CN108767741A - A kind of preformed armor rods installation wrapping head - Google Patents

A kind of preformed armor rods installation wrapping head Download PDF

Info

Publication number
CN108767741A
CN108767741A CN201810721048.XA CN201810721048A CN108767741A CN 108767741 A CN108767741 A CN 108767741A CN 201810721048 A CN201810721048 A CN 201810721048A CN 108767741 A CN108767741 A CN 108767741A
Authority
CN
China
Prior art keywords
bearing
armor rods
preformed armor
wrapping head
spanner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810721048.XA
Other languages
Chinese (zh)
Other versions
CN108767741B (en
Inventor
苑爱国
沈刚
金卓琛
郭峰
孙超
谢晖
刘伟杰
徐�明
刘哲辰
周纯智
于涛
关永宝
侯葳
孙雁翎
张辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201810721048.XA priority Critical patent/CN108767741B/en
Publication of CN108767741A publication Critical patent/CN108767741A/en
Application granted granted Critical
Publication of CN108767741B publication Critical patent/CN108767741B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

A kind of preformed armor rods installation wrapping head, including spanner, bearing three, conducting wire, bearing two, preformed armor rods, bearing four, bearing one;Wherein:Spanner middle and upper part is concave arc structure, is equipped with bearing three, bearing two and bearing one at concave arc structure, bearing three, bearing two and bearing one are contacted with conducting wire rolling friction;Bearing four is installed behind spanner middle and upper part, preformed armor rods are disposed in bearing four.Advantages of the present invention:Contact surface with conducting wire is circular section, installs rolling bearing in arcuate structure part, eliminates the abrasion between wrapping head and conducting wire;It is hollow bearing at the back side of the arc surface with conductive contact, preformed armor rods are through in hollow bearing by when operation, when rotate wrapping head, the only rolling friction of bearing between preformed armor rods and wrapping head;The root part of handle of wrapping head is designed to flat arc, at the ending of preformed armor rods, can will be inserted into the gap of preformed armor rods end with it, and be wound in conductive wire cross-section direction, preformed armor rods end is installed in place.

Description

A kind of preformed armor rods installation wrapping head
Technical field
The present invention relates to power system device field, more particularly to a kind of preformed armor rods install wrapping head.
Background technology
To ensure the safety of the important Crossover phase operation of transmission line of electricity, installation preformed armor rods are needed on the tension tower conducting wire of circuit Attached drainage, in carrying out preformed armor rods installation process, because there is no special installation tool, since preformed armor rods line footpath is thicker, harder, installation Process is very difficult.The work project is just carried out at present, and in promoting the use of from now on, preformed armor rods special installation tool is owed It lacks, is urgent problem to be solved in preformed armor rods application.
Invention content
The purpose of the invention is to be easily installed operation, a kind of preformed armor rods installation wrapping head has been provided.
The present invention provides a kind of preformed armor rods to install wrapping head, it is characterised in that:The preformed armor rods install wrapping head, packet Include spanner 1, bearing 32, conducting wire 3, bearing 24, preformed armor rods 5, bearing 46, bearing 1;
Wherein:1 middle and upper part of spanner is concave arc structure, and bearing 32,24 and of bearing are equipped at concave arc structure Bearing 1, bearing 32, bearing 24 and bearing 1 are contacted with 3 rolling friction of conducting wire;Spanner is equipped with bearing behind 1 middle and upper part 46, preformed armor rods 5 are disposed in bearing 46.
The spanner 1, tail structure are flat, carry through-hole.
The diameter of the bearing 1 is respectively less than the diameter of bearing 32 and bearing 24.
The bearing 32 and bearing 24 is deep groove ball bearing.
5 radical of preformed armor rods is 2~4.
The flexible casing of 1 the foot section brought of spanner.
Laborsaving, time saving, easy to operate effect is played in preformed armor rods installation process, size is that 10 cun of spanners are similar, It is used freely when operation, easily left-hand seat, easy to carry.Its material is metal steel material, and strength and toughness is high;With conducting wire and preformed The contact surface of silk is rolling bearing, minimum by being reduced to the abrasion of conducting wire, not damage wires;Protect preformed armor rods original attached simultaneously The diamond dust is not worn, and ensures that the power that holds of preformed armor rods does not reduce;The root part of handle of wrapping head is designed to flat arc, pre- At the ending of hank knotting, preformed armor rods end position can be installed in place with it.
Advantages of the present invention:
Preformed armor rods of the present invention install wrapping head, and the contact surface with conducting wire is circular section, in arcuate structure portion Divide installation rolling bearing, eliminates the abrasion between wrapping head and conducting wire;It is hollow at the back side of the arc surface with conductive contact Preformed armor rods are through in hollow bearing by bearing, when operation, when rotating wrapping head, there was only the rolling of bearing between preformed armor rods and wrapping head Dynamic friction, without wearing preformed armor rods;The root part of handle of wrapping head is designed to flat arc, at the ending of preformed armor rods, can use it It will be inserted into the gap of preformed armor rods end, and be wound in conductive wire cross-section direction, preformed armor rods end is installed in place.
Description of the drawings
Below in conjunction with the accompanying drawings and embodiment the present invention is described in further detail:
Fig. 1 is that preformed armor rods install wrapping head structural schematic diagram.
Specific implementation mode
Embodiment 1
The present invention provides a kind of preformed armor rods to install wrapping head, it is characterised in that:The preformed armor rods install wrapping head, packet Include spanner 1, bearing 32, conducting wire 3, bearing 24, preformed armor rods 5, bearing 46, bearing 1;
Wherein:1 middle and upper part of spanner is concave arc structure, and bearing 32,24 and of bearing are equipped at concave arc structure Bearing 1, bearing 32, bearing 24 and bearing 1 are contacted with 3 rolling friction of conducting wire;Spanner is equipped with bearing behind 1 middle and upper part 46, preformed armor rods 5 are disposed in bearing 46.
The spanner 1, tail structure are flat, carry through-hole.
The diameter of the bearing 1 is respectively less than the diameter of bearing 32 and bearing 24.
5 radical of preformed armor rods is 2.
The flexible casing of 1 the foot section brought of spanner.
Laborsaving, time saving, easy to operate effect is played in preformed armor rods installation process, size is that 10 cun of spanners are similar, It is used freely when operation, easily left-hand seat, easy to carry.Its material is metal steel material, and strength and toughness is high;With conducting wire and preformed The contact surface of silk is rolling bearing, minimum by being reduced to the abrasion of conducting wire, not damage wires;Protect preformed armor rods original attached simultaneously The diamond dust is not worn, and ensures that the power that holds of preformed armor rods does not reduce;The root part of handle of wrapping head is designed to flat arc, pre- At the ending of hank knotting, preformed armor rods end position can be installed in place with it.
Embodiment 2
The present invention provides a kind of preformed armor rods to install wrapping head, it is characterised in that:The preformed armor rods install wrapping head, packet Include spanner 1, bearing 32, conducting wire 3, bearing 24, preformed armor rods 5, bearing 46, bearing 1;
Wherein:1 middle and upper part of spanner is concave arc structure, and bearing 32,24 and of bearing are equipped at concave arc structure Bearing 1, bearing 32, bearing 24 and bearing 1 are contacted with 3 rolling friction of conducting wire;Spanner is equipped with bearing behind 1 middle and upper part 46, preformed armor rods 5 are disposed in bearing 46.
The spanner 1, tail structure are flat, carry through-hole.
The diameter of the bearing 1 is respectively less than the diameter of bearing 32 and bearing 24.
The bearing 32 and bearing 24 is deep groove ball bearing.
5 radical of preformed armor rods is 3.
The flexible casing of 1 the foot section brought of spanner.
Laborsaving, time saving, easy to operate effect is played in preformed armor rods installation process, size is that 10 cun of spanners are similar, It is used freely when operation, easily left-hand seat, easy to carry.Its material is metal steel material, and strength and toughness is high;With conducting wire and preformed The contact surface of silk is rolling bearing, minimum by being reduced to the abrasion of conducting wire, not damage wires;Protect preformed armor rods original attached simultaneously The diamond dust is not worn, and ensures that the power that holds of preformed armor rods does not reduce;The root part of handle of wrapping head is designed to flat arc, pre- At the ending of hank knotting, preformed armor rods end position can be installed in place with it.
Embodiment 3
The present invention provides a kind of preformed armor rods to install wrapping head, it is characterised in that:The preformed armor rods install wrapping head, packet Include spanner 1, bearing 32, conducting wire 3, bearing 24, preformed armor rods 5, bearing 46, bearing 1;
Wherein:1 middle and upper part of spanner is concave arc structure, and bearing 32,24 and of bearing are equipped at concave arc structure Bearing 1, bearing 32, bearing 24 and bearing 1 are contacted with 3 rolling friction of conducting wire;Spanner is equipped with bearing behind 1 middle and upper part 46, preformed armor rods 5 are disposed in bearing 46.
The spanner 1, tail structure are flat, carry through-hole.
The diameter of the bearing 1 is respectively less than the diameter of bearing 32 and bearing 24.
The bearing 32 and bearing 24 is deep groove ball bearing.
5 radical of preformed armor rods is 4.
The flexible casing of 1 the foot section brought of spanner.
Laborsaving, time saving, easy to operate effect is played in preformed armor rods installation process, size is that 10 cun of spanners are similar, It is used freely when operation, easily left-hand seat, easy to carry.Its material is metal steel material, and strength and toughness is high;With conducting wire and preformed The contact surface of silk is rolling bearing, minimum by being reduced to the abrasion of conducting wire, not damage wires;Protect preformed armor rods original attached simultaneously The diamond dust is not worn, and ensures that the power that holds of preformed armor rods does not reduce;The root part of handle of wrapping head is designed to flat arc, pre- At the ending of hank knotting, preformed armor rods end position can be installed in place with it.

Claims (6)

1. a kind of preformed armor rods install wrapping head, it is characterised in that:The preformed armor rods install wrapping head, including spanner (1), bearing Three (2), conducting wire (3), bearing two (4), preformed armor rods (5), bearing four (6), bearing one (7);
Wherein:Spanner (1) middle and upper part is concave arc structure, and bearing three (2), bearing two (4) are equipped at concave arc structure With bearing one (7), bearing three (2), bearing two (4) and bearing one (7) are contacted with conducting wire (3) rolling friction;Spanner (1) middle and upper part Bearing four (6) is installed below, preformed armor rods (5) are disposed in bearing four (6).
2. preformed armor rods described in accordance with the claim 1 install wrapping head, it is characterised in that:The spanner (1), tail structure are Flat carries through-hole.
3. preformed armor rods described in accordance with the claim 1 install wrapping head, it is characterised in that:The diameter of the bearing one (7) is equal Less than the diameter of bearing three (2) and bearing two (4).
4. preformed armor rods described in accordance with the claim 1 install wrapping head, it is characterised in that:The bearing three (2) and bearing two (4) it is deep groove ball bearing.
5. preformed armor rods described in accordance with the claim 1 install wrapping head, it is characterised in that:Described preformed armor rods (5) radical be 2~ 4.
6. preformed armor rods described in accordance with the claim 1 install wrapping head, it is characterised in that:Described spanner (1) tail portion is with soft Property casing.
CN201810721048.XA 2018-07-04 2018-07-04 Preformed armor rod installation coiler Active CN108767741B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810721048.XA CN108767741B (en) 2018-07-04 2018-07-04 Preformed armor rod installation coiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810721048.XA CN108767741B (en) 2018-07-04 2018-07-04 Preformed armor rod installation coiler

Publications (2)

Publication Number Publication Date
CN108767741A true CN108767741A (en) 2018-11-06
CN108767741B CN108767741B (en) 2021-03-09

Family

ID=63975790

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810721048.XA Active CN108767741B (en) 2018-07-04 2018-07-04 Preformed armor rod installation coiler

Country Status (1)

Country Link
CN (1) CN108767741B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202616682U (en) * 2012-06-19 2012-12-19 邢台供电公司 Winder for single metal wires, aluminum-wrapped tapes and pre-stranded wires
CN203326477U (en) * 2013-06-19 2013-12-04 国家电网公司 Preformed armor rod winding tool
CN105048342A (en) * 2015-08-05 2015-11-11 国网浙江省电力公司台州供电公司 Special tool for installing preformed armor rods
CN208508373U (en) * 2018-07-04 2019-02-15 国网辽宁省电力有限公司营口供电公司 A kind of preformed armor rods installation wrapping head

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202616682U (en) * 2012-06-19 2012-12-19 邢台供电公司 Winder for single metal wires, aluminum-wrapped tapes and pre-stranded wires
CN203326477U (en) * 2013-06-19 2013-12-04 国家电网公司 Preformed armor rod winding tool
CN105048342A (en) * 2015-08-05 2015-11-11 国网浙江省电力公司台州供电公司 Special tool for installing preformed armor rods
CN208508373U (en) * 2018-07-04 2019-02-15 国网辽宁省电力有限公司营口供电公司 A kind of preformed armor rods installation wrapping head

Also Published As

Publication number Publication date
CN108767741B (en) 2021-03-09

Similar Documents

Publication Publication Date Title
CN208508373U (en) A kind of preformed armor rods installation wrapping head
CN108767741A (en) A kind of preformed armor rods installation wrapping head
CN204243269U (en) A kind of earth connection plug-in type auto take-up
CN208028489U (en) A kind of high efficiency cord holder
CN208903722U (en) A kind of low pressure tensile wear-resistant cable of bucket wheel machine
CN103398221B (en) Square forming device for parallel bunched cables
CN104577718A (en) Lightning rod provided with wind indicator
CN103551474B (en) Start led by wire loop
CN203229323U (en) Cable steering device
CN212011914U (en) Water conservancy construction is with device of sunkening cord
CN206775063U (en) A kind of wire clamp
CN207267228U (en) A kind of spanner for 2,000,000 connectors of L9
CN201044346Y (en) Binary-split single-damping ball-hinged spacer
CN207792191U (en) A kind of paper for daily use with shoulder pad structure unreels shaft device
CN106786276A (en) A kind of wire clamp
CN209658844U (en) A kind of NLL type strain clamp for preventing conducting wire from wearing
CN202076752U (en) Novel wire clamp of conductor spacer
CN207082375U (en) The main shaft guide roller of armoring machine
CN208608646U (en) A kind of cable general-purpose traction fixture
CN204946598U (en) A kind of novel parallel bundling insulated cable
CN211880585U (en) Wire collecting device for collecting earphone wire
CN103452369B (en) Pole guy tools
CN205159946U (en) Bunch seat
CN207069463U (en) Portable wire clamp threading tool
CN207418016U (en) Belt trolley power supply removal cable pulley shell device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant