CN208501518U - A kind of Coping Construction bracket - Google Patents

A kind of Coping Construction bracket Download PDF

Info

Publication number
CN208501518U
CN208501518U CN201821090988.5U CN201821090988U CN208501518U CN 208501518 U CN208501518 U CN 208501518U CN 201821090988 U CN201821090988 U CN 201821090988U CN 208501518 U CN208501518 U CN 208501518U
Authority
CN
China
Prior art keywords
fixed link
supporting beam
connecting rod
hole
bridge pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821090988.5U
Other languages
Chinese (zh)
Inventor
王强
谭明刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Da Hang Construction Engineering Co Ltd
Original Assignee
Sichuan Da Hang Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Da Hang Construction Engineering Co Ltd filed Critical Sichuan Da Hang Construction Engineering Co Ltd
Priority to CN201821090988.5U priority Critical patent/CN208501518U/en
Application granted granted Critical
Publication of CN208501518U publication Critical patent/CN208501518U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of Coping Construction brackets, belong to construction engineering technical field, solve the problems, such as that existing bracket does not adapt to different size of bridge pier, including the fixed link being fixedly installed on bridge pier and the supporting beam being set to above fixed link, fixation kit is provided in fixed link, the both ends of fixed link are fixedly installed the connecting column being fixedly connected with supporting beam, fixed link includes the first fixed link and the second fixed link, the first connector for connecting the first fixed link Yu the second fixed link is provided in first fixed link, supporting beam includes the first supporting beam and the second supporting beam for being slideably positioned in the first supporting beam, the second connector for connecting the first supporting beam Yu the second supporting beam is provided in first supporting beam.Length by changing fixed link and supporting beam keeps the versatility of the bracket good to adapt to various sizes of bridge pier.

Description

A kind of Coping Construction bracket
Technical field
The utility model relates to construction engineering technical field, in particular to a kind of Coping Construction bracket.
Background technique
Bent cap is the crossbeam being arranged at the top of bridge pile bent pier, and also known as cap beam, main function are supporting bridge superstructures, And whole load is passed into substructure.In current bridge engineering construction construction, due to bridge height, geology and landform item Part limitation, Partial Bridges lower part uses the structure type of Single column pier and Prestressed Slab Beams, generally by setting support on pier stud Point uses I-steel or Bailey bracket as bent cap Support bracket.
Authorization Notice No. is that the Chinese patent of CN202730656U discloses a kind of highway bridge Single column pier Coping Construction use Double embrace hoop triangle bracket, upper anchor ear and lower anchor ear including lock ring on Single column pier pier shaft;Preceding level is fixed on upper anchor ear Strut and rear horizontal strut;It is respectively provided with hound one and hound two between lower anchor ear at left and right sides of presylvian fissure bar, and Presylvian fissure bar, hound one and hound two form a triangle bracket;Afterwards at left and right sides of horizontal strut with lower anchor ear it Between be respectively provided with hound three and hound four, and rear horizontal strut, hound three and hound four form a triangle support Frame;Bridging is mounted between hound one and hound three and between hound two and hound four.The bracket utilizes Upper anchor ear and lower anchor ear hug frictional force caused by Single column pier pier shaft to undertake bent cap and man-machine equal loads.
Disadvantage is that in order to increase the frictional force between anchor ear and Single column pier pier shaft, the dimensions of anchor ear is usual It is compatible with Single column pier, and for various sizes of Single column pier, different anchor ears is needed replacing, trivial operations, the bracket It has some limitations.
Utility model content
The purpose of this utility model is to provide a kind of Coping Construction brackets, have and adapt to the excellent of different size of bridge pier Point.
The above-mentioned technical purpose of the utility model has the technical scheme that
A kind of Coping Construction bracket, including the fixed link being fixedly installed on bridge pier and the branch being set to above fixed link Beam is supportted, the fixed link and supporting beam are two and are set on the two sidewalls of bridge pier face, be provided in the fixed link For fixing the fixation kit of fixed link position, the both ends of the fixed link are fixedly installed the connection being fixedly connected with supporting beam Column, the fixed link include the first fixed link and the second fixed link for being slideably positioned in the first fixed link, and described first is fixed The first connector for connecting the first fixed link Yu the second fixed link is provided on bar, the supporting beam includes the first supporting beam With the second supporting beam being slideably positioned in the first supporting beam, it is provided in first supporting beam for connecting the first supporting beam With the second connector of the second supporting beam.
Implement above-mentioned technical proposal, when the lesser bridge pier of size in use, first to close to the first fixed link direction The second fixed link is slided, to shorten the length of fixed link, the first fixed link and the second fixed link position are made by the first connector It is fixed;The second supporting beam is pushed to the first supporting beam direction again, shortens the length of supporting beam, then makes the by the second connector One supporting beam is fixed with the second supporting beam position, is fixed on two fixed links on bridge pier together with supporting beam finally by fixation kit , keep the versatility of the bracket good to adapt to various sizes of bridge pier by the length of change fixed link and supporting beam.
Preferably, first fixed link offers several first mounting holes along length direction, and described second is fixed Bar offers the first connecting hole along length direction, and first connector is the first connection being arranged in the first mounting hole Bolt.
Implement above-mentioned technical proposal, after fixed link length adjustment is good, and when the first mounting hole and the first connecting hole face, Rotation first connection bolt, be threadedly coupled the first connection bolt with the first connecting hole, thus reach fix the first fixed link and The purpose of second fixed link.
Preferably, first supporting beam offers several second mounting holes, second support along length direction Beam offers the second connecting hole along length direction, and first connector is the second connection being arranged in the second mounting hole Bolt.
Implement above-mentioned technical proposal, after supporting beam length adjustment is good, and when the second mounting hole and the second connecting hole face, Rotation second connection bolt, be threadedly coupled the second connection bolt with the second connecting hole, thus reach fix the first supporting beam and The purpose of second supporting beam.
Preferably, the both ends of the fixed link are provided with the diagonal brace connecting with supporting beam.
Implement above-mentioned technical proposal, the setting of diagonal brace plays support support beam action, improves the stability of entire bracket And the structural strength of supporting beam is improved, support beam deformed is avoided to a certain extent.
Preferably, one end of the diagonal brace and fixed link be hinged, the other end and supporting beam are hinged.
Implement above-mentioned technical proposal, diagonal brace is hinged with fixed link and supporting beam respectively, make diagonal brace only by along diagonal brace axis To active force, avoid diagonal brace from being caused diagonal brace to deform by bending stress, extend the service life of diagonal brace.
Preferably, the fixation kit includes mounting plate and fixing bolt, and the mounting plate is fixedly installed in fixed link, The fixing bolt passes through mounting plate and is connect with bridge pier so that fixed link position is fixed.
Implement above-mentioned technical proposal, when fixed link is installed, mounting plate is fixed on bridge pier by fixing bolt, thus real Now fix the purpose of fixed link position.
Preferably, deep floor is fixedly connected between the mounting plate and fixed link.
Implement above-mentioned technical proposal, the setting of deep floor effectively improves the structural strength of mounting plate, improves installation The service life of plate.
Preferably, it is fixedly connected with connecting rod between the diagonal brace in two fixed links, the connecting rod includes hollow One connecting rod and the second connecting rod being slideably positioned in first connecting rod, offer connection through-hole on first connecting rod, and second Threaded hole is offered in connecting rod, rotation is provided with the connection bolt for being threadedly coupled with threaded hole in the connection through-hole.
Implement above-mentioned technical proposal, when the size of bridge pier is larger, pulls second to connect along the direction far from first connecting rod Extension bar after connecting rod length adjustment is good, is rotatablely connected bolt to extend the length of connecting rod, makes to connect bolt and threaded hole It is threadedly engaged, to achieve the purpose that limit the second connecting rod position, by adjusting the length of connecting rod, to adapt to different sizes Bridge pier.
In conclusion the utility model ought make in contrast to having the beneficial effect that for the prior art in the lesser bridge pier of size Used time first slides the second fixed link to the direction close to the first fixed link and passes through the first connector to shorten the length of fixed link Fix the first fixed link with the second fixed link position;The second supporting beam is pushed to the first supporting beam direction again, makes supporting beam Length shortens, then fixes the first supporting beam with the second supporting beam position by the second connector, will finally by fixation kit Two fixed links are fixed on bridge pier together with supporting beam, by changing the length of fixed link and supporting beam, to adapt to different rulers Very little bridge pier keeps the versatility of the bracket good.
Detailed description of the invention
Fig. 1 is the whole structural schematic diagram of the utility model embodiment;
Fig. 2 is the portion the A enlarged drawing in Fig. 1;
Fig. 3 is the explosive view of the utility model embodiment;
Fig. 4 is the portion the B enlarged drawing in Fig. 3;
Fig. 5 is the portion the C enlarged drawing in Fig. 3;
Fig. 6 is the portion the D enlarged drawing in Fig. 3.
Appended drawing reference: 1, fixed link;11, the first fixed link;111, the first mounting hole;1111, the first connection bolt; 1112, hand-held part;12, the second fixed link;121, the first connecting hole;2, supporting beam;21, the first supporting beam;211, the second installation Hole;2111, the second connection bolt;22, the second supporting beam;221, the second connecting hole;3, fixation kit;31, mounting plate;311, add Strong floor;32, fixing bolt;4, diagonal brace;5, connecting column;51, foot-driven lever;6, connecting rod;61, first connecting rod;611, it connects Through-hole;6111, bolt is connected;6112, rotation section;62, the second connecting rod;621, threaded hole.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment:
As shown in Figure 1, 2, a kind of Coping Construction bracket including the fixed link 1 being fixedly installed on bridge pier and is set to The supporting beam 2 of 1 top of fixed link, bridge pier are rectangular bridge pier, and supporting beam 2 is made of channel steel, and notch is arranged back to bridge pier, Fixed link 1 and supporting beam 2 are two and are set on the two sidewalls of bridge pier face, are provided in fixed link 1 for fixed solid The fixation kit 3 of 1 position of fixed pole, the both ends of fixed link 1 are provided with the diagonal brace 4 connecting with supporting beam 2, to improve entire bracket Stability and the structural strength for improving supporting beam 2, avoid 2 bending deformation of supporting beam to a certain extent;One end of diagonal brace 4 and solid Fixed pole 1 is hinged, the other end and supporting beam 2 are hinged so that diagonal brace 4 only by the active force axial along diagonal brace 4, avoid diagonal brace 4 by Cause diagonal brace 4 to deform to bending stress, extends the service life of diagonal brace 4.
As shown in Figure 1, 2, fixation kit 3 includes mounting plate 31 and fixing bolt 32, and mounting plate 31 is welded on fixed link 1 It is bonded on bottom wall and with bridge pier, fixing bolt 32 passes through mounting plate 31 and connect with bridge pier so that 1 position of fixed link is fixed;Mounting plate It is fixedly connected with deep floor 311 between 31 and fixed link 1, three pieces of deep floors 311 are fixedly installed on every piece of mounting plate 31, to mention The structural strength of high mounting plate 31 improves the service life of mounting plate 31.
As shown in Figure 3,4, the both ends of fixed link 1 are fixedly installed the connecting column 5 being fixedly connected with supporting beam 2, connecting column 5 It is vertically arranged, uniform intervals are fixedly installed several foot-driven levers 51 on connecting column 5, and in order to worker's climbing, fixed link 1 is wrapped Including first fixed link 11 and the second fixed link 12 for being slideably positioned in the first fixed link 11, is arranged in the first fixed link 11 useful In the first connector of connection the first fixed link 11 and the second fixed link 12.First fixed link 11 is offered along length direction Several first mounting holes 111, the second fixed link 12 offer the first connecting hole 121 along length direction, and the first connector is The first connection bolt 1111 being arranged in the first mounting hole 111, the first connection bolt 1111 stretch out outside the first mounting hole 111 One end is fixedly installed hand-held part 1112, in order to worker's rotation the first connection bolt 1111.
After 1 length adjustment of fixed link is good, and when the first mounting hole 111 and the first 121 face of connecting hole, rotation first connects Connecting bolt 1111 is threadedly coupled the first connection bolt 1111 with the first connecting hole 121, fixes the first fixed link 11 to reach With the purpose of the second fixed link 12.
As shown in Fig. 3,5, supporting beam 2 includes the first second for supporting beam 21 and being slideably positioned in the first supporting beam 21 Beam 22 is supportted, the second connector for connecting the first supporting beam 21 and the second supporting beam 22 is provided in the first supporting beam 21;The One supporting beam 21 offers several second mounting holes 211 along length direction, and the second supporting beam 22 is opened along length direction Equipped with the second connecting hole 221, the first connector is the second connection bolt 2111 being arranged in the second mounting hole 211, the second peace Dress hole 211 and the second connecting hole 221 are set on the side wall of 2 face of supporting beam.
After 2 length adjustment of supporting beam is good, and when the second mounting hole 211 and the second 221 face of connecting hole, rotation second connects Connecting bolt 2111 is threadedly coupled the second connection bolt 2111 with the second connecting hole 221, fixes the first supporting beam 21 to reach With the purpose of the second supporting beam 22.
As shown in Fig. 3,6, connecting rod 6 is fixedly connected between the diagonal brace 4 in two fixed links 1, connecting rod 6 includes hollow First connecting rod 61 and the second connecting rod 62 for being slideably positioned in first connecting rod 61, the company of offering on first connecting rod 61 Hole 611 is connected, threaded hole 621 is offered in the second connecting rod 62, rotation, which is provided with, in connection through-hole 611 is used for and threaded hole The 621 connection bolts 6111 being threadedly coupled, it is big that one end that connection bolt 6111 stretches out outside connection through-hole 611 is fixedly installed diameter In the discoid rotation section 6112 of connection bolt 6111, in order to be rotatablely connected bolt 6111.
When the size of bridge pier is larger, the second connecting rod 62 is pulled along the direction far from first connecting rod 61, is connected with extending The length of extension bar 6 is rotatablely connected bolt 6111 after 6 length adjustment of connecting rod is good, makes to connect bolt 6111 and threaded hole 621 It is threadedly engaged, to achieve the purpose that limit 62 position of the second connecting rod, by adjusting the length of connecting rod 6, to adapt to difference The bridge pier of size.
Specific work process: when in the lesser bridge pier of size in use, first sliding to the direction close to the first fixed link 11 Dynamic second fixed link 12, to shorten the length of fixed link 1, after 1 length adjustment of fixed link is good, and the first mounting hole 111 and the When one 121 face of connecting hole, rotation the first connection bolt 1111 makes 121 screw thread of the first connection bolt 1111 and the first connecting hole Connection is so that 1 length of fixed link is fixed;The second supporting beam 22 is pushed to 21 direction of the first supporting beam again, makes the length of supporting beam 2 Shorten, after 2 length adjustment of supporting beam is good, and when the second mounting hole 211 and the second 221 face of connecting hole, the second connection of rotation Bolt 2111 is threadedly coupled the second connection bolt 2111 with the second connecting hole 221, makes the first supporting beam 21 and the second supporting beam 22 positions are fixed, and are fixed on bridge pier two fixed links 1 together with supporting beam 2 finally by fixing bolt 32, are passed through change The length of fixed link 1 and supporting beam 2 keeps the versatility of the bracket good to adapt to various sizes of bridge pier.
The above is only the exemplary embodiment of the utility model, the protection scope rather than limited the present invention, The protection scope of the utility model is determined by the attached claims.

Claims (8)

1. a kind of Coping Construction bracket, characterized in that including the fixed link (1) being fixedly installed on bridge pier and be set to fixation Supporting beam (2) above bar (1), the fixed link (1) and supporting beam (2) are two and are set to the two sidewalls of bridge pier face On, it is provided with the fixation kit (3) for fixing fixed link (1) position on the fixed link (1), the two of the fixed link (1) End is fixedly installed the connecting column (5) being fixedly connected with supporting beam (2), the fixed link (1) including the first fixed link (11) and The second fixed link (12) being slideably positioned on the first fixed link (11) is provided with for connecting on first fixed link (11) First connector of the first fixed link (11) and the second fixed link (12), the supporting beam (2) include the first supporting beam (21) and The second supporting beam (22) being slideably positioned on the first supporting beam (21) is provided with for connecting on first supporting beam (21) Second connector of the first supporting beam (21) and the second supporting beam (22).
2. a kind of Coping Construction bracket according to claim 1, characterized in that first fixed link (11) is along itself Length direction offers several first mounting holes (111), and second fixed link (12) offers first along length direction Connecting hole (121), first connector are the first connection bolt (1111) being arranged in the first mounting hole (111).
3. a kind of Coping Construction bracket according to claim 2, characterized in that first supporting beam (21) is along itself Length direction offers several second mounting holes (211), and second supporting beam (22) offers second along length direction Connecting hole (221), first connector are the second connection bolt (2111) being arranged in the second mounting hole (211).
4. a kind of Coping Construction bracket according to claim 3, characterized in that the both ends of the fixed link (1) are arranged There is the diagonal brace (4) connecting with supporting beam (2).
5. a kind of Coping Construction bracket according to claim 4, characterized in that one end of the diagonal brace (4) and fixation Bar (1) is hinged, the other end and supporting beam (2) are hinged.
6. a kind of Coping Construction bracket according to claim 1, characterized in that the fixation kit (3) includes installation Plate (31) and fixing bolt (32), the mounting plate (31) are fixedly installed on fixed link (1), and the fixing bolt (32) passes through Mounting plate (31) is connect with bridge pier so that fixed link (1) position is fixed.
7. a kind of Coping Construction bracket according to claim 6, characterized in that the mounting plate (31) and fixed link (1) deep floor (311) are fixedly connected between.
8. a kind of Coping Construction bracket according to claim 1, characterized in that the diagonal brace (4) on two fixed links (1) Between be fixedly connected with connecting rod (6), the connecting rod (6) includes hollow first connecting rod (61) and is slideably positioned in first The second connecting rod (62) in connecting rod (61) offers connection through-hole (611), the second connecting rod on first connecting rod (61) (62) it is offered on threaded hole (621), rotation is provided with for connecting with threaded hole (621) screw thread in the connection through-hole (611) The connection bolt (6111) connect.
CN201821090988.5U 2018-07-11 2018-07-11 A kind of Coping Construction bracket Expired - Fee Related CN208501518U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821090988.5U CN208501518U (en) 2018-07-11 2018-07-11 A kind of Coping Construction bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821090988.5U CN208501518U (en) 2018-07-11 2018-07-11 A kind of Coping Construction bracket

Publications (1)

Publication Number Publication Date
CN208501518U true CN208501518U (en) 2019-02-15

Family

ID=65283925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821090988.5U Expired - Fee Related CN208501518U (en) 2018-07-11 2018-07-11 A kind of Coping Construction bracket

Country Status (1)

Country Link
CN (1) CN208501518U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113463522A (en) * 2021-08-11 2021-10-01 北京住总集团有限责任公司 Auxiliary device and method for bent cap construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113463522A (en) * 2021-08-11 2021-10-01 北京住总集团有限责任公司 Auxiliary device and method for bent cap construction

Similar Documents

Publication Publication Date Title
KR101171039B1 (en) Partially and fully earth-anchored cable-stayed bridge using main span prestressing appratus and construction method for the same
CN201560400U (en) Stayed-cable hanging basket
CN209584871U (en) A kind of only column great cantilever Coping Construction bracket of high pier
CN108978471A (en) A kind of support device and its installation method increasing cable-stayed bridge abnormity Sarasota rigidity
CN110172912A (en) A kind of solid pier capping beam processing construction method
CN208501518U (en) A kind of Coping Construction bracket
CN209990118U (en) Hanging basket counterweight-free fixing device for steel structure
CN111851317B (en) Method for installing arch ring of arch bridge
CN206408539U (en) A kind of rope-suspension bridge bulk noose construction bracket
CN104047233B (en) Method for construction of continuous beam linear segment without floor stand
CN210458971U (en) A assembled bracket for bridge construction
CN212052268U (en) Arch bridge
CN202644593U (en) Soil nail pull-out test reaction force frame
CN209082344U (en) A kind of cable-stayed type large-span steel roof beam structure
CN103835238B (en) A kind of high pier cable stayed bridge No. 0 block non-stand construction method and the structure in constructing
CN212376021U (en) Steel corbel and support-free installation connecting node comprising same
CN214832022U (en) Supporting device for preventing and controlling down-warping of box girder
KR101198960B1 (en) Bridge girde with the function of adjusting pre-stress
CN210712513U (en) Temporary tower beam consolidation structure
CN207891754U (en) A kind of continuous girders by suspension grouting 0# block cast-in-place supports
CN206800197U (en) Cable-stayed bridge beam body, which pours, uses template assembly
CN209194710U (en) A kind of assembling type steel structure supporting beam for building
CN110629683A (en) Composite assembling type bridge cantilever construction bracket
KR101080924B1 (en) Beams reinforced structures and reinforcement method
CN210458985U (en) Cantilever beam zero number piece strutting arrangement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190215

Termination date: 20210711

CF01 Termination of patent right due to non-payment of annual fee