CN208577927U - Kerbstone installation and maintenance tool - Google Patents

Kerbstone installation and maintenance tool Download PDF

Info

Publication number
CN208577927U
CN208577927U CN201820717271.2U CN201820717271U CN208577927U CN 208577927 U CN208577927 U CN 208577927U CN 201820717271 U CN201820717271 U CN 201820717271U CN 208577927 U CN208577927 U CN 208577927U
Authority
CN
China
Prior art keywords
pull rod
kerbstone
maintenance tool
utility
maintenance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820717271.2U
Other languages
Chinese (zh)
Inventor
粟思橙
廖纪明
蔡向昇
汪家明
李桂军
肖凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCFEB Civil Engineering Co Ltd
Original Assignee
CCFEB Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCFEB Civil Engineering Co Ltd filed Critical CCFEB Civil Engineering Co Ltd
Priority to CN201820717271.2U priority Critical patent/CN208577927U/en
Application granted granted Critical
Publication of CN208577927U publication Critical patent/CN208577927U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of kerbstones to pacify maintenance tool, comprising: the freely adjustable pull rod of length, the handle for being fixed on pull rod one end, the protrusion played hook part, be fixed on pull rod tip along the extending direction of pull rod for being vertically fixed on the pull rod other end;Described hook part includes the inclined-plane for being provided with serrated slot.The utility model kerbstone installation and maintenance tool can dismantle kerbstone be installed, damaged under the conditions of activity space is lesser, cause biggish damage to the molded position in periphery when avoiding kerbstone maintenance and influence;It is easy to operate simultaneously, the efficiency of kerbstone maintenance can be effectively improved.

Description

Kerbstone installation and maintenance tool
Technical field
The utility model belongs to construction engineering technical field, and in particular to a kind of kerbstone installation and maintenance tool.
Background technique
Kerbstone can be divided into vertical curb and flush curb.In general, Kerb of concrete prefabricated section is heavier, geometric dimension For 75 × 38 × 12cm vertical curb prefabricated section weight up to 80kg, transhipment, installation, maintenance process homework burden are heavier.Curb Stone inevitably faces in subsequent construction the problem of vehicle or cal rolling, impact failure after the completion of construction.Completion is tested Damaged kerbstone must be replaced before receipts.Asphalt surface course has been constructed on the outside of plane stone in the case where finish, in order to The kerbstone of displacement is adjusted, or the kerbstone that replacement has damaged, it is necessary to first by the bituminous sheaths adjacent with flush curb Layer is abolished, and flush curb is taken out, then vertical curb is replaced again or by kerbstone dorsally by with a large amount of side of excavating of planting soil It is replaceable.
Utility model content
In view of the above-mentioned problems, the utility model provides a kind of kerbstone installation and maintenance tool, which solve maintenance curbs Shi Shixu abolishes adjacent asphalt surface course and is affected to road overall image and the rear flatness for mending asphalt surface course, excavates road The problems such as it is more that kerb back side planting soil influences position, and homework burden is heavier, and construction efficiency is low.
The utility model is achieved through the following technical solutions.
Kerbstone installation and maintenance tool, characterized by comprising: the freely adjustable pull rod of length is fixed on pull rod one end Handle, be vertically fixed on the protrusion played hook part, be fixed on along the extending direction of pull rod pull rod tip of the pull rod other end;It is described Playing hook part includes the inclined-plane for being provided with serrated slot.
As optimal technical scheme, the protrusion is the downwardly projecting hemisphere bodily form.
As optimal technical scheme, the pull rod includes upper connecting rod, lower pull rod, the bolt for being provided with slot;The upper connecting rod It in the slot of pluggable to lower pull rod, and is locked by bolt, with the length of free adjusting yoke.
The utility model has the beneficial effects that
The utility model kerbstone installation and maintenance tool can under the conditions of activity space is lesser to it is being installed, Damaged kerbstone is dismantled, and is caused biggish damage to the molded position in periphery when avoiding kerbstone maintenance and is influenced; It is easy to operate simultaneously, the efficiency of kerbstone maintenance can be effectively improved.
Detailed description of the invention
Fig. 1 is the main view of the utility model kerbstone installation and maintenance tool;
Fig. 2 is the left view of the utility model kerbstone installation and maintenance tool;
Fig. 3 is schematic diagram when the utility model kerbstone installation and maintenance tool rod length is adjusted;
Fig. 4 is schematic diagram when the utility model kerbstone installation and maintenance tool uses;
Fig. 5 is the schematic diagram lifted when vertical curb is placed in ground using the utility model kerbstone installation and maintenance tool;
The meaning respectively marked in above-mentioned figure are as follows:
1- handle;
2- pull rod, 21- upper connecting rod, pull rod under 22-, 23- bolt;
3- plays hook part, the inclined-plane 31-;
The protrusion 4-;
5- vertical curb;
6- flush curb;
7- planting soil.
Specific embodiment
Other than objects, features and advantages described above, there are also other purposes, feature and excellent for the utility model Point.Below with reference to Figure of description, the utility model is described in further detail.What is constituted part of this application is attached Figure is used to provide a further understanding of the present invention, and the illustrative embodiments and their description of the utility model are for explaining this Utility model does not constitute improper limits to the present invention.
Embodiment 1
Kerbstone installation and maintenance tool, please refers to Fig. 1, Fig. 2, comprising: the freely adjustable pull rod 2 of length is fixed on drawing 2 The handle 1 of one end is vertically fixed on playing hook part 3, being fixed on 2 tip of pull rod along the extending direction of pull rod 2 for 2 other end of pull rod Protrusion 4;Playing hook part 3 includes the inclined-plane 31 for being provided with serrated slot;In above structure, the length of pull rod 2 is freely adjustable, to adapt to not With the vertical curb of height specification;The inclined-plane 31 for playing hook part 3 is provided with serrated slot, vertical curb hook part from when can prevent from lifting vertical curb 3 slip;The protrusion 4 of 2 tip of pull rod setting can be used for lifting and quickly take out when being placed in ground after kerbstone, please refers to figure 5, when use, holds handle 1 with protrusion 4 as fulcrum rotation, has made the disengaging of hook part 3 kerbstone;
The application method of the utility model kerbstone installation and maintenance tool is as follows:
Referring to Fig. 4, the planting soil 7 that 5 side greenbelt of vertical curb backfills is dug out into one of groove first with hook part 3 is played, 5 backrest of vertical curb is exposed and abolished simultaneously;Hook part 3 has been recycled to be inserted into the hook between vertical curb 5 and flush curb 6 In seam, jointing mortar is striked and is cleaned out;Later, two people station is at the both ends of vertical curb 5 respectively by of two maintenance tools 5 bottom of vertical curb is inserted into from the jointing between the groove, vertical curb 5 and flush curb 6 of greenbelt planting soil 7 in hook part 3, and two people are same again When firmly vertical curb 5 lifted to be removed or slightly be moved be repaired or replaced by maintenance tool.
Further, for the ease of the adjusting of 2 length of pull rod, while guaranteeing the force-applied intensity of pull rod 2, referring to Fig. 3, Pull rod 2 includes upper connecting rod 21, the lower pull rod 22 for being provided with slot, bolt 23;In the slot of pluggable to the lower pull rod 22 of upper connecting rod 21, And locked by bolt 23, with the length of free adjusting yoke 2.
Further, it quickly takes out, asks when lifting for the ease of the utility model tool and be placed in ground after kerbstone Refering to Fig. 5, protrusion 4 is the downwardly projecting hemisphere bodily form;It is that fulcrum rotates the utility model that handle 1 is held when use with protrusion 4 Tool has made hook part 3 be detached from kerbstone.

Claims (3)

1. kerbstone installation and maintenance tool, characterized by comprising: the freely adjustable pull rod (2) of length is fixed on pull rod one The handle (1) at end is vertically fixed on playing hook part (3), being fixed on pull rod along the extending direction of pull rod (2) for pull rod (2) other end (2) protrusion (4) of tip;Described hook part (3) includes the inclined-plane (31) for being provided with serrated slot.
2. kerbstone installation and maintenance tool as described in claim 1, it is characterised in that the protrusion (4) is downwardly projecting half Spherical.
3. the kerbstone installation and maintenance tool as described in claim 1-2 is any, it is characterised in that the pull rod (2) includes pull-up Bar (21), the lower pull rod (22) for being provided with slot, bolt (23);The slot of pluggable to the lower pull rod of the upper connecting rod (21) (22) It is interior, and locked by bolt (23), with the length of free adjusting yoke (2).
CN201820717271.2U 2018-05-14 2018-05-14 Kerbstone installation and maintenance tool Active CN208577927U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820717271.2U CN208577927U (en) 2018-05-14 2018-05-14 Kerbstone installation and maintenance tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820717271.2U CN208577927U (en) 2018-05-14 2018-05-14 Kerbstone installation and maintenance tool

Publications (1)

Publication Number Publication Date
CN208577927U true CN208577927U (en) 2019-03-05

Family

ID=65506147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820717271.2U Active CN208577927U (en) 2018-05-14 2018-05-14 Kerbstone installation and maintenance tool

Country Status (1)

Country Link
CN (1) CN208577927U (en)

Similar Documents

Publication Publication Date Title
CN206512569U (en) Concrete road surface steel form
CN208577927U (en) Kerbstone installation and maintenance tool
CN102031757B (en) Method for constructing bottom plate guide layer of jacked-in frame bridge
CN208533545U (en) A kind of side slope sash beam adjustable formwork
CN111322007A (en) Omnibearing high-pressure rotary spraying machine
CN103806435A (en) Terrace subsidence treatment method and terrace structure
CN205000660U (en) Supplementary tool to lock of adjusting
CN106592568B (en) A kind of terrace uniform settlement structure and construction method
CN205224090U (en) It trails a step concrete back seat that advances prefabricated frame in top on sloping slide to become
CN204898592U (en) Road snow removing shovel
CN213538565U (en) Road bridge linkage segment becomes rigidity road bed
CN205035047U (en) Road maintenance is with sticking up brick device
CN211922604U (en) Soil and wood settlement-prevention combined pile
CN212508057U (en) Omnibearing high-pressure rotary spraying machine
CN209907168U (en) Road and bridge curb ramming device
CN106869198A (en) The method that a kind of sagging dead zone of non cohesire soil reinforces pole and tower foundation using cross beam
CN204738265U (en) Road snow removing shovel with adjustable
CN218756881U (en) Road surface bituminous paving instrument
CN108930226A (en) The construction method of jacked frame bridge upper box in the way of spreading slide plate
CN205934639U (en) Temporary road surface system
CN217460107U (en) Deviation rectifying and limiting device for track plate structure
CN107605159A (en) Secondary structure vertical member concrete construction pours device and construction method
CN210049550U (en) Adjustable concrete terrace construction template
CN205021404U (en) Instrument is laid to marble
CN219261169U (en) Curb stone pit soil backfill device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant