wirerope 10。
When installation, as shown in Figure 1, first passing through well known technique casting concrete, and the swivel nut part 20 is pre-buried to this In concrete, so that the first web portion 22 of swivel nut part 20 is concordant with ground, and make the opening of internal thread hole 24 outwardly.When mixed After solidifying soil hardening, the threaded shank 31 of screw rod part 30 is threadedly connected in the internal thread hole 24 of swivel nut part 20.Then in screw rod part First fastener 60 is installed at first screw hole 33 on head 32 and at the second screw hole 41 of the first connector 40, utilizes the first fastening First connector 40 is mounted on the end face on 30 head 32 of screw rod part by part 60.First fastener 60 can be selected and described the The screw or bolt that one screw hole 33 matches.Thereafter, by 50 pairing of the second connector on the first connector 40, so that second connects The arch 51 of fitting 50 forms the installation space 70 of arcuation towards the first connector 40, thereafter in third screw hole 42 and the 4th spiral shell Second fastener 80 is installed at hole 54, is connected to the first connector 40 and 50 pairing of the second connector using the second fastener 80 Together.Well known bolt kit can be selected in second fastener 80.
In use, one end of wirerope 10 to be passed through to the installation for having the first connector 40 and the second connector 50 to be combined to form Then space 70 is buckled using wirerope 10 wirerope 10 carrying out card knot, or carries out knotting processing to wirerope 10, to make Wirerope 10 is obtained to link together with the anchorage element.The other end of wirerope then can by well known mode and movable plank house, As the crossbeam of movable plank house links together.Thereafter, twisting tool can be used, the head of screw rod part 30 as described in spanner rotation 32, so that screw rod part 30 adjusts the tightness of wirerope 10 with respect to the generation axial displacement of swivel nut part 20.
Since the windproof anchorage element of the movable plank house of the utility model is built-in turnbuckle part 20, by screw rod part 30 and swivel nut Part 20 is threaded togather, so that screw rod part 30 can adjust displacement by rotation, and then can be directly used for adjusting steel The degrees of tensions of cord 10 both may be used it is not necessary that tension is adjusted using flower basket bolt between ground anchor and wirerope 10 To play the role of ground anchor, and the adjustment effect of flower basket bolt can be played, dual-use material has very strong practicability.This Outside, the windproof anchorage element of the movable plank house of the utility model also acts as traditional anchorage element and carries out using for example, can be Connecting plate is installed between the head 32 of screw rod part 30 and the first web portion 22 of swivel nut part 20, it then is set on connecting plate His component, to realize the function of accordingly anchoring.On the other hand, pass through second between the first connector 40 and the second connector 50 Fastener 80 is fastenedly connected, and not only connection is reliable, but also it is easy to dismount, and can be facilitated separation and be taken wirerope 10 Out.In addition, when needing to dismount all temporary buildings, can directly screw out the screw rod part 30 when building site is completed and make ground Internal built-in fitting is taken out without protrusion, without diging up concrete at this in face.The radix saposhnikoviae of the movable plank house of the utility model Anchorage element can directly can be not only attached with wirerope 10 with multi-purpose content and tension is adjusted to wirerope 10, But also the dismounting of wirerope 10 can be facilitated, and can also be used in daily anchor connection, with structure novel, connection is reliable, Convenient and practical feature.
Although being disclosed by above embodiments to the utility model, the scope of the utility model is not limited to In this, under conditions of conceiving without departing from the utility model, above each component can be understood similar with technical field personnel Or equivalent element is replaced.

Claims (8)

1. a kind of windproof anchorage element of movable plank house, which is characterized in that it includes pre-buried swivel nut part (20), screw rod part (30), the first connector (40) and the second connector (50), one end of the screw rod part (30) and swivel nut part (20) screw thread Connection, the other end of the screw rod part (30) are removably fastenedly connected with first connector (40), second connection Part (50) is connect with the first connector (40) pairing, between be formed with installation space (70), in use, it is described first connect The installation space (70) formed between fitting (40) and the second connector (50) can be used for connecting steel wire ropes (10), the screw rod part (30) threaded connection between the swivel nut part (20) can be used for adjusting the degrees of tensions of the wirerope (10).
2. the windproof anchorage element of movable plank house as described in claim 1, which is characterized in that the swivel nut part (20) includes being in Columnar main part (21), be equipped on the main part (21) it is one or more along its axially extending internal thread hole (24), Molding first web portion (22) in conjunction and are respectively equipped at the both ends along its length of the main part (21) Two web portion (23), first web portion (22) and the second web portion (23) parallel interval are prominent respectively to be formed Outer circumferential walls in the main part (21).
3. the windproof anchorage element of movable plank house as claimed in claim 2, which is characterized in that the internal thread hole (24) is blind Hole.
4. the windproof anchorage element of movable plank house as described in claim 1, which is characterized in that the screw rod part (30) includes one The body formed or threaded shank (31) being fixedly connected and head (32), the head (32) are connected to the one of the threaded shank (31) End is equipped with external screw thread on the threaded shank (31), is equipped in the end face of the free end of the head (32) described for connecting The first screw hole (33) of first connector (40).
5. the windproof anchorage element of movable plank house as claimed in claim 4, which is characterized in that the head (32) is in hexangle type Blocks.
6. the windproof anchorage element of movable plank house as claimed in claim 4, which is characterized in that first connector (40) is Plate body is equipped with the second screw hole (41) corresponding with the first screw hole (33) at the middle part of first connector (40), Third screw hole (42) are symmetrically arranged in the two sides of second screw hole (41).
7. the windproof anchorage element of movable plank house as claimed in claim 6, which is characterized in that the second connector (50) packet Include integrally formed arch (51), the first engaging lug (52) and the second engaging lug (53), first engaging lug (52) and second Engaging lug (53) is connected to the opposite both ends in the arch (51), in first engaging lug (52) and the second engaging lug (53) the 4th screw hole (54) is respectively equipped on, position is corresponding with third screw hole (42) respectively.
8. the windproof anchorage element of movable plank house as claimed in claim 7, which is characterized in that in first screw hole (33) and Be connected at second screw hole (41) the first fastener (60), the screw rod part (30) and first connector (40) by this One fastener (60) is removably fastened together;Is connected at the third screw hole (42) and the 4th screw hole (54) Two fasteners (80), first connector (40) and second connector (50) are detachable by second fastener (80) Be fastened together.
CN201820871373.XU 2018-06-06 2018-06-06 The windproof anchorage element of movable plank house Expired - Fee Related CN208618401U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820871373.XU CN208618401U (en) 2018-06-06 2018-06-06 The windproof anchorage element of movable plank house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820871373.XU CN208618401U (en) 2018-06-06 2018-06-06 The windproof anchorage element of movable plank house

Publications (1)

Publication Number Publication Date
CN208618401U true CN208618401U (en) 2019-03-19

Family

ID=65702680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820871373.XU Expired - Fee Related CN208618401U (en) 2018-06-06 2018-06-06 The windproof anchorage element of movable plank house

Country Status (1)

Country Link
CN (1) CN208618401U (en)

Similar Documents

Publication Publication Date Title
KR100930829B1 (en) Pannel have rockbolt coupler
CN103437423B (en) Controllable quantitative release connection method and structure for steel truss
CN202139744U (en) Space hyperbolic quadrangular unit type suspended ceiling adapter claw piece
CN208618401U (en) The windproof anchorage element of movable plank house
CN207553321U (en) Prefabricated panel connection structure and building construction
KR20070040777A (en) Fixing apparatus for facing material of building
CN107460848A (en) A kind of flood situation comes interim corridor or the baffle device for water in corridor
CN205955173U (en) Modular link wall spare subassembly
CN203701569U (en) Special locking piece for fixing scaffold floor of scaffold
CN107926376A (en) Agricultural greenhouse junction button
CN208534911U (en) Adjustable movable plank house anchorage element
CN108868105A (en) The construction method adjusted convenient for building scaffold verticality
CN208293854U (en) A kind of open dry-hang aluminum plate system
CN203113761U (en) Wall connection structure of scaffold
KR100769318B1 (en) Steel structure connection support and Systemform setting structure using the same
CN205189402U (en) Back edge connecting device of steel and wood structure of template
CN201003224Y (en) Unit type suspended ceiling point claw transfer member
CN204456822U (en) A kind of drop in leaf of scaffold construction layer
CN205046830U (en) Formula steel pipe scaffold is detained to bowl
CN211691534U (en) Suspender expansion bolt fixing tool
CN202194364U (en) Light-weight oblique-pull type scaffold
CN207598650U (en) Agricultural greenhouse junction button
CN209243948U (en) A kind of concrete reserved steel bar adjustment device
CN205218960U (en) A straight -bar formula rotary device for screwing furred ceiling pole expansion bolts
CN203006799U (en) Standard knot coupling sleeve stop device of tower crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190319