CN208533533U - A kind of foundation pit locking shaped element - Google Patents

A kind of foundation pit locking shaped element Download PDF

Info

Publication number
CN208533533U
CN208533533U CN201820724674.XU CN201820724674U CN208533533U CN 208533533 U CN208533533 U CN 208533533U CN 201820724674 U CN201820724674 U CN 201820724674U CN 208533533 U CN208533533 U CN 208533533U
Authority
CN
China
Prior art keywords
locating
bridge arm
clip ear
foundation pit
shaped element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820724674.XU
Other languages
Chinese (zh)
Inventor
丰有发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DALI CONSTRUCTION GROUP Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820724674.XU priority Critical patent/CN208533533U/en
Application granted granted Critical
Publication of CN208533533U publication Critical patent/CN208533533U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a kind of foundation pits to lock shaped element, and positioning unit includes the first locating piece and the second locating piece, and when the first bridge arm and the second bridge arm are vertically arranged, the first recessing groove and the second recessing groove are mutually chimeric;Positioning node portion includes the first locating clip ear and the second locating clip ear, first locating clip ear and the second locating clip ear are oppositely arranged and form grasping part, when the first bridge arm and the second bridge arm are located at grasping part, the first locating clip ear and the second locating clip ear can tighten grasping part under external force the first locating piece and the second locating piece are fixed on positioning node portion.Pass through two locating pieces, so that it may realize the fixation to positioning node portion and machined surface, while guaranteeing fixed effect, facilitate operation.

Description

A kind of foundation pit locking shaped element
Technical field
The utility model relates to civic building foundation pit equipment, lock shaped element more specifically to a kind of foundation pit.
Background technique
Foundation pit is the heatable adobe sleeping platform excavated in basic engineering position by substrate absolute altitude and basic plane size.It should basis before excavation Geological hydrology data determines excavation plan in conjunction with live nearby buildings situation, and performs water-proof drainage work.It excavates not deep The available method for putting side slope of person, makes Stability of Earth Slopes, and gradient size is provided to determine by related construction.It excavates relatively deep and neighbouring builds The person that builds object, can use foundation pit walls method for protecting support, gunite concrete wall protecting method, and Large Foundation Pit even uses diaphram wall and colonnade Formula cast-in-situ bored pile is the methods of chain, protection outside soil layer collapse into;No influencer is nearby built, underground can be reduced with well-point method Water level, using slope open cut;Natural cold air freezing process excavation etc. can be used in cold district.And non-support foundation pit is generally used for More foundation is not deep, and the construction time is shorter, does not influence the safety of close to buildings when digging foundation pit.Level of ground water is lower than substrate, Or infiltration capacity is small, does not influence crater wall stability.The crater wall form of non-support foundation pit is divided into vertical crater wall, slope and stairstepping hole Wall and change gradient crater wall.
And relatively conventional design method is to lay steel mesh by the crater wall in foundation pit, and steel mesh is then fitted in hole The surface of wall, and curing agent is sprayed on steel mesh by way of spraying again until cover steel mesh, and presently, by In laying out-of-flatness, so the phenomenon that being easy to appear irregular spraying, causes local location intensity inadequate, influence whole by stress Intensity causes security risk.
Utility model content
In view of this, the utility model aim is to provide a kind of foundation pit locking shaped element.
In order to solve the above-mentioned technical problem, the technical solution of the utility model is: a kind of foundation pit locking shaped element, including steel Muscle net and several positioning units, the steel mesh include several transverse rod strips, several vertical bar items and positioning node portion, transverse direction The adjacent positioning node portion of any two is connected by transverse rod strip, and the adjacent positioning node portion of vertical any two passes through described perpendicular Rib connection, the positioning unit include the first locating piece and the second locating piece, and first locating piece includes the first bridge arm With two the first locating pins for being connected to the first bridge arm both ends, first bridge arm is provided with the first recessing groove, and described Two locating pieces include the second bridge arm and two the second locating pins for being connected to the second bridge arm, and second bridge arm is towards institute It states the first bridge arm and is provided with the second recessing groove, when first bridge arm and the second bridge arm are vertically arranged, first recessing groove It is mutually chimeric with second recessing groove;The positioning node portion includes the first locating clip ear and the second locating clip ear, institute It states the first locating clip ear and the second locating clip ear is oppositely arranged and is formed grasping part, when first bridge arm and described When two bridge arms are located at the grasping part, the first locating clip ear and the second locating clip ear can be tightened described under external force Grasping part is to be fixed on the positioning node portion for first locating piece and second locating piece.
Further: first locating pin is provided with the first hangnail.
Further: second locating pin is provided with the second hangnail.
Further: being arranged in two the first locating pin opposite tilts of same first bridge arm.
Further: being arranged in two the second locating pin opposite tilts of same second bridge arm.
Further: the first locating clip ear is set as the first curved metal part, and the second locating clip ear is set as The protrusion direction of second curved metal part, the first curved metal part and the second curved metal part is disposed opposite to each other.
The utility model has the technical effect that following aspect: being arranged in this way, can play one preferably Fixed effect passes through two locating pieces, so that it may realize the fixation to positioning node portion and machined surface, guarantee fixed effect Meanwhile facilitating operation.
Detailed description of the invention
A kind of Fig. 1: steel mesh structure principle chart of foundation pit locking shaped element of the utility model;
Fig. 2: a kind of positioning unit of foundation pit locking shaped element of the utility model is coupled structure chart;
A kind of Fig. 3: node locating portion schematic diagram of foundation pit locking shaped element of the utility model;
A kind of Fig. 4: first locating piece schematic diagram of foundation pit locking shaped element of the utility model;
A kind of Fig. 5: second locating piece schematic diagram of foundation pit locking shaped element of the utility model.
Appended drawing reference: 100, transverse rod strip;200, vertical bar item;300, positioning node portion;301, weld material layer;310, first Locating clip ear;320, the second locating clip ear;400, the first locating piece;410, the first bridge arm;411, the first recessing groove;420, first Locating pin;421, the first hangnail;500, the second locating piece;510, the second bridge arm;511, the second recessing groove;520, the second positioning Nail;521, the second hangnail.
Specific embodiment
Below in conjunction with attached drawing, specific embodiment of the present utility model is described in further detail, so that the utility model skill Art scheme is more readily understood and grasps.
Referring to figs. 1 to shown in Fig. 5, a kind of foundation pit locks shaped element, including steel mesh and several positioning units, the steel Muscle net includes several transverse rod strips 100, several vertical bar items 200 and positioning node portion 300, the adjacent positioning of lateral any two Node 300 is connected by transverse rod strip 100, and the adjacent positioning node portion 300 of vertical any two is connected by the vertical bar item 200 It connects, the positioning unit includes the first locating piece 400 and the second locating piece 500, and first locating piece 400 includes the first bridge Arm 410 and two the first locating pins 420 for being connected to 410 both ends of the first bridge arm, first bridge arm 410 are provided with first Recessing groove 411, second locating piece 500 include the second bridge arm 510 and are connected to two second of the second bridge arm 510 Locating pin 520, second bridge arm 510 are provided with the second recessing groove 511 towards first bridge arm 410, when first bridge When arm 410 and the second bridge arm 510 are vertically arranged, first recessing groove 411 and second recessing groove 511 are mutually chimeric;Institute Stating positioning node portion 300 includes the first locating clip ear 310 and the second locating clip ear 320,310 He of the first locating clip ear The second locating clip ear 320 is oppositely arranged and is formed grasping part, when first bridge arm 410 and second bridge arm 510 When positioned at the grasping part, the first locating clip ear 310 and the second locating clip ear 320 can be tightened described under external force Grasping part is to be fixed on the positioning node portion 300 for first locating piece 400 and second locating piece 500.Installation Process is as follows, and first steel mesh is laid on machined surface first, and the first locating piece 400 is then hammered into the machined surface, The position for guaranteeing to hammer into is needed, two the first locating pins 420 in the two sides in positioning node portion 300, guarantee fixed effect respectively, and The second locating piece 500 is hammered into machined surface afterwards, needs to keep the second bridge arm 510 vertical with the first bridge arm 410, corresponding resigning Slot is mutually twisted, and is equivalent to each positioning node in this way and is passed through four locating pins and is fixed, and four locating pin stress phases Interaction, then the first locating piece 400 and the abjection of the second locating piece 500 in order to prevent, by the setting of locating clip ear, plays one The effect of a fixation, it is only necessary to clamp the first locating clip ear 310 and the second locating clip ear 320 by clamp type tool when use, Move toward one another it, so that it may so that grasping part is tightened, to fix the first locating piece 400 and the second locating piece 500 in described Positioning node portion 300.
First locating pin 420 is provided with the first hangnail 421.Second locating pin 520 is provided with the second hangnail 521.It is arranged in this way, prevents it from deviating from from machined surface, improves fixed effect.
It is arranged in two 420 opposite tilts of the first locating pin of same first bridge arm 410.In same second bridge arm 510 Two 520 opposite tilt of the second locating pin settings.It is arranged in this way, guarantees stressed effect, while can play relatively reliable Fixed effect.
The first locating clip ear 310 is set as the first curved metal part, and the second locating clip ear 320 is set as second The protrusion direction of curved metal part, the first curved metal part and the second curved metal part is disposed opposite to each other.Pass through arc The setting of metalwork passes through the deformation nature of metal, so that it may guarantee fixed effect, and can also in the first curved metal part and Weld material layer 301 is set on second curved metal part, facilitates welding.
Certainly, the representative instance of above only the utility model, in addition to this, the utility model can also have other a variety of Specific embodiment, all technical solutions formed using equivalent substitution or equivalent transformation all fall within the requires of the utility model protection Within the scope of.

Claims (6)

1. a kind of foundation pit locks shaped element, it is characterised in that: including steel mesh and several positioning units, the steel mesh includes There are several transverse rod strips, several vertical bar items and positioning node portion, the adjacent positioning node portion of lateral any two passes through transverse rod strip Connection, the adjacent positioning node portion of vertical any two are connected by the vertical bar item, and the positioning unit includes first fixed Position part and the second locating piece, first locating piece include the first bridge arm and are connected to two first of the first bridge arm both ends Locating pin, first bridge arm are provided with the first recessing groove, and second locating piece includes the second bridge arm and is connected to Two the second locating pins of the second bridge arm, second bridge arm is provided with the second recessing groove towards first bridge arm, when described When first bridge arm and the second bridge arm are vertically arranged, first recessing groove and second recessing groove are mutually chimeric;The positioning Node includes the first locating clip ear and the second locating clip ear, the first locating clip ear and the second locating clip ear phase To being arranged and formed grasping part, when first bridge arm and second bridge arm are located at the grasping part, described first Locating clip ear and the second locating clip ear can tighten the grasping part under external force with by first locating piece and described Second locating piece is fixed on the positioning node portion.
2. a kind of foundation pit as described in claim 1 locks shaped element, it is characterised in that: first locating pin is provided with first Hangnail.
3. a kind of foundation pit as described in claim 1 locks shaped element, it is characterised in that: second locating pin is provided with second Hangnail.
4. a kind of foundation pit as described in claim 1 locks shaped element, it is characterised in that: in two first of same first bridge arm The setting of locating pin opposite tilt.
5. a kind of foundation pit as described in claim 1 locks shaped element, it is characterised in that: in two second of same second bridge arm The setting of locating pin opposite tilt.
6. a kind of foundation pit as described in claim 1 locks shaped element, it is characterised in that: the first locating clip ear is set as the One curved metal part, the second locating clip ear are set as the second curved metal part, the first curved metal part and described The protrusion direction of two curved metal parts is disposed opposite to each other.
CN201820724674.XU 2018-05-15 2018-05-15 A kind of foundation pit locking shaped element Expired - Fee Related CN208533533U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820724674.XU CN208533533U (en) 2018-05-15 2018-05-15 A kind of foundation pit locking shaped element

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820724674.XU CN208533533U (en) 2018-05-15 2018-05-15 A kind of foundation pit locking shaped element

Publications (1)

Publication Number Publication Date
CN208533533U true CN208533533U (en) 2019-02-22

Family

ID=65394781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820724674.XU Expired - Fee Related CN208533533U (en) 2018-05-15 2018-05-15 A kind of foundation pit locking shaped element

Country Status (1)

Country Link
CN (1) CN208533533U (en)

Similar Documents

Publication Publication Date Title
CN106812150A (en) A kind of mountain area steep slope region Road Bridge Pile Foundation construction method
CN109183787A (en) A kind of forming method of man-made digging pile mould-pipe
CN108385700A (en) Slope reinforcement and guard method
CN108867692A (en) The protection of city big cross section open trench tunnel Nearby Structure and tunnel foundation pit method for digging
CN106988305A (en) A kind of pile-column pier construction method of underground integrated molding
CN208533533U (en) A kind of foundation pit locking shaped element
CN211143084U (en) Supporting construction of foundation ditch
CN109208594A (en) Processing method, steel pile casting structure and the drilled pile of sinking steel protecting canister chance boulder
CN208533538U (en) A kind of foundation pit styling components
CN110344394A (en) A kind of surrounding deep foundation pit shallow embedding structure base ruggedized construction and construction method
CN109944597B (en) Tunnel entering construction method based on protection of natural vegetation on side and up slopes
Kath et al. Engineering impacts of karst: three engineering case studies in cambrian and ordovician carbonates of the valley and ridge province
CN107227737A (en) Section-steel Piles pattern foundation pit supporting structure and method for pulling out
CN207109806U (en) The artificial friction pile of noiseless no airborne dust and short time limit
CN208563343U (en) A kind of foundation pit helps solidifying fixing piece
CN117052421B (en) Tunnel portal supporting structure in deep slippage and large bias state and construction method
KR102272014B1 (en) Riverbank and river bed protection structure using ground anchor assembly
CN115217114B (en) Construction method of foundation pit rescue back pressure platform
Polk et al. Cars and karst: investigating the National Corvette Museum sinkhole
Cotton et al. Recent advances in the top-down construction of a 26.4 meter deep soil nail retention system-Bellevue technology tower
JPS6233772Y2 (en)
Sæthern et al. Pre-Grouting of Large Rock Caverns in the Oslo Field-A Case Study
CN105297889A (en) House construction method for framework structure construction with loess landform reverse construction method
Sorochan et al. Experience in Designing Effective Zero Cycle Solutions.
Gingery et al. Soil Mix Seismic Fix

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190419

Address after: 311200 Room 601, Yongtaifeng Square, 297 Shixinbei Road, Xiaoshan Economic and Technological Development Zone, Hangzhou City, Zhejiang Province

Patentee after: DALI CONSTRUCTION GROUP CO., LTD.

Address before: 014010 No. 45 Iron and Steel Avenue, Kun District, Baotou City, Inner Mongolia Autonomous Region (Zhongye Oriental Engineering Technology Co., Ltd.)

Patentee before: Feng Youfa

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190222

Termination date: 20210515