CN208508373U - A kind of preformed armor rods installation wrapping head - Google Patents

A kind of preformed armor rods installation wrapping head Download PDF

Info

Publication number
CN208508373U
CN208508373U CN201821047570.6U CN201821047570U CN208508373U CN 208508373 U CN208508373 U CN 208508373U CN 201821047570 U CN201821047570 U CN 201821047570U CN 208508373 U CN208508373 U CN 208508373U
Authority
CN
China
Prior art keywords
bearing
armor rods
preformed armor
wrapping head
spanner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821047570.6U
Other languages
Chinese (zh)
Inventor
苑爱国
沈刚
金卓琛
郭峰
孙超
谢晖
刘伟杰
徐�明
刘哲辰
周纯智
于涛
关永宝
侯葳
孙雁翎
张辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201821047570.6U priority Critical patent/CN208508373U/en
Application granted granted Critical
Publication of CN208508373U publication Critical patent/CN208508373U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

A kind of preformed armor rods installation wrapping head, including spanner, bearing three, conducting wire, bearing two, preformed armor rods, bearing four, bearing one;Wherein: spanner middle and upper part is concave arc structure, is equipped with bearing three, bearing two and bearing one at concave arc structure, bearing three, bearing two and bearing one are contacted with conducting wire rolling friction;Bearing four is installed behind spanner middle and upper part, is disposed with preformed armor rods in bearing four.The advantages of the utility model: the contact surface with conducting wire is circular section, installs rolling bearing in arcuate structure part, eliminates the abrasion between wrapping head and conducting wire;It is hollow bearing at the back side of the arc surface with conductive contact, preformed armor rods are through in hollow bearing by when operation, when rotate wrapping head, the only rolling friction of bearing between preformed armor rods and wrapping head;The root part of handle of wrapping head is designed to flat arc, at the ending of preformed armor rods, can will be inserted into the gap of preformed armor rods end with it, and wind in conductive wire cross-section direction, preformed armor rods end is installed in place.

Description

A kind of preformed armor rods installation wrapping head
Technical field
The utility model relates to power system device field, in particular to a kind of preformed armor rods install wrapping head.
Background technique
For the safety for guaranteeing the important Crossover phase operation of transmission line of electricity, installation preformed armor rods are needed on the tension tower conducting wire of route Attached drainage, in carrying out preformed armor rods installation process, because there is no special installation tool, since preformed armor rods line footpath is thicker, harder, installation Process is very difficult.The job is just carried out at present, and in popularization and use from now on, preformed armor rods special installation tool is owed It lacks, is urgent problem to be solved in preformed armor rods application.
Utility model content
The purpose of this utility model is to have provided a kind of preformed armor rods installation wrapping head for the ease of installation operation.
The utility model provides a kind of preformed armor rods installation wrapping head, it is characterised in that: the preformed armor rods install winding Device, including spanner 1, bearing 32, conducting wire 3, bearing 24, preformed armor rods 5, bearing 46, bearing 1;
Wherein: 1 middle and upper part of spanner is concave arc structure, is equipped with bearing 32,24 and of bearing at concave arc structure Bearing 1, bearing 32, bearing 24 and bearing 1 are contacted with 3 rolling friction of conducting wire;Spanner is equipped with bearing behind 1 middle and upper part 46, preformed armor rods 5 are disposed in bearing 46.
The spanner 1, tail structure are flat, have through-hole.
The diameter of the bearing 1 is respectively less than the diameter of bearing 32 and bearing 24.
The bearing 32 and bearing 24 is deep groove ball bearing.
5 radical of preformed armor rods is 2~4.
The flexible casing of 1 the foot section brought of spanner.
Laborsaving, time saving, easy to operate effect is played in preformed armor rods installation process, size is that 10 cun of spanners are similar, It is used freely when operation, is extremely easy to get started, easy to carry.Its material is metal steel material, and strength and toughness is high;With conducting wire and preformed The contact surface of silk is rolling bearing, minimum by being reduced to the abrasion of conducting wire, not damage wires;Protect preformed armor rods original attached simultaneously Diamond dust be not worn, guarantee that the power that holds of preformed armor rods does not reduce;The root part of handle of wrapping head is designed to flat arc, pre- At the ending of hank knotting, preformed armor rods end position can be installed in place with it.
The advantages of the utility model:
Preformed armor rods described in the utility model install wrapping head, and the contact surface with conducting wire is circular section, in arc knot Rolling bearing is installed in structure part, eliminates the abrasion between wrapping head and conducting wire;In the back side of the arc surface with conductive contact is Preformed armor rods are through in hollow bearing by empty bearing, when operation, when rotate wrapping head, only bearing between preformed armor rods and wrapping head Rolling friction, without wearing preformed armor rods;The root part of handle of wrapping head is designed to flat arc, can at the ending of preformed armor rods It will be inserted into the gap of preformed armor rods end with it, and be wound in conductive wire cross-section direction, preformed armor rods end is installed in place.
Detailed description of the invention
With reference to the accompanying drawing and embodiment is described in further detail the utility model:
Fig. 1 is that preformed armor rods install wrapping head structural schematic diagram.
Specific embodiment
Embodiment 1
The utility model provides a kind of preformed armor rods installation wrapping head, it is characterised in that: the preformed armor rods install winding Device, including spanner 1, bearing 32, conducting wire 3, bearing 24, preformed armor rods 5, bearing 46, bearing 1;
Wherein: 1 middle and upper part of spanner is concave arc structure, is equipped with bearing 32,24 and of bearing at concave arc structure Bearing 1, bearing 32, bearing 24 and bearing 1 are contacted with 3 rolling friction of conducting wire;Spanner is equipped with bearing behind 1 middle and upper part 46, preformed armor rods 5 are disposed in bearing 46.
The spanner 1, tail structure are flat, have through-hole.
The diameter of the bearing 1 is respectively less than the diameter of bearing 32 and bearing 24.
5 radical of preformed armor rods is 2.
The flexible casing of 1 the foot section brought of spanner.
Laborsaving, time saving, easy to operate effect is played in preformed armor rods installation process, size is that 10 cun of spanners are similar, It is used freely when operation, is extremely easy to get started, easy to carry.Its material is metal steel material, and strength and toughness is high;With conducting wire and preformed The contact surface of silk is rolling bearing, minimum by being reduced to the abrasion of conducting wire, not damage wires;Protect preformed armor rods original attached simultaneously Diamond dust be not worn, guarantee that the power that holds of preformed armor rods does not reduce;The root part of handle of wrapping head is designed to flat arc, pre- At the ending of hank knotting, preformed armor rods end position can be installed in place with it.
Embodiment 2
The utility model provides a kind of preformed armor rods installation wrapping head, it is characterised in that: the preformed armor rods install winding Device, including spanner 1, bearing 32, conducting wire 3, bearing 24, preformed armor rods 5, bearing 46, bearing 1;
Wherein: 1 middle and upper part of spanner is concave arc structure, is equipped with bearing 32,24 and of bearing at concave arc structure Bearing 1, bearing 32, bearing 24 and bearing 1 are contacted with 3 rolling friction of conducting wire;Spanner is equipped with bearing behind 1 middle and upper part 46, preformed armor rods 5 are disposed in bearing 46.
The spanner 1, tail structure are flat, have through-hole.
The diameter of the bearing 1 is respectively less than the diameter of bearing 32 and bearing 24.
The bearing 32 and bearing 24 is deep groove ball bearing.
5 radical of preformed armor rods is 3.
The flexible casing of 1 the foot section brought of spanner.
Laborsaving, time saving, easy to operate effect is played in preformed armor rods installation process, size is that 10 cun of spanners are similar, It is used freely when operation, is extremely easy to get started, easy to carry.Its material is metal steel material, and strength and toughness is high;With conducting wire and preformed The contact surface of silk is rolling bearing, minimum by being reduced to the abrasion of conducting wire, not damage wires;Protect preformed armor rods original attached simultaneously Diamond dust be not worn, guarantee that the power that holds of preformed armor rods does not reduce;The root part of handle of wrapping head is designed to flat arc, pre- At the ending of hank knotting, preformed armor rods end position can be installed in place with it.
Embodiment 3
The utility model provides a kind of preformed armor rods installation wrapping head, it is characterised in that: the preformed armor rods install winding Device, including spanner 1, bearing 32, conducting wire 3, bearing 24, preformed armor rods 5, bearing 46, bearing 1;
Wherein: 1 middle and upper part of spanner is concave arc structure, is equipped with bearing 32,24 and of bearing at concave arc structure Bearing 1, bearing 32, bearing 24 and bearing 1 are contacted with 3 rolling friction of conducting wire;Spanner is equipped with bearing behind 1 middle and upper part 46, preformed armor rods 5 are disposed in bearing 46.
The spanner 1, tail structure are flat, have through-hole.
The diameter of the bearing 1 is respectively less than the diameter of bearing 32 and bearing 24.
The bearing 32 and bearing 24 is deep groove ball bearing.
5 radical of preformed armor rods is 4.
The flexible casing of 1 the foot section brought of spanner.
Laborsaving, time saving, easy to operate effect is played in preformed armor rods installation process, size is that 10 cun of spanners are similar, It is used freely when operation, is extremely easy to get started, easy to carry.Its material is metal steel material, and strength and toughness is high;With conducting wire and preformed The contact surface of silk is rolling bearing, minimum by being reduced to the abrasion of conducting wire, not damage wires;Protect preformed armor rods original attached simultaneously Diamond dust be not worn, guarantee that the power that holds of preformed armor rods does not reduce;The root part of handle of wrapping head is designed to flat arc, pre- At the ending of hank knotting, preformed armor rods end position can be installed in place with it.

Claims (6)

1. a kind of preformed armor rods install wrapping head, it is characterised in that: the preformed armor rods install wrapping head, including spanner (1), bearing Three (2), conducting wire (3), bearing two (4), preformed armor rods (5), bearing four (6), bearing one (7);
Wherein: spanner (1) middle and upper part is concave arc structure, is equipped with bearing three (2), bearing two (4) at concave arc structure With bearing one (7), bearing three (2), bearing two (4) and bearing one (7) are contacted with conducting wire (3) rolling friction;Spanner (1) middle and upper part Bearing four (6) is installed below, is disposed with preformed armor rods (5) in bearing four (6).
2. preformed armor rods described in accordance with the claim 1 install wrapping head, it is characterised in that: the spanner (1), tail structure are Flat has through-hole.
3. preformed armor rods described in accordance with the claim 1 install wrapping head, it is characterised in that: the diameter of the bearing one (7) is equal Less than the diameter of bearing three (2) and bearing two (4).
4. preformed armor rods described in accordance with the claim 1 install wrapping head, it is characterised in that: the bearing three (2) and bearing two It (4) is deep groove ball bearing.
5. preformed armor rods described in accordance with the claim 1 install wrapping head, it is characterised in that: preformed armor rods (5) radical is 2~ 4.
6. preformed armor rods described in accordance with the claim 1 install wrapping head, it is characterised in that: spanner (1) tail portion is with soft Property casing.
CN201821047570.6U 2018-07-04 2018-07-04 A kind of preformed armor rods installation wrapping head Active CN208508373U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821047570.6U CN208508373U (en) 2018-07-04 2018-07-04 A kind of preformed armor rods installation wrapping head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821047570.6U CN208508373U (en) 2018-07-04 2018-07-04 A kind of preformed armor rods installation wrapping head

Publications (1)

Publication Number Publication Date
CN208508373U true CN208508373U (en) 2019-02-15

Family

ID=65282517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821047570.6U Active CN208508373U (en) 2018-07-04 2018-07-04 A kind of preformed armor rods installation wrapping head

Country Status (1)

Country Link
CN (1) CN208508373U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108767741A (en) * 2018-07-04 2018-11-06 国网辽宁省电力有限公司营口供电公司 A kind of preformed armor rods installation wrapping head

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108767741A (en) * 2018-07-04 2018-11-06 国网辽宁省电力有限公司营口供电公司 A kind of preformed armor rods installation wrapping head
CN108767741B (en) * 2018-07-04 2021-03-09 国网辽宁省电力有限公司营口供电公司 Preformed armor rod installation coiler

Similar Documents

Publication Publication Date Title
CN203839891U (en) Four-split wire rotary type anti-galloping damping spacer rod
CN208508373U (en) A kind of preformed armor rods installation wrapping head
CN210669287U (en) Electric power construction tensioner bullwheel convenient to change
CN208028489U (en) A kind of high efficiency cord holder
CN204886018U (en) Intraductal area silk device of wearing of building electrical engineering
CN108767741A (en) A kind of preformed armor rods installation wrapping head
CN104518388B (en) A kind of connection transfer device being used between rotary part and static component
CN207691314U (en) A kind of aluminium armor tape quickly winds specific purpose tool
CN102946070B (en) The numb stock device of transmission line bracing wire
CN212011914U (en) Water conservancy construction is with device of sunkening cord
CN202076752U (en) Novel wire clamp of conductor spacer
CN204538564U (en) A kind of wire stretcher
CN202299576U (en) Tool for binding tower stay wires
CN205724668U (en) A kind of tightener for stringing
CN201608498U (en) Cable connector protective device
CN202957529U (en) Strand twisting device for stay wire of electric transmission line
CN202279568U (en) Power-free paying-off device for cantilever
CN220570201U (en) Auxiliary device for cable laying
CN205141519U (en) Multi -functional wiring ware of cable
CN211018188U (en) Low-voltage wire grip
CN203285135U (en) High-voltage steel strand stay wire bundle binding tool
CN103452369B (en) Pole guy tools
CN203911355U (en) Hoisting system of insulator string
CN203754154U (en) Electric power wire take-up and pay-off device
CN212076047U (en) A take-up and pay-off for wind-powered electricity generation becomes oar control cable

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant