CN208571239U CN201821095820.3U CN201821095820U CN208571239U CN 208571239 U CN208571239 U CN 208571239U CN 201821095820 U CN201821095820 U CN 201821095820U CN 208571239 U CN208571239 U CN 208571239U
Authority
CN
China
Prior art keywords
output end
electrical output
transformer
modularization
speed rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821095820.3U
Other languages
Chinese (zh)
Inventor
莫伟昆
张强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN QIFEI ELECTRIC CO Ltd
Original Assignee
WUHAN QIFEI ELECTRIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN QIFEI ELECTRIC CO Ltd filed Critical WUHAN QIFEI ELECTRIC CO Ltd
Priority to CN201821095820.3U priority Critical patent/CN208571239U/en
Application granted granted Critical
Publication of CN208571239U publication Critical patent/CN208571239U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Abstract

It is disclosed by the utility model to belong to electric railway traction power supply system technical field, specially a kind of high-speed rail electrification modularization traction substation, including 220KV voltage transformer, the electrical output end of 220KV voltage transformer is connected with 220KV arrester, the electrical output end of 220KV arrester is connected with 20KV three-pole isolator, the electrical output end of 20KV three-pole isolator is connected with 220KV current transformer, the electrical output end of 220KV current transformer is connected with 220KV breaker, the electrical output end of 220KV breaker is connected with 220KV main transformer, the electrical output end of 220KV main transformer is connected with 27.5KVGIS switchgear, 27.5KVGIS switchgear electrical property output end is connected with secondary low-voltage equipment , which facilitates installation, invests small, revolutionizes that former field device dispersion, long construction period, transitional link is more, invests big problem, and substantially increase the security reliability that equipment is run.

Description

A kind of high-speed rail electrification modularization traction substation
Technical field
The utility model relates to electric railway traction power supply system technical field, specially a kind of high-speed rail electrification module Change traction substation.
Background technique
The existing Traction Substation of Electric Railway in China, still continues to use old design pattern, builds house, casting basis, peace Standby, test and debugging etc. is installed, field device dispersion, long construction period, transitional link is more, investment is big, this results in quality control Difficulty, the postrun system risk of equipment investment increase, and constructional deficiency is more, and some defect how many years do not have been found that, only It is just found when causing consequence, seriously affecting power supply safety, greatly reduces equipment reliability of operation.Existing electric railway supplies The generalized information system that electric system uses, the plug of high-voltgae pothead are that artificial check and correction is installed, and work on the spot area is small, installing force Square is big, is easy to be damaged in end installation process, for this purpose, we have proposed a kind of high-speed rail electrification modularization traction substations.
Utility model content
The purpose of this utility model is to provide a kind of high-speed rail electrification modularization traction substations, to solve above-mentioned background The field device dispersion that its is proposed in technology, long construction period, transitional link is more, the big quality control of investment is difficult, work on the spot area It is small, mounting torque is big, impaired problem is easy in end installation process.
To achieve the above object, the utility model provides the following technical solutions: a kind of high-speed rail electrification modularization traction change Electric institute, including 220KV voltage transformer, the electrical output end of the 220KV voltage transformer are connected with 220KV arrester, institute The electrical output end for stating 220KV arrester is connected with 20KV three-pole isolator, and the electrical property of the 20KV three-pole isolator is defeated Outlet is connected with 220KV current transformer, and the electrical output end of the 220KV current transformer is connected with 220KV breaker, institute The electrical output end for stating 220KV breaker is connected with 220KV main transformer, and the electrical output end of the 220KV main transformer connects It is connected to 27.5KVGIS switchgear, the 27.5KVGIS switchgear electrical property output end is connected with secondary low-voltage equipment.
Preferably, the 220KV arrester uses 220KV Zinc-Oxide Arrester.
Preferably, be equipped in the secondary low-voltage equipment ac and dc systems, background monitoring system, telecommunication system, Intelligent monitor system, integrated system, charging measuring equipment.
Preferably, partition is installed between 220KV main transformer described in four groups.
Preferably, the 220KV main transformer secondary side is connect using high-tension cable with 27.5KVGIS switchgear.
Compared with prior art, the utility model has the beneficial effects that
1) the utility model scheme, equipment are formed by multiple groups block combiner, before factory by the technology of each height die block, set Standby, installation, debugging efforts are completed, mix the interface cable with plug-in unit, transport to scene and carry out block combiner, to constitute entire High-speed rail traction substation facilitates installation, invests small;
2) equipment is by the construction and installation of all electrical equipments, debugging in the factory for having good environment and professional technician Interior progress revolutionizes former field device dispersion, the problem that long construction period, transitional link is more, investment is big, and greatly improves The security reliability of equipment operation;
3) high-voltgae pothead can be stuck on guide groove using the screw structure for having guide groove to go up and down, be passed through screw rod by the equipment It rotates and realizes the installation of end and retract, the installation of this specification geometric dimension is that the safe mass of end operation is protected Card.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is utility model works schematic diagram.
In figure: 1 220KV voltage transformer, 2 220KV arresters, 3 20KV three-pole isolators, 4 220KV electric currents are mutual Sensor, 5 220KV breakers, 6 220KV main transformers, 7 27.5KVGIS switchgears, 8 secondary low-voltage equipment.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of technical solution referring to FIG. 1-2: a kind of high-speed rail electrification modularization traction power transformation The electrical output end of institute, including 220KV voltage transformer 1,220KV voltage transformer 1 is connected with 220KV arrester 2,220KV The electrical output end of arrester 2 is connected with 20KV three-pole isolator 3, the electrical output end connection of 20KV three-pole isolator 3 There is 220KV current transformer 4, the electrical output end of 220KV current transformer 4 is connected with 220KV breaker 5,220KV breaker 5 electrical output end is connected with 220KV main transformer 6, and the electrical output end of 220KV main transformer 6 is connected with 27.5KVGIS and opens Cabinet 7 is closed, the electrical output end of 27.5KVGIS switchgear 7 is connected with secondary low-voltage equipment 8.
Wherein, 220KV arrester 2 uses 220KV Zinc-Oxide Arrester, and valve block is equipped with using zinc oxide as primary raw material Other metal oxides, long service life are equipped with ac and dc systems, background monitoring system, long-range logical in secondary low-voltage equipment 8 Letter system, intelligent monitor system, integrated system, charging measuring equipment, convenient for the various equipment in monitoring electric substation, four groups Partition is installed between 220KV main transformer 6,220KV main transformer 6 is separated, prevents from having an impact when operation, 220KV master 6 secondary side of transformer is connect using high-tension cable with 27.5KVGIS switchgear 7, easy for installation, highly-safe.
Working principle: the utility model scheme is connected to 220KV voltage by high-tension cable when in use, by electric system On mutual inductor 1, electric system conveying high pressure three-phase electricity, by 220KV voltage transformer 1 can with the voltage on conversion line, Be connected with 220KV arrester 2 in the electrical output end of 220KV voltage transformer 1,220KV arrester 2 can protect equipment from Thunder and lightning moment impact wave attacks, and the electrical output end of 220KV arrester 2 is connected with 20KV three-pole isolator 3, tri- pole 20KV every It leaves pass 3 and circuit is closed and cut-off in zero load situation, the method for operation for changing equipment is cooperated with breaker, carries out certain model The operation of interior nonloaded line is enclosed, the investment of no-load transformer can be carried out and exits operation, visible cut-off point can be formed, 220KV current transformer 4 can measure, protects and control high-tension current and be converted to the unified electric current of comparison, play current transformation It is connected with 220KV breaker 5 with the electrical output end of the effect of electrical isolation, 220KV current transformer 4, when on high-tension cable When serious overload occurs or when short circuit and under-voltage and other failures occur, 220KV breaker 5 protects automatic shutdown circuit Equipment in electric substation, reduces loss, and the electrical output end of 220KV breaker 5 is connected with 220KV main transformer 6,220KV master Transformer 6 can by by electric system conveying Lai 220KV high-tension current be changed into the dedicated electric current of high-speed rail, 220KV main transformer 6 Electrical output end be connected with 27.5KVGIS switchgear 7, the internal current voltage transformer of 27.5KVGIS switchgear 7, bus, 10KV use by oneself allosteric at the equipment such as generalized information system, equipment for managing electric substation, the electrical output end of 27.5KVGIS switchgear 7 It is connected with secondary low-voltage equipment 8, ac and dc systems, background monitoring system, long-range logical are installed in the inside of secondary low-voltage equipment 8 Letter system, intelligent monitor system, integrated system, charging measuring equipment, for the various equipment in monitoring electric substation, this programme is mentioned High-speed rail electrification modularization traction substation out, is formed by multiple groups block combiner, before factory by the technology of each height die block, Equipment, installation, debugging efforts are completed, mix the interface cable with plug-in unit, transport to scene and carry out block combiner, to constitute whole A high-speed rail traction substation facilitates installation, and investment is small, and debugging carries out in the factory for having good environment and professional technician, It revolutionizes former field device dispersion, the problem that long construction period, transitional link is more, investment is big, and substantially increases equipment High-voltgae pothead can be stuck on guide groove using the screw structure for having guide groove to go up and down, be passed through screw rod by the security reliability of operation It rotates and realizes the installation of end and retract, the installation of this specification geometric dimension is that the safe mass of end operation is protected Card.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of high-speed rail electrification modularization traction substation, including 220KV voltage transformer (1), it is characterised in that: described The electrical output end of 220KV voltage transformer (1) is connected with 220KV arrester (2), and the electrical property of the 220KV arrester (2) is defeated Outlet is connected with 20KV three-pole isolator (3), and the electrical output end of the 20KV three-pole isolator (3) is connected with 220KV The electrical output end of current transformer (4), the 220KV current transformer (4) is connected with 220KV breaker (5), described The electrical output end of 220KV breaker (5) is connected with 220KV main transformer (6), and the electrical property of the 220KV main transformer (6) is defeated Outlet is connected with 27.5KVGIS switchgear (7), and the electrical output end of the 27.5KVGIS switchgear (7) is connected with secondary low-voltage and sets Standby (8).
2. a kind of high-speed rail electrification modularization traction substation according to claim 1, it is characterised in that: the 220KV Arrester (2) uses 220KV Zinc-Oxide Arrester.
3. a kind of high-speed rail electrification modularization traction substation according to claim 1, it is characterised in that: described secondary low Pressure equipment (8) in be equipped with ac and dc systems, background monitoring system, telecommunication system, intelligent monitor system, integrated system, Charging measuring equipment.
4. a kind of high-speed rail electrification modularization traction substation according to claim 1, it is characterised in that: described in four groups 220KV main transformer is equipped with partition between (6).
5. a kind of high-speed rail electrification modularization traction substation according to claim 1, it is characterised in that: the 220KV Main transformer (6) secondary side is connect using high-tension cable with 27.5KVGIS switchgear (7).
CN201821095820.3U 2018-07-11 2018-07-11 A kind of high-speed rail electrification modularization traction substation Expired - Fee Related CN208571239U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821095820.3U CN208571239U (en) 2018-07-11 2018-07-11 A kind of high-speed rail electrification modularization traction substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821095820.3U CN208571239U (en) 2018-07-11 2018-07-11 A kind of high-speed rail electrification modularization traction substation

Publications (1)

Publication Number Publication Date
CN208571239U true CN208571239U (en) 2019-03-01

Family

ID=65492556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821095820.3U Expired - Fee Related CN208571239U (en) 2018-07-11 2018-07-11 A kind of high-speed rail electrification modularization traction substation

Country Status (1)

Country Link
CN (1) CN208571239U (en)

Similar Documents

Publication Publication Date Title
CN203119316U (en) Power electronic substation
CN208571239U (en) A kind of high-speed rail electrification modularization traction substation
CN208001101U (en) A kind of high-tension switch cabinet and its radiator
CN206742721U (en) A kind of intelligent modularized change
CN103812086A (en) High voltage electromotor protection system
CN204834551U (en) Novel fuse protective case for high tension switchgear
CN204497636U (en) A kind of built on stilts inlet wire China used for wind power generation formula case becomes
CN208352837U (en) A kind of movable-type intelligent power distribution station
CN204497637U (en) A kind of photovoltaic generation integral type transformer station
CN203377601U (en) Standby transformer reactive power compensator capable of adjusting power factor
CN209642167U (en) A kind of AC metal looped network switch apparatus
CN203301016U (en) Outdoor box type substation
CN205863673U (en) The energy-conservation Intelligent control cabinet of photovoltaic generating system
CN207184052U (en) A kind of thunder-prevention switch cabinet with discharging gap
CN111907379A (en) 10kV/27.5kV electrified railway auxiliary traction power supply
CN101630586B (en) Air switch preventing voltage transformer secondary side anti-charge
CN201623495U (en) Reactive power compensation complete equipment of SVC transformer substation
CN213990152U (en) 330kV high-voltage parallel reactor compensation station system
CN216794597U (en) High-voltage power supply relay protection system of tower crane
CN204905742U (en) Middling pressure looped netowrk vacuum circuit breaker cabinet
CN211017999U (en) Low-voltage switch system and distribution board thereof
CN209329766U (en) A kind of wiring of institute, electric substation electricity consumption
CN202997577U (en) High-voltage line reactive automatic compensation device
CN214626350U (en) Low residual voltage bus protector
CN219144057U (en) Vacuum circuit breaker

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190301