CN209585640U - Assembled concrete pump line fixes bracket - Google Patents
Assembled concrete pump line fixes bracket Download PDFInfo
- Publication number
- CN209585640U CN209585640U CN201920193086.2U CN201920193086U CN209585640U CN 209585640 U CN209585640 U CN 209585640U CN 201920193086 U CN201920193086 U CN 201920193086U CN 209585640 U CN209585640 U CN 209585640U
- Authority
- CN
- China
- Prior art keywords
- fixed
- hoop
- positioning base
- column
- concrete pump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000003381 stabilizer Substances 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 9
- 238000010276 construction Methods 0.000 abstract description 6
- 238000005086 pumping Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 230000008093 supporting effect Effects 0.000 description 1
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
组装式混凝土泵管固定支架,包括条形的定位底座,定位底座上固定有竖直的立柱,立柱的一侧固定有倾斜的安装架,安装架的下端固定在定位底座上;所述安装架的上侧设有水平的第一抱箍,安装架背离立柱的一侧设有竖直的第二抱箍,安装架的正上方设有斜置的第三抱箍,第一抱箍、第三抱箍和第二抱箍均固定在T型的转脚支撑上,第一抱箍上的转脚支撑固定在立柱上,第三抱箍上的转脚支撑固定在安装架上,第二抱箍上的转脚支撑固定在定位底座上;所述定位底座的两侧固定有若干固定支脚;固定支脚上成型有若干竖直的安装孔。它将传统混凝土泵管竖向固定、水平固定及弯管固定集成在一个固定支架上,极大简化了混凝土泵管固定施工。
The assembled concrete pump pipe fixing bracket includes a strip-shaped positioning base, a vertical column is fixed on the positioning base, an inclined mounting frame is fixed on one side of the column, and the lower end of the mounting frame is fixed on the positioning base; the mounting frame There is a horizontal first hoop on the upper side of the mounting frame, a vertical second hoop is provided on the side of the mounting frame away from the column, and a slanted third hoop is provided directly above the mounting frame. The first hoop, the second hoop Both the three hoops and the second hoop are fixed on the T-shaped swivel foot support, the swivel foot support on the first hoop is fixed on the column, the swivel foot support on the third hoop is fixed on the mounting frame, and the second hoop is fixed on the mounting frame. The swivel feet on the hoop are supported and fixed on the positioning base; a number of fixed feet are fixed on both sides of the positioning base; a number of vertical installation holes are formed on the fixed feet. It integrates the vertical fixation, horizontal fixation and elbow fixation of traditional concrete pump pipes on a fixed bracket, which greatly simplifies the construction of concrete pump pipe fixation.
Description
技术领域:Technical field:
本实用新型涉及建筑辅助装置的技术领域,更具体地说涉及组装式混凝土泵管固定支架。The utility model relates to the technical field of building auxiliary devices, in particular to an assembled concrete pump pipe fixing bracket.
背景技术:Background technique:
目前混凝土泵送技术作为混凝土垂直运输的重要技术手段已被广泛地应用于各种高层、超高层建筑施工中。混凝土泵管固定作为混凝土泵送的重要一环,直接影响着混凝土在垂直运送过程的安全性与稳定性。而混凝土泵管转角处由于受力情况复杂,更是混凝土泵管固定的重难点部位。传统的混凝土泵管转角固定,一般由水平固定、弯管固定和竖向固定三部分组成,多采用钢管搭设,存在以下缺点:①需要对水平管、转角部位与竖向管分别搭设安装架,施工相对比较复杂,且需要占用较大的空间。②由钢管搭设的安装架由于缺少可靠的固定措施,无法支承混凝土泵管泵送过程中在弯管部位产生的动力荷载。③混凝土泵管在泵管过程中受到摩擦力作用会发生竖向及水平方向窜动,会使钢管支架产生偏位、变形,严重影响其支撑效果。At present, concrete pumping technology has been widely used in the construction of various high-rise and super high-rise buildings as an important technical means of concrete vertical transportation. Concrete pump pipe fixing is an important part of concrete pumping, which directly affects the safety and stability of concrete during vertical transportation. The corner of the concrete pump pipe is the most important and difficult part to fix the concrete pump pipe due to the complicated stress situation. The corner fixing of traditional concrete pump pipes is generally composed of three parts: horizontal fixing, elbow fixing and vertical fixing. Most of them are erected by steel pipes, which have the following disadvantages: ① It is necessary to set up mounting frames for horizontal pipes, corner parts and vertical pipes respectively. The construction is relatively complicated and requires a large space. ② Due to the lack of reliable fixing measures, the installation frame erected by the steel pipe cannot support the dynamic load generated at the elbow during the pumping process of the concrete pump pipe. ③ Concrete pump pipes will move vertically and horizontally under the action of friction during the pumping process, which will cause deviation and deformation of steel pipe supports, which will seriously affect their supporting effect.
实用新型内容:Utility model content:
本实用新型的目的就是针对现有技术之不足,其将传统混凝土泵管竖向固定、水平固定及弯管固定集成在一个固定支架上,极大简化了混凝土泵管固定施工。The purpose of this utility model is to address the deficiencies of the prior art. It integrates the vertical fixation, horizontal fixation and elbow fixation of traditional concrete pump pipes on a fixed bracket, which greatly simplifies the construction of concrete pump pipe fixation.
组装式混凝土泵管固定支架,包括条形的定位底座,定位底座上固定有竖直的立柱,立柱的一侧固定有倾斜的安装架,安装架的下端固定在定位底座上;所述安装架的上侧设有水平的第一抱箍,安装架背离立柱的一侧设有竖直的第二抱箍,安装架的正上方设有斜置的第三抱箍,第一抱箍、第三抱箍和第二抱箍均固定在T型的转脚支撑上,第一抱箍上的转脚支撑固定在立柱上,第三抱箍上的转脚支撑固定在安装架上,第二抱箍上的转脚支撑固定在定位底座上;所述定位底座的两侧固定有若干固定支脚;固定支脚上成型有若干竖直的安装孔。The assembled concrete pump pipe fixing bracket includes a strip-shaped positioning base, a vertical column is fixed on the positioning base, an inclined mounting frame is fixed on one side of the column, and the lower end of the mounting frame is fixed on the positioning base; the mounting frame There is a horizontal first hoop on the upper side of the mounting frame, a vertical second hoop is provided on the side of the mounting frame away from the column, and a slanted third hoop is provided directly above the mounting frame. The first hoop, the second hoop Both the three hoops and the second hoop are fixed on the T-shaped swivel foot support, the swivel foot support on the first hoop is fixed on the column, the swivel foot support on the third hoop is fixed on the mounting frame, and the second hoop is fixed on the mounting frame. The swivel feet on the hoop are supported and fixed on the positioning base; several fixed feet are fixed on both sides of the positioning base; several vertical installation holes are formed on the fixed feet.
优选的,所述的第三抱箍与安装架相垂直。Preferably, the third hoop is perpendicular to the installation frame.
优选的,所述立柱背离安装架的一侧设有倾斜的辅助支撑,辅助支撑的上端固定在立柱上,辅助支撑的下端固定在定位底座上。Preferably, the side of the column facing away from the installation frame is provided with an inclined auxiliary support, the upper end of the auxiliary support is fixed on the column, and the lower end of the auxiliary support is fixed on the positioning base.
优选的,所述辅助支撑、立柱、安装架、定位底座、转脚支撑和固定支脚之间的固定连接均采用螺栓组件连接。Preferably, the fixed connection between the auxiliary support, the column, the mounting frame, the positioning base, the swivel foot support and the fixed foot is all connected by a bolt assembly.
优选的,所述定位底座的下端面和固定支脚的下端面在同一平面内。Preferably, the lower end surface of the positioning base and the lower end surface of the fixing leg are in the same plane.
本实用新型的有益效果在于:The beneficial effects of the utility model are:
1、它将传统混凝土泵管竖向固定、水平固定及弯管固定集成在一个固定支架上,极大简化了混凝土泵管固定施工。1. It integrates the vertical fixation, horizontal fixation and elbow fixation of traditional concrete pump pipes on a fixed bracket, which greatly simplifies the construction of concrete pump pipe fixation.
2、它采用固定支架可以利用膨胀螺栓与楼地面锚固固定,无需预埋,摆脱了竖向固定对泵管布置位置的制约,极大提高了混凝土泵管布置的灵活性。2. It adopts the fixed bracket, which can be anchored and fixed with the floor by using expansion bolts, without pre-embedding, and gets rid of the restriction of vertical fixing on the position of the pump pipe, which greatly improves the flexibility of the concrete pump pipe layout.
3、它采用的固定支架各零部件之间采用螺栓连接,组装及拆卸简单方便,可重复多次使用。3. The components of the fixed bracket are connected by bolts, the assembly and disassembly are simple and convenient, and can be used repeatedly.
附图说明:Description of drawings:
图1为本实用新型正视的结构示意图;Fig. 1 is the structural representation of the utility model front view;
图2为本实用新型侧视的结构示意图。Fig. 2 is a schematic structural view of the utility model in side view.
图中:1、定位底座;2、立柱;3、安装架;4、第一抱箍;5、固定支脚;6、第二抱箍;7、转脚支撑;8、辅助支撑;9、固定支脚;10、膨胀螺栓;11、混凝土泵管。In the figure: 1. Positioning base; 2. Column; 3. Mounting frame; 4. First hoop; 5. Fixed foot; 6. Second hoop; Legs; 10. Expansion bolts; 11. Concrete pump pipe.
具体实施方式:Detailed ways:
实施例:见图1、2所示,组装式混凝土泵管固定支架,包括条形的定位底座1,定位底座1上固定有竖直的立柱2,立柱2的一侧固定有倾斜的安装架3,安装架3的下端固定在定位底座1上;所述安装架3的上侧设有水平的第一抱箍4,安装架3背离立柱2的一侧设有竖直的第二抱箍6,安装架3的正上方设有斜置的第三抱箍5,第一抱箍4、第三抱箍5和第二抱箍6均固定在T型的转脚支撑7上,第一抱箍4上的转脚支撑7固定在立柱2上,第三抱箍5上的转脚支撑7固定在安装架3上,第二抱箍6上的转脚支撑7固定在定位底座1上;所述定位底座1的两侧固定有若干固定支脚9;固定支脚9上成型有若干竖直的安装孔。Embodiment: As shown in Figures 1 and 2, the assembled concrete pump pipe fixing bracket includes a strip-shaped positioning base 1, a vertical column 2 is fixed on the positioning base 1, and an inclined mounting frame is fixed on one side of the column 2 3. The lower end of the mounting frame 3 is fixed on the positioning base 1; the upper side of the mounting frame 3 is provided with a horizontal first hoop 4, and the side of the mounting frame 3 away from the column 2 is provided with a vertical second hoop 6. There is an oblique third hoop 5 directly above the installation frame 3. The first hoop 4, the third hoop 5 and the second hoop 6 are all fixed on the T-shaped swivel foot support 7. The first hoop The swivel foot support 7 on the hoop 4 is fixed on the column 2, the swivel foot support 7 on the third hoop 5 is fixed on the installation frame 3, and the swivel foot support 7 on the second hoop 6 is fixed on the positioning base 1 ; The two sides of the positioning base 1 are fixed with a number of fixed feet 9; the fixed feet 9 are formed with a number of vertical mounting holes.
优选的,所述的第三抱箍5与安装架3相垂直。Preferably, the third hoop 5 is perpendicular to the installation frame 3 .
优选的,所述立柱2背离安装架3的一侧设有倾斜的辅助支撑8,辅助支撑8的上端固定在立柱2上,辅助支撑8的下端固定在定位底座1上。Preferably, the side of the column 2 facing away from the installation frame 3 is provided with an inclined auxiliary support 8 , the upper end of the auxiliary support 8 is fixed on the column 2 , and the lower end of the auxiliary support 8 is fixed on the positioning base 1 .
优选的,所述辅助支撑8、立柱2、安装架3、定位底座1、转脚支撑7和固定支脚9之间的固定连接均采用螺栓组件连接。Preferably, the fixed connection between the auxiliary support 8, the column 2, the mounting frame 3, the positioning base 1, the swivel foot support 7 and the fixed foot 9 is all connected by a bolt assembly.
优选的,所述定位底座1的下端面和固定支脚9的下端面在同一平面内。Preferably, the lower end surface of the positioning base 1 and the lower end surface of the fixing leg 9 are in the same plane.
工作原理:本实用新型为组装式混凝土泵管固定支架,转脚支撑7与第一抱箍4、第三抱箍5或第二抱箍6是在组装之间固定在一起的,安装时通过螺栓组件和转脚支撑7将第一抱箍4、第三抱箍5或第二抱箍6分别安装到立柱2、定位底座1和安装架3上,然后通过螺栓组件将该固定支架组装并利用膨胀螺栓10将组装好的固定支架安装相应的施工区域;Working principle: This utility model is an assembled concrete pump pipe fixing bracket. The swivel foot support 7 and the first hoop 4, the third hoop 5 or the second hoop 6 are fixed together during assembly. Install the first hoop 4, the third hoop 5 or the second hoop 6 on the column 2, the positioning base 1 and the mounting frame 3 respectively by the bolt assembly and the swivel foot support 7, and then assemble the fixed bracket through the bolt assembly and Utilize the expansion bolt 10 to install the fixed bracket assembled in the corresponding construction area;
从而当安装混凝土泵管11时,则将第一抱箍4、第三抱箍5或第二抱箍6打开,将混凝土泵管11与第一抱箍4、第三抱箍5或第二抱箍6相固接,就可以固定支撑混凝土泵管11,此固定支架集成度高,占用空间小,同时方便组装固定,并方便回收重复使用。Therefore, when the concrete pump pipe 11 is installed, the first hoop 4, the third hoop 5 or the second hoop 6 are opened, and the concrete pump pipe 11 is connected with the first hoop 4, the third hoop 5 or the second hoop. The 6 phases of the hoops are fixedly connected, and the concrete pump pipe 11 can be fixedly supported. This fixing bracket has a high degree of integration, takes up little space, is convenient for assembly and fixing, and is convenient for recycling and reuse.
所述实施例用以例示性说明本实用新型,而非用于限制本实用新型。任何本领域技术人员均可在不违背本实用新型的精神及范畴下,对所述实施例进行修改,因此本实用新型的权利保护范围,应如本实用新型的权利要求所列。The embodiments are used to illustrate the utility model, but not to limit the utility model. Any person skilled in the art can modify the embodiments without violating the spirit and scope of the utility model, so the protection scope of the utility model should be as listed in the claims of the utility model.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920193086.2U CN209585640U (en) | 2019-02-13 | 2019-02-13 | Assembled concrete pump line fixes bracket |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920193086.2U CN209585640U (en) | 2019-02-13 | 2019-02-13 | Assembled concrete pump line fixes bracket |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209585640U true CN209585640U (en) | 2019-11-05 |
Family
ID=68354353
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920193086.2U Expired - Fee Related CN209585640U (en) | 2019-02-13 | 2019-02-13 | Assembled concrete pump line fixes bracket |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209585640U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113216638A (en) * | 2021-04-16 | 2021-08-06 | 湖南响箭重工科技股份有限公司 | Conveying pipe device, pumping system and pump truck |
-
2019
- 2019-02-13 CN CN201920193086.2U patent/CN209585640U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113216638A (en) * | 2021-04-16 | 2021-08-06 | 湖南响箭重工科技股份有限公司 | Conveying pipe device, pumping system and pump truck |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105040945B (en) | Connection node structure of fair-faced concrete prefabrication exterior wall hanging plates | |
| CN209585630U (en) | Building construction formwork adjustable support frame | |
| CN209585640U (en) | Assembled concrete pump line fixes bracket | |
| CN202577960U (en) | A Suspended Outer Bearing Composite Steel Formwork Applied in Roller Compacted Concrete Construction | |
| CN209211917U (en) | A prefabricated beam support structure | |
| CN115492373A (en) | The formwork support structure of the cantilevered platform floating outside the building with bay windows | |
| CN111853354A (en) | A height-adjustable anti-seismic support hanger | |
| CN206874312U (en) | A kind of novel shield tunnel pre-buried channel flow dedicated shock-proof support | |
| CN218323888U (en) | The formwork support structure of the cantilevered platform floating outside the building with bay windows | |
| CN204570988U (en) | Reinforced concrete frame column load conversion device | |
| CN105586987B (en) | Open trench tunnel open type agent structure side wall Bailey bracket formwork and its construction technology | |
| CN208830763U (en) | A steel lattice support device for super heavy components | |
| CN206971716U (en) | A kind of concrete exterior wall body fixed-type device | |
| CN216340861U (en) | Diagonal bracing structure for aluminum alloy template | |
| CN207004059U (en) | A kind of combined support frame and wall-panels supports structure | |
| CN202266025U (en) | Support structure for on-site concrete beam template | |
| CN217175696U (en) | Laminated floor slab formwork system | |
| CN207727978U (en) | Girderless floor bolumn cap template reinforcing device | |
| CN204664623U (en) | A kind of vertical pump line fixing device | |
| CN212224667U (en) | Roof steel truss assembled tire frame | |
| CN204571041U (en) | Floor | |
| CN211257760U (en) | A triangular support device for cantilevered scaffolding | |
| CN209907217U (en) | Large-volume bearing platform cooling system | |
| CN222253055U (en) | A vertical support reinforcement device for a high-leg hanging basket | |
| CN221828535U (en) | Space-adjustable cable bridge frame with high compression resistance and bending resistance |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191105 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |