CN208539485U - A kind of packaged type turns over threeway portal structure - Google Patents
A kind of packaged type turns over threeway portal structure Download PDFInfo
- Publication number
- CN208539485U CN208539485U CN201821336334.6U CN201821336334U CN208539485U CN 208539485 U CN208539485 U CN 208539485U CN 201821336334 U CN201821336334 U CN 201821336334U CN 208539485 U CN208539485 U CN 208539485U
- Authority
- CN
- China
- Prior art keywords
- cover board
- vertical siphunculus
- slideway
- packaged type
- turns over
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Details Of Indoor Wiring (AREA)
Abstract
Threeway portal structure is turned over the utility model discloses a kind of packaged type, it is related to Pipeline Bridge frame equipment technical field, there is the main gantry of opening including side upward, the open end of host bridge frame is provided with the cover board for covering opening and the vertical siphunculus for corridor common line to be guided into user room, the cover board is mutually pushed against with the vertical siphunculus, and the space walked for route is formed between host bridge frame and the cover board, the vertical siphunculus.By the setting of vertical siphunculus, make route without being pierced by from main gantry and terminal box, without reducing occupied space, and then the clear height of furred ceiling can be improved for terminal box and route is reserved installs and wear space.Route is not necessarily to repeatedly detour for evacuation pipeline simultaneously, installs relatively simple.
Description
Technical field
The utility model relates to Pipeline Bridge frame equipment technical fields, more specifically, it relates to which a kind of packaged type is upper
Turn over threeway portal structure.
Background technique
With the continuous development of urban construction, various types office and hotel's public building are more and more, and architectural design is walked
Develop to solid space, the clear height comfort of public space is required higher and higher.Due to the development and cost of market economy
Consider, compared with entry there are architectural design layer height is relatively low, in order to guarantee good sale effect and create comfortable office ring
Border.When Art Design is to building space decorative model effect detailed treatment, and to public corridor and Office Area furred ceiling clear height control
System requires very high.
The strong and weak home-in-pipe in traditional interior is connect with the main gantry electric bridge frame in corridor, and basic use is opened in gantry side or bottom surface
Terminal box is installed in bottom surface again, corresponding route is first guided in terminal box, then is drawn from terminal box and againsts corridor upwards in hole
During which top also needs also to need to extend downwardly when encountering girder around other pipelines, until around home-in-pipe.Due to wiring
It box and needs to occupy certain space from the line that terminal box is drawn, so that furred ceiling will be mounted below terminal box, while want and wiring
Box keeps a fixed spacing, convenient for the maintenance in later period, therefore occupancy height is increased, to reduce the clear height of furred ceiling.
Utility model content
In view of the deficienciess of the prior art, turning over threeway the purpose of this utility model is to provide a kind of packaged type
Portal structure makes route without being pierced by from main gantry and terminal box by the setting of vertical siphunculus, without for terminal box with
Route is reserved to be installed and wears space, reduces occupied space, and then the clear height of furred ceiling can be improved.
To achieve the above object, the utility model provides following technical solution:
A kind of packaged type turns over threeway portal structure, has the main gantry of opening, host bridge including side upward
The open end of frame is provided with the cover board for covering opening and the vertical siphunculus for corridor common line to be guided into user room,
The cover board is mutually pushed against with the vertical siphunculus, is formed between host bridge frame and the cover board, the vertical siphunculus for line
The space that road is walked.
By using above-mentioned technical proposal, the corresponding space of walking to be formed that is routed through can be entered vertical siphunculus
It is interior, then be pierced by from the outlet of vertical siphunculus, it is then dispensed in user.By the setting of vertical siphunculus, it is not necessarily to route from master
Gantry and terminal box are pierced by, and without for the reserved installation of terminal box and route and wearing space, reduce occupied space, in turn
The clear height of furred ceiling can be improved.Route is not necessarily to repeatedly detour for evacuation pipeline simultaneously, installs relatively simple.
Preferably, the vertical siphunculus is in flared close to host bridge frame one end.
It, can be with vertical siphunculus when route enters in vertical siphunculus from main gantry by using above-mentioned technical proposal
Contacted at dog-ear, and it is more sharp at dog-ear, therefore route be possible to be in the presence of being cut it is bad.By the way that vertical siphunculus is close
Main gantry one end is arranged to flared so that more smoothly mitigated at the dog-ear of vertical siphunculus, greatly reduce route cut it is bad
Probability, to play preferable protective effect to route.
Preferably, the vertical siphunculus side wall offers service ports, and the vertical siphunculus side wall is arranged useful by bolt
In the maintenance door for covering the service ports.
By using above-mentioned technical proposal, when the line failure in main gantry, staff can looser a bolt,
Directly maintenance door is removed and is repaired, it is simple to operate.
Preferably, the vertical siphunculus side wall offers service ports, and the vertical siphunculus side wall is rotatably equipped with for covering
The maintenance door of the service ports is covered, the maintenance door and the vertical siphunculus side wall are respectively arranged with the first magnet to attract each other
With the second magnet.
By using above-mentioned technical proposal, when the line failure in main gantry, staff can be by maintenance door
It opens, when maintenance finishes, maintenance door can be closed.The first magnet and the second magnet attract each other simultaneously, avoid maintenance door certainly
It moves and opens and dust is caused to enter.
Preferably, detachably sliding is arranged on host bridge frame for the cover board and the vertical siphunculus.
By using above-mentioned technical proposal, main gantry is separated with cover board, vertical siphunculus, facilitates carrying during installation.And
Cover board and vertical siphunculus, which slide, to be arranged on main gantry, so as to adjust cover board according to specific installation site demand and vertically lead to
The position of pipe, improves applicability.
Preferably, host bridge frame open end is provided with concave slideway, and the cover board and the vertical siphunculus are all provided with
It is equipped with the sliding block with slideway sliding cooperation.
By using above-mentioned technical proposal, select cover board and vertical siphunculus at the position of main gantry as needed, it is mobile
When sliding block moved along slideway, realize cover board and vertical siphunculus position adjusting.
Preferably, the fixation kit connecting with the slideway is provided on the sliding block, the fixation kit includes screw thread
The storming bolt being mounted on the sliding block and the slideway and the lock washer being set on the stud of the storming bolt.
By using above-mentioned technical proposal, acted on vertical siphunculus due in route is pullled, might have power, it may
It can be that vertical siphunculus is toppled over.Sliding block and cunning are installed to by the way that lock washer to be set on the stud of bolt, then by storming bolt
On road, the fixation to vertical siphunculus is realized, so as to avoid the occurrence of the phenomenon that vertical siphunculus is toppled over.And the setting of lock washer can
Avoiding storming bolt, there is a phenomenon where loosen.
Preferably, host bridge frame open at one end is provided with the slideway in concave arc shape, the sliding channel that the slideway is formed
Section opening width be less than sliding channel section maximum width;The cover board and the vertical siphunculus be provided with
The elastic sliding vane of the slideway sliding cooperation, and the elastic sliding vane is located at the outer one end of the slideway and is provided with for facilitating bending
The connection sheet of the elastic sliding vane.
By using above-mentioned technical proposal, the slideway of concave arc shape can be such that elastic sliding vane is limited in ground way, make bullet
Property slide plate be not easy from slideway take out, play fixed effect.Elastic sliding vane is flexible simultaneously, and staff can be connected by operation
Contact pin carrys out elasticity of flexure slide plate, so that elastic sliding vane be separated from slideway, realizes that cover board, vertical siphunculus are removable with main gantry
It unloads.During installation, first vertical duct or cover board are placed on main gantry, and elastic sliding vane is made to abut slideway open end, then
Vertical duct or cover board are pressed downward, elastic sliding vane is curved inwardly due to the reaction force by slideway open end, until
Elastic sliding vane maximum width in the horizontal direction is exactly equal to the opening width in the section in the sliding channel of slideway, and elastic sliding vane is
It can enter in slideway, complete installation.
Preferably, the vertical siphunculus is provided with the interface being connected in multiple groups and the vertical siphunculus far from main gantry one end
It is piped, and includes the inlet wire at adjacent two family in the piping of interface described in every group.
By using above-mentioned technical proposal, the setting of multiple groups interface piping can distribute route relatively sharp, avoid route
Confusion, and it is convenient to overhaul in deuterogenesis's failure, improve the efficiency of maintenance.
Compared with prior art, the utility model has the advantages that:
1, by the setting of vertical siphunculus, make route without being pierced by from main gantry and terminal box, without for terminal box
Installation is reserved with route and wears space, reduces occupied space, and then the clear height of furred ceiling can be improved;
2, by the setting of maintenance door, the route in vertical siphunculus is overhauled convenient for later stage work personnel;
3, by the setting of baffle, the main gantry in addition to cover board covering part is covered, plays dust-proof effect, reduces ash
Accumulation of the dirt in main gantry, no longer needs to clear up when needing to safeguard convenient for the later period;
4, route, can be assigned to more users, and keep route relatively sharp, avoid line by the setting being piped by interface
The confusion on road.
Detailed description of the invention
Fig. 1 is the schematic perspective view of embodiment one;
Fig. 2 is the explosive view of embodiment one;
Fig. 3 is the portion the A enlarged drawing of Fig. 2;
Fig. 4 is the schematic perspective view of the vertical siphunculus of embodiment two;
Fig. 5 is the explosive view of embodiment three.
Appended drawing reference: 1, main gantry;11, slideway;2, cover board;21, sliding block;22, elastic sliding vane;23, connection sheet;31, strong
Attack bolt;32, lock washer;4, vertical siphunculus;41, service ports;411, the second magnet;42, maintenance door;421, the first magnet;
5, interface is piped;6, commuting case.
Specific embodiment
With reference to the accompanying drawings and examples, the utility model is described in detail.
Embodiment one:
A kind of packaged type turns over threeway portal structure, referring to Fig.1, including main gantry 1, side has main gantry 1 upward
There is an opening, detachably sliding is provided with cover board 2 and vertical siphunculus 4 on main gantry 1, main gantry 1, cover board 2, between vertical siphunculus 4
Form the space walked for route.
Vertical siphunculus 4 is in flared close to main 1 one end of gantry, and is fixedly installed in vertical siphunculus 4 far from main 1 one end of gantry
Have multiple groups in horizontally disposed interface piping 5, interface piping 5 be connected to inside vertical siphunculus 4, for guide line;Every group connects
Mouth piping 5 includes four root canal roads, and is fixedly installed commuting case 6 in every group interface piping 5.Include in every group interface piping 5
There is the inlet wire at adjacent two family.
Referring to Fig. 2 and Fig. 3, the open end of main gantry 1, which is integrally formed, is provided with concave slideway 11, cover board 2 and vertical
Siphunculus 4 is integrally formed the sliding block 21 being provided with the sliding cooperation of slideway 11 towards main 1 side of gantry, is provided on sliding block 21
The fixation kit being connect with slideway 11.
Fixation kit includes storming bolt 31 and lock washer 32, and lock washer 32 is made of rubber.Storm bolt 31
It is threadably mounted on sliding block 21 and slideway 11, lock washer 32 is set on the stud of storming bolt 31, and lock washer 32 is located at
It storms between the head and sliding block 21 of bolt 31.
Vertical 4 side wall of siphunculus offers service ports 41, and is provided with by bolt for covering in the side wall of vertical siphunculus 4
The maintenance door 42 of service ports 41.
The working principle of the present embodiment:
When installation, first cover board 2, vertical siphunculus 4 are placed on main gantry 1, and make sliding block 21 in slideway 11.Further according to
It needs to adjust to suitable position, then be set to lock washer 32 on the stud of storming bolt 31, then tighten fixation.
When route is installed, the route on main gantry 1 is sequentially passed through into cover board 2, vertical siphunculus 4, the then distribution of interface piping 5
To user.
When needing to overhaul, bolt can be backed out, remove maintenance door 42 and checked.
Embodiment two:
A kind of packaged type turns over threeway portal structure, and referring to Fig. 4, the difference with embodiment one is: vertical siphunculus 4
Side wall offers service ports 41, the side walls hinged maintenance door 42 having for covering service ports 41 of vertical siphunculus 4, maintenance door 42 and perpendicular
It is embedded with the first magnet 421 and the second magnet 411 to attract each other respectively to 4 side wall opposite side of siphunculus.
The working principle of the present embodiment:
When needing to overhaul, maintenance door 42 is opened, can be checked.After having checked, maintenance door 42 is closed, together
When the first magnet 421 and the second magnet 411 attract each other, avoid maintenance door 42 from automatically opening under the action of the forces of the wind.
Embodiment three:
A kind of packaged type turns over threeway portal structure, and referring to Fig. 5, the difference with embodiment one or embodiment two exists
In: the open end of main gantry 1 is integrally formed the slideway 11 being provided in concave arc shape, and slideway 11 forms sliding channel, and slides logical
The opening width in the section in road is less than the maximum width in the section in sliding channel.Cover board 2 and vertical siphunculus 4 are integrally formed setting
There is the elastic sliding vane 22 with the sliding cooperation of slideway 11, and stretches out the outer one end of slideway 11 in elastic sliding vane 22 and be integrally formed the company of being provided with
Contact pin 23, so that need to only move connection sheet 23 in operation can separate slideway 11 for cover board 2.
The working principle of the present embodiment:
During installation, first vertical duct 4 or cover board 2 are placed on main gantry, and elastic sliding vane 22 is made to abut slideway 11
Then vertical duct 4 or cover board 2 are pressed downward by open end, elastic sliding vane 22 is due to the reaction by 11 open end of slideway
Power and curve inwardly, until the maximum width in the horizontal direction of elastic sliding vane 22 be exactly equal to slideway 11 sliding channel section
Opening width, elastic sliding vane 22 can enter in slideway 11, complete installation.
The above is only the preferred embodiment of the utility model, and the protection scope of the utility model is not limited merely to
Above-described embodiment, technical solution belonging to the idea of the present invention belong to the protection scope of the utility model.It should refer to
Out, for those skilled in the art, it is without departing from the principle of the utility model it is several improvement and
Retouching, these improvements and modifications also should be regarded as the protection scope of the utility model.
Claims (9)
1. a kind of packaged type turns over threeway portal structure, there is the main gantry (1) of opening including side upward, feature exists
In: the open end of host bridge frame (1) is provided with for covering the cover board (2) being open and for guiding corridor common line into use
The vertical siphunculus (4) in family room, the cover board (2) and the vertical siphunculus (4) mutually push against, host bridge frame (1) with it is described
The space walked for route is formed between cover board (2), the vertical siphunculus (4).
2. a kind of packaged type according to claim 1 turns over threeway portal structure, it is characterised in that: described vertical logical
It is in flared that (4), which are managed, close to host bridge frame (1) one end.
3. a kind of packaged type according to claim 1 turns over threeway portal structure, it is characterised in that: described vertical logical
Pipe (4) side wall offers service ports (41), and vertical siphunculus (4) side wall is provided with by bolt for covering the service ports
(41) maintenance door (42).
4. a kind of packaged type according to claim 1 turns over threeway portal structure, it is characterised in that: described vertical logical
Pipe (4) side wall offers service ports (41), and vertical siphunculus (4) side wall is rotatably equipped with for covering the service ports (41)
Maintenance door (42), the maintenance door (42) and the vertical siphunculus (4) side wall are respectively arranged with the first magnet to attract each other
(421) and the second magnet (411).
5. a kind of packaged type according to claim 1 turns over threeway portal structure, it is characterised in that: the cover board
(2) it is arranged on host bridge frame (1) with the detachable sliding of the vertical siphunculus (4).
6. a kind of packaged type according to claim 5 turns over threeway portal structure, it is characterised in that: host bridge frame
(1) open end is provided with concave slideway (11), and the cover board (2) and the vertical siphunculus (4) are provided with and the cunning
The sliding block (21) of road (11) sliding cooperation.
7. a kind of packaged type according to claim 6 turns over threeway portal structure, it is characterised in that: the sliding block
(21) fixation kit connecting with the slideway (11) is provided on, the fixation kit includes being threadably mounted at the sliding block
(21) storming bolt (31) and on the slideway (11) and the lock washer being set on the stud of storming bolt (31)
(32)。
8. a kind of packaged type according to claim 5 turns over threeway portal structure, it is characterised in that: host bridge frame
(1) open at one end is provided with the slideway (11) in concave arc shape, and the opening in the section in the sliding channel that the slideway (11) is formed is wide
Degree is less than the maximum width in the section in sliding channel;The cover board (2) and the vertical siphunculus (4) are provided with and the slideway
(11) elastic sliding vane (22) of sliding cooperation, and the elastic sliding vane (22) is located at the slideway (11) outer one end and is provided with and is used for
Facilitate the connection sheet (23) for being bent the elastic sliding vane (22).
9. a kind of packaged type according to claim 1 turns over threeway portal structure, it is characterised in that: described vertical logical
Pipe (4) is provided with the interface piping (5) being connected in multiple groups and the vertical siphunculus (4), and every group of institute far from main gantry (1) one end
State interface piping (5) in include adjacent two family inlet wire.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821336334.6U CN208539485U (en) | 2018-08-18 | 2018-08-18 | A kind of packaged type turns over threeway portal structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821336334.6U CN208539485U (en) | 2018-08-18 | 2018-08-18 | A kind of packaged type turns over threeway portal structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208539485U true CN208539485U (en) | 2019-02-22 |
Family
ID=65378533
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821336334.6U Active CN208539485U (en) | 2018-08-18 | 2018-08-18 | A kind of packaged type turns over threeway portal structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208539485U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112542810A (en) * | 2019-09-23 | 2021-03-23 | Oppo(重庆)智能科技有限公司 | Movably-suspended wire slot |
-
2018
- 2018-08-18 CN CN201821336334.6U patent/CN208539485U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112542810A (en) * | 2019-09-23 | 2021-03-23 | Oppo(重庆)智能科技有限公司 | Movably-suspended wire slot |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208539485U (en) | A kind of packaged type turns over threeway portal structure | |
CN201297565Y (en) | Sunlight system for interior illumination of buildings | |
CN110258632A (en) | A kind of pipe gallery line branches mouth of direct-burried outlet | |
CN211368777U (en) | Utility tunnel | |
CN208486424U (en) | A kind of furred ceiling electricity separation system | |
CN104265134A (en) | Anti-haze solar purification window | |
CN205878475U (en) | Portable air supply system in superelevation layer | |
CN208486425U (en) | A kind of furred ceiling electricity separation system | |
WO2019218200A1 (en) | Suspended ceiling system having high-voltage cable installed therein | |
CN113323204B (en) | Exposed frame glass curtain wall | |
CN205724444U (en) | A kind of outdoor low voltage power cabinet being easy to ventilate | |
CN206039174U (en) | Campsite water and electricity supply stake | |
CN205481355U (en) | Air cleaner with STB | |
CN107327968A (en) | Air-conditioner outdoor unit | |
CN203928315U (en) | Air outlet structure and air conditioner with same | |
CN208604981U (en) | A kind of house that pipeline is separated with main structure | |
CN207705744U (en) | A kind of buried cable branch box | |
CN206337581U (en) | A kind of Urban Underground piping lane installs mouth mechanism | |
WO2019218208A1 (en) | Suspended ceiling | |
CN110499861A (en) | A kind of furred ceiling electricity separation system | |
CN208890281U (en) | A kind of embedded network line laying pipeline | |
CN110499860A (en) | A kind of furred ceiling electricity separation system | |
CN209265028U (en) | A kind of modified optical fiber distributing box | |
CN209119712U (en) | A kind of building interior pipeline installation structure | |
CN208818895U (en) | A kind of cable runs structure with switching well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |