CN108868105A - The construction method adjusted convenient for building scaffold verticality - Google Patents

The construction method adjusted convenient for building scaffold verticality Download PDF

Info

Publication number
CN108868105A
CN108868105A CN201710333448.9A CN201710333448A CN108868105A CN 108868105 A CN108868105 A CN 108868105A CN 201710333448 A CN201710333448 A CN 201710333448A CN 108868105 A CN108868105 A CN 108868105A
Authority
CN
China
Prior art keywords
verticality
threaded screw
scaffold
screw rod
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710333448.9A
Other languages
Chinese (zh)
Inventor
刘尊高
兰慧频
毛叔东
刘宇
王天祺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201710333448.9A priority Critical patent/CN108868105A/en
Publication of CN108868105A publication Critical patent/CN108868105A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of construction method adjusted convenient for building scaffold verticality, this method determines that embedded steel tube is embedded in the specific location in structure beam forms first, and embedded steel tube is placed into behind the position and is fastened with structure beam steel bar colligation;Structure beam forms casting concrete simultaneously conserves, two threaded screw rods are separately connected embedded steel tube and scaffold by fastener, it is connected between two threaded screw rods using inner thread sleeve, rotating female screw sleeve adjusts the spacing of two threaded screw rods, to adjust scaffold and structure case bay, achieve the purpose that adjust scaffold verticality.The verticality that this construction method greatly facilitates scaffold adjusts operation, improves operating efficiency, reduces cost of labor, it is ensured that the security performance of scaffold has prevented security risk.

Description

The construction method adjusted convenient for building scaffold verticality
Technical field
The present invention relates to a kind of construction methods adjusted convenient for building scaffold verticality.
Background technique
Scaffold is widely used in construction site, for external wall, interior decoration or layer height is higher can not be straight The job platform that construction is set up is connect, meanwhile, and solve the bracket that construction site is vertically and horizontally transported and set up.It is building It builds in construction, is both needed to adjust its verticality according to specification after scaffold installation, to ensure its security performance;Especially external wall Scaffold after the completion of setting up each layer or after the strong wind heavy rain and it is long-term be not used after, will be to scaffold Whether verticality is reexamined, confirm its verticality within the scope of tolerance.But the verticality of scaffold is adjusted It is a very time-consuming and laborious job, traditional scaffold is fixed in such a way that embedded steel tube is in conjunction with wirerope mostly to be built It builds on component, embedded steel tube is fixed on building element by concreting, and wirerope both ends are separately connected embedded steel tube and foot Hand cradle, scaffold verticality is by tightening or loosens wirerope realization adjusting, it is clear that the form of construction work that the verticality is adjusted is cumbersome And large labor intensity, high labor cost adjust low efficiency, and influence the security performance of scaffold, there are certain safety is hidden Suffer from.
Summary of the invention
Technical problem to be solved by the invention is to provide it is a kind of convenient for building scaffold verticality adjust construction method, The verticality that this construction method greatly facilitates scaffold adjusts operation, improves operating efficiency, reduces cost of labor, it is ensured that The security performance of scaffold, has prevented security risk.
In order to solve the above technical problems, the present invention includes following step convenient for the construction method that building scaffold verticality is adjusted Suddenly:
Step 1: determining the position of embedded steel tube after structure beam die plate reinforcing and displacement structure beam steel;
Step 2: embedded steel tube is placed into determining position and is anchored on structure beam steel using tied silk binding;
Step 3: the position and lashed state to embedded steel tube check, coagulation is poured to structure beam forms after passed examination Soil simultaneously conserves;
Step 4: the first threaded screw rod is connected embedded steel tube by fastener, the second threaded screw rod is passed through into fastener connecting pin hand Frame is connected between the first threaded screw rod and the second threaded screw rod using inner thread sleeve, forward or backwards rotating female screw sleeve The spacing of the first threaded screw rod and the second threaded screw rod is adjusted, to adjust scaffold and structure case bay, reaches and adjusts foot hand The purpose of frame verticality.
Further, pre-buried length >=300mm of the embedded steel tube, stretch out structural beams length >=200mm.
Further, through-hole is radially opened up in the middle part of the inner thread sleeve, which is inserted into convenient for internal screw thread using inserted link The rotation of sleeve.
Further, it is screwed into locking nut respectively on first threaded screw rod and the second threaded screw rod, it is vertical to scaffold After degree is adjusted, locking nut respectively inwards tighten by screw shell, to lock the first threaded screw rod, the second threaded screw rod and interior The position of screw shell.
Further, the fastener is o-ring or anchor plate.
Since the present invention uses above-mentioned technical proposal convenient for the construction method that building scaffold verticality is adjusted, i.e. this method is first First determine that embedded steel tube is embedded in the specific location in structure beam forms, and embedded steel tube is placed into behind the position and structure joist steel Muscle binding fastening;Structure beam forms casting concrete simultaneously conserves, and two threaded screw rods are separately connected embedded steel tube by fastener And scaffold, it is connected using inner thread sleeve between two threaded screw rods, rotating female screw sleeve adjusts two threaded screw rods Spacing achievees the purpose that adjust scaffold verticality to adjust scaffold and structure case bay.This construction method is greatly convenient The verticality of scaffold adjusts operation, improves operating efficiency, reduces cost of labor, it is ensured that the safety of scaffold Can, prevent security risk.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and embodiments:
Fig. 1 is the construction method schematic diagram that the present invention is adjusted convenient for building scaffold verticality;
Fig. 2 is the structural schematic diagram of o-ring fastener in this method;
Fig. 3 is the structural schematic diagram that board fastener is anchored in this method.
Specific embodiment
Embodiment is as shown in Figure 1, the present invention includes the following steps convenient for the construction method that building scaffold verticality is adjusted:
Step 1: determining the position of embedded steel tube 2 after 1 reinforcing bar of 1 formwork reinforcement of structural beams and displacement structure beam;
Step 2: embedded steel tube 2 is placed into determining position and is anchored on 1 reinforcing bar of structural beams using tied silk binding;
It pours Step 3: the position and lashed state to embedded steel tube 2 check, after passed examination to 1 template of structural beams mixed Solidifying soil simultaneously conserves;
Step 4: the first threaded screw rod 3 is connected embedded steel tube 2 by fastener 4, the second threaded screw rod 5 is connected by fastener 4 Scaffold 6 is connected between first threaded screw rod 3 and the second threaded screw rod 5 using inner thread sleeve 7, forward or backwards in rotation Screw shell 7 adjusts the spacing of the first threaded screw rod 3 and the second threaded screw rod 5, so that scaffold 6 and 1 spacing of structural beams are adjusted, Achieve the purpose that adjust 6 verticality of scaffold.
Preferably, pre-buried length >=300mm of the embedded steel tube 2, stretch out structural beams 1 length >=200mm.To ensure The rigidity of 2 node of embedded steel tube, avoids embedded steel tube 2 from pulling.
Preferably, 7 middle part of inner thread sleeve radially opens up through-hole 71, is inserted into the through-hole 71 using inserted link convenient for interior The rotation of screw shell 7.
Preferably, it is screwed into locking nut 31,51 respectively on first threaded screw rod 3 and the second threaded screw rod 5, to foot hand After 6 verticality of frame is adjusted, locking nut 31,51 respectively inwards tighten by screw shell 7, to lock the first threaded screw rod 3, the The position of two threaded screw rods 5 and inner thread sleeve 7.
As shown in Figures 2 and 3, it is preferred that the fastener 4 is o-ring or anchor plate.O-ring or anchor plate facilitate One threaded screw rod 3 and the second threaded screw rod 5 are separately connected embedded steel tube 2 and scaffold 6, and easy disassembly, repeat recycling benefit With saving construction cost.
The construction that this method is adjusted for scaffold verticality is made that technological improvement, easy to operate practical, saves people Work cost and construction time, while only having embedded steel tube that cannot be secondary use in work progress, remaining each component is repeatable to follow Ring uses, and the alternative wall-connecting piece of embedded steel tube.This method has saved plenty of time and cost of labor, it is ensured that the peace of scaffold Full performance, has prevented security risk.

Claims (5)

1. a kind of construction method adjusted convenient for building scaffold verticality, it is characterised in that this method includes the following steps:
Step 1: determining the position of embedded steel tube after structure beam die plate reinforcing and displacement structure beam steel;
Step 2: embedded steel tube is placed into determining position and is anchored on structure beam steel using tied silk binding;
Step 3: the position and lashed state to embedded steel tube check, coagulation is poured to structure beam forms after passed examination Soil simultaneously conserves;
Step 4: the first threaded screw rod is connected embedded steel tube by fastener, the second threaded screw rod is passed through into fastener connecting pin hand Frame is connected between the first threaded screw rod and the second threaded screw rod using inner thread sleeve, forward or backwards rotating female screw sleeve The spacing of the first threaded screw rod and the second threaded screw rod is adjusted, to adjust scaffold and structure case bay, reaches and adjusts foot hand The purpose of frame verticality.
2. the construction method according to claim 1 adjusted convenient for building scaffold verticality, it is characterised in that:It is described pre- It buries pre-buried length >=300mm of steel pipe, stretch out length >=200mm of structural beams.
3. the construction method according to claim 1 or 2 adjusted convenient for building scaffold verticality, it is characterised in that:Institute It states and radially opens up through-hole in the middle part of inner thread sleeve, the rotation which is convenient for inner thread sleeve is inserted into using inserted link.
4. the construction method according to claim 3 adjusted convenient for building scaffold verticality, it is characterised in that:Described It is screwed into locking nut respectively on one threaded screw rod and the second threaded screw rod, after being adjusted to scaffold verticality, locking nut Screw shell is tightened respectively inwards, to lock the position of the first threaded screw rod, the second threaded screw rod and inner thread sleeve.
5. the construction method according to claim 4 adjusted convenient for building scaffold verticality, it is characterised in that:The button Part is o-ring or anchor plate.
CN201710333448.9A 2017-05-12 2017-05-12 The construction method adjusted convenient for building scaffold verticality Pending CN108868105A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710333448.9A CN108868105A (en) 2017-05-12 2017-05-12 The construction method adjusted convenient for building scaffold verticality

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710333448.9A CN108868105A (en) 2017-05-12 2017-05-12 The construction method adjusted convenient for building scaffold verticality

Publications (1)

Publication Number Publication Date
CN108868105A true CN108868105A (en) 2018-11-23

Family

ID=64319820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710333448.9A Pending CN108868105A (en) 2017-05-12 2017-05-12 The construction method adjusted convenient for building scaffold verticality

Country Status (1)

Country Link
CN (1) CN108868105A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111608354A (en) * 2019-07-26 2020-09-01 北新集团建材股份有限公司 Keel fixing assembly and keel fixing system
CN111764634A (en) * 2020-06-29 2020-10-13 中天华南建设投资集团有限公司 Novel scaffold wall connecting piece and using method
CN112160606A (en) * 2020-09-04 2021-01-01 马传钊 Section bar lead screw combination reinforcing bar engineering construction equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201176705Y (en) * 2008-04-14 2009-01-07 江苏广宇建设集团有限公司 Adjusting device of scaffoldings in vertical direction
CN204174911U (en) * 2014-08-11 2015-02-25 金华市东山机械厂 A kind of scaffold connecting device
CN204174910U (en) * 2014-08-11 2015-02-25 金华市东山机械厂 A kind of wall-connecting device of scaffold
CN104675101A (en) * 2015-02-11 2015-06-03 浙江省二建建设集团有限公司 Wall-linking element of scaffold and construction method of wall-linking element
CN205955173U (en) * 2016-08-27 2017-02-15 上海宝冶集团有限公司 Modular link wall spare subassembly

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201176705Y (en) * 2008-04-14 2009-01-07 江苏广宇建设集团有限公司 Adjusting device of scaffoldings in vertical direction
CN204174911U (en) * 2014-08-11 2015-02-25 金华市东山机械厂 A kind of scaffold connecting device
CN204174910U (en) * 2014-08-11 2015-02-25 金华市东山机械厂 A kind of wall-connecting device of scaffold
CN104675101A (en) * 2015-02-11 2015-06-03 浙江省二建建设集团有限公司 Wall-linking element of scaffold and construction method of wall-linking element
CN205955173U (en) * 2016-08-27 2017-02-15 上海宝冶集团有限公司 Modular link wall spare subassembly

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111608354A (en) * 2019-07-26 2020-09-01 北新集团建材股份有限公司 Keel fixing assembly and keel fixing system
CN111764634A (en) * 2020-06-29 2020-10-13 中天华南建设投资集团有限公司 Novel scaffold wall connecting piece and using method
CN112160606A (en) * 2020-09-04 2021-01-01 马传钊 Section bar lead screw combination reinforcing bar engineering construction equipment

Similar Documents

Publication Publication Date Title
CN204098463U (en) Builder's jack
CN105926916A (en) Cable-stayed suspended combined supporting system and construction method based on intelligent monitoring
CN106760461B (en) A kind of installation method of full fabricated scaffold overhanging
CN108868105A (en) The construction method adjusted convenient for building scaffold verticality
CN104895279B (en) The cladding attachment structure and its construction method of precast wall panel and precast beam
CN106150060B (en) Construction method based on assembled wall-connecting piece exterior wall scaffold system
CN105862602B (en) The convertible template system and its construction method of hollow concrete leaning tower
CN106192758A (en) Construction method for constructing large high pier column by using cantilever formwork
CN105569242A (en) Assembling method for composite floor slabs
CN110761411A (en) Large-span suspended spherical dome concrete pouring method
CN105201082A (en) Construction method of expansion joint shape setting formwork
CN106801511A (en) A kind of super large reserved opening hanging mould structure and its construction method
CN104912231B (en) The cladding attachment structure and its construction method of prefabricated outer wall panel and shear wall
CN111236621A (en) Fixing system for beam-side embedded overhanging scaffold
CN110735530A (en) external wall steel formwork and internal wall aluminum formwork combination system and operation method thereof
CN105256995B (en) A kind of shear wall structure movement joint inner side template bracing means and construction method
CN203891462U (en) Form erecting device for fair-faced concrete independent columns
CN206016230U (en) It is based on assembled wall-connecting piece exterior wall scaffold system
CN106499180B (en) A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method
CN207794600U (en) A kind of oblique bracing means of building form
CN109441093A (en) Casing wall-through pull rod formula connects wall fixed Combination device and its construction method of installation
CN211775814U (en) Reinforcing anchorage device for steel strand counter-pulling reinforcing template
CN114439202A (en) Thin-wall ultrahigh wall body double-side template operation platform and adjustable fixing system
CN210316532U (en) Shear wall template
CN207295716U (en) A kind of cantilever combined steel template

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123