CN208472700U - A kind of Novel water conservancy dykes and dams bored grouting machine - Google Patents

A kind of Novel water conservancy dykes and dams bored grouting machine Download PDF

Info

Publication number
CN208472700U
CN208472700U CN201820646397.5U CN201820646397U CN208472700U CN 208472700 U CN208472700 U CN 208472700U CN 201820646397 U CN201820646397 U CN 201820646397U CN 208472700 U CN208472700 U CN 208472700U
Authority
CN
China
Prior art keywords
pipe
grouting
support
plate
dams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820646397.5U
Other languages
Chinese (zh)
Inventor
阮小彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Hongsen Highway Engineering Technology Co., Ltd.
Original Assignee
Chengdu Yalian Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Yalian Science And Technology Co Ltd filed Critical Chengdu Yalian Science And Technology Co Ltd
Priority to CN201820646397.5U priority Critical patent/CN208472700U/en
Application granted granted Critical
Publication of CN208472700U publication Critical patent/CN208472700U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of Novel water conservancy dykes and dams bored grouting machines, it mainly include boring assemblies and slip casting component, the slip casting component includes pipe winding wheel, feed pipe for mortar, communicating pipe, valve, Grouting Pipe, grouting pump, slurry can, battery, jelly suction pipe and bottom plate, the grouting pump, slurry can and battery are all made of the upper surface that bolt is fixed on bottom plate, support plate integrally may be implemented in the horizontal positioned of inclination dam facing in the utility model, the realization that integrally can be convenient so vertically drills, the slip casting in drilling of slip casting component is recycled after drilling, the slip casting structure of each drilling at this time is identical, therefore effect is outstanding.

Description

A kind of Novel water conservancy dykes and dams bored grouting machine
Technical field
The utility model relates to water conservancy equipment fields, more particularly, to a kind of Novel water conservancy dykes and dams bored grouting machine.
Background technique
Traditional is divided into high-pressure slip-casting and low-pressure grouting to dam reinforcement, and general low-pressure grouting is mostly beaten in dam facing downwards Hole, at this time drilling are in that equidistant interval is arranged, and the then slip casting in drilling again is whole finally to show vertical curtain shape reinforcement knot Structure, but traditional punching is mostly hand-held, therefore the angle punched is not mostly identical, to be difficult to show vertical curtain shape knot Structure.
Utility model content
The utility model is to overcome above situation insufficient, it is desirable to provide a kind of technical solution that can solve the above problem.
A kind of Novel water conservancy dykes and dams bored grouting machine mainly includes boring assemblies and slip casting component, the slip casting component It is described including pipe winding wheel, feed pipe for mortar, communicating pipe, valve, Grouting Pipe, grouting pump, slurry can, battery, jelly suction pipe and bottom plate Grouting pump, slurry can and battery are all made of the upper surface that bolt is fixed on bottom plate, and the feeder ear of battery passes through conducting wire The power connection end in grouting pump is connect, access of also connecting on the conducting wire between battery and grouting pump has switch;The grouting pump into Slurry mouth is connected the grout outlet of slurry can by jelly suction pipe, and the grout outlet of grouting pump is docked with one end of feed pipe for mortar;It is described defeated Another one end for terminating at communicating pipe of pipe is starched, the form that the other end of communicating pipe is threadedly coupled is to being connected to Grouting Pipe, slip casting Pipe is made of rigid straight pipe, and the valve series connection is taken out the cement slurry in slurry can using grouting pump on communicating pipe It sends out out and through Grouting Pipe, Grouting Pipe is realized by the on-off of control valve to drilling at this time for stretching in drilling Slip casting;The boring assemblies mainly include horizontally disposed support plate, and the corner location of plate is supported to offer up and down The guide pillar hole of formula, supports the center of plate to offer the centre bore of formula up and down;It is living in the guide pillar hole Dynamic to be inserted with the support post being vertically arranged, wherein the outer surface of support post is threaded structure, and screw thread on support post There are two screw thread adjusting ring, screw thread adjusting ring sets up the upper and lower sides in support plate separately for socket, can be with by rotation screw thread adjusting ring Adjust its position on support post;Movable sleeve is gone back on the support post equipped with support ring, support ring is located at support plate The top position of lower square thread adjusting ring, and support ring horizontal abutment utilizes four in the lower surface position of support plate at this time Support ring realizes that the level to support plate is lifted, while support plate is realized under the clamping action of two screw thread adjusting rings It is fixed;The bottom of the support post is fixedly installed with brake wheel using screw, facilitates whole movement using brake wheel, simultaneously Also the fixation of position may be implemented;The central hole is inserted with the cylinder-like structure that the sleeve being vertically arranged is in both ends open, and Sleeve is in being vertically arranged, and activity is inserted with columned guide post in the sleeve, and the outer wall of guide post and the inner wall of sleeve slide Fitting is arranged, and is fixed with pressing plate on the top surface of the guide post in the form of welding, and the lower surface of guide post is solid using screw Surely there is fuel oil drill motor, the drive shaft of fuel oil drill motor is arranged downwards, and the bottom of drive shaft is solid by shaft coupling Surely it is connected with the shaft being arranged downwards, the bottom fixing sleeve of shaft is equipped with drilling rod collet, is fixed on drilling rod collet The drilling rod being arranged downwards, drives drilling rod rotation under the driving effect of fuel oil drill motor, mating sleeve and guide post it Between guiding movement, so as to facilitate drilling rod for the dam facing with certain slope, tune can be passed through vertically to drilling Save the physical location of different support posts reach support plate level, specifically punch position first will support plate lift to It is horizontal, a certain or two support posts are fixedly clamped using screw thread adjusting ring and support plate at this time, incited somebody to action at this time The bottom of other support post and dam body face contact, are then fixed again, and support plate integrally may be implemented in inclination dam facing Horizontal positioned, the realization that integrally can be convenient so vertically drills, and the slip casting in drilling of slip casting component is recycled after drilling, this When each drilling slip casting structure it is identical, therefore effect is outstanding.
As a further solution of the present invention: being fixed with air-bubble using screw in a side of the support plate Level facilitates support plate to be adjusted to level using air-bubble level.
As a further solution of the present invention: it is welded with side fixed plate in a side of the support plate, The outer surface of side fixed plate is welded with connecting rod, and pipe winding wheel is weldingly fixed on connecting rod, using pipe winding wheel to extra defeated Slurry pipe.
As a further solution of the present invention: the bottom surface quadrangle of the bottom plate is equipped with bottom plate pulley, bottom plate is utilized Pulley facilitates bottom plate mobile.
As a further solution of the present invention: the upper surface gluing of the guide post is fixed with cushion.
As a further solution of the present invention: offering corresponding pin hole in the sleeve and guide post, pass through Sleeve may be implemented in insertion pin in pin hole and the position of guide post limits.
It is put the utility model has the beneficial effects that support plate integrally may be implemented in the utility model in the level of inclination dam facing It sets, the realization that integrally can be convenient so vertically drills, and the slip casting in drilling of slip casting component is recycled after drilling, at this time each The slip casting structure of drilling is identical, therefore effect is outstanding.
The additional aspect and advantage of the utility model will be set forth in part in the description, partially will be from following description In become obvious, or recognized by the practice of the utility model.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the partial structural diagram one of the utility model.
Fig. 2 is the partial structural diagram of the utility model.
In figure: 1- supports plate, 2- guide pillar hole, 3- centre bore, 4- air-bubble level, 5- support post, 6- support Ring, 7- screw thread adjusting ring, 8- brake wheel, 9- sleeve, 10- guide post, 11- pressing plate, 12- cushion, 13- fuel oil drill motor, 14- Drive shaft, 15- shaft coupling, 16- shaft, 17- drilling rod collet, 18- drilling rod, the side 19- fixed plate, 20- connecting rod, 21- pipe winding wheel, 22- feed pipe for mortar, 23- communicating pipe, 24- valve, 25- Grouting Pipe, 26- grouting pump, 27- slurry can, 28- battery, 29- take out slurry Pipe, 30- bottom plate, 31- bottom plate pulley.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1~2, in the utility model embodiment, a kind of Novel water conservancy dykes and dams bored grouting machine, main includes boring Aperture member and slip casting component, the slip casting component include pipe winding wheel 21, feed pipe for mortar 22, communicating pipe 23, valve 24, Grouting Pipe 25, grouting pump 26, slurry can 27, battery 28, jelly suction pipe 29 and bottom plate 30, the grouting pump 26, slurry can 27 and storage Battery 28 is all made of the upper surface that bolt is fixed on bottom plate 30, and the feeder ear of battery 28 is connect by conducting wire in grouting pump 26 Power connection end, access of also connecting on the conducting wire between battery 28 and grouting pump 26 have switch;The stock inlet of the grouting pump 26 is logical The grout outlet that jelly suction pipe 29 is connected slurry can 27 is crossed, the grout outlet of grouting pump 26 is docked with one end of feed pipe for mortar 22;It is described Another one end for terminating at communicating pipe 23 of feed pipe for mortar 22, the form that the other end of communicating pipe 23 is threadedly coupled is to being connected to slip casting Pipe 25, Grouting Pipe 25 are made of rigid straight pipe, and 24 series connection of the valve will be stored up on communicating pipe 23 using grouting pump 26 Cement slurry in slurry tank 27 is extracted out and is sent out through Grouting Pipe 25, and Grouting Pipe 25 passes through control valve for stretching in drilling at this time The on-off of door 24 realizes the slip casting to drilling;The boring assemblies mainly include horizontally disposed support plate 1, support plate 1 corner location offers the guide pillar hole 2 of formula up and down, and the center of support plate 1 offers formula up and down Centre bore 3;Activity is inserted with the support post 5 being vertically arranged in the guide pillar hole 2, wherein the outer surface of support post 5 It is threaded structure, and screw thread is socketed with two screw thread adjusting rings 7 on support post 5, screw thread adjusting ring 7 sets up separately flat in support The upper and lower sides of plate 1, by rotating its adjustable position on support post 5 of screw thread adjusting ring 7;On the support post 5 Also movable sleeve is equipped with support ring 6, and support ring 6 is located at the top position of the lower square thread adjusting ring 7 of support plate 1, and 6 water of support ring The flat lower surface position for being fitted in support plate 1 realizes that the level to support plate 1 is lifted using four support rings 6 at this time, together When under the clamping action of two screw thread adjusting rings 7 realize support plate 1 fixation;The bottom of the support post 5 uses spiral shell Silk is fixedly installed with brake wheel 8, facilitates whole movement using brake wheel 8, while the fixation of position also may be implemented;In described The cylinder-like structure that the sleeve 9 being vertically arranged is in both ends open is inserted at heart hole 3, and sleeve 9 is in be vertically arranged, the sleeve 9 Interior activity is inserted with columned guide post 10, and the outer wall of guide post 10 is bonded setting, the guide post with the sliding of the inner wall of sleeve 9 Pressing plate 11 is fixed on 10 top surface in the form of welding, the lower surface of guide post 10 is fixed with fuel oil drilling machine horse using screw Up to 13, the drive shaft 14 of fuel oil drill motor 13 is arranged downwards, and the bottom of drive shaft 14 connects by the way that shaft coupling 15 is fixed It is connected to the shaft 16 being arranged downwards, the bottom fixing sleeve of shaft 16 is equipped with drilling rod collet 17, and clamping is solid on drilling rod collet 17 Surely there is the drilling rod 18 being arranged downwards, drive drilling rod 18 to rotate under the driving effect of fuel oil drill motor 13, mating sleeve 9 With the guiding movement between guide post 10, so as to facilitate drilling rod 18 can be vertically to drilling, for certain slope For dam facing, reach the level of support plate 1 by adjusting the physical location of different support posts 5, specifically in punching position Set first will the support lift of plate 1 to horizontal, a certain or two support posts 5 are utilized into screw thread adjusting ring 7 and support at this time Plate 1 is fixedly clamped, and at this time by the bottom of other support post 5 and dam body face contact, then fixes again, integrally can be real Now in the horizontal positioned of inclination dam facing, the realization that integrally can be convenient so vertically drills support plate 1, recycles after drilling The slip casting in drilling of slip casting component, the slip casting structure of each drilling at this time is identical, therefore effect is outstanding.
Air-bubble level 4 is fixed with using screw in a side of the support plate 1, utilizes 4 convenience of air-bubble level Support plate 1 is adjusted to level.
Side fixed plate 19 is welded in a side of the support plate 1, the outer surface welding of side fixed plate 19 is solid Surely there is connecting rod 20, and pipe winding wheel 21 is weldingly fixed on connecting rod 20, using pipe winding wheel 21 to extra feed pipe for mortar 22.
The bottom surface quadrangle of the bottom plate 30 is equipped with bottom plate pulley 31, facilitates bottom plate 30 mobile using bottom plate pulley 31.
The upper surface gluing of the guide post 10 is fixed with cushion 12.
Corresponding pin hole is offered in the sleeve 9 and guide post 10, may be implemented by being inserted into pin in pin hole The limitation of the position of sleeve 9 and guide post 10.
The working principle of the utility model is: driving drilling rod 18 to rotate under the driving effect of fuel oil drill motor 13, match Guiding movement between trap cylinder 9 and guide post 10, so as to facilitate drilling rod 18 certain for having vertically to drilling For the dam facing of the gradient, reaches the level of support plate 1 by adjusting the physical location of different support posts 5, specifically exist Punch position first will the support lift of plate 1 to horizontal, a certain or two support posts 5 are utilized into screw thread adjusting rings 7 at this time It is fixedly clamped with support plate 1, at this time by the bottom of other support post 5 and dam body face contact, then fixes again, it is whole Support plate 1 may be implemented in the horizontal positioned of inclination dam facing, the realization that integrally can be convenient so vertically drills, after drilling The slip casting in drilling of slip casting component is recycled, the slip casting structure of each drilling at this time is identical, therefore effect is outstanding.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (6)

1. a kind of Novel water conservancy dykes and dams bored grouting machine mainly includes boring assemblies and slip casting component, the slip casting component packet Include pipe winding wheel, feed pipe for mortar, communicating pipe, valve, Grouting Pipe, grouting pump, slurry can, battery, jelly suction pipe and bottom plate, the note Stock pump, slurry can and battery are all made of the upper surface that bolt is fixed on bottom plate, and the feeder ear of battery is connect by conducting wire Access of also connecting in the power connection end of grouting pump, on the conducting wire between battery and grouting pump has switch;The grouting pump into slurry Mouth is connected the grout outlet of slurry can by jelly suction pipe, and the grout outlet of grouting pump is docked with one end of feed pipe for mortar;The defeated slurry Another one end for terminating at communicating pipe of pipe, the form that the other end of communicating pipe is threadedly coupled is to being connected to Grouting Pipe, Grouting Pipe It is made of rigid straight pipe, and the valve series connection is on communicating pipe, which is characterized in that the boring assemblies mainly include water The support plate of flat setting, supports the corner location of plate to offer the guide pillar hole of formula up and down, supports in plate Heart position offers the centre bore of formula up and down;Activity is inserted with the support post being vertically arranged in the guide pillar hole, The outer surface of middle support post is threaded structure, and screw thread is socketed with two screw thread adjusting rings, screw thread tune on support post Pitch circle sets up the upper and lower sides in support plate separately, by rotating its adjustable position on support post of screw thread adjusting ring;Institute It states and goes back movable sleeve on support post equipped with support ring, support ring is located at the top position of square thread adjusting ring under support plate, and For support ring horizontal abutment in the lower surface position of support plate, the bottom of the support post is fixedly installed with brake using screw Wheel, the central hole is inserted with the cylinder-like structure that the sleeve being vertically arranged is in both ends open, and sleeve is in be vertically arranged, described Activity is inserted with columned guide post in sleeve, and the outer wall of guide post is bonded setting, the guide post with the sliding of the inner wall of sleeve Top surface on be fixed with pressing plate in the form of welding, the lower surface of guide post is fixed with fuel oil drill motor using screw, fires The drive shaft of oily drill motor is arranged downwards, and the bottom of drive shaft is fixedly connected with by shaft coupling and is arranged downwards Shaft, the bottom fixing sleeve of shaft is equipped with drilling rod collet, is fixed with the drilling rod being arranged downwards on drilling rod collet.
2. Novel water conservancy dykes and dams bored grouting machine according to claim 1, which is characterized in that the side of the support plate Air-bubble level is fixed with using screw on side.
3. Novel water conservancy dykes and dams bored grouting machine according to claim 1, which is characterized in that the side of the support plate Side fixed plate is welded on side, the outer surface of side fixed plate is welded with connecting rod, and pipe winding wheel is weldingly fixed on connecting rod On.
4. Novel water conservancy dykes and dams bored grouting machine according to claim 1, which is characterized in that the bottom surface quadrangle of the bottom plate Bottom plate pulley is installed.
5. Novel water conservancy dykes and dams bored grouting machine according to claim 1, which is characterized in that the upper surface of the guide post Gluing is fixed with cushion.
6. Novel water conservancy dykes and dams bored grouting machine according to claim 1, which is characterized in that on the sleeve and guide post Offer corresponding pin hole.
CN201820646397.5U 2018-05-03 2018-05-03 A kind of Novel water conservancy dykes and dams bored grouting machine Expired - Fee Related CN208472700U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820646397.5U CN208472700U (en) 2018-05-03 2018-05-03 A kind of Novel water conservancy dykes and dams bored grouting machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820646397.5U CN208472700U (en) 2018-05-03 2018-05-03 A kind of Novel water conservancy dykes and dams bored grouting machine

Publications (1)

Publication Number Publication Date
CN208472700U true CN208472700U (en) 2019-02-05

Family

ID=65219982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820646397.5U Expired - Fee Related CN208472700U (en) 2018-05-03 2018-05-03 A kind of Novel water conservancy dykes and dams bored grouting machine

Country Status (1)

Country Link
CN (1) CN208472700U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441357A (en) * 2020-03-23 2020-07-24 中亿丰建设集团股份有限公司 Grouting equipment for main structure of large building foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441357A (en) * 2020-03-23 2020-07-24 中亿丰建设集团股份有限公司 Grouting equipment for main structure of large building foundation

Similar Documents

Publication Publication Date Title
CN208472700U (en) A kind of Novel water conservancy dykes and dams bored grouting machine
CN109973058A (en) A kind of double-deck stacked mining device of individual well containing coalbed methane system and discharge and mining method
CN205876245U (en) A clear hole system for holing build stake
CN113774911B (en) Pipe pile variable-diameter hole guiding and pile pressing synchronous construction equipment and method
CN111810195A (en) Grouting process and device for geotechnical engineering
CN205688443U (en) It is applicable to the core stake guider of cement slotting built pile
CN216950237U (en) Drilling device for piling on soft foundation ground
CN211080193U (en) Be used for ground processing apparatus
CN215406021U (en) Device for controlling upward floating of bored concrete pile reinforcement cage
CN214363722U (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN211777371U (en) Underground oil-water separation device
CN213539106U (en) Foundation reinforcing structure
CN210140826U (en) Pile position locating rod for improving qualification rate of immersed tube pore-forming
CN212076482U (en) Cyclone aeration air-lift sludge reflux pump
CN114406542A (en) Hollow anchor cable welding device
CN211256961U (en) High-pressure rotary jet pile machine
CN209244498U (en) More Power compound drilling tools
CN107859480A (en) Make the rig and its application method of shallow hole
CN210177497U (en) Rotary spraying machine
CN108265707A (en) One kind can the multi-functional middle pick of tuning fetch earth and plant stake device and its construction method
CN208667226U (en) A kind of filler oxidation ditch cage filler suitable for samll cities and towns
CN207092092U (en) A kind of steel-pipe pile piling machine suitable for beach
CN204646120U (en) Anti-collapse resistance to wearing drags for sand drilling tool
CN209704605U (en) A kind of composite material anchor shaft
CN209493206U (en) The elevator of cinder in STEELMAKING PRODUCTION line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190522

Address after: 050000 District C, Lanjun, 47 Donggang Road, Yuhua District, Shijiazhuang City, Hebei Province, 12-2-103

Patentee after: Hebei Hongsen Highway Engineering Technology Co., Ltd.

Address before: 610000 No. 24, No. 24 Tianhui Road, Chengdu high tech Zone, Sichuan 12

Patentee before: Chengdu Yalian science and Technology Co Ltd

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190205

Termination date: 20210503