CN208473891U - Tunnel steel arch frame junction steel plate fast accurate positioning device - Google Patents

Tunnel steel arch frame junction steel plate fast accurate positioning device Download PDF

Info

Publication number
CN208473891U
CN208473891U CN201821194680.5U CN201821194680U CN208473891U CN 208473891 U CN208473891 U CN 208473891U CN 201821194680 U CN201821194680 U CN 201821194680U CN 208473891 U CN208473891 U CN 208473891U
Authority
CN
China
Prior art keywords
steel
positioning
mold
plate
positioning mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821194680.5U
Other languages
Chinese (zh)
Inventor
陈小羊
王寿忆
张�浩
徐桃
金阳
韩彦舟
胡连超
景玉婷
陈劲松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201821194680.5U priority Critical patent/CN208473891U/en
Application granted granted Critical
Publication of CN208473891U publication Critical patent/CN208473891U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides tunnel steel arch frame junction steel plate fast accurate positioning device;The quick of junction steel plate is realized well, and precise positioning improves splicing efficiency when steel arch-shelf is set up;Its technical solution solved includes laterally disposed I-steel, I-steel upper ends have positioning mold, positioning mold is the channel steel structure of U-shaped, positioning mold includes the bottom plate being bonded with I-steel upper end and two vertical plates that bottom plate top is vertically placed, the bottom plate lower end of positioning mold is equipped with the locating clamp plate being placed in outside I-steel, running through on the bottom plate of positioning mold has mold fixing axle, the transverse slat of I-steel is run through and between the transverse slat of I-steel to be threadedly coupled in the lower end of mold fixing axle, is fixed with positioning pin on a cant board of positioning mold;The utility model clever structure.

Description

Tunnel steel arch frame junction steel plate fast accurate positioning device
Technical field
The utility model relates to tunnel steel arch frame interconnection technique fields, especially tunnel steel arch frame junction steel plate fast accurate Positioning device.
Background technique
The installation of road preliminary bracing steel arch-shelf is the critical process of constructing tunnel, due to tunneling operation narrow space, by tunnel Operation side limitation, Tunnel steel arch-shelf are had to segmental machining, on-site consolidation.
Due to steel arch-shelf connecting plate and steelframe butting error, hole position error, assembled error, the initial stage branch of on-site consolidation is caused The connection of steelframe connecting portion is not close, and connecting plate bolt hole misplaces, and bolt installation is not in place and other issues is protected, at the beginning of influencing tunnel Phase supporting steelframe entirety stress causes preliminary bracing steelframe connecting portion weak load-bearing point.Currently, Tunnel steel arch Frame connecting plate and arch generally use the mode of scribing line welding, and without fixed processing mold, spiro keyhole position is more casual, and scene is spelled Dress is difficult, assembled of poor quality, and opening often occurs for connecting plate, dislocation, connection bolt installs not on, causes splicing low efficiency, welds Quality not can guarantee.
Utility model content
For above situation, for the defect for overcoming the prior art, the utility model provides tunnel steel arch frame junction steel plate Fast accurate positioning device;The quick of junction steel plate is realized well, and precise positioning improves splicing when steel arch-shelf is set up Efficiency.
Its technical solution solved includes laterally disposed I-steel, and I-steel upper ends have positioning mold, positioning mould Tool is the channel steel structure of U-shaped, and positioning mold includes the bottom plate being bonded with I-steel upper end and vertically places above bottom plate Two vertical plates, the bottom plate lower end of positioning mold are equipped with the locating clamp plate being placed in outside I-steel, run through on the bottom plate of positioning mold There is mold fixing axle, the transverse slat of I-steel is run through and between the transverse slat of I-steel to be threadedly coupled in the lower end of mold fixing axle, Positioning pin is fixed on one cant board of positioning mold.
The utility model clever structure, realizes the quick of junction steel plate well, and precise positioning improves steel arch-shelf frame If when splicing efficiency.
Detailed description of the invention
Fig. 1 is the utility model overall schematic I.
Fig. 2 is the utility model entirety stereoscopic schematic diagram II.
Fig. 3 is 2 stereoscopic schematic diagram A of the utility model positioning mold.
Fig. 4 is 2 stereoscopic schematic diagram B of the utility model positioning mold.
Specific embodiment
Specific embodiment of the present utility model is described in further detail below in conjunction with attached drawing.
By Fig. 1-4 it is found that the utility model includes laterally disposed I-steel 1,1 upper ends of I-steel have positioning mold 2, positioning mold 2 is the channel steel structure of U-shaped, and positioning mold 2 includes on the bottom plate 3 and bottom plate 3 being bonded with 1 upper end of I-steel Two vertical plates 4 that Fang Shuxiang is placed, 3 lower end of bottom plate of positioning mold 2 are equipped with the locating clamp plate 5 being placed in outside I-steel 1, positioning Through there is a mold fixing axle 6 on the bottom plate 3 of mold 2, the lower end of mold fixing axle 6 through I-steel 1 transverse slat and with I-steel 1 Transverse slat between to be threadedly coupled, on a cant board 4 of positioning mold 2 be fixed with positioning pin 7.
In order to keep the fixation of positioning mold 2 more firm, 5 locating clamp plate 5 of locating clamp plate is added using 10mm steel plate Work, the spacing between two locating clamp plates 5 are 1mm bigger than 1 width dimensions of I-steel.
For the ease of welding steel to just, it is symmetrically arranged with before and after the positioning pin 7 on the vertical plate 4 of the positioning mold 2 Two positioning pins 7, positioning pin 7 are placed in vertical plate 4 close to 4 front and rear sides edge of vertical plate.
The vertical plate 4 that the positioning mold 2 is equipped with 7 side of positioning pin is concordant with a side end face of I-steel 1.
The positioning mold 2 is made of 20# channel steel.
The positioning pin 7 is welded on the vertical plate 4 of positioning mold 2.
Positioning mold 2 is caught in the I-steel 1 processed, due to positioning mould when specifically used by the utility model first 3 lower end of bottom plate of tool 2 is equipped with locating clamp plate 5, can be very good the outside for being stuck in I-steel 1, and having for adjustment positioning mold 2 is fixed Mold fixing axle 6 is tightened after the side of the vertical plate 4 of position pin 7 is concordant with 1 end of I-steel mold is fixed, prevent mold from sending out Raw movement;Furthermore pin hole is being drilled out in advance on needing the junction steel plate 8 welded, positioning pin 7 need to be according between steel plate design aperture Away from being precisely welded and fixed, the diameter of positioning pin 7 is 0.5mm smaller than steel plate design bore size;The position of pin hole and positioning pin 7 It is corresponding, it is bonded the end face of junction steel plate 8 with the end of I-steel 1 concordantly, is realized by the cooperation of positioning pin 7 and pin hole 9 The positioning of junction steel plate 8;8 two sides of steel plate leakage part is welded to connect after fixation first, to steel plate and 1 fix tightly of I-steel Fixing mould is removed rearward, continues 1 two sides rest part of welding H-bar, and last 1 web part of welding H-bar is thus complete It is connect at steel arch-shelf junction steel plate 8 with quick, the precise positioning of I-steel 1, ensure that can smoothly, quickly when steel arch-shelf is set up Splicing.
The utility model is by devising positioning mold 2, can be effective when welding to steel arch-shelf junction steel plate 8 Guarantee junction steel plate 8 be bonded with the positioning of I-steel 1, while by between the pin hole on positioning pin 7 and junction steel plate 8 Location fit, the influence for effectively preventing the shaking and thermal deformation of junction steel plate 8 in the welding process from generating, to pros Just, welding efficiency significantly improves.
The utility model clever structure, realizes the quick of junction steel plate well, and precise positioning improves steel arch-shelf frame If when splicing efficiency.

Claims (6)

1. tunnel steel arch frame junction steel plate fast accurate positioning device, which is characterized in that including laterally disposed I-steel (1), I-steel (1) upper ends have positioning mold (2), positioning mold (2) be U-shaped channel steel structure, positioning mold (2) include with Two vertical plates (4) vertically placed above the bottom plate (3) and bottom plate (3) of the fitting of I-steel (1) upper end, positioning mold (2) Bottom plate (3) lower end, which is equipped with, is placed in the external locating clamp plate (5) of I-steel (1), and running through on the bottom plate (3) of positioning mold (2) has mould Have fixing axle (6), the lower end of mold fixing axle (6) runs through the transverse slat of I-steel (1) and is spiral shell between the transverse slat of I-steel (1) Line connects, and is fixed with positioning pin (7) on a cant board (4) for positioning mold (2).
2. tunnel steel arch frame junction steel plate fast accurate positioning device according to claim 1, which is characterized in that described Locating clamp plate (5) locating clamp plate (5) is processed using 10mm steel plate, and the spacing between two locating clamp plates (5) is than I-steel (1) width Spend the big 1mm of size.
3. tunnel steel arch frame junction steel plate fast accurate positioning device according to claim 1, which is characterized in that described Two positioning pins (7) are symmetrically arranged with before and after positioning pin (7) on the vertical plate (4) of positioning mold (2), positioning pin (7) is placed in vertical plate (4) close to vertical plate (4) front and rear sides edge.
4. tunnel steel arch frame junction steel plate fast accurate positioning device according to claim 1, which is characterized in that described The vertical plate (4) that positioning mold (2) is equipped with positioning pin (7) side is concordant with a side end face of I-steel (1).
5. tunnel steel arch frame junction steel plate fast accurate positioning device according to claim 1, which is characterized in that described Positioning mold (2) is made of 20# channel steel.
6. tunnel steel arch frame junction steel plate fast accurate positioning device according to claim 1, which is characterized in that described Positioning pin (7) is welded on the vertical plate (4) of positioning mold (2).
CN201821194680.5U 2018-07-26 2018-07-26 Tunnel steel arch frame junction steel plate fast accurate positioning device Expired - Fee Related CN208473891U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821194680.5U CN208473891U (en) 2018-07-26 2018-07-26 Tunnel steel arch frame junction steel plate fast accurate positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821194680.5U CN208473891U (en) 2018-07-26 2018-07-26 Tunnel steel arch frame junction steel plate fast accurate positioning device

Publications (1)

Publication Number Publication Date
CN208473891U true CN208473891U (en) 2019-02-05

Family

ID=65208886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821194680.5U Expired - Fee Related CN208473891U (en) 2018-07-26 2018-07-26 Tunnel steel arch frame junction steel plate fast accurate positioning device

Country Status (1)

Country Link
CN (1) CN208473891U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653776A (en) * 2019-02-20 2019-04-19 中交公局厦门工程有限公司 A kind of first connecting plate constructing device between branch steel arch-shelf in tunnel
CN109848627A (en) * 2019-03-29 2019-06-07 中交路桥建设有限公司 A kind of positioning fixture and construction method suitable for steel arch-shelf connecting plate
CN111805141A (en) * 2020-07-13 2020-10-23 中交一公局第四工程有限公司 Tunnel steel bow member connecting plate positioner
CN112901077A (en) * 2021-05-06 2021-06-04 中铁九局集团第七工程有限公司 Positioning device and positioning method for tunnel primary support steel arch anchor rod drilling

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653776A (en) * 2019-02-20 2019-04-19 中交公局厦门工程有限公司 A kind of first connecting plate constructing device between branch steel arch-shelf in tunnel
CN109848627A (en) * 2019-03-29 2019-06-07 中交路桥建设有限公司 A kind of positioning fixture and construction method suitable for steel arch-shelf connecting plate
CN111805141A (en) * 2020-07-13 2020-10-23 中交一公局第四工程有限公司 Tunnel steel bow member connecting plate positioner
CN111805141B (en) * 2020-07-13 2024-04-30 中交一公局第四工程有限公司 Tunnel steel arch connecting steel plate positioning device
CN112901077A (en) * 2021-05-06 2021-06-04 中铁九局集团第七工程有限公司 Positioning device and positioning method for tunnel primary support steel arch anchor rod drilling
CN112901077B (en) * 2021-05-06 2021-07-06 中铁九局集团第七工程有限公司 Positioning device and positioning method for tunnel primary support steel arch anchor rod drilling

Similar Documents

Publication Publication Date Title
CN208473891U (en) Tunnel steel arch frame junction steel plate fast accurate positioning device
KR101161687B1 (en) Jig for welding flange to pipe
CN201685061U (en) Excavator bucket stick tailored-welding tooling
CN106392457A (en) Fast positioning welding tool for automobile exhaust pipe
CN104690472B (en) Body assembly welding clamp after frame of motorcycle
CN207609430U (en) Tunnel steel arch frame junction steel plate positioning mold
KR20140145405A (en) Pipe Alignment Assist Device With A Spirit Level
CN205147710U (en) Steel tube welding jig
CN104588948B (en) A kind of electric power wheel self-discharging vehicle front frame assembly tool and assemble method
KR102479683B1 (en) A system for combining axis and wheel of train by press type
CN217667370U (en) Quick clamping device is used in automobile parts processing
KR101549131B1 (en) jig for pannel welding rib
CN214978839U (en) Positioning device for steel arch frame connecting plate
CN209716857U (en) A kind of junction steel plate positioning device
CN109531023A (en) A kind of junction steel plate positioning device and construction method
KR20150102321A (en) Apparatus and method for preventing welding distortion beteween pipe and flange
KR20150039954A (en) Form panel equipped with distance maintenance implement for concrete
JP4697873B2 (en) Connector
KR200167627Y1 (en) Auto suppy device for a connection tip welding
CN205520657U (en) Well device is made by oneself to support axle mounting panel
CN207806978U (en) A kind of tunnel arch ring flange fixing tool
JP4399319B2 (en) Reaction force mount and pile press-in method using the same
CN218322231U (en) Tool for assembling steel templates
CN217667417U (en) Battery box body welding tool
CN211524077U (en) Secondary beam side form reinforcing and shaping construction tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190205