CN208594760U - One kind is laid bricks operation platform - Google Patents
One kind is laid bricks operation platform Download PDFInfo
- Publication number
- CN208594760U CN208594760U CN201821120674.5U CN201821120674U CN208594760U CN 208594760 U CN208594760 U CN 208594760U CN 201821120674 U CN201821120674 U CN 201821120674U CN 208594760 U CN208594760 U CN 208594760U
- Authority
- CN
- China
- Prior art keywords
- frame
- scaffold
- support frame
- operation platform
- adjusting bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
One kind is laid bricks operation platform, including support frame and scaffold;Side on the support frame is arranged by column grafting in the scaffold;The utility model makes the utility model assembly or disassembly in practice all extremely convenient in the structure that overall structure is bridging type, and realize that modularization makes operation strategies wider, it is provided with telescoping mechanism on the support frame, the utility model is made to store and carry all more efficient and convenient when not needed;In the husky ash box that is provided with certain altitude on scaffold and set when brick box to lay bricks that worker is more laborsaving to improve efficiency of laying bricks, it is provided with adjusting bracket to make that desired height can be reached according to the superposition quantity of adjusting bracket when needing different height operation platform, so that the utility model applicability is more extensive.
Description
Technical field
The utility model relates to the operation platforms in building, and in particular to a kind of operation platform laid bricks.
Background technique
In present skyscraper, it is essential for laying bricks, and operation platform will necessarily be built in brick-laying processes, is passed now
The way of system be it is with plank or steelframe overlap joint and high in the block with metope and overlap in layer, such labour increase and
Inefficiency;When tradition is laid bricks, bricklayer is usually that a hand takes one hand of brick that brick is taken then to smear husky ash, in this process
In take brick and smear husky ash and will bend over to carry out so that labor intensity of workers is excessive, and be easy to cause occupational disease and work imitated
Rate is not high;The plank or steelframe finally dismantled after finishing building wall are often scrapped, such waste of resource and in demolishing process
Waste manpower and material resources.
Utility model content
The utility model provides one kind and lays bricks operation platform, this operation platform solves labor intensity in traditional technology
Greatly, inefficiency and the problem of waste of resource.
The problem of the utility model, is not limited to purpose mentioned above, the utility model technical field it is general
Logical technical staff can be expressly understood that unmentioned other problems according to following contents.
To achieve the above object, the utility model structure technology scheme is as follows: one kind is laid bricks operation platform, including support frame
And scaffold;Side on the support frame is arranged by column grafting in the scaffold;
Support frame as described above includes telescoping mechanism, two sub-frames and four rolling;To be below described two close to construction metope
Sub-frame is arranged in parallel in the front and back and hingedly forms support frame by telescoping mechanism, and is located on the frame of front
It is provided with step, the telescoping mechanism includes the two secondary rod members by two connecting rods intersections in X-type respectively, every pair hinge bar
In its point of intersection, two endpoints of wherein one end of two secondary rod members are respectively hinged at described corresponding to it the hinge joint of part
On frame, two endpoints of the other end of two secondary rod members are hinged in same hinged set, and the hinged set is equipped with interior
The tubular structure of screw thread, positioning screw rod are screwed into two hinged sets and lock the articulated structure between two secondary rod members;It is described
The bottom end of corresponding four feet of frame is arranged in four rolling, and two of them are the universal of locking piece, and remaining two, wheel are fixed
To wheel, the bottom end of a sub-frame is equipped with a universal wheel and a directional wheel simultaneously;
The scaffold includes support platform, slide bar and husky ash box;The support platform is lauched on construction metope side
Level land is provided with the slide bar of two pentagonal prism types, sliding part is provided in the sand ash box, and husky ash box passes through sliding part and cunning
Bar is in slidable connection.
Further, the operation platform further includes the adjusting bracket for adjusting height;The adjusting bracket is set by grafting
It is placed between support frame and scaffold, the lower end of adjusting bracket is provided with the inserted terminal for connecting support frame, the upper end of adjusting bracket
It is provided with the bell end for connection construction frame.
Further, it is provided on the scaffold and sets brick box, and the brick box of setting is slidably disposed on slide bar.
Further, frame top surface two sides are provided with sliding block, and are connected with two connecting rods in frame top surface and intersect
In the rod member of X-type, the hinge joint of every vice connecting rod is in its point of intersection, and wherein the two of connecting rod endpoint is respectively hinged at institute
State on sliding block, the sliding block be in frame slidable connection.
The utility model has the beneficial effects that the utility model makes the use of the new type in the structure that overall structure is bridging type
Assembly or disassembly is all extremely convenient in practice, and realizes that modularization makes operation strategies wider, is arranged on the support frame
There is telescoping mechanism that the utility model is made to store and carry all more efficient and convenient when not needed;One is provided on scaffold
Determine the husky ash box of height and set when brick box to lay bricks that worker is more laborsaving to improve efficiency of laying bricks, is provided with adjusting bracket and makes
It needs that desired height can be reached when different height operation platform according to the superposition quantity of adjusting bracket, so that the utility model is suitable
It is more extensive with property.
Detailed description of the invention
Fig. 1 is the utility model structure chart
Fig. 2 is support frame side view
Fig. 3 is scaffold side structure schematic diagram
Fig. 4 is support frame top view
Fig. 5 is hinged set structural schematic diagram
Component label instructions: support frame 1, scaffold 2, adjusting bracket 3, frame 11, step 12, idler wheel 13, telescoping mechanism 14,
Connecting rod 141, positioning screw rod 142, hinged set 143, sliding block 144, husky ash box 21, slide bar 22, set brick box 23, support platform 24,
Sliding part 211, bell end 31, inserted terminal 32.
Specific embodiment
It elaborates with reference to the accompanying drawing to the utility model.
As shown in figure 1-3, one kind is laid bricks operation platform, including support frame 1 and scaffold 2;The scaffold 2 passes through column
Grafting is arranged above support frame 1;
Support frame as described above 1 includes telescoping mechanism 14, two sub-frames 11 and four rolling 13;After being close to construction metope
Face, two sub-frame 11 are arranged in parallel in the front and back and hingedly form support frame 1, and position by telescoping mechanism 14
In being provided with step 12 on the frame 11 of front, the telescoping mechanism 14 includes two secondary respectively by two intersections of connecting rods 141 in X
The rod member of type, the hinge joint of every pair rod member is in its point of intersection, two endpoints of wherein one end of two secondary rod members
It is respectively hinged on the frame 11 corresponding to it, two endpoints of the other end of two secondary rod members are hinged on same hinge
In female connector 143, the hinged set 143 is to set internal thread tubular structure, and positioning screw rod 142 is screwed into the band of two hinged sets 143
The articulated structure between two secondary rod members is locked in the hole 145 of internal screw thread;The four rolling 13 is arranged in frame 11
The bottom end of corresponding four feet, two of them are the universal of locking piece, and remaining two, wheel are directional wheel, a sub-frame 11
Bottom end be equipped with a universal wheel and a directional wheel simultaneously;
The scaffold 2 includes support platform 24, slide bar 22 and husky ash box 21;The support platform 24 is close to construction metope
Side is horizontally provided with the slide bar 22 of two pentagonal prism types up and down, and sliding part 211, and husky ash box are provided in the sand ash box 21
21 pass through sliding part 211 and slide bar 22 in slidable connection.The setting of the telescoping mechanism 14 is so that in storage and dismounting
It is more convenient, and the setting of husky ash box 21 is so that the utility model is more humanized in practical, so that taking husky ash more convenient
To saving the time, and improve the efficiency of construction, the setting of idler wheel 13 so that the workbench it is mobile get up it is more laborsaving.
Further, the operation platform further includes the adjusting bracket 3 for adjusting height;The adjusting bracket 3 passes through grafting
It is set between support frame 1 and scaffold 2, the lower end of adjusting bracket 3 is provided with the inserted terminal 32 for connecting support frame 1, adjusts
The upper end of frame 3 is provided with the bell end 31 for connection construction frame 2.The setting of the structure so that the applicability of this platform is stronger,
Previous operation platform can be saved repeatedly to demand is reached by grafting adjusting bracket 3 in the demand for needing different height
The time consumed when overlap joint, to improve efficiency and save the amount of labour.
Further, it is provided on the scaffold 2 and sets brick box 23, and the brick box 23 of setting is slidably disposed on slide bar
On 22, the setting saving for setting brick box 23 takes the time of brick when laying bricks, and takes brick more aspect quick.
Further, the 11 top surface two sides of frame are provided with sliding block 144, and are connected with two connections in 11 top surface of frame
Bar 141 intersect be in X-type rod member, the hinge joint of every vice connecting rod 141 is in its point of intersection, wherein the two of connecting rod 141
Endpoint is respectively articulated on the slide block, the sliding block 144 be in 11 slidable connection of frame.The setting of the structure makes a side
Face increases the support strength of support frame 1, is achieved the contractile function for shrinking support frame 1.
Hereinafter, being illustrated to the effect of the embodiment constituted in the above described manner:
The operation platform system of laying bricks of the utility model is made of support frame 1, scaffold 2 and adjusting bracket 2, concrete composition structure
Shown in part and distributing position (such as Fig. 1-3), its working principle is that whole assembly work, different height are realized by adjusting bracket 3
The needs built a wall are spent, platform construction in brick-laying processes are realized by the assembly of scaffold 2 and support frame 1, concrete operations process:
Scaffold 2 is stretched out by the telescoping mechanism 14 of support frame 1 according to the size of construction location space before first step construction, is reached
Suitable position, which just screws in positioning screw rod 141 in the tapped hole 145 of threaded hinged set 143, makes support frame 1 not
Sliding, second step increase by 3 quantity of adjusting bracket suitably according to the face height of having built a wall to reach suitable height, two-by-two adjusting bracket 3 it
Between by socket joint connect, when third step determines metope height and adjusting bracket 3, scaffold 2 is assembled on adjusting bracket 3 or is propped up
On support 1, and by husky ash box 21 and sets brick box 23 and fill so that more convenient and efficient when laying bricks, needs after finishing building one end height
Scaffold 2 is just removed when increasing height, then adds adjusting bracket 3.It is built by this step cycle.
Finally, it is stated that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, although ginseng
The utility model is described in detail according to preferred embodiment, those skilled in the art should understand that, it can be to this
The technical solution of utility model is modified or replaced equivalently, without departing from the objective and model of technical solutions of the utility model
It encloses, should all cover in the scope of the claims of the utility model.
Claims (4)
- The operation platform 1. one kind is laid bricks, which is characterized in that including support frame (1) and scaffold (2);The scaffold (2) passes through Column grafting setting is above support frame (1);Support frame as described above (1) includes telescoping mechanism (14), two sub-frames (11) and four rolling (13);To be close to construction metope Below, two sub-frame (11) is arranged in parallel in the front and back and hingedly forms support frame by telescoping mechanism (14) (1), it and on the frame (11) of front is provided with step (12), the telescoping mechanism (14) includes two pairs respectively by two companies Extension bar (141) intersect be in X-type rod member, the hinge joint of every pair rod member in its point of intersection, two secondary rod members its Two endpoints of middle one end are respectively hinged on the frame (11) corresponding to it, and two of the other end of two secondary rod members Endpoint is hinged in same hinged set, and the hinged set is to set internal thread tubular structure, and positioning screw rod (142) is screwed into two The articulated structure between two secondary rod members is locked in hinged set;Four rolling (13) setting is corresponding in frame (11) Four feet bottom end, two of them are the universal of locking piece, and remaining two, wheel are directional wheel, a sub-frame (11) Bottom end is equipped with a universal wheel and a directional wheel simultaneously;The scaffold (2) includes support platform (24), slide bar (22) and husky ash box (21);The support platform (24) is close to apply Work metope side is horizontally provided with the slide bar (22) of two pentagonal prism types up and down, is provided with sliding part on the sand ash box (21) (211), and husky ash box (21) passes through sliding part (211) and slide bar (22) in slidable connection.
- 2. one kind is laid bricks operation platform according to claim 1, which is characterized in that the operation platform further includes for adjusting The adjusting bracket (3) of height;The adjusting bracket (3) is set between support frame (1) and scaffold (2) by grafting, adjusting bracket (3) Lower end be provided with the inserted terminal (32) for connecting support frame (1), the upper end of adjusting bracket (3) is provided with for connection construction frame (2) bell end (31).
- 3. one kind is laid bricks operation platform according to claim 1, which is characterized in that be provided on the scaffold (2) and set brick Box (23), and the brick box (23) of setting is slidably disposed on slide bar (22).
- 4. one kind is laid bricks operation platform according to claim 1, which is characterized in that frame (11) the top surface two sides are provided with Sliding block (144), and the rod member that two connecting rods (141) intersections are in X-type, every vice connecting rod are connected in frame (11) top surface (141) hinge joint is in its point of intersection, and wherein two endpoints of connecting rod (141) are respectively articulated on the slide block, the cunning Block (144) be in frame (11) slidable connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821120674.5U CN208594760U (en) | 2018-07-13 | 2018-07-13 | One kind is laid bricks operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821120674.5U CN208594760U (en) | 2018-07-13 | 2018-07-13 | One kind is laid bricks operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208594760U true CN208594760U (en) | 2019-03-12 |
Family
ID=65602946
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821120674.5U Expired - Fee Related CN208594760U (en) | 2018-07-13 | 2018-07-13 | One kind is laid bricks operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208594760U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116181074A (en) * | 2022-12-29 | 2023-05-30 | 杭萧钢构(山东)有限公司 | Construction method for high-altitude positioning of steel structure building steel castings |
-
2018
- 2018-07-13 CN CN201821120674.5U patent/CN208594760U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116181074A (en) * | 2022-12-29 | 2023-05-30 | 杭萧钢构(山东)有限公司 | Construction method for high-altitude positioning of steel structure building steel castings |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105133850B (en) | A kind of reinforcement means of existing Analysis of Loess Cave Dwellings | |
CN203782942U (en) | Mounting system used for multi-dimensional-adjusting double-curved-surface titanium-plate curtain wall | |
CN208594760U (en) | One kind is laid bricks operation platform | |
CN103806643B (en) | A kind of shear wall steel form assembly and form of construction work thereof | |
CN204570393U (en) | A kind of double-block type bed plate limited impression builds servicing unit | |
CN205046851U (en) | Building template | |
CN103195079B (en) | Installing type template, installing type template group and complete installing type plate device | |
CN206487122U (en) | A kind of mortar joint pointer of small-sized hollow building block wall | |
CN203654721U (en) | Support frame | |
CN207211518U (en) | Steel construction house beam | |
CN104453235B (en) | Current conversion station fire wall construction technology | |
CN111677325B (en) | A building reinforcing apparatus for city planning | |
CN203769302U (en) | Steel moulding plate component for shear wall | |
CN207892230U (en) | A kind of novel aluminum alloy pattern plate | |
CN206971775U (en) | Masonry mortar pointer | |
CN207362876U (en) | Build aluminum alloy mould plate piping lane corner combined structure | |
CN207244974U (en) | A kind of green plant installation system in market | |
CN207152266U (en) | A kind of construction costs dedicated | |
CN207194407U (en) | A kind of wall and surface spray-painting gun clamping device | |
CN205617763U (en) | Omnipotent support combined bay support element and omnipotent support combined bay | |
CN209066911U (en) | Cement tile work auxiliary device suitable for architectural engineering | |
CN205822778U (en) | A kind of huge post of stiffness is without screw aluminum alloy formwork system | |
CN205821976U (en) | A kind of easy-to-mount high intensity overlapping beam slab | |
CN205894308U (en) | Workshop stand embedded iron structure | |
CN204609317U (en) | A kind of building smoother |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190312 Termination date: 20200713 |
|
CF01 | Termination of patent right due to non-payment of annual fee |