CN108930226A - The construction method of jacked frame bridge upper box in the way of spreading slide plate - Google Patents

The construction method of jacked frame bridge upper box in the way of spreading slide plate Download PDF

Info

Publication number
CN108930226A
CN108930226A CN201810947984.2A CN201810947984A CN108930226A CN 108930226 A CN108930226 A CN 108930226A CN 201810947984 A CN201810947984 A CN 201810947984A CN 108930226 A CN108930226 A CN 108930226A
Authority
CN
China
Prior art keywords
slide plate
cabinet
spreading
foundation pit
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810947984.2A
Other languages
Chinese (zh)
Inventor
王佳武
黄剑
赵齐
高龙
高翔
张继培
鲜炳林
杨志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd filed Critical China Railway Sixth Group Co Ltd
Priority to CN201810947984.2A priority Critical patent/CN108930226A/en
Publication of CN108930226A publication Critical patent/CN108930226A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of construction method of the jacked frame bridge upper box in the way of spreading slide plate.It includes setting foundation pit guard system;Form foundation pit;Slide plate and cabinet is made;In nose and both the ground mesohigh rotary churning pile below the region between wired outside constituted spreading slide plate;In shoveling jacking cabinet, until box-body jacking in place.The present invention has the advantage that improving the soil bearing capacity in the region using spreading slide plate.The jack-in process raising middle flask weight heart is more than half stroke always on slide plate and spreading slide plate, and pontic front end, which comes back, pricks head amplitude significantly reduces, and posture is steady.It is later in place to jacking that cabinet center of gravity leaves slide plate, its rear end is always on slide plate and spreading slide plate, there is no since slide plate is short and small and soil bearing capacity is insufficient, jacking later period box back is caused to sink suddenly, cause the state at bottom after height before entire cabinet, so as to cause both wired reinforcement systems are difficult in maintenance or even unstability, to seriously jeopardize traffic safety.

Description

The construction method of jacked frame bridge upper box in the way of spreading slide plate
Technical field
The invention belongs to wear multiply road technical field of construction under Framed underpass bridge, spreading slide plate is utilized more particularly to a kind of Mode jacked frame bridge upper box construction method.
Background technique
With the rapid development of China's Urbanization Construction, the frame bridge construction of undercrossing tunnel is more and more, usually adopts at present It is constructed with jacking.This construction method is arranged in both grounds of wired side mainly by being centered around to excavation pit The foundation pit enclosure stake of two sides and rear end, the anti-foundation pit protection system for moving stake and the subgrade protection stake composition positioned at foundation pit front end outer side System;Then excavate by foundation pit enclosure stake, the anti-foundation soil moved in the middle and back space that stake surrounds and form foundation pit, the front end of foundation pit Portion is in ramped shaped;The slide plate of reinforced concrete structure is made on the bottom surface of foundation pit middle and back later;Then it is tied up on slide plate Cabinet steel reinforcement cage and the supporting module on the outside of cabinet steel reinforcement cage;The casting concrete in template later, the shape after concrete setting At the cabinet for constituting frame bridge main body;Then shoveling lateral dominance in side is with the jack being arranged between anti-shifting stake and box back to both Wired lower section jacking cabinet, until box-body jacking in place, finally construct other affiliated facilities and frame bridge be made.But due to Multiply is worn under at present, and both wired situation is more and more, and the structure size of cabinet is just relatively large in this case, pushes up Cheng Yue It more grows, therefore jacking construction difficulty can increase considerably.It is in particular in following point: as described above, foundation pit front end It is all foundation soil below slope, it is clear that bearing capacity is poor, is especially particularly acute in the high area of water level.In box-body jacking process In, when region where cabinet front is located at slope, since the soil bearing capacity in the region is poor, the center of gravity of cabinet will It moves forward because of front and back bearing capacity difference, is at this moment possible to that cabinet is therefore caused to prick head problem;And when cabinet front enters Both under wired, but when not yet jacking is in place, when box back will be located at the region where slope, the bearing capacity of usual roadbed is big At this moment soil bearing capacity in slope region is possible to therefore cause cabinet new line problem;In short, utilizing traditional top Worn under into method jacking multiply both wired oversize cabinet when, be difficult to control the posture of cabinet, therefore be no longer satisfied existing Phase security and functional requirement;As a result, work progress risk is larger, jeopardize traffic safety;After-frame bridge formation attitude error in place It is larger, exceed code requirement, will affect successive projects construction and use functional requirement.
Summary of the invention
To solve the above-mentioned problems, the purpose of the present invention is to provide a kind of jacked frame bridges in the way of spreading slide plate The construction method of upper box.
In order to achieve the above object, the construction of the jacked frame bridge upper box provided by the invention in the way of spreading slide plate Method includes the following steps carried out in order:
1) setting is centered around the foundation pit enclosure stake to excavation pit two sides and rear end, anti-shifting in both grounds of wired side Stake and positioned at foundation pit front end outer side subgrade protection stake, then be located at foundation pit two sides foundation pit enclosure stake top portion between be arranged Thus support constitutes foundation pit guard system;
2) excavate by foundation pit enclosure stake, the anti-foundation soil moved in the middle and back space that stake surrounds and form foundation pit, before foundation pit End is in ramped shaped;
3) slide plate of reinforced concrete structure is made on the bottom surface of foundation pit middle and back;Then cabinet steel is tied up on slide plate Muscle cage and the supporting module on the outside of cabinet steel reinforcement cage;The casting concrete in template later is formed after concrete setting and is constituted The cabinet of frame bridge main body, form removal;
4) while making cabinet, more are made in nose and both in the ground below the region between wired outside High-pressure rotary jet grouting pile is made of spreading slide plate more high-pressure rotary jet grouting piles, and the stake top absolute altitude of high-pressure rotary jet grouting pile is higher than the table of slide plate Face absolute altitude;
5) side shoveling lateral dominance with the jack being arranged between anti-shifting stake and box back to both wired lower section jacking cabinets, Until box-body jacking in place, during excavating the foundation soil above spreading slide plate, high-pressure rotary jet grouting pile upper end is higher by slide plate Pile crown is abolished, and measures the elevation of slide plate and spreading slide plate in time, flushes slide plate and the top surface of spreading slide plate.
The width of the spreading slide plate and cabinet it is of same size, length is according to the center of gravity of cabinet and the phase of nose It is determined to position and close to both wired position of cabinet side.
The pile head elevation control of the high-pressure rotary jet grouting pile is at the above position 10cm of sled surface;Driving depth control is in 3m model In enclosing.
The construction method of the jacked frame bridge upper box provided by the invention in the way of spreading slide plate has the advantages that
First, the soil bearing capacity in the region is improved using spreading slide plate.
Second, the jack-in process raising middle flask weight heart is more than half stroke always on slide plate and spreading slide plate, the lift of pontic front end Head, bundle head amplitude significantly reduce, and posture is steady.
Third, cabinet center of gravity are left in place to jacking after slide plate, and its rear end is always on slide plate and spreading slide plate, no Can exist since slide plate is short and small and soil bearing capacity is insufficient, cause jacking later period box back to sink suddenly, cause entire cabinet It is preceding it is high after bottom state, so as to cause both wired reinforcement systems are difficult in maintenance or even unstability, to seriously jeopardize traffic safety.
Detailed description of the invention
Fig. 1 is to be constructed using the construction method of the jacked frame bridge upper box provided by the invention in the way of spreading slide plate When construction site plan view.
Fig. 2 is to be constructed using the construction method of the jacked frame bridge upper box provided by the invention in the way of spreading slide plate When construction site longitudinal direction cross-section diagram.
Fig. 3 is to be constructed using the construction method of the jacked frame bridge upper box provided by the invention in the way of spreading slide plate When construction site transverse cross.
Specific embodiment
In the following with reference to the drawings and specific embodiments to provided by the invention in the way of spreading slide plate on jacked frame bridge The construction method of cabinet is described in detail.
As shown in Fig. 1-Fig. 3, the construction party of the jacked frame bridge upper box provided by the invention in the way of spreading slide plate Method includes the following steps carried out in order:
1) setting is centered around the foundation pit enclosure stake 1 to excavation pit two sides and rear end, resists in both grounds of wired side Stake 2 and the subgrade protection stake 3 positioned at foundation pit front end outer side are moved, is then being located at 1 top of foundation pit enclosure stake of foundation pit two sides Between be arranged support, thus constitute foundation pit guard system;
2) excavate by foundation pit enclosure stake 1, the anti-foundation soil moved in the middle and back space that stake 2 surrounds and form foundation pit, foundation pit Front end 4 is in ramped shaped;
3) slide plate 5 of reinforced concrete structure is made on the bottom surface of foundation pit middle and back;Then cabinet is tied up on slide plate 5 Steel reinforcement cage and the supporting module on the outside of cabinet steel reinforcement cage;The casting concrete in template later, forms structure after concrete setting At the cabinet 6 of frame bridge main body, form removal;
4) it while making cabinet 6, is made in 5 front end of slide plate and both in the ground below the region between wired 7 outside More high-pressure rotary jet grouting piles are made of spreading slide plate 8 more high-pressure rotary jet grouting piles, and the stake top absolute altitude of high-pressure rotary jet grouting pile is higher than slide plate 5 surface level;The width of spreading slide plate 8 is of same size with cabinet 6, center of gravity and slide plate 5 front end of the length according to cabinet 6 It relative position and is determined close to both wired 7 position of 6 side of cabinet;The pile head elevation control of high-pressure rotary jet grouting pile is in slide plate At the above position 10cm in 5 surfaces;Stake is long to be determined according to foundation bearing capacity obtained by design requirement minimum bearing capacity and actual experiment, this Driving depth control in embodiment is within the scope of 3m;
5) shoveling lateral dominance in side, which is used, is arranged in the anti-jack moved between stake 2 and 6 rear end of cabinet to jacking case below both wired 7 Body 6, until box-body jacking in place, during excavating the foundation soil above spreading slide plate 8, high-pressure rotary jet grouting pile upper end is higher by cunning The pile crown of plate 5 is abolished, and measures the elevation of slide plate 5 and spreading slide plate 8 in time, flushes slide plate 5 and the top surface of spreading slide plate 8.

Claims (3)

1. a kind of construction method of the jacked frame bridge upper box in the way of spreading slide plate, it is characterised in that: the construction Method includes the following steps carried out in order:
1) setting is centered around foundation pit enclosure stake (1), anti-shifting to excavation pit two sides and rear end in both grounds of wired side Then stake (2) and the subgrade protection stake (3) positioned at foundation pit front end outer side are pushed up in the foundation pit enclosure stake (1) for being located at foundation pit two sides Support is set between portion, thus constitutes foundation pit guard system;
2) excavate by foundation pit enclosure stake (1), the anti-foundation soil moved in the middle and back space that stake (2) surround and form foundation pit, foundation pit Front end (4) is in ramped shaped;
3) slide plate (5) of reinforced concrete structure is made on the bottom surface of foundation pit middle and back;Then cabinet is tied up on slide plate (5) Steel reinforcement cage and the supporting module on the outside of cabinet steel reinforcement cage;The casting concrete in template later, forms structure after concrete setting At the cabinet (6) of frame bridge main body, form removal;
4) it while making cabinet (6), is made in slide plate (5) front end and both in the ground below the region between wired (7) outside Make more high-pressure rotary jet grouting piles, be made of spreading slide plate (8) more high-pressure rotary jet grouting piles, and the stake top absolute altitude of high-pressure rotary jet grouting pile is higher than Slide plate (5 surface level;
5) setting of side shoveling lateral dominance moves the jack between stake (2) and cabinet (6) rear end to jacking below both wired (7) anti- Cabinet (6), until box-body jacking in place, during excavating the foundation soil above spreading slide plate (8), by high-pressure rotary jet grouting pile upper end The pile crown for being higher by slide plate (5) is abolished, and measures the elevation of slide plate (5) and spreading slide plate (8) in time, keeps slide plate (5) and spreading sliding The top surface of plate (8) flushes.
2. the construction method of the jacked frame bridge upper box according to claim 1 in the way of spreading slide plate, feature Be: the width of the spreading slide plate (8) is of same size with cabinet (6), and length is according to the center of gravity and slide plate of cabinet (6) (5) position of the relative position of front end and both wired (7) close to cabinet (6) side determines.
3. the construction method of the jacked frame bridge upper box according to claim 1 in the way of spreading slide plate, feature Be: the pile head elevation control of the high-pressure rotary jet grouting pile is at the above position 10cm in slide plate (5) surface;Driving depth control is in 3m model In enclosing.
CN201810947984.2A 2018-08-20 2018-08-20 The construction method of jacked frame bridge upper box in the way of spreading slide plate Pending CN108930226A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810947984.2A CN108930226A (en) 2018-08-20 2018-08-20 The construction method of jacked frame bridge upper box in the way of spreading slide plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810947984.2A CN108930226A (en) 2018-08-20 2018-08-20 The construction method of jacked frame bridge upper box in the way of spreading slide plate

Publications (1)

Publication Number Publication Date
CN108930226A true CN108930226A (en) 2018-12-04

Family

ID=64446145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810947984.2A Pending CN108930226A (en) 2018-08-20 2018-08-20 The construction method of jacked frame bridge upper box in the way of spreading slide plate

Country Status (1)

Country Link
CN (1) CN108930226A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764315A (en) * 2020-07-09 2020-10-13 中铁六局集团天津铁路建设有限公司 Method for sleeving top of railway culvert in flood season

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3419449A1 (en) * 1984-05-24 1986-02-13 KOMM GmbH & Co KG, Schwerlasthubsysteme Gleitbau, 8503 Altdorf Device and method for displacement of structural components
FR2701734A1 (en) * 1993-02-19 1994-08-26 Beauthier Jean Marie Method for the construction of structures under a slope of a railroad or the like.
CN102277880A (en) * 2011-04-21 2011-12-14 中铁六局集团有限公司 Large-sized box jacking control construction method capable of enhancing accuracy
CN102808381A (en) * 2012-08-21 2012-12-05 中铁十局集团有限公司 High-water-level silty-soil underneath-pass multi-track railway frame bridge jacking and butting construction method
CN105908625A (en) * 2016-04-13 2016-08-31 中铁建大桥工程局集团第四工程有限公司 Construction method for adding frame bridge under existing railway line based on dragging method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3419449A1 (en) * 1984-05-24 1986-02-13 KOMM GmbH & Co KG, Schwerlasthubsysteme Gleitbau, 8503 Altdorf Device and method for displacement of structural components
FR2701734A1 (en) * 1993-02-19 1994-08-26 Beauthier Jean Marie Method for the construction of structures under a slope of a railroad or the like.
CN102277880A (en) * 2011-04-21 2011-12-14 中铁六局集团有限公司 Large-sized box jacking control construction method capable of enhancing accuracy
CN102808381A (en) * 2012-08-21 2012-12-05 中铁十局集团有限公司 High-water-level silty-soil underneath-pass multi-track railway frame bridge jacking and butting construction method
CN105908625A (en) * 2016-04-13 2016-08-31 中铁建大桥工程局集团第四工程有限公司 Construction method for adding frame bridge under existing railway line based on dragging method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
丁任盛: "《铁路营业线工程施工技术》", 30 June 2014 *
李家稳: "《框架桥盾构法施工技术》", 30 November 2012 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764315A (en) * 2020-07-09 2020-10-13 中铁六局集团天津铁路建设有限公司 Method for sleeving top of railway culvert in flood season

Similar Documents

Publication Publication Date Title
CN102352590B (en) Method for splicing highfill roadbed by adopting pile-sheet retaining wall
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN206768834U (en) A kind of deep basal pit combined support structure
CN203905018U (en) Supporting and protecting system with combined double-row piles in combination with oblique anchors
CN105804119A (en) Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN103774675A (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN104594361B (en) A kind of I shape fender post and building enclosure also serve as the construction method of agent structure
CN205475197U (en) Soft native karst foundation stabilization structure
CN104532714B (en) Roadbed structure for treating deep soft soil karst foundation
CN103290847A (en) Inner oblique beam supporting structure for oversized-area deep foundation pit and construction method
CN111042053A (en) Permanent temporary combined retaining wall structure in urban hydraulic engineering and construction method thereof
CN109667273A (en) A kind of construction method of deep foundation pit supporting structure
CN104712341B (en) Bed shallow covering shield driving stratum consolidation system and its construction method
CN207525567U (en) A kind of pile plate composite structure suitable for Steep Slope Embankment
CN108930226A (en) The construction method of jacked frame bridge upper box in the way of spreading slide plate
CN206512620U (en) A kind of steel basil is buried jacking box culvert device
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN108252307A (en) A kind of foundation pit construction method for underground tunnel upper
CN102031757B (en) Method for constructing bottom plate guide layer of jacked-in frame bridge
CN106120853B (en) A kind of inverted construction method of frame bridge
CN211872840U (en) Face combination retaining wall structure forever among urban hydraulic engineering
CN205529734U (en) A U -shaped retaining structure for filling road bed
CN111041995B (en) Construction method for U-shaped frame structure to penetrate high-speed rail bridge obliquely downwards
CN209604029U (en) A kind of railway tunnel bottom structure packaged type formwork jumbo

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Qi Pengyu

Inventor after: Wang Jiawu

Inventor after: Huang Jian

Inventor after: Zhao Qi

Inventor after: Gao Long

Inventor after: Gao Xiang

Inventor after: Zhang Jipei

Inventor after: Xian Binglin

Inventor after: Yang Zhi

Inventor before: Wang Jiawu

Inventor before: Huang Jian

Inventor before: Zhao Qi

Inventor before: Gao Long

Inventor before: Gao Xiang

Inventor before: Zhang Jipei

Inventor before: Xian Binglin

Inventor before: Yang Zhi

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181204