CN103398221B - Parallel bundled cable normalizer - Google Patents

Parallel bundled cable normalizer Download PDF

Info

Publication number
CN103398221B
CN103398221B CN201310290183.0A CN201310290183A CN103398221B CN 103398221 B CN103398221 B CN 103398221B CN 201310290183 A CN201310290183 A CN 201310290183A CN 103398221 B CN103398221 B CN 103398221B
Authority
CN
China
Prior art keywords
mounting plate
lower support
support frame
groove
upper bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310290183.0A
Other languages
Chinese (zh)
Other versions
CN103398221A (en
Inventor
王华俊
胡秋生
胡显军
季宁军
吴广飞
吴林洋
黄从民
吴文军
吴太清
吴大铨
吴志平
吴昊天
杨耀作
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STATE GRID ZHEJIANG YUANQING COUNTY POWER SUPPLY Co
State Grid Corp of China SGCC
Lishui Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
STATE GRID ZHEJIANG YUANQING COUNTY POWER SUPPLY Co
State Grid Corp of China SGCC
Lishui Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STATE GRID ZHEJIANG YUANQING COUNTY POWER SUPPLY Co, State Grid Corp of China SGCC, Lishui Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical STATE GRID ZHEJIANG YUANQING COUNTY POWER SUPPLY Co
Priority to CN201310290183.0A priority Critical patent/CN103398221B/en
Publication of CN103398221A publication Critical patent/CN103398221A/en
Application granted granted Critical
Publication of CN103398221B publication Critical patent/CN103398221B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention relates to a square forming device for parallel bunched cables. The square forming device comprises a lower support provided with a first groove and an upper support provided with a second groove. One end of the upper support is in rotatable connection with one end of the lower support. The other end of the upper support is in butt joint with the other end of the lower support. The lower support is provided with a locking device used for enabling the upper support to be locked on the lower support. The inside of the second groove is movably connected with a first fixed pulley. The inside of the first groove is movably connected with a second fixed pulley. Gaps for allowing the parallel bunched cables to penetrate conveniently are formed between the first fixed pulley and the second fixed pulley. The square forming device has the advantages that the parallel bunched cables penetrate the gaps between the first fixed pulley and the second fixed pulley, pressure exertion and square forming processing is carried out on the parallel bunched cables simultaneously through the first fixed pulley and the second fixed pulley, what is needed is that one person carries out paying-off operations, one person ties ribbons, square forming work procedures are simplified, work load is reduced, square forming efficiency is improved, and the parallel bunched cables are orderly after square forming operations.

Description

平行集束电缆归方器Parallel bundled cable normalizer

技术领域technical field

本发明涉及平行集束电缆归方器。The invention relates to a squarer for parallel bundled cables.

背景技术Background technique

平行集束电缆是在借鉴国外绞合式绝缘导线束应用的基础上,通过在导线的制造工艺和结构方面进行改进而形成的新型导线材料,具有耐候性、抗日光老化。架设方便、线损低、无漏电、安全可靠等优点,平行集束电缆在放线前,根据工艺要求必须进行归方(归方是指将四条平行的集束导线进行折叠,并且用扎带固定牢固)后方可进行架线,手动归方时需至少三人以上,放线、归方、系扎带,进展缓慢且工序复杂,归方后的平行集束电缆存在歪曲,且在放线的过程当中容易出现问题,施工人员长时间的用手按压,不仅施工进展缓慢,且使得施工人员劳累不堪,常常会造成一系列的职业病,如手掌虎口部位酸麻无力。Parallel bundled cable is a new type of wire material formed by improving the manufacturing process and structure of the wire on the basis of referring to the application of stranded insulated wire bundles abroad. It has weather resistance and sunlight aging resistance. It has the advantages of convenient erection, low wire loss, no leakage, safety and reliability, etc. Before the parallel bundled cables are laid out, they must be squared according to the process requirements (squaring refers to folding four parallel bundled wires and fixing them firmly with cable ties. ) before wiring can be carried out. At least three people are required for manual homing. The process of unwinding, homing, and tying cable ties is slow and complicated. Problems are prone to occur. Construction workers press their hands for a long time, which not only slows down the construction progress, but also makes the construction workers extremely tired, often causing a series of occupational diseases, such as numbness and weakness in the palm of the hand.

发明内容Contents of the invention

本发明要解决的技术问题是现有平行集束电缆在归方时工作量大,工作进度缓慢,平行集束电缆归方效果不好,从而提供平行集束电缆归方器。The technical problem to be solved by the present invention is that the existing parallel bundled cables have a large workload and slow work progress during homing, and the homing effect of the parallel bundled cables is not good, so a parallel bundled cable homing device is provided.

为了解决上述技术问题,本发明是通过以下技术方案实现的:平行集束电缆归方器,包括设有第一凹槽的下支架、设有第二凹槽的上支架,所述上支架的一端与下支架的一端转动连接,所述上支架的另一端对接在下支架的另一端上,所述下支架上设有将上支架锁紧在下支架上的锁紧装置,所述第二凹槽内活动连接有第一定滑轮,所述第一凹槽内活动有第二定滑轮,所述第一定滑轮与第二定滑轮之间形成便于平行集束电缆穿设的间隙。In order to solve the above-mentioned technical problems, the present invention is achieved through the following technical solutions: a parallel bundled cable squarer, comprising a lower bracket provided with a first groove, an upper bracket provided with a second groove, one end of the upper bracket Rotately connected with one end of the lower bracket, the other end of the upper bracket is docked on the other end of the lower bracket, the lower bracket is provided with a locking device for locking the upper bracket on the lower bracket, and the second groove A first fixed pulley is movably connected, and a second fixed pulley is movable in the first groove, and a gap is formed between the first fixed pulley and the second fixed pulley to facilitate the passage of parallel bundled cables.

优选的,还包括可安装在电杆上的卡紧装置,所述卡紧装置包括第一安装板、第二安装板,所述第二安装板的一端与第一安装板的一端转动连接,所述第二安装板的另一端与第一安装板的另一端活动连接,所述第一安装板与第二安装板之间形成与电杆配合的安装孔,所述第一安装板与下支架相连,所述第二安装板上设有挂扣,通过卡紧装置提高了实用性能,能有效的保证杆上作业人员进行平行集束电缆的归方操作,安全可靠,使用效果好。Preferably, it also includes a clamping device that can be installed on the pole, the clamping device includes a first mounting plate and a second mounting plate, one end of the second mounting plate is rotatably connected to one end of the first mounting plate, The other end of the second mounting plate is movably connected with the other end of the first mounting plate, and a mounting hole for matching with the pole is formed between the first mounting plate and the second mounting plate, and the first mounting plate and the lower The brackets are connected, and the second mounting plate is provided with a buckle, which improves the practical performance through the clamping device, and can effectively ensure that the operator on the pole performs the homing operation of the parallel bundled cables, which is safe and reliable, and has a good use effect.

优选的,所述第一定滑轮的圆弧侧壁为光滑平面,所述第二定滑轮的圆弧侧壁上设有环形凹槽,通过光滑平面与环形凹槽同时对线缆进行下压受力,使导线成田字形归方,操作简单,使用效果好。Preferably, the arc side wall of the first fixed pulley is a smooth plane, the arc side wall of the second fixed pulley is provided with an annular groove, and the cable is simultaneously pressed down by the smooth plane and the annular groove Forced to make the lead wires return to the square in the shape of a field, the operation is simple, and the use effect is good.

优选的,所述第一定滑轮通过第一销轴固定在上支架上,所述第一销轴的两端通过第一轴承活动连接在上支架上,所述上支架上设有便于第一轴承活动的第一滑槽,所述第二定滑轮通过第二销轴固定在下支架上,所述第二销轴的两端通过第二轴承活动连接在下支架上,所述下支架上设有便于第二轴承活动的第二滑槽,连接可靠,便于第一定滑轮、第二定滑轮调节,使得第一定滑轮和第二定滑轮对平行集束电缆受力点改变,调整至适当位置,并进行平行集束电缆的归方,适应不同型号的平行集束电缆的归方处理,实用性能好。Preferably, the first fixed pulley is fixed on the upper bracket through the first pin shaft, and the two ends of the first pin shaft are movably connected to the upper bracket through the first bearing, and the upper bracket is equipped with a The first chute where the bearing moves, the second fixed pulley is fixed on the lower bracket through the second pin shaft, and the two ends of the second pin shaft are movably connected to the lower bracket through the second bearing, and the lower bracket is provided with The second chute, which facilitates the movement of the second bearing, is connected reliably and is convenient for the adjustment of the first fixed pulley and the second fixed pulley, so that the stress point of the first fixed pulley and the second fixed pulley on the parallel bundled cables can be changed and adjusted to an appropriate position. And carry out the homing of parallel bundled cables, adapt to the homing processing of parallel bundled cables of different types, and have good practical performance.

优选的,所述锁紧装置包括底端固定在下支架上的螺杆、活动连接在螺杆顶端的挡板,所述上支架上设有卡块,所述卡块上设有与螺杆配合的第一卡槽,所述第一卡槽的底端为圆弧形,连接可靠,便于调节,可靠性能好。Preferably, the locking device includes a screw whose bottom end is fixed on the lower bracket, and a baffle plate movably connected to the top of the screw, the upper bracket is provided with a block, and the block is provided with a first The card slot, the bottom end of the first card slot is arc-shaped, the connection is reliable, the adjustment is convenient, and the reliability is good.

优选的,所述上支架与下支架通过第一转轴转动连接,所述下支架上设有与第一转轴配合的第一轴套,所述上支架上设有与第一转轴配合的第二轴套,连接可靠,使用效果好。Preferably, the upper bracket and the lower bracket are rotatably connected through a first rotating shaft, the lower bracket is provided with a first sleeve matching with the first rotating shaft, and the upper bracket is provided with a second shaft sleeve matching with the first rotating shaft. Shaft sleeve, reliable connection, good use effect.

优选的,所述第一安装板与第二安装板通过螺栓活动连接,所述螺栓的一端通过第二转轴转动连接在第一安装板上,所述螺栓的另一端与第二安装板固定连接,所述第一安装板上设有与第二转轴配合的连接孔,所述第一安装板和第二安装板上均设有与螺栓配合的第二卡槽,所述螺栓的另一端设有调节螺母,通过螺栓设置,使第一安装板与第二安装板安装拆卸方便,结构简单,使用效果好,螺栓与第二卡槽的配合后通过调节螺母来调节安装孔大小,提高了使用效果,实用性能提高,使得卡紧装置在杆塔任何位置都能够牢固可靠。Preferably, the first mounting plate is movably connected to the second mounting plate through a bolt, one end of the bolt is rotatably connected to the first mounting plate through a second rotating shaft, and the other end of the bolt is fixedly connected to the second mounting plate , the first mounting plate is provided with a connecting hole for matching with the second rotating shaft, the first mounting plate and the second mounting plate are provided with a second slot for matching with a bolt, and the other end of the bolt is provided with There are adjusting nuts, which are set by bolts, so that the installation and disassembly of the first mounting plate and the second mounting plate are convenient, the structure is simple, and the use effect is good. After the bolts are matched with the second slot, the size of the mounting hole can be adjusted by adjusting the nuts, which improves the use. The effect and the practical performance are improved, so that the clamping device can be firm and reliable at any position of the pole tower.

优选的,所述第一安装板与第二安装板通过第三轴承转动连接,所述第一安装板与第二安装板上均设有第三轴承安装的轴承套,结构简单,安装方便,便于第三轴承的转动,使用效果好。Preferably, the first mounting plate and the second mounting plate are rotatably connected through a third bearing, and the first mounting plate and the second mounting plate are provided with bearing sleeves mounted on the third bearing, which have a simple structure and are easy to install. It is convenient for the rotation of the third bearing, and the use effect is good.

优选的,所述第一安装板的中部、第二安装板的中部均为半圆形,所述第一安装板的中部与第二安装板的中部形成与电杆配合的安装孔,结构简单,使用效果好。Preferably, the middle part of the first installation board and the middle part of the second installation board are both semicircular, and the middle part of the first installation board and the middle part of the second installation board form a mounting hole matched with the pole, and the structure is simple , the effect is good.

优选的,还包括横截面为L形的连板,所述连板的水平部与第一安装板连接,所述连板的竖直部与下支架连接,连接可靠,便于杆上作业,实用性能好。Preferably, it also includes a connecting plate with an L-shaped cross section, the horizontal part of the connecting plate is connected to the first mounting plate, the vertical part of the connecting plate is connected to the lower bracket, the connection is reliable, and it is convenient for working on the pole. Good performance.

综上所述,本发明的优点:将平行集束电缆穿设在第一定滑轮与第二定滑轮之间设有的间隙内,通过第一定滑轮与第二定滑轮同时对平行集束电缆进行施压归方处理,只需一人放线,一人系扎带,简化了归方工序,降低了工作量,提高了归方效率,归方后的平行集束电缆整齐。In summary, the advantages of the present invention are: the parallel bundled cables are passed through the gap provided between the first fixed pulley and the second fixed pulley, and the parallel bundled cables are simultaneously carried out through the first fixed pulley and the second fixed pulley. For pressure return, only one person needs to pay out the wires and one person to tie the cable tie, which simplifies the return process, reduces the workload, improves the return efficiency, and the parallel bundled cables are neat after return.

附图说明Description of drawings

下面结合附图对本发明作进一步说明:The present invention will be further described below in conjunction with accompanying drawing:

图1为本发明平行集束电缆归方器的结构示意图;Fig. 1 is the structural representation of parallel bundled cable squarer of the present invention;

图2为本发明卡紧装置的结构示意图。Fig. 2 is a structural schematic diagram of the clamping device of the present invention.

具体实施方式Detailed ways

如图1、图2所示,平行集束电缆归方器,包括设有第一凹槽11的下支架1、设有第二凹槽21的上支架2,所述上支架2的一端与下支架1的一端转动连接,所述上支架2的另一端对接在下支架1的另一端上,所述下支架1上设有将上支架2锁紧在下支架1上的锁紧装置3,所述第二凹槽21内活动连接有第一定滑轮4,所述第一凹槽11内活动有第二定滑轮5,所述第一定滑轮4与第二定滑轮5之间形成便于平行集束电缆穿设的间隙,还包括可安装在电杆上的卡紧装置6,所述卡紧装置6包括第一安装板61、第二安装板62,所述第二安装板62的一端与第一安装板61的一端转动连接,所述第二安装板62的另一端与第一安装板61的另一端活动连接,所述第一安装板61与第二安装板62之间形成与电杆配合的安装孔63,所述第一安装板61与下支架1相连,所述第二安装板62上设有挂扣64,通过卡紧装置6提高了实用性能,能有效的保证杆上作业人员进行平行集束电缆的归方操作,安全可靠,使用效果好,所述第一定滑轮4的圆弧侧壁为光滑平面,所述第二定滑轮5的圆弧侧壁上设有环形凹槽51,通过光滑平面与环形凹槽51同时对线缆进行下压受力,使导线成田字形归方,操作简单,使用效果好,所述第一定滑轮4通过第一销轴7固定在上支架2上,所述第一销轴7的两端通过第一轴承71活动连接在上支架2上,所述上支架2上设有便于第一轴承71活动的第一滑槽23,所述第二定滑轮5通过第二销轴8固定在下支架1上,所述第二销轴8的两端通过第二轴承81活动连接在下支架1上,所述下支架1上设有便于第二轴承81活动的第二滑槽12,连接可靠,便于第一定滑轮4、第二定滑轮5调节,使得第一定滑轮4和第二定滑轮5对平行集束电缆受力点改变,调整至适当位置,并进行平行集束电缆的归方,适应不同型号的平行集束电缆的归方处理,实用性能好,所述锁紧装置3包括底端固定在下支架1上的螺杆31、活动连接在螺杆31顶端的挡板32,所述上支架2上设有卡块22,所述卡块22上设有与螺杆31配合的第一卡槽221,所述第一卡槽221的底端为圆弧形,连接可靠,便于调节,可靠性能好,所述上支架2与下支架1通过第一转轴9转动连接,所述下支架1上设有与第一转轴9配合的第一轴套,所述上支架2上设有与第一转轴9配合的第二轴套,连接可靠,使用效果好,所述第一安装板61与第二安装板62通过螺栓67活动连接,所述螺栓67的一端通过第二转轴68转动连接在第一安装板61上,所述螺栓67的另一端与第二安装板62固定连接,所述第一安装板61上设有与第二转轴68配合的连接孔611,所述第一安装板61和第二安装板62上均设有与螺栓67配合的第二卡槽69,所述螺栓67的另一端设有调节螺母671,通过螺栓67设置,使第一安装板61与第二安装板62安装拆卸方便,结构简单,使用效果好,螺栓67与第二卡槽69的配合后通过调节螺母671来调节安装孔63大小,提高了使用效果,实用性能提高,使得卡紧装置6在杆塔任何位置都能够牢固可靠,所述第一安装板61与第二安装板62通过第三轴承65转动连接,所述第一安装板61与第二安装板62上均设有第三轴承65安装的轴承套66,结构简单,安装方便,便于第三轴承65的转动,使用效果好,所述第一安装板61的中部、第二安装板62的中部均为半圆形,所述第一安装板61的中部与第二安装板62的中部形成与电杆配合的安装孔63,结构简单,使用效果好,还包括横截面为L形的连板13,所述连板13的水平部与第一安装板61连接,所述连板13的竖直部与下支架1连接,连接可靠,便于杆上作业,实用性能好。As shown in Fig. 1 and Fig. 2, the parallel bundled cable squarer includes a lower bracket 1 provided with a first groove 11, an upper bracket 2 provided with a second groove 21, and one end of the upper bracket 2 is connected to the lower bracket 2. One end of the bracket 1 is rotationally connected, the other end of the upper bracket 2 is docked on the other end of the lower bracket 1, and the lower bracket 1 is provided with a locking device 3 for locking the upper bracket 2 on the lower bracket 1. A first fixed pulley 4 is movably connected in the second groove 21, a second fixed pulley 5 is movable in the first groove 11, and a parallel cluster is formed between the first fixed pulley 4 and the second fixed pulley 5. The gap where the cables pass through also includes a clamping device 6 that can be installed on the pole. The clamping device 6 includes a first mounting plate 61 and a second mounting plate 62. One end of the second mounting plate 62 is connected to the first mounting plate 62. One end of a mounting plate 61 is rotatably connected, and the other end of the second mounting plate 62 is movably connected with the other end of the first mounting plate 61, and an electric pole is formed between the first mounting plate 61 and the second mounting plate 62. The matching mounting hole 63, the first mounting plate 61 is connected with the lower bracket 1, the second mounting plate 62 is provided with a hook 64, the practical performance is improved through the clamping device 6, and the operation on the pole can be effectively guaranteed It is safe and reliable for personnel to return the parallel bundled cables, and the use effect is good. The arc side wall of the first fixed pulley 4 is a smooth plane, and the arc side wall of the second fixed pulley 5 is provided with an annular concave The groove 51, through the smooth plane and the annular groove 51, simultaneously presses down the cable to make the wire return in a square shape, which is easy to operate and has a good use effect. The first fixed pulley 4 is fixed on the On the upper bracket 2, the two ends of the first pin shaft 7 are flexibly connected to the upper bracket 2 through the first bearing 71, and the upper bracket 2 is provided with a first chute 23 to facilitate the movement of the first bearing 71, so The second fixed pulley 5 is fixed on the lower bracket 1 through the second pin shaft 8, and the two ends of the second pin shaft 8 are movably connected on the lower bracket 1 through the second bearing 81. The second chute 12 where the second bearing 81 moves is reliable in connection, and is convenient for the adjustment of the first fixed pulley 4 and the second fixed pulley 5, so that the stress point of the first fixed pulley 4 and the second fixed pulley 5 on the parallel bundled cables can be changed and adjusted. To the appropriate position, and carry out the square of the parallel bundled cables, adapt to the square of parallel bundled cables of different types, and have good practical performance. The baffle plate 32 at the top of the screw rod 31, the upper bracket 2 is provided with a block 22, the block 22 is provided with a first slot 221 that cooperates with the screw rod 31, and the bottom end of the first slot 221 is Arc-shaped, reliable connection, easy to adjust, good reliability performance, the upper bracket 2 and the lower bracket 1 are rotatably connected through the first rotating shaft 9, and the lower bracket 1 is provided with a first sleeve that cooperates with the first rotating shaft 9 , the upper bracket 2 is provided with a second shaft sleeve that cooperates with the first rotating shaft 9, the connection is reliable, and the use effect is good. The first mounting plate 61 and the second mounting plate 62 are movably connected by bolts 67, and the bolts One end of 67 turns by second rotating shaft 68 The other end of the bolt 67 is fixedly connected with the second mounting plate 62, and the first mounting plate 61 is provided with a connecting hole 611 matched with the second rotating shaft 68. Both the first mounting plate 61 and the second mounting plate 62 are provided with a second draw-in groove 69 cooperating with the bolt 67, and the other end of the bolt 67 is provided with an adjusting nut 671, which is set by the bolt 67 so that the first mounting plate 61 and the The second mounting plate 62 is easy to install and disassemble, simple in structure, and good in use effect. After the cooperation between the bolt 67 and the second clamping groove 69, the size of the mounting hole 63 is adjusted by adjusting the nut 671, which improves the use effect and practical performance, and makes the clamping The device 6 can be firm and reliable at any position of the tower. The first mounting plate 61 and the second mounting plate 62 are rotationally connected through the third bearing 65, and the first mounting plate 61 and the second mounting plate 62 are provided with a first The bearing sleeve 66 installed by the three bearings 65 has a simple structure, is convenient to install, is convenient for the rotation of the third bearing 65, and has a good use effect. The middle part of the first mounting plate 61 and the middle part of the second mounting plate 62 are semicircular. The middle part of the first mounting plate 61 and the middle part of the second mounting plate 62 form a mounting hole 63 matched with the electric pole, which has a simple structure and good use effect, and also includes a connecting plate 13 with an L-shaped cross section, the connecting plate The horizontal part of 13 is connected with the first mounting plate 61, and the vertical part of the connecting plate 13 is connected with the lower support 1, the connection is reliable, it is convenient to work on the pole, and the practical performance is good.

根据平行集束电缆的规格来调节第一定滑轮4与第二定滑轮5之间的间隙,通过调节螺栓67调节第一安装板61与第二安装板62之间的安装孔63大小将卡紧装置6固定在作业电杆上,放线后,将平行集束电缆的一端穿设在间隙内,通过第一定滑轮4与第二定滑轮5对平行集束电缆同时受力进行归方处理,工作人员通过扎带将归方后的平行集束电缆进行绑扎,依次进行操作,就可以方便的对平行集束电缆进行归方处理。Adjust the gap between the first fixed pulley 4 and the second fixed pulley 5 according to the specifications of the parallel bundled cables, adjust the size of the mounting hole 63 between the first mounting plate 61 and the second mounting plate 62 through the adjusting bolt 67 to clamp The device 6 is fixed on the work pole. After the wires are laid out, one end of the parallel bundled cables is passed through the gap, and the parallel bundled cables are subjected to force at the same time through the first fixed pulley 4 and the second fixed pulley 5. The personnel bind the bundled parallel bundled cables with cable ties, and operate sequentially, so that the bundled parallel bundled cables can be conveniently put into squares.

将平行集束电缆穿设在第一定滑轮与第二定滑轮之间设有的间隙内,通过第一定滑轮与第二定滑轮同时对平行集束电缆进行施压归方处理,只需一人放线,一人系扎带,简化了归方工序,降低了工作量,提高了归方效率,归方后的平行集束电缆整齐。Pass the parallel bundled cables in the gap between the first fixed pulley and the second fixed pulley, and simultaneously apply pressure to the parallel bundled cables through the first fixed pulley and the second fixed pulley. One person ties the cable tie, which simplifies the homing process, reduces the workload, improves the homing efficiency, and the parallel bundled cables are tidy after homing.

Claims (10)

1. the parallel conductor cable side of returning device, it is characterized in that: comprise the lower support frame (1) that is provided with the first groove (11), be provided with the upper bracket (2) of the second groove (21), one end of one end of described upper bracket (2) and lower support frame (1) is rotationally connected, the other end of described upper bracket (2) is docked on the other end of lower support frame (1), described lower support frame (1) is provided with upper bracket (2) is locked to the locking device (3) on lower support frame (1), in described the second groove (21), be connected with the first static pulley (4), the interior activity of described the first groove (11) has the second static pulley (5), between described the first static pulley (4) and the second static pulley (5), form and be convenient to the gap that parallel conductor cable wears.
2. the parallel conductor cable according to claim 1 side of returning device, it is characterized in that: also comprise the gripping mechanism (6) that can be arranged on electric pole, described gripping mechanism (6) comprises the first mounting plate (61), the second mounting plate (62), one end of one end of described the second mounting plate (62) and the first mounting plate (61) is rotationally connected, the other end of described the second mounting plate (62) is flexibly connected with the other end of the first mounting plate (61), between described the first mounting plate (61) and the second mounting plate (62), form the mounting hole (63) coordinating with electric pole, described the first mounting plate (61) is connected with lower support frame (1), described the second mounting plate (62) is provided with and buckles (64).
3. the parallel conductor cable according to claim 1 side of returning device, is characterized in that: the circular arc sidewall of described the first static pulley (4) is smooth flat, and the circular arc sidewall of described the second static pulley (5) is provided with annular groove (51).
4. the parallel conductor cable according to claim 1 side of returning device, it is characterized in that: described the first static pulley (4) is fixed on upper bracket (2) by the first bearing pin (7), the two ends of described the first bearing pin (7) are movably connected on upper bracket (2) by clutch shaft bearing (71), described upper bracket (2) is provided with is convenient to movable the first chute (23) of clutch shaft bearing (71), described the second static pulley (5) is fixed on lower support frame (1) by the second bearing pin (8), the two ends of described the second bearing pin (8) are movably connected on lower support frame (1) by the second bearing (81), described lower support frame (1) is provided with is convenient to movable the second chute (12) of the second bearing (81).
5. the parallel conductor cable according to claim 1 side of returning device, it is characterized in that: described locking device (3) comprises that bottom is fixed on screw rod (31) on lower support frame (1), is movably connected in the baffle plate (32) on screw rod (31) top, described upper bracket (2) is provided with fixture block (22), described fixture block (22) is provided with the first draw-in groove (221) coordinating with screw rod (31), and the bottom of described the first draw-in groove (221) is circular arc.
6. the parallel conductor cable side of returning device according to claim 1 or 5, it is characterized in that: described upper bracket (2) is rotationally connected by the first rotating shaft (9) with lower support frame (1), described lower support frame (1) is provided with the first axle sleeve coordinating with the first rotating shaft (9), and described upper bracket (2) is provided with the second axle sleeve coordinating with the first rotating shaft (9).
7. the parallel conductor cable according to claim 2 side of returning device, it is characterized in that: described the first mounting plate (61) is flexibly connected by bolt (67) with the second mounting plate (62), one end of described bolt (67) is rotatably connected on the first mounting plate (61) by the second rotating shaft (68), the other end of described bolt (67) is fixedly connected with the second mounting plate (62), described the first mounting plate (61) is provided with the attachment hole (611) coordinating with the second rotating shaft (68), on described the first mounting plate (61) and the second mounting plate (62), be equipped with the second draw-in groove (69) coordinating with bolt (67), the other end of described bolt (67) is provided with adjusting nut (671).
8. the parallel conductor cable according to claim 2 side of returning device, it is characterized in that: described the first mounting plate (61) is rotationally connected by the 3rd bearing (65) with the second mounting plate (62), on described the first mounting plate (61) and the second mounting plate (62), be equipped with the bearing housing (66) that the 3rd bearing (65) is installed.
9. the parallel conductor cable according to claim 2 side of returning device, it is characterized in that: the middle part of the middle part of described the first mounting plate (61), the second mounting plate (62) is semicircle, the middle part of described the first mounting plate (61) forms with the middle part of the second mounting plate (62) mounting hole (63) coordinating with electric pole.
10. the parallel conductor cable according to claim 2 side of returning device, it is characterized in that: also comprise that cross section is L shaped connecting plate (13), the horizontal part of described connecting plate (13) is connected with the first mounting plate (61), and the vertical portion of described connecting plate (13) is connected with lower support frame (1).
CN201310290183.0A 2013-07-11 2013-07-11 Parallel bundled cable normalizer Active CN103398221B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310290183.0A CN103398221B (en) 2013-07-11 2013-07-11 Parallel bundled cable normalizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310290183.0A CN103398221B (en) 2013-07-11 2013-07-11 Parallel bundled cable normalizer

Publications (2)

Publication Number Publication Date
CN103398221A CN103398221A (en) 2013-11-20
CN103398221B true CN103398221B (en) 2014-10-01

Family

ID=49561905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310290183.0A Active CN103398221B (en) 2013-07-11 2013-07-11 Parallel bundled cable normalizer

Country Status (1)

Country Link
CN (1) CN103398221B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104973284A (en) * 2015-06-12 2015-10-14 国家电网公司 Wire bundling installation forming device
CN106451261A (en) * 2016-12-21 2017-02-22 丹阳特瑞莱电子有限公司 Bundling device for electric cable assemblies
CN113941455A (en) * 2021-10-13 2022-01-18 中国工程物理研究院总体工程研究所 Novel pipeline support structure applied to high-speed geotechnical centrifuge

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201378706Y (en) * 2009-03-17 2010-01-06 山东鱼台电力制造业有限公司 Overhead bundling hardware fitting for parallel bunched cables
CN202550413U (en) * 2012-05-23 2012-11-21 浙江省天台县供电公司 Parallel bunched cable tightener
CN202633832U (en) * 2012-06-25 2012-12-26 庆元县供电局 Parallel bunched cable wire clamping device
CN203374973U (en) * 2013-07-11 2014-01-01 国家电网公司 Parallel bunched cable ordering device

Also Published As

Publication number Publication date
CN103398221A (en) 2013-11-20

Similar Documents

Publication Publication Date Title
CN202019162U (en) Adjustable cable bending device
CN206758672U (en) One kind ground wire fixture
CN203289007U (en) 10kV insulated wire fixing device
CN103398221B (en) Parallel bundled cable normalizer
CN202633826U (en) Antiwear device for movable cable
CN205122822U (en) Solid ground line
CN203251021U (en) Pay-off trolley clamping device
CN203385757U (en) Angular adjustment mechanism cooperating with overhead line fault indicator installation tool for use
CN203071258U (en) Jointing clamp for live-line work
CN206820364U (en) Special tools for power distribution lines
CN102969671B (en) Equipotential outlet trolley for double bundle conductor
CN103601033B (en) Bundling wire square forming device
CN103247972B (en) Wire tractor
CN203374973U (en) Parallel bunched cable ordering device
CN203352050U (en) High-voltage cable wire clamping device
CN204696559U (en) A kind of novel 35kV insulated lock lever fixture of adjustable angle
CN204068049U (en) A kind of charged for replacement 220kV linear string bunch of insulator cross-arm jig
CN204205402U (en) UHVDC Transmission Lines changes tangent tower wire clamp tool
CN203760819U (en) Winder for electrician
CN104201611B (en) UHVDC Transmission Lines change tangent tower wire clamp tool
CN203218791U (en) wire retractor
CN202949167U (en) Tool for mounting insulators
CN204290237U (en) A kind of adjustable cable pay off rack
CN206023034U (en) A kind of collection bunch side of returning device
CN105788816B (en) A kind of combined type distribution transformer stand and its application method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant