CN208586876U - A kind of detachable tubular pillar operating platform - Google Patents
A kind of detachable tubular pillar operating platform Download PDFInfo
- Publication number
- CN208586876U CN208586876U CN201820884420.4U CN201820884420U CN208586876U CN 208586876 U CN208586876 U CN 208586876U CN 201820884420 U CN201820884420 U CN 201820884420U CN 208586876 U CN208586876 U CN 208586876U
- Authority
- CN
- China
- Prior art keywords
- tubular pillar
- operation table
- operating platform
- anchor ear
- fixed anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides a kind of detachable tubular pillar operating platform, the detachable tubular pillar operating platform is spliced by symmetrical two operation table, the operation table surface is provided with multiple landing beams, operation table side center is provided with tubular pillar semicircle orifice, the operation table bottom is provided with platform fine strain of millet support, the platform fine strain of millet support side is connect with the operation table, its other side is connect with tubular pillar, described two station bottoms are additionally provided with fixed anchor ear, are fixed the two operation table splicings by the fixed anchor ear.Compared with prior art, the cost that the advantageous effects of detachable tubular pillar operating platform described in the utility model are that structure is simplified, are dismounted easily, can be effectively reduced tubular pillar installation, and the period of tubular pillar installation is effectively reduced, furthermore it is also possible to which the detachable tubular pillar operating platform of required man power and material is repaired in the maintenance for efficiently reducing tubular pillar.
Description
Technical field
The utility model relates to steel building technical field of construction, specifically, being related to a kind of detachable tubular pillar behaviour
Make platform.
Background technique
With the fast development of construction(al)steel, pushed away extensively by the architecture structure form of primary building material of steel
Extensively, the relevant technologies are also constantly improve, the main components such as the girder steel made of fashioned iron and steel plate etc., steel column, steel truss of steel construction
Composition, and using derusting rust-proofings techniques such as silanizations.Weld seam, bolt or rivet interlacement are generallyd use between each component or component.
Because its self weight is lighter, and easy construction, it is widely used in the fields such as large-sized workshop, venue, Super High.
Round tube steel column largely uses in steel construction because its succinct moulding, structure stress are clear.Steel pipe column is usually to make
It is constructed for the support of steel construction, because needing to the work such as erecting and welding are carried out at the top of steel pipe column and segmentation, so in steel pipe
In the installation process of column, need to set up interim operating platform at the top of tubular pillar and each segmentation.
Under the prior art, above-mentioned this operating platform is set up, welding platform bracket etc. on tubular pillar is needed to connect
Building, platform bracket is to support level caused by the vertical reaction and brake force and frictional resistance of static load and mobile load from drop in beam
Power, the platform bracket after the completion of setting up also need to be removed with gas flame cuttiug, and to the crator of tubular pillar and platform junction, cut slot
Equal welding defects carry out repair welding and polishing, it is clear that it is such set up after remove, the method for polishing is needed in construction and construction
After expend a large amount of human and material resources, improve construction cost to a certain extent, also extend the period of construction.In addition, set up,
It removes, also the cylinder of tubular pillar can more or less be damaged during repair welding polishing;After platform removal, weight can not be carried out
It is multiple to utilize, when needing to be transferred to next stage and being constructed, need to set up platform again and supplement patching material so that
Construction continues, in this way, further increasing construction loss.
In view of this, should be improved to the prior art, to solve the above-mentioned technical problems in the prior art.
Utility model content
In order to solve the above-mentioned technical problem the utility model is made, the purpose is to provide, a kind of structure is simplified, tears open
Dress is easy, can be effectively reduced the cost of tubular pillar installation, and the period of tubular pillar installation is effectively reduced, separately
Outside, the detachable tubular pillar operating platform of required man power and material is repaired in the maintenance that can also efficiently reduce tubular pillar.
To achieve the goals above, the utility model provides a kind of detachable tubular pillar operating platform, described detachable
Tubular pillar operating platform is spliced by symmetrical two operation table, and the operation table surface is provided with multiple landing beams, institute
It states operation table side center and is provided with tubular pillar semicircle orifice, the operation table bottom is provided with platform fine strain of millet support, described
Platform fine strain of millet support side is connect with the operation table, and the other side is connect with tubular pillar, and described two station bottoms are also set up
There is fixed anchor ear, is fixed the two operation table splicings by the fixed anchor ear.
Preferably, annular girder, the annular girder and the tubular pillar half has can be set in the edge of the operation table
It can be evenly spaced between circular hole and be provided with multiple radiation beams, multiple shop fixtures can be set between radiation beam described in every two
Round steel.
It is further preferred that the guardrail vertical with plane where the operation table can be set on the annular girder
Bar.
Preferably, may include the first fixed anchor ear and the second fixed anchor ear, the described first fixed anchor ear can be set in
Between the operation table and tubular pillar, the described second fixed anchor ear be can be set between the platform fine strain of millet support and tubular pillar.
Further preferably, the described first fixed anchor ear and the second fixed anchor ear can include junction steel plate and activity
Bolt, the movable bolt can pass through the junction steel plate and tense, by the described first fixed anchor ear and second fixed armful
Hoop is fixed.
It is further preferred that when the splicing of two operation tables, between could be formed between two junction steel plates
The length of gap, the gap can be in the range of 4mm to 6mm.
Still further preferably, the length of the junction steel plate can be in the range of 60mm to 80mm, the connection steel
The thickness of plate can be in the range of 80mm to 120mm.
Preferably, the bore of the tubular pillar semicircle orifice can be greater than the diameter of tubular pillar.
As described above with practice it is found that working as standard in detachable tubular pillar operating platform described in the utility model
When standby construction, docked by two symmetrical operation tables, and be sheathed on tubular pillar, then by the first fixed anchor ear of bottom into
Row is connected and fixed, and the platform fine strain of millet support of bottom setting is connected and fixed by the second fixed anchor ear with tubular pillar;When needs are in tubular pillar
Different height when being constructed, it is only necessary to unclamp the first fixed anchor ear and the second fixed anchor ear, and adjust two by pulley blocks
Operation table height in vertical direction is simultaneously spliced again, completes to relocate;After the completion of construction, it is only necessary to unclamp first
Fixed anchor ear and the second fixed anchor ear, then two operation tables are slowly put down by pulley blocks can easily complete operating platform
Dismounting work.In conclusion this kind described in the utility model detachable tubular pillar operating platform, can effectively avoid existing
Have and need to build interim station in technology repeatedly, and station can not repeated disassembled and assembled recycling, cause working sources and life
Produce a large amount of wastes of cost;On the other hand, it avoids in the prior art after the completion of construction, needs to tear operating platform open
It removes, and crator to tubular pillar and platform junction and cuts the welding defects such as slot and repair, significantly reduce and be produced into
Originally, while reducing the construction volume of construction personnel, the installation period of tubular pillar is significantly shortened.
Detailed description of the invention
Fig. 1 is schematic diagram, shows detachable tubular pillar operating platform described in one embodiment of the utility model
Structure;
Fig. 2 is schematic diagram, shows the structure in the direction A-A in Fig. 1;
Fig. 3 is schematic diagram, shows the structure of operation table in detachable tubular pillar operating platform shown in FIG. 1;
Fig. 4 is partial enlargement diagram, shows first of part B in detachable tubular pillar operating platform shown in Fig. 2
The structure of fixed anchor ear;
Fig. 5 is partial enlargement diagram, shows second of C portion in detachable tubular pillar operating platform shown in Fig. 2
The structure of fixed anchor ear.
Specific embodiment
The embodiment of detachable tubular pillar operating platform described in the utility model a kind of described below with reference to the accompanying drawings.
Those skilled in the art will recognize, without departing from the spirit and scope of the utility model, Ke Yiyong
A variety of different modes are modified described embodiment.Therefore, attached drawing and description are regarded as illustrative in nature, without
It is for limiting scope of protection of the claims.In addition, in the present specification, attached drawing is drawn not in scale, and identical attached
Icon note indicates identical part.
Fig. 1 is schematic diagram, shows detachable tubular pillar operating platform described in one embodiment of the utility model
Structure.Fig. 2 is schematic diagram, shows the structure in the direction A-A in Fig. 1.Fig. 3 is schematic diagram, is shown shown in FIG. 1 detachable
The structure of operation table in tubular pillar operating platform.
As shown in Figure 1 to Figure 3, the detachable tubular pillar operating platform as described in the examples of the utility model includes two
A operation table 1 as shown in Figure 3, pass through two operation tables 1 dock and be connected and fixed to be formed it is described in the utility model removable
Tubular pillar operating platform is unloaded, in the embodiment of the utility model, operation table 1 is in semicircle shape, in its of the utility model
In his embodiment, operation table 1 can also be arranged to other symmetrical samples according to specific needs and scheduled carrying needs
Formula.
As shown in Figures 2 and 3, the side center position of operation table 1 is formed with tubular pillar semicircle orifice 11, tubular pillar half
The bore of circular hole 11 is greater than the diameter of tubular pillar 10, when the docking of two operation tables 1, two tubular pillar semicircle orifices of center
11 are spliced into tubular pillar circular hole, so that two operation tables 1 can be set on tubular pillar 10.The setting of its surface of operation table 1
There are multiple landing beams, specifically, the edge of operation table 1 is provided with annular girder 12, annular girder 12 is for wrapping up station
The entire edge of plate 1, region of 1 surface of operation table between annular girder 12 and tubular pillar semicircle orifice 11 are evenly spaced
Multiple radiation beams 13 are provided with, multiple shop fixtures round steel 14, annular girder 12, radiation 13 and of beam are provided between every two radiation beam 13
The whole operation surface of the composition operation table 1 of shop fixtures round steel 14.In the other embodiments of the utility model, 1 table of operation table
Face can also be made up of the operation surface of other patterns the beam column of other patterns, and the embodiments of the present invention are without being limited thereto.
In addition, be also provided on annular girder 12 with 1 place plane of operation table it is perpendicular go along with sb. to guard him railing 2, going along with sb. to guard him railing 2 can be with
The effective construction safety for ensureing construction personnel when constructing on operation table 1.It is provided between operation table 1 and tubular pillar 10
First fixed anchor ear.
Referring to Fig. 1,1 bottom of operation table is provided with platform fine strain of millet support 3, the side of platform fine strain of millet support 3 and the bottom of operation table 1
Connection, the other end are connect with tubular pillar 10, and Fig. 4 is partial enlargement diagram, show detachable tubular pillar behaviour shown in FIG. 1
Make the structure of the first fixed anchor ear in platform.Fig. 5 is partial enlargement diagram, shows detachable tubular pillar shown in FIG. 1
The structure of the second fixed anchor ear in operating platform.As shown in Figure 4 and Figure 5, is provided between platform fine strain of millet support 3 and tubular pillar 10
Two fixed anchor ears, the first fixed anchor ear and the second fixed anchor ear all include junction steel plate 21 and movable bolt 22, pass through movable screw
Bolt 22 passes through junction steel plate 21 and tenses to fix the first fixed anchor ear and the second fixed anchor ear.The length of junction steel plate 21 exists
In 60mm to 80mm range, thickness is in the range of 80mm to 120mm, when the splicing of two operation tables 1, two junction steel plates 21
Between retention gap, the length in the gap is in the range of 4mm to 6mm, and in the embodiment of the utility model, first is fixed
For the junction steel plate 21 of anchor ear having a size of 60mm*20mm*80mm, the size of the junction steel plate 21 of the second fixed anchor ear is 80mm*
20mm*120mm retains the gap of 4.5mm, the reality of the utility model when the splicing of two operation tables 1 between two junction steel plates 21
It applies example to be adjusted with the size of tubular pillar 10, the embodiments of the present invention are without being limited thereto.
As described above with practice it is found that working as standard in detachable tubular pillar operating platform described in the utility model
When standby construction, docked by two symmetrical operation tables, and be sheathed on tubular pillar, then by the first fixed anchor ear of bottom into
Row is connected and fixed, and the platform fine strain of millet support of bottom setting is connected and fixed by the second fixed anchor ear with tubular pillar;When needs are in tubular pillar
Different height when being constructed, it is only necessary to unclamp the first fixed anchor ear and the second fixed anchor ear, and adjust two by pulley blocks
Operation table height in vertical direction is simultaneously spliced again, completes to relocate;After the completion of construction, it is only necessary to unclamp first
Fixed anchor ear and the second fixed anchor ear, then two operation tables are slowly put down by pulley blocks can easily complete operating platform
Dismounting work.In conclusion this kind described in the utility model detachable tubular pillar operating platform, can effectively avoid existing
Have and need to build interim station in technology repeatedly, and station can not repeated disassembled and assembled recycling, cause working sources and life
Produce a large amount of wastes of cost;On the other hand, it avoids in the prior art after the completion of construction, needs to tear operating platform open
It removes, and crator to tubular pillar and platform junction and cuts the welding defects such as slot and repair, significantly reduce and be produced into
Originally, while reducing the construction volume of construction personnel, the installation period of tubular pillar is significantly shortened.
It is described in an illustrative manner above with reference to attached drawing according to a kind of detachable tubular pillar behaviour described in the utility model
Make platform.It will be understood by those skilled in the art, however, that a kind of detachable tubular pillar proposed for above-mentioned the utility model
Operating platform can also make various improvement on the basis of not departing from the content of the present invention.Therefore, the guarantor of the utility model
Shield range should be determined by the content of appended claims.
Claims (8)
1. a kind of detachable tubular pillar operating platform, which is characterized in that the detachable tubular pillar operating platform is by symmetrical two
Operation table is spliced, and the operation table surface is provided with multiple landing beams, and operation table side centre bit installs
It is equipped with tubular pillar semicircle orifice, the operation table bottom is provided with platform fine strain of millet support, the platform fine strain of millet support side and the station
Plate connection, the other side are connect with tubular pillar, and described two station bottoms are additionally provided with fixed anchor ear, are embraced by the fixation
Hoop fixes the two operation table splicings.
2. detachable tubular pillar operating platform as described in claim 1, which is characterized in that the edge of the operation table is set
It is equipped with annular girder, is evenly spaced between the annular girder and the tubular pillar semicircle orifice and is provided with multiple radiation beams, every two
Multiple shop fixtures round steel are provided between the radiation beam.
3. tubular pillar operating platform as claimed in claim 2 detachable, which is characterized in that be provided on the annular girder and institute
What plane was vertical where stating operation table goes along with sb. to guard him railing.
4. detachable tubular pillar operating platform as described in claim 1, which is characterized in that including the first fixed anchor ear and second
Fixed anchor ear, the described first fixed anchor ear are set between the operation table and tubular pillar, the described second fixed anchor ear setting
Between the platform fine strain of millet support and tubular pillar.
5. detachable tubular pillar operating platform as claimed in claim 4, which is characterized in that the described first fixed anchor ear and second
Fixed anchor ear all includes junction steel plate and movable bolt, and the movable bolt passes through the junction steel plate and tenses, will be described
First fixed anchor ear and the second fixed anchor ear are fixed.
6. detachable tubular pillar operating platform as claimed in claim 5, which is characterized in that when the two operation table splicings
When, gap is formed between two junction steel plates, and the length in the gap is in the range of 4mm to 6mm.
7. detachable tubular pillar operating platform as claimed in claim 5, which is characterized in that the length of the junction steel plate exists
In the range of 60mm to 80mm, the thickness of the junction steel plate is in the range of 80mm to 120mm.
8. detachable tubular pillar operating platform as described in claim 1, which is characterized in that the bore of the tubular pillar semicircle orifice
Greater than the diameter of tubular pillar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820884420.4U CN208586876U (en) | 2018-06-07 | 2018-06-07 | A kind of detachable tubular pillar operating platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820884420.4U CN208586876U (en) | 2018-06-07 | 2018-06-07 | A kind of detachable tubular pillar operating platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208586876U true CN208586876U (en) | 2019-03-08 |
Family
ID=65536210
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820884420.4U Active CN208586876U (en) | 2018-06-07 | 2018-06-07 | A kind of detachable tubular pillar operating platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208586876U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110656588A (en) * | 2019-10-12 | 2020-01-07 | 孔令绅 | Portable supporting and protecting structure for elevated road and bridge and assembling method thereof |
CN114215323A (en) * | 2021-12-27 | 2022-03-22 | 广州地铁设计研究院股份有限公司 | Civil engineering and mechanical-electrical integration assembly type maintenance platform and construction method thereof |
-
2018
- 2018-06-07 CN CN201820884420.4U patent/CN208586876U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110656588A (en) * | 2019-10-12 | 2020-01-07 | 孔令绅 | Portable supporting and protecting structure for elevated road and bridge and assembling method thereof |
CN114215323A (en) * | 2021-12-27 | 2022-03-22 | 广州地铁设计研究院股份有限公司 | Civil engineering and mechanical-electrical integration assembly type maintenance platform and construction method thereof |
CN114215323B (en) * | 2021-12-27 | 2023-04-07 | 广州地铁设计研究院股份有限公司 | Civil engineering and mechanical integration assembly type maintenance platform and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208586876U (en) | A kind of detachable tubular pillar operating platform | |
CN104070316B (en) | A kind of assembled group of welded H section steel is to device and using method thereof | |
KR20140002354U (en) | Scaffold fixing apparatus for ship | |
JP2021031884A (en) | Bridge upper structure removal method | |
JP6411970B2 (en) | Method for dismantling and removing mobile work vehicle and mobile work vehicle | |
CN103452045B (en) | A kind of steel bridge can't harm manufacturing process | |
KR101095449B1 (en) | Bridge deck dismembering method and its equipment | |
KR20090102342A (en) | Jig for dismantal of scaffolding big girder | |
CN108528763B (en) | Operation method for enlarging operation space in sealed cabin of spacecraft | |
CN105839539A (en) | Rigid frame bridge zero section support and construction method thereof | |
JPH09268778A (en) | Disassembling method of water-contained gas holder and member used for the same method | |
CN105466709B (en) | Column device is removed for frame structure Progressive Collapse assembled | |
CN104442150B (en) | A kind of stainless steel landscape sculpture installation method | |
US11390497B2 (en) | Construction system | |
CN103592116B (en) | A kind of load cylinder positioning system of shield duct piece testing machine | |
CN105544955A (en) | Elevator shaft tool type operation steel platform and manufacturing method thereof | |
CN110644364A (en) | Hoop construction platform and using method thereof | |
CN103883130B (en) | Spatial mesh structure medium-small diameter penstock installation method | |
CN214530209U (en) | Bridge deck plate joint plate assembling and positioning device for chord member of steel truss girder bridge | |
JP6781314B2 (en) | How to check the turbine diaphragm | |
CN215803452U (en) | Steel construction uninstallation device | |
CN114480758B (en) | Modular dismantling method for blast furnace frame | |
CN211277093U (en) | Saddle-shaped assembled high-altitude welding platform | |
KR20120134772A (en) | Manufacturing method for tank top base medium subassembly of ship having duck keel | |
CN210795587U (en) | Tower crane attachment installation operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |