CN208533511U - A kind of building concrete tubular pole - Google Patents

A kind of building concrete tubular pole Download PDF

Info

Publication number
CN208533511U
CN208533511U CN201820897186.9U CN201820897186U CN208533511U CN 208533511 U CN208533511 U CN 208533511U CN 201820897186 U CN201820897186 U CN 201820897186U CN 208533511 U CN208533511 U CN 208533511U
Authority
CN
China
Prior art keywords
fixedly installed
concrete tubular
close
support plate
tubular pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820897186.9U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zunyi Zhongleichengdu Commercial Concrete Co Ltd
Original Assignee
Zunyi Zhongleichengdu Commercial Concrete Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zunyi Zhongleichengdu Commercial Concrete Co Ltd filed Critical Zunyi Zhongleichengdu Commercial Concrete Co Ltd
Priority to CN201820897186.9U priority Critical patent/CN208533511U/en
Application granted granted Critical
Publication of CN208533511U publication Critical patent/CN208533511U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The utility model belongs to technical field of building construction, specially a kind of building concrete tubular pole, including concrete tubular pile entirety and balancing frame, the upper end of the concrete tubular pile entirety is fixedly installed with reinforcing support plate, and the inner surface of concrete tubular pile entirety close to the position reinforced among support plate through there is ventilation hole, the inner surface for reinforcing support plate is fixedly installed with force column, and the upper end of force column is fixedly installed with support column close to the position for reinforcing support plate upper end, the inner surface of the balancing frame is fixedly installed with bearing pile close to the position of support column lower end, and the side of bearing pile is fixedly installed with positioning stress stake close to the position of balancing frame side, a kind of building concrete tubular pole described in the utility model, equipped with reinforcing support plate, balancing frame and positioning stress stake, it can be improved the stability of tubular pole, and it can increase forced area , while keeping tubular pole firmer, bring better prospect of the application.

Description

A kind of building concrete tubular pole
Technical field
The utility model belongs to technical field of building construction, specially a kind of building concrete tubular pole.
Background technique
Tubular pole is a kind of material for infrastructure, is generally used for building engineering field, tubular pole is by concrete strength etc. Grade and wall thickness can be divided into prestressed concrete pipe pile, thin tubular piles produced by prestressed concrete and prestressed high-strength concrete pile.
By the development of many years, the efficiency of concrete tubular pile is significantly improved, but there are some problems.It passes The forced area of the concrete tubular pile of system is smaller, and the stablizing effect used is lower, and traditional tubular pole is not firm enough, while positioning effect Fruit is poor, so that process is brought certain influence to people.
It to be solved the problems, such as so providing a kind of building concrete tubular pole and becoming us.
Utility model content
It is mentioned above in the background art to solve the purpose of this utility model is to provide a kind of building concrete tubular pole Problem.
To achieve the above object, the utility model provides the following technical solutions:
A kind of building concrete tubular pole, including concrete tubular pile entirety and balancing frame, whole upper of the concrete tubular pile End is fixedly installed with reinforcing support plate, and the inner surface of concrete tubular pile entirety runs through close to the position reinforced among support plate and has Ventilation hole, the inner surface for reinforcing support plate is fixedly installed with force column, and the upper end of force column is in reinforcing support plate The position at end is fixedly installed with support column, and the inner surface of the balancing frame is fixedly installed with load-bearing close to the position of support column lower end Stake, and the side of bearing pile is fixedly installed with positioning stress stake close to the position of balancing frame side, the lower section of the balancing frame is leaned on The position of nearly bearing pile lower end is equipped with terminal pad, and the lower end of terminal pad is fixed close to the position of concrete tubular pile entirety lower end Fixed underpan is installed, the side of the concrete tubular pile entirety is fixedly installed with cement fixing layer, and the one of cement fixing layer Side is fixedly installed with microlith fixing layer, and the side of the microlith fixing layer is fixedly installed with silt mixed layer, and silt mixed layer Inner surface be fixedly installed with No.1 steel pipe fixing pipe, upper end and balancing frame of the lower end for reinforcing support plate by bearing pile Inner surface be fixedly connected, the side of the cement fixing layer passes through the other side of microlith fixing layer and the side of silt mixed layer It is fixedly connected.
Preferably, the quantity of the force column and support column is several groups, and the outer surface of force column and support column It is fixedly connected by reinforcing the inner surface of support plate with the outer surface of ventilation hole.
Preferably, the quantity of the positioning stress stake is ten groups, and the lower end for positioning stress stake passes through fixed underpan Upper end be fixedly connected with the lower end of terminal pad.
Preferably, position of the inner surface of the No.1 steel pipe fixing pipe among silt mixed layer is fixedly mounted There is No.1 concrete material layer.
Preferably, position of the inner surface of the No.1 concrete material layer among No.1 steel pipe fixing pipe is solid Dingan County is equipped with No. two steel pipe fixing pipes.
Preferably, position of the inner surface of No. two steel pipe fixing pipes among No.1 concrete material floor is solid Dingan County is equipped with No. two concrete material floor.
Compared with prior art, the utility model has the beneficial effects that the utility model can be increased using support plate is reinforced Add bearing area, make building more safety and stablize, tubular pole use can be made more stable using balancing frame, can preferably supported Anti- natural weather, while the robustness of tubular pole is improved, keep it more durable, so that the safety that tubular pole uses is further increased, The bearing capacity of tubular pole can be increased using positioning stress stake, while can continue to pour into the ring that positioning stress stake surrounds Concrete positions it, keeps tubular pole more durable, and whole device is easy to operate, easy to use, the effect of load-bearing and safety It is more preferable relative to traditional approach.
Detailed description of the invention
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the partial view of the utility model;
Fig. 3 is the cross-sectional view of A in the utility model Fig. 1.
In figure: 1, concrete tubular pile is whole;2, support plate is reinforced;3, ventilation hole;4, force column;5, support column;6, it balances Disk;7, bearing pile;8, stress stake is positioned;9, terminal pad;10, fixed underpan;11, cement fixing layer;12, microlith fixing layer;13, Silt mixed layer;14, No.1 steel pipe fixing pipe;15, No.1 concrete material layer;16, No. two steel pipe fixing pipes;17, No. two are mixed Solidifying soil material layer.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be understood that term " on ", "lower", "front", "rear", "left", "right", The orientation or positional relationship of the instructions such as "top", "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of building concrete tubular pole, including concrete Tubular pole whole 1 and balancing frame 6, the upper end of concrete tubular pile whole 1, which is fixedly installed with, reinforces support plate 2, and concrete tubular pile is whole Close to the position reinforced among support plate 2 through there is ventilation hole 3, the inner surface for reinforcing support plate 2 is fixedly mounted the inner surface of body 1 There is force column 4, and the upper end of force column 4 is fixedly installed with support column 5 close to the position for reinforcing 2 upper end of support plate, balancing frame 6 Inner surface is fixedly installed with bearing pile 7 close to the position of 5 lower end of support column, and the side of bearing pile 7 is close to 6 side of balancing frame Position is fixedly installed with positioning stress stake 8, and the lower section of balancing frame 6 is equipped with terminal pad 9 close to the position of 7 lower end of bearing pile, and The lower end of terminal pad 9 is fixedly installed with fixed underpan 10 close to the position of whole 1 lower end of concrete tubular pile, and concrete tubular pile is whole 1 side is fixedly installed with cement fixing layer 11, and the side of cement fixing layer 11 is fixedly installed with microlith fixing layer 12, microlith The side of fixing layer 12 is fixedly installed with silt mixed layer 13, and the inner surface of silt mixed layer 13 is fixedly installed with No.1 steel pipe Fixing pipe 14, the lower end for reinforcing support plate 2 are fixedly connected by the upper end of bearing pile 7 with the inner surface of balancing frame 6, and cement is fixed The side of layer 11 is fixedly connected by the other side of microlith fixing layer 12 with the side of silt mixed layer 13;Further, stress The quantity of column 4 and support column 5 is several groups, and the outer surface of force column 4 and support column 5 passes through the interior table for reinforcing support plate 2 Face is fixedly connected with the outer surface of ventilation hole 3;Further, the quantity for positioning stress stake 8 is ten groups, and positions stress stake 8 Lower end is fixedly connected by the upper end of fixed underpan 10 with the lower end of terminal pad 9;Further, No.1 steel pipe fixing pipe 14 is interior Position of the surface among silt mixed layer 13 is fixedly installed with No.1 concrete material layer 15;Further, No.1 coagulation Position of the inner surface of soil material floor 15 among No.1 steel pipe fixing pipe 14 is fixedly installed with No. two steel pipe fixing pipes 16;Into One step, position of the inner surface of No. two steel pipe fixing pipes 16 among No.1 concrete material floor 15 is fixedly installed with No. two Concrete material layer 17.
Working principle: the inner surface of No. two steel pipe fixing pipes 16 is spread into No. two concrete material floor 17 and No.1 coagulation Soil material layer 15 is reinforced, and carries out second consolidation using No.1 steel pipe fixing pipe 14, while being smeared by silt mixed layer 13, By cement fixing layer 11, microlith fixing layer 12 and the outside for being applied to No.1 steel pipe fixing pipe 14, it is whole to improve concrete tubular pile The durability of body 1 keeps it firmer, and concrete tubular pile whole 1 is mounted on ground by cooperation fixed underpan 10, and is consolidated It is fixed, the stability used is improved, supports bearing pile 7 in conjunction with terminal pad 9, and by 7 load-bearing of bearing pile, while using positioning stress stake 8 are positioned and are supported, and bearing capacity is increased, and are facilitated staff to concrete is added inside it, are made concrete by balancing frame 6 Tubular pole whole 1 more balances, and increases stability, and cooperation ventilation hole 3 is divulged information, and forms pipeline, increases load-bearing in conjunction with support plate 2 is reinforced Area, while bearing capacity is further increased, and supported by force column 4 and support column 5, power is shared, to make concrete tubular pile Whole 1 can preferably be used for building-supporting, more practical.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of building concrete tubular pole, including concrete tubular pile whole (1) and balancing frame (6), it is characterised in that: the coagulation The upper end of native tubular pole whole (1), which is fixedly installed with, reinforces support plate (2), and the inner surface of concrete tubular pile whole (1) close to plus For the intermediate position of clamped support plate (2) through having ventilation hole (3), the inner surface for reinforcing support plate (2) is fixedly installed with stress Column (4), and the upper end of force column (4) is fixedly installed with support column (5) close to the position for reinforcing support plate (2) upper end, it is described flat The inner surface of weighing apparatus disk (6) is fixedly installed with bearing pile (7) close to the position of support column (5) lower end, and the side of bearing pile (7) is leaned on The position of nearly balancing frame (6) side is fixedly installed with positioning stress stake (8), and the lower section of the balancing frame (6) is close to bearing pile (7) The position of lower end is equipped with terminal pad (9), and the lower end of terminal pad (9) is solid close to the position of whole (1) lower end of concrete tubular pile Dingan County is equipped with fixed underpan (10), and the side of the concrete tubular pile whole (1) is fixedly installed with cement fixing layer (11), and water The side of mud fixing layer (11) is fixedly installed with microlith fixing layer (12), and the side of the microlith fixing layer (12) is fixedly installed with Silt mixed layer (13), and the inner surface of silt mixed layer (13) is fixedly installed with No.1 steel pipe fixing pipe (14), the reinforcing The lower end of support plate (2) is fixedly connected by the upper end of bearing pile (7) with the inner surface of balancing frame (6), the cement fixing layer (11) side is fixedly connected by the other side of microlith fixing layer (12) with the side of silt mixed layer (13).
2. a kind of building concrete tubular pole according to claim 1, it is characterised in that: the force column (4) and support column (5) quantity is several groups, and the outer surface of force column (4) and support column (5) pass through reinforce the inner surface of support plate (2) with The outer surface of ventilation hole (3) is fixedly connected.
3. a kind of building concrete tubular pole according to claim 1, it is characterised in that: the number of positioning stress stake (8) Amount is ten groups, and the lower end for positioning stress stake (8) passes through the fixed company in the upper end of fixed underpan (10) and the lower end of terminal pad (9) It connects.
4. a kind of building concrete tubular pole according to claim 1, it is characterised in that: the No.1 steel pipe fixing pipe (14) Inner surface be fixedly installed with No.1 concrete material layer (15) close to the intermediate position of silt mixed layer (13).
5. a kind of building concrete tubular pole according to claim 4, it is characterised in that: the No.1 concrete material layer (15) inner surface is fixedly installed with No. two steel pipe fixing pipes (16) close to the intermediate position of No.1 steel pipe fixing pipe (14).
6. a kind of building concrete tubular pole according to claim 5, it is characterised in that: No. two steel pipe fixing pipes (16) Inner surface be fixedly installed with No. two concrete material floor (17) close to the intermediate position of No.1 concrete material floor (15).
CN201820897186.9U 2018-06-11 2018-06-11 A kind of building concrete tubular pole Expired - Fee Related CN208533511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820897186.9U CN208533511U (en) 2018-06-11 2018-06-11 A kind of building concrete tubular pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820897186.9U CN208533511U (en) 2018-06-11 2018-06-11 A kind of building concrete tubular pole

Publications (1)

Publication Number Publication Date
CN208533511U true CN208533511U (en) 2019-02-22

Family

ID=65382139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820897186.9U Expired - Fee Related CN208533511U (en) 2018-06-11 2018-06-11 A kind of building concrete tubular pole

Country Status (1)

Country Link
CN (1) CN208533511U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309077A (en) * 2021-07-05 2021-08-27 扬州工业职业技术学院 A connection structure for precast concrete stake

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309077A (en) * 2021-07-05 2021-08-27 扬州工业职业技术学院 A connection structure for precast concrete stake

Similar Documents

Publication Publication Date Title
CN105822330A (en) GFRP tube concrete support for underground engineering supporting and construction technology thereof
CN210421082U (en) Bridge pile foundation reinforced structure
CN208533511U (en) A kind of building concrete tubular pole
CN202208916U (en) High-strength concrete prefabricated pile
CN102041814A (en) Novel composite pile (ground) foundation and application method thereof
CN205857147U (en) A kind of FRP composite and coral concrete foundation structure system
CN108149775A (en) A kind of prefabricated Boosting pumping station of PE and its mounting process
CN209555959U (en) A kind of civil engineering Combined concrete ground pilum
CN209025072U (en) Reinforced concrete sleeve stake
CN207906576U (en) A kind of combined type push pipe rear backrest
CN214993788U (en) Assembled cement soil composite pile
CN211340834U (en) But novel fan basis of self-adaptation stable control
CN204590222U (en) A kind of anti-settling plastic drainage inspection well
CN209703544U (en) A kind of native pile foundation of monitoring upright bar
CN207092066U (en) A kind of civil engineering built pile
CN201943071U (en) Implantable steel tube anchor rod with stabs
CN206736743U (en) Lay the easy structure of mountable steel bridge
CN205876344U (en) Bonding steel reinforcement device for highway tunnel lining surface
CN214276932U (en) Special measuring device of multi-functional urban and rural planning design
CN205530400U (en) Batter pile test model steel reinforcement cage cushion inclines
CN109537586A (en) A kind of pedestal pile
CN205242468U (en) Combination reinforced structure of pile foundation
CN209722946U (en) CFG Compound Foundation builds base reinforced structure
CN205804397U (en) A kind of communication three pipe steel tower isolated footings
CN217500197U (en) Anti-floating anchor rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190222

Termination date: 20190611