CN208608923U - A kind of photovoltaic construction pre-cast concrete pier of high stability - Google Patents

A kind of photovoltaic construction pre-cast concrete pier of high stability Download PDF

Info

Publication number
CN208608923U
CN208608923U CN201821232413.2U CN201821232413U CN208608923U CN 208608923 U CN208608923 U CN 208608923U CN 201821232413 U CN201821232413 U CN 201821232413U CN 208608923 U CN208608923 U CN 208608923U
Authority
CN
China
Prior art keywords
pier body
hole
lower pier
pier
ground nail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821232413.2U
Other languages
Chinese (zh)
Inventor
陈五奎
刘强
雷晓全
李文江
党海林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengcheng County Li Ke Steel Structure Co Ltd
Original Assignee
Chengcheng County Li Ke Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengcheng County Li Ke Steel Structure Co Ltd filed Critical Chengcheng County Li Ke Steel Structure Co Ltd
Priority to CN201821232413.2U priority Critical patent/CN208608923U/en
Application granted granted Critical
Publication of CN208608923U publication Critical patent/CN208608923U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

The utility model discloses a kind of photovoltaic construction pre-cast concrete piers of high stability, including lower pier body, upper pier body, firm ground nail, upper pier body is in the top center position for being horizontally set on lower pier body, and it is flexibly connected with lower pier body, upper pier body, the inside of lower pier body is equipped with the fixation hole being vertical setting, the side of fixation hole is set there are two symmetrical location hole, the side of fixation hole is set there are four equally distributed connecting hole, connecting hole is circumferentially positioned at the surrounding of fixation hole, the inside of lower pier body is equipped with firm ground nail, the bosom position of fixation hole is arranged in firm ground nail insertion, and clearance fit is realized between fixation hole, the inside of lower pier body is equipped with auxiliary positioning ground nail, auxiliary positioning ground nail is embedded in the bosom position that location hole is arranged in, it is strong with road holding, it is convenient for the positioning in hole above and below when installation between pier body, up and down Connection procedure is simple between pier body and stability is strong.

Description

A kind of photovoltaic construction pre-cast concrete pier of high stability
Technical field
It is especially a kind of photovoltaic construction of high stability with prefabricated the utility model relates to pre-cast concrete pier technical field Clump.
Background technique
Since photovoltaic apparatus own wt is lighter, for photovoltaic apparatus pedestal when it is wide to install rear choke, therefore installing Weight have it is required, it is desirable that it has biggish self weight, and is not easy to be corroded, in summary condition, selects prefabricated water Mud pier meets the requirements very much as the fixed point that photovoltaic apparatus is installed.
It is found by retrieval, the utility model of patent No. CN206524798U discloses a kind of " the prefabricated water of photovoltaic construction Mud pier ", including the first pier body, the second pier body, clump weight, groove, the first fixed link, the second fixed link, the first nut, the second spiral shell Through-hole is offered on mother, pedestal, through-hole, the first pier body and the second pier body, between the clump weight and the first fixed link It is threadedly coupled and clump weight is symmetricly set on the first pier body or the second pier body, open up fluted on clump weight, first is solid Fixed pole passes through through-hole perforation and is arranged and clump weight is fixed in the first fixed link by the first nut, second fixed link One end is integrally molded pedestal and the second fixed link passes through the first pier body and the second pier body is fixed the two by the second nut.
However, the analysis found that, the photovoltaic construction of existing high stability is had the following disadvantages with pre-cast concrete pier;Its One: playing stabilization only with self gravity, road holding is weaker, second, position is easy to happen offset between pier body up and down, leads Cause connecting hole that can not be aligned;Third, connection procedure is cumbersome between pier body up and down, make troubles to staff, and between each other Connective stability is weak.
Utility model content
Therefore, in order to solve above-mentioned deficiency, the photovoltaic that the utility model provides a kind of high stability herein is constructed with prefabricated Clump has road holding strong, is convenient for the positioning in hole when installation between pier body up and down, connection procedure is simple and steady between upper and lower pier body The advantages that qualitative strong.
The utility model is realized in this way a kind of photovoltaic construction pre-cast concrete pier of high stability is constructed, including under Pier body, upper pier body, firm ground nail, upper pier body are in the top center position for being horizontally set on lower pier body, and are connected with lower pier body activity It connects, the inside of upper pier body and lower pier body is equipped with the fixation hole being vertical setting, and the side of fixation hole sets that there are two symmetrical Location hole, the side of fixation hole sets there are four equally distributed connecting hole, and connecting hole is circumferentially positioned at the surrounding of fixation hole, under The inside of pier body is equipped with firm ground nail, and the bosom position of fixation hole is arranged in firm ground nail insertion, and between fixation hole Realize clearance fit, the inside of lower pier body is equipped with auxiliary positioning ground nail, and auxiliary positioning ground nail is embedded in the inside that location hole is arranged in Middle position, and clearance fit is realized between location hole, the inside of lower pier body is equipped with fastening screw, fastening screw insertion setting In the bosom position of connecting hole, and clearance fit is realized between connecting hole, the top of fastening screw is through setting upper The top of the top center position of pier body, fastening screw is equipped with the second fastening nut, and the second fastening nut passes through with fastening screw Be threadedly coupled, the side of lower pier body is equipped with dorsalis medullae spinalis extension base, and dorsalis medullae spinalis extension base is in the side wall for being horizontally set on lower pier body, and with lower pier body It fits closely and fixes, the top of dorsalis medullae spinalis extension base is equipped with equally distributed positioning screw, and positioning screw, which is vertical setting, to be extended The top center position of substrate, and be fixed by screws with dorsalis medullae spinalis extension base, the top of positioning screw is equipped with the first fastening spiral shell Mother is connected through a screw thread between the first fastening nut and positioning screw, and the top of upper pier body is equipped with two pieces of symmetrical installations The inside of upper pier body is arranged in the bottom end insertion of plate, mounting plate, and fits closely and fix with upper pier body, and the side of mounting plate is set There is mounting hole.
As an improvement of the above technical solution, the photovoltaic of high stability, which is constructed, uses pre-cast concrete pier, sets at the top of lower pier body There is the curved locating piece in edge, the curved locating piece in edge is vertical setting in the top edge position of lower pier body, and tight with lower pier body Close to post and fix, the curved locating piece in edge of the top setting of lower pier body can fix upper pier body, so that peace It will not shift during dress and after the installation is completed between upper pier body and lower pier body, inside and outside the curved locating piece in edge 90 degree of angles are formed, and the edge of the curved locating piece in edge is overlapped with lower pier body tip edge.
As an improvement of the above technical solution, the photovoltaic construction pre-cast concrete pier of high stability, the top of dorsalis medullae spinalis extension base Equipped with clump weight, the bottom middle position of positioning screw is arranged in counterweight block nesting, and realizes that gap is matched between positioning screw It closes, clump weight can increase the weight of lower pier body, so that will not cause because lower pier body weight is too light after installing photovoltaic apparatus Photovoltaic apparatus is toppled over, and the safety of product is improved.
As an improvement of the above technical solution, the photovoltaic construction pre-cast concrete pier of high stability, the bottom of upper pier body is set There is through-hole, through-hole is in the bottom middle position for being horizontally set on pier body, and photovoltaic apparatus during installation can run through the axis of bottom end In through-hole, so that the weight of upper pier body acts directly on photovoltaic apparatus, the stability of photovoltaic apparatus is improved.
The utility model provides a kind of photovoltaic construction pre-cast concrete pier of high stability by improving herein, with existing height The photovoltaic construction of stability is compared with pre-cast concrete pier, have the advantages that it is strong with road holding, when installation up and down between pier body Convenient for the positioning in hole, connection procedure is simple between upper and lower pier body and stability is strong, embodies are as follows:
Advantage 1: the top of lower pier body is equipped with the curved locating piece in edge, and the curved locating piece in edge is vertical setting in lower pier body Top edge position, and fit closely and fix with lower pier body, the curved locating piece in edge of the top setting of lower pier body can Upper pier body is fixed, so that will not occur partially in installation process and after the installation is completed between upper pier body and lower pier body It moves, 90 degree of angles, and the edge of the curved locating piece in edge and lower pier body top side is respectively formed inside and outside the curved locating piece in edge Edge is overlapped.
Advantage 2: the top of dorsalis medullae spinalis extension base is equipped with clump weight, and the bottom interposition of positioning screw is arranged in counterweight block nesting It sets, and realizes clearance fit between positioning screw, clump weight can increase the weight of lower pier body, so that installing photovoltaic apparatus Afterwards, photovoltaic apparatus will not be caused to topple over because lower pier body weight is too light, improves the safety of product.
Advantage 3: the bottom of upper pier body is equipped with through-hole, and through-hole is in the bottom middle position for being horizontally set on pier body, photovoltaic The axis of bottom end can be applied in through-hole by equipment during installation, so that the weight of upper pier body acts directly on photovoltaic apparatus, be mentioned The stability of high photovoltaic apparatus.
Detailed description of the invention
Fig. 1 is a kind of photovoltaic construction pre-cast concrete pier structure schematic diagram of high stability of the utility model;
Fig. 2 is a kind of lower pier body partial cutaway view of the photovoltaic construction pre-cast concrete pier of high stability of the utility model;
Fig. 3 is a kind of upper pier body partial structurtes signal of the photovoltaic construction pre-cast concrete pier of high stability of the utility model Figure.
Serial number as shown in the figure: the curved locating piece 6 in lower pier body 1, clump weight 2, connecting hole 3, fixation hole 4, location hole 5, edge, Positioning screw 7, the first fastening nut 8, dorsalis medullae spinalis extension base 9, firm ground nail 10, auxiliary positioning ground nail 11, fastening screw 12, upper pier body 13, the second fastening nut 14, mounting plate 15, mounting hole 16 and through-hole 17.
Specific embodiment
The utility model is described in detail below in conjunction with attached drawing 1- Fig. 3, to the skill in the utility model embodiment Art scheme is clearly and completely described, it is clear that and the described embodiments are only a part of the embodiments of the utility model, and The embodiment being not all of.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creativeness Every other embodiment obtained, fall within the protection scope of the utility model under the premise of labour.
The utility model provides a kind of photovoltaic construction pre-cast concrete pier of high stability by improving herein, such as Fig. 1-figure Shown in 3, it can be practiced as follows;Including lower pier body 1, upper pier body 13, firm ground nail 10, upper pier body 13 is in level The top center position of lower pier body 1 is set, and is flexibly connected with lower pier body 1, the inside of upper pier body 13 and lower pier body 1 is equipped with The fixation hole 4 being vertical setting, the side of fixation hole 4 are set there are two symmetrical location hole 5, and the side of fixation hole 4 is equipped with Four equally distributed connecting holes 3, connecting hole 3 are circumferentially positioned at the surrounding of fixation hole 4, and the inside of lower pier body 1 is equipped with firmly Nail 10, firm ground nail 10 is embedded in the bosom position that fixation hole 4 is arranged in, and realizes clearance fit between fixation hole 4, under The inside of pier body 1 is equipped with auxiliary positioning ground nail 11, and auxiliary positioning ground nail 11 is embedded in the bosom position that location hole 5 is arranged in, And clearance fit is realized between location hole 5, the inside of lower pier body 1 is equipped with fastening screw 12, and the insertion setting of fastening screw 12 exists The bosom position of connecting hole 3, and clearance fit is realized between connecting hole 3, the top of fastening screw 12 exists through setting The top center position of upper pier body 13, the top of fastening screw 12 are equipped with the second fastening nut 14, the second fastening nut 14 with it is tight Gu screw 12 is connected through a screw thread, the side of lower pier body 1 is equipped with dorsalis medullae spinalis extension base 9, and dorsalis medullae spinalis extension base 9 is in be horizontally set on lower pier body 1 Side wall, and fit closely and fix with lower pier body 1, the top of dorsalis medullae spinalis extension base 9 is equipped with equally distributed positioning screw 7, positioning Screw rod 7 is vertical setting in the top center position of dorsalis medullae spinalis extension base 9, and is fixed by screws with dorsalis medullae spinalis extension base 9, positions spiral shell The top of bar 7 is equipped with the first fastening nut 8, is connected through a screw thread between the first fastening nut 8 and positioning screw 7, upper pier body 13 Top be equipped with two pieces of symmetrical mounting plates 15, the bottom end insertion of mounting plate 15 is arranged in the inside of upper pier body 13, and with Upper pier body 13 is fitted closely and is fixed, and the side of mounting plate 15 is equipped with mounting hole 16.
The top of lower pier body is equipped with the curved locating piece 6 in edge, and the curved locating piece 6 in edge is vertical setting in lower pier body 1 Top edge position, and fit closely and fix with lower pier body 1, the curved locating piece 6 in edge of the top setting of lower pier body 1 can Upper pier body 13 is fixed, so that in installation process and after the installation is completed will not between upper pier body 13 and lower pier body 1 It shifts, 90 degree of angles, and the edge of the curved locating piece 6 in edge and lower pier is respectively formed inside and outside the curved locating piece 6 in edge 1 tip edge of body is overlapped.
The top of dorsalis medullae spinalis extension base 9 be equipped with clump weight 2, the embedding bottom middle position for being set on positioning screw 7 of clump weight 2, And clearance fit is realized between positioning screw 7, clump weight 2 can increase the weight of lower pier body 1, so that installing photovoltaic apparatus Afterwards, photovoltaic apparatus will not be caused to topple over because lower 1 weight of pier body is too light, improves the safety of product.
The bottom of upper pier body 13 is equipped with through-hole 17, and through-hole 17 is in the bottom middle position for being horizontally set on pier body 13, light The axis of bottom end can be applied in through-hole 17 by volt equipment during installation, so that the weight of upper pier body 13 acts directly on photovoltaic apparatus On, improve the stability of photovoltaic apparatus.
The photovoltaic construction of a kind of high stability working principle of pre-cast concrete pier: firstly, staff is by fastening screw 12 penetrate in connecting hole 3 from lower 1 bottom end of pier body, then by the lower pier body of the photovoltaic construction of this kind of high stability pre-cast concrete pier Firm ground nail 10 is driven underground through fixation hole 4 after adjusting direction in the position of photovoltaic apparatus to be installed for 1 horizontal, then will Two auxiliary positioning ground nails 11 squeeze into ground through location hole 5, and upper pier body 12 is placed on lower pier after fixing to lower pier body 1 1 top center position of body guarantees the one-to-one correspondence of connecting hole 3 inside upper pier body 13 and lower pier body 1 when placement, is set in advance in down Fastening screw 12 inside pier body 1 can come out through the connecting hole 3 of upper pier body 13, and the second fastening nut 14 is nested in fastening spiral shell It follows closely 12 tops and tightens, at this time stable connection between upper pier body 13 and lower pier body 1, then clump weight 2 is nested on positioning screw 7 And tighten the first fastening nut 8 and it is fixed, entire pre-cast concrete pier fixation finishes, and photovoltaic apparatus is finally passed through installation Plate 15 is connected thereto.
In summary;The photovoltaic construction pre-cast concrete pier of high stability described in the utility model, with existing high stability Photovoltaic construction compared with pre-cast concrete pier and have road holding strong, be convenient for the positioning in hole, upper and lower pier when installation between pier body up and down Connection procedure is simple between body and stability is strong.
The foregoing description of the disclosed embodiments can be realized professional and technical personnel in the field or using originally practical new Type.Various modifications to these embodiments will be readily apparent to those skilled in the art, and determine herein The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause This, the present invention will not be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The widest scope consistent with features of novelty.

Claims (4)

1. a kind of photovoltaic construction pre-cast concrete pier of high stability, including lower pier body (1), upper pier body (13), firm ground nail (10), it is characterised in that: the upper pier body (13) be in be horizontally set on the top center position of lower pier body (1), and with lower pier body (1) it is flexibly connected, the inside of the upper pier body (13) and lower pier body (1) is equipped with the fixation hole (4) being vertical setting, described solid The side for determining hole (4) is set there are two symmetrical location hole (5), and the side of the fixation hole (4) sets that there are four be uniformly distributed Connecting hole (3), the connecting hole (3) is circumferentially positioned at the surrounding of fixation hole (4), and the inside of the lower pier body (1) is equipped with steady Gu ground nail (10), firm ground nail (10) insertion is arranged in the bosom position of fixation hole (4), and with fixation hole (4) it Between realize clearance fit, the inside of the lower pier body (1) is equipped with auxiliary positioning ground nail (11), and the auxiliary positioning ground nail (11) is embedding Enter to be arranged in the bosom position of location hole (5), and realizes clearance fit between location hole (5), the lower pier body (1) Inside is equipped with fastening screw (12), and the fastening screw (12) insertion is arranged in the bosom position of connecting hole (3), and with even It connects and realizes clearance fit between hole (3), the top of the fastening screw (12) is through setting in the top center of upper pier body (13) The top of position, the fastening screw (12) is equipped with the second fastening nut (14), second fastening nut (14) and fastening spiral shell Nail (12) is connected through a screw thread, and the side of the lower pier body (1) is equipped with dorsalis medullae spinalis extension base (9), and the dorsalis medullae spinalis extension base (9) sets in level The side wall in lower pier body (1) is set, and fits closely and fixes with lower pier body (1), the top of the dorsalis medullae spinalis extension base (9) is equipped with uniform The positioning screw (7) of distribution, the positioning screw (7) are vertical setting in the top center position of dorsalis medullae spinalis extension base (9), and with prolong It stretches substrate (9) to be fixed by screws, the top of the positioning screw (7) is equipped with the first fastening nut (8), and described first is tight Gu be connected through a screw thread between nut (8) and positioning screw (7), the top of the upper pier body (13) be equipped with two pieces it is symmetrical The bottom end insertion of mounting plate (15), the mounting plate (15) is arranged in the inside of upper pier body (13), and close with upper pier body (13) It posts and fixes, the side of the mounting plate (15) is equipped with mounting hole (16).
2. the photovoltaic construction pre-cast concrete pier of a kind of high stability according to claim 1, it is characterised in that: the lower pier The top of body (1) is equipped with the curved locating piece in edge (6), and the curved locating piece in edge (6) is vertical setting in lower pier body (1) Top edge position, and fit closely and fix with lower pier body (1).
3. the photovoltaic construction pre-cast concrete pier of a kind of high stability according to claim 1, it is characterised in that: the extension The top of substrate (9) is equipped with clump weight (2), the embedding bottom middle position for being set on positioning screw (7) of clump weight (2), And clearance fit is realized between positioning screw (7).
4. the photovoltaic construction pre-cast concrete pier of a kind of high stability according to claim 1, it is characterised in that: the upper pier The bottom of body (13) is equipped with through-hole (17), and the through-hole (17) is in the bottom middle position for being horizontally set on pier body (13).
CN201821232413.2U 2018-08-02 2018-08-02 A kind of photovoltaic construction pre-cast concrete pier of high stability Active CN208608923U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821232413.2U CN208608923U (en) 2018-08-02 2018-08-02 A kind of photovoltaic construction pre-cast concrete pier of high stability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821232413.2U CN208608923U (en) 2018-08-02 2018-08-02 A kind of photovoltaic construction pre-cast concrete pier of high stability

Publications (1)

Publication Number Publication Date
CN208608923U true CN208608923U (en) 2019-03-15

Family

ID=65671498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821232413.2U Active CN208608923U (en) 2018-08-02 2018-08-02 A kind of photovoltaic construction pre-cast concrete pier of high stability

Country Status (1)

Country Link
CN (1) CN208608923U (en)

Similar Documents

Publication Publication Date Title
CN210328901U (en) Fence for animal husbandry breeding
CN208608923U (en) A kind of photovoltaic construction pre-cast concrete pier of high stability
CN112909742A (en) Lightning protection device for high-rise building
CN207714362U (en) A kind of adjustable equipment supporter
CN209250196U (en) A kind of lightning rod core that can consolidate installation
CN208586920U (en) Steel column installs alignment tool
CN208589948U (en) A kind of novel BIPV project photovoltaic module support device II
CN205453607U (en) Horizontal device is adjusted to photovoltaic support
CN209585640U (en) Assembled concrete pump line fixes bracket
CN211313306U (en) Movable scaffold for constructional engineering
CN207977705U (en) A kind of pole grasp type distribution box fixing bracket and the distribution box mating with it
CN209637224U (en) A kind of assembled wall
CN208201845U (en) A kind of sand proof net of quick release installation
CN208183801U (en) A kind of pumped well port control cabinet connector
CN209523768U (en) A kind of fall of ground controlling device
CN210184028U (en) Dragon fruit planting frame column
CN206873957U (en) A kind of ground photovoltaic column pre-embedded anchoring bolts constructing device
CN209013137U (en) A kind of streetlamp lamp socket
CN207161875U (en) A kind of valve buttress applied to long distance pipeline yard
CN219569658U (en) Building earthwork height-adjustable guardrail
CN205569673U (en) Badminton block frame
CN205374521U (en) Horizontal rack of electric power laboratory glassware
CN208479527U (en) A kind of fixed pedestal of photovoltaic bracket
CN205840376U (en) A kind of safety barrier apparatus
CN220621364U (en) Steel pipe protection railing of adjustable height and width

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant