CN208458180U - Rain and snow type ventilation by air passage device arranged side by side - Google Patents

Rain and snow type ventilation by air passage device arranged side by side Download PDF

Info

Publication number
CN208458180U
CN208458180U CN201821016938.2U CN201821016938U CN208458180U CN 208458180 U CN208458180 U CN 208458180U CN 201821016938 U CN201821016938 U CN 201821016938U CN 208458180 U CN208458180 U CN 208458180U
Authority
CN
China
Prior art keywords
arranged side
rain
valve plate
air duct
flashing board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201821016938.2U
Other languages
Chinese (zh)
Inventor
杨立年
刘欣
吉锦
单晓晴
杨丽萍
李立田
朱妍华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821016938.2U priority Critical patent/CN208458180U/en
Application granted granted Critical
Publication of CN208458180U publication Critical patent/CN208458180U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Specific Sealing Or Ventilating Devices For Doors And Windows (AREA)

Abstract

The utility model discloses a kind of rain and snow type ventilation by air passage devices arranged side by side, including multiple air duct skeletons arranged side by side and outer casing, the flashing board that upper, middle and lower-ranking is in tilted layout and adjacent two layers inclined direction is opposite is connected between multiple air duct skeletons arranged side by side, the multiple flashing boards being located on the same floor are arranged in parallel to form air duct arranged side by side, and middle layer flashing board and the dislocation of lower layer's flashing board are arranged;In being hinged with respectively by disc support frame on each air duct skeleton arranged side by side and between adjacent two upper layer flashing boards hang valve plate, in hang valve plate connect respectively with headstock gear;In hang after valve plate fully opens each air duct arranged side by side be separated into two air ducts;In hang air duct arranged side by side after valve plate completely closes and extraneous close;Upper, middle and lower-ranking ditch is laid between multiple air duct skeletons arranged side by side.Not only performance of ventilating is good for the ventilator, but also rain-proof, snow defence effect are good, can be avoided and rainwater reverse irrigation leakage and accumulated snow, snow melt leakage problems inside winter occurs.

Description

Rain and snow type ventilation by air passage device arranged side by side
Technical field
The utility model relates to architectural environment power-saving technology, in particular to a kind of rain and snow type ventilation by air passage device arranged side by side.
Background technique
National standard with reference to atlas 11CJ33 ventilation by air passage device arranged side by side from Chinese patent CN 201866883U, CN102269460A etc., wherein CN 201866883U illustrates that its performance " can reach available ventilation area greater than roofing opening 80% ", and being spaced ventilation by air passage device is only " within 40% ", illustrates that air channel structure arranged side by side has very superior performance of ventilating Advantage.But invention CN103206762A thereafter negates comprehensively to the rainproof function of above-mentioned patent, in background note: " passing through The test of practice, the rainproof effect of ventilation by air passage device arranged side by side be not it is highly desirable, especially in rainstorm weather, the stream of rainwater Speed is too quickly, and existing structure can not effectively be defendd, dredged, collected and be excluded to rainwater at all ", but in technical solution On, " convex ribs " are arranged simply on flashing board only to slow down rainwater flow velocity in invention CN103206762A.Due to " rainwater flow velocity mistake It suddenly is not " ventilation by air passage device arranged side by side anti-the main reason for not living rainwater, above-mentioned technical proposal does not solve " can not be to rain Water is effectively defendd, is dredged, collected and is excluded " problem, and " the closing headstock gear waterproof " is even more that can not determine The scheme of use premise condition, and close ventilation rainproof and also do not meet wind sheltering type Natural Ventilation Technology In One Green requirement.
The anti-incessantly rainwater of ventilation by air passage device arranged side by side is invalid technique, and performance of ventilating is high and invalid again, on The structure rain-proof problem for stating patent is always existed and could not thoroughly be solved, and main cause is the rain-proof problem to air channel structure arranged side by side Understanding is insufficient.In fact, the rain-proof problem of ventilation by air passage device mainly includes following aspect side by side: 1, to the rain-proof weight of flashing board Folded understanding is insufficient, from CN201866883 U case Figure of description 4 as can be seen that design allows rainwater direct projection to bottom rain-proof Plate or sink will lead to the rainwater splashed and fall into interior;2, multilayer flashing board connects draining and dredges to a large amount of rainwater caused by bottom And queueing problem, this is that the distinctive flashing board of air duct type technology arranged side by side is in caused by unilateral oblique form, and the interval wind The rainwater of road formula ventilator upper layer flashing board and middle layer flashing board 5 does not need then to be discharged to the exclusion of bottom flashing board;3, top air duct It is open to lack rain-proof control function.Since there are above-mentioned technical problems, although ventilation by air passage device and interval air duct type are logical side by side Wind device is equally using the way in bottom setting headstock gear, but the bigger rainwater of the big formation of air duct available ventilation area falls side by side Filling amount causes the rain-proof of rainstorm weather rainfall and ventilator internal structure, the uncertain problem of drain function.
Snow defence is the guarantee sexual function with the ventilation by air passage device arranged side by side of rain-proof no less important, although above-mentioned patent is not bright Really illustrate the snow defence function of its structure, but it is equally existed due to the open snowfall in top air duct and snow defence control problem.And In fact, light snowflake, which has, to be more difficult anti-inorganization with the wind than rainwater and drifts characteristic, and will not be instant as rainwater It flows away, when weather, snowflake flows backward from the open air duct in top to be easy to descend slowly and lightly onto bottom sink and the valve plate of closing Face, necessarily leads to snow melt leakage after accumulated snow is more than rain-proof structure height, and Winter Snow can constantly gather inside ventilator, melt Change, freeze to form the bigger slush mixture of load, it is sufficient to ventilator malformation be caused to destroy.
Based on the above issues, although foregoing invention CN103206762A clearly proposes the prior art, there are rainproof functions to lack It falls into, but due to lacking substantive technological means, has to take following rain-proof, snow defence technical measures in practical application: 1, It adds partition and becomes air duct arranged side by side to be spaced air duct, to block rain-impact lower layer flashing board.2, setting inclination almost horizontal is anti- Rain plate, to reduce rainwater flow velocity.3, to dredge uncertain displacement, the big specification rhone of setting and opening and closing at bottom flashing board Device.Above structure forms ventilating-type shielding and the blocking to air duct arranged side by side in various degree, can not be formed and improve effective roofing Natural Ventilation Technology In One Green, it is even more impossible to guarantee the big performance of ventilating advantage of air channel structure available ventilation area arranged side by side.
In addition, there is also real abdomen frame boards to influence daylighting function, lacks and guarantees that installation strength is asked for ventilation by air passage device side by side Topic.Since ventilation by air passage device valve plate arranged side by side is arranged in bottom, causes valve plate dust stratification dirt that can not clean influence daylighting function, exist Valve plate can not Maintenance and Repair and damage falls indoor danger and valve plate condensation is directly dripped into indoor problem.
In product cost, ventilation by air passage device arranged side by side there is also due to frame board merogenesis combined frame intensity it is low, lack guarantor The overall skeleton intensity of card and basis installation, product mix installation also need to design a large amount of foundation structures and increase building cost cost Problem.
Summary of the invention
The technical problem to be solved by the utility model is to provide one kind, not only performance of ventilating is good, but also rain-proof, snow defence are imitated Fruit is good, can be avoided and the rain and snow type air duct arranged side by side that rainwater flows backward accumulated snow inside leakage and winter, snow melt leakage problems occurs Formula ventilator.
The technical solution of the utility model is as follows:
A kind of rain and snow type ventilation by air passage device arranged side by side, lattice air duct skeleton arranged side by side including multiple parallel arrangements and solid It is scheduled on the outer casing of multiple skeleton surroundings in air duct arranged side by side, upper, middle and lower-ranking inclination is connected between multiple air duct skeletons arranged side by side The arrangement and opposite flashing board of adjacent two layers inclined direction, the multiple flashing boards being located on the same floor are arranged in parallel to form wind arranged side by side Road, middle layer flashing board and the dislocation of lower layer's flashing board are arranged, and the neighboring edge upright projection of adjacent two middle layer flashing boards is fallen in In the corresponding lower layer's flashing board in lower section;
It is respectively equipped with disc support frame on each air duct skeleton arranged side by side and between adjacent two upper layer flashing boards, Between adjacent two upper layer flashing boards of multiple air duct skeletons arranged side by side respectively by disc support frame be uniformly hinged in hang valve plate, In hang valve plate and connect respectively with headstock gear, the switch for valve plate outstanding in controlling;In hang adjacent two after valve plate fully opens Air duct arranged side by side between a upper layer flashing board is separated into two air ducts;In hang adjacent two upper layer rain-proofs after valve plate completely closes Air duct arranged side by side and extraneous closing between plate;
It is laid with upper, middle and lower-ranking ditch between multiple air duct skeletons arranged side by side, wherein upper layer ditch is respectively provided at often A upper layer flashing board and after opening in hang valve plate lower edge, middle layer or lower layer ditch be respectively provided at each corresponding middle layer or under Layer flashing board lower edge.
As further preferred, it is described in hang after valve plate fully opens, lower edge is pressed in corresponding upper layer ditch, The upright projection of top edge is fallen in the middle part of the corresponding upper layer ditch in lower section.
As further preferred, the lower edge of the upper layer flashing board is pressed in corresponding upper layer ditch, top edge Upright projection is fallen in the middle part of the corresponding upper layer ditch in lower section, to guarantee vertical rain-proof overlapping.
As further preferred, the both ends in the upper layer ditch are pierced by by outer casing respectively, for rainwater to be immediately discharged to Outside guarantees to the dredging of heavy rain, excludes.
As further preferred, distinguish between multiple air duct skeletons arranged side by side positioned at the upper edge of each upper layer flashing board Equipped with ridge tiles, it is described in hang valve plate completely close rear top edge be stuck in corresponding ridge tiles and with corresponding adjacent upper layer flashing board Ridge is formed, lower edge is pressed in corresponding upper layer ditch and forms V-type with corresponding adjacent upper layer flashing board, to form valve plate Rain and snow and drain function when closing.
As further preferred, the middle layer and lower layer ditch of the upper layer ditch and lower section are located on same vertical line, with Hang when valve plate opens maximum that multiple rain-proof of interlocking is formed with three layers of flashing board is Chong Die in guarantee.
As further preferred, the top edge phase mutual respect in vertical direction of the middle layer flashing board and lower layer flashing board It is folded, for improving rain and snow effect.
As further preferred, the middle layer flashing board and lower layer's flashing board are linked together with corresponding ditch respectively, with It is further simplified structure.
As further preferred, the outer casing lower part of corresponding middle layer flashing board and lower layer's rain-proof board ends is circular arc Shape, the middle layer flashing board are inserted into the arc-shaped cavity of corresponding outer casing respectively with lower layer's rain-proof board ends.
As further preferred, it is described in hang valve plate and be rigidly connected respectively with headstock gear, opened with hanging valve plate in realizing Any position positioning can be opened by closing under the control of device, to adjust rain-proof, snow defence function and ventilation function.
It is the truss structure being formed by connecting by fashioned iron as further preferred, described air duct skeleton arranged side by side, to guarantee to tie Structure combination and installation strength.
The beneficial effects of the utility model are:
1, due to being connected between multiple air duct skeletons arranged side by side, upper, middle and lower-ranking is in tilted layout and adjacent two layers tilt Contrary flashing board passes through disc support frame respectively between adjacent two upper layer flashing boards of multiple air duct skeletons arranged side by side In being uniformly equipped with hang valve plate, in hang valve plate connect respectively with headstock gear;It is laid between multiple air duct skeletons arranged side by side Upper, middle and lower-ranking ditch, wherein upper layer ditch be respectively provided at each upper layer flashing board and open after in hang valve plate lower edge, Middle layer or lower layer ditch are respectively provided at each corresponding middle layer or lower layer's flashing board lower edge;By three layers of flashing board and ditch and In hang valve plate cooperation, thoroughly solve ventilation by air passage device arranged side by side rainwater can not effectively be defendd in rainstorm weather, The problem of dredging, collect and excluding;Meanwhile outstanding valve plate can ensure the effective of air channel structure arranged side by side in by upper layer flashing board The big performance of ventilating advantage of draught area.
2, the utility model hangs valve plate technology by having concurrently in valve plate and upper layer flashing board function, forms and existing skill The entirely different ventilation by air passage device structure arranged side by side of art, in hang after valve plate is opened and not will form to air duct arranged side by side as air channel structure Block, in hang valve plate close after then realize thoroughly barrier exterior space sealing function, and in hang valve plate adjust aperture simultaneously Have the function of adjusting ventilation quantity and control rain and snow, does not have to solve the headstock gear being arranged in below bottom flashing board There is rain and snow adjusting function, valve plate opens the problem for blocking air duct influence ventilation.
3, the utility model is by taking the air duct skeleton arranged side by side of truss structure, can not only guarantee self structure intensity and Integrally there is large span installation strength after combination installation, the setting function of valve plate and headstock gear, and lattice are hanged in guarantee Skeleton can light transmission so that solving ventilation by air passage device arranged side by side influences daylighting function using real web-type skeleton solve plate The problem of formula splicing framework is due to without guaranteeing integral installation intensity and needing to be arranged a large amount of auxiliary foundation support constructions, thus Product cost greatly reduces.
Detailed description of the invention
Fig. 1 is the structural schematic diagram hanged when valve plate is opened in the utility model.
Fig. 2 is the side view of Fig. 1.
In figure: air duct arranged side by side skeleton 1, rectangular frame 101, upper beam 102, lower beam 103, cant beam 104, disc support frame 105, outer casing 2, ditch 3, upper layer flashing board 4, middle layer flashing board 5, lower layer's flashing board 6, ridge tiles 7, in hang valve plate 8, vertical pole 9, Drive crossbeam 10, connecting rod 11, air duct 12 arranged side by side.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without creative efforts All other embodiment obtained, fall within the protection scope of the utility model.
As Figure 1-Figure 2, the utility model relates to a kind of rain and snow type ventilation by air passage device arranged side by side, including it is multiple flat Row arrangement and by the more lattice interconnected of vertical pole 9 air duct skeletons 1 arranged side by side, the present embodiment is with three air duct arranged side by side skeletons For.Each air duct skeleton 1 side by side is the truss structure being formed by connecting by fashioned iron, and including a rectangular frame 101, in rectangle It is equipped with upper beam 102 and lower beam 103 in frame 101 and upper, middle and lower-ranking will be divided into inside rectangular frame 101, in rectangle frame Each layer of inside of frame 101 is evenly equipped with multiple cant beams 104 respectively, for installing flashing board.In multiple skeleton 1 surroundings in air duct arranged side by side It is fixed with outer casing 2.
There is upper, middle and lower-ranking flashing board by rivet interlacement between multiple air duct skeletons 1 arranged side by side, it is anti-to be followed successively by upper layer Rain plate 4, middle layer flashing board 5 and lower layer's flashing board 6.Each layer of flashing board is tilted and is arranged parallel respectively, and adjacent two layers are anti- The inclined direction of rain plate on the contrary, form multiple air ducts arranged side by side 12 between the multiple flashing boards being located on the same floor, middle layer flashing board 5 with Lower layer's flashing board 6 dislocation arrangement, and the neighboring edge upright projection of adjacent two middle layer flashing boards 5 fall in lower section it is corresponding one In lower layer's flashing board 6.
It is welded respectively on the upper beam 102 in each air duct skeleton 1 arranged side by side and between adjacent two upper layer flashing boards 4 It is connected to disc support frame 105, passes through valve plate branch respectively between adjacent two upper layer flashing boards 4 of multiple air duct skeletons 1 arranged side by side Support 105 is uniformly distributed be hingedly equipped in hang valve plate 8, in hang valve plate 8 and connect respectively with headstock gear, for valve plate 8 outstanding in controlling Switch.Hanged in described after valve plate 8 fully opens with upper layer flashing board 4 close to parallel, and by adjacent two upper layer flashing boards 4 it Between air duct arranged side by side 12 be separated into two air ducts;In hang between adjacent two upper layer flashing boards 4 after valve plate 8 completely closes and Arrange air duct 12 and extraneous closing.
Upper, middle and lower-ranking ditch 3 is laid between multiple air duct skeletons 1 arranged side by side, each layer of ditch 3 is uniformly distributed Multiple and each ditch 3 is the V-shaped molded piece in section, and wherein upper layer ditch 3 is respectively provided at each 4 He of upper layer flashing board It is hanged in after unlatching on the upper beam 102 at 8 lower edge of valve plate, it is anti-that each middle layer ditch 3 is respectively provided at each corresponding middle layer On lower beam 103 at 5 lower edge of rain plate, each lower layer ditch 3 is respectively provided at each corresponding 6 lower edge of lower layer's flashing board 101 bottom beam of rectangular frame on.The upper layer ditch 3 is located on same vertical line with the middle layer of lower section and lower layer ditch, to protect It is Chong Die that the rain-proof of interlocking when opening maximum with three layers of flashing boards formation quadruple of valve plate 8 is hanged in card.
The lower edge of the upper layer flashing board 4 is pressed in corresponding upper layer ditch, and the upright projection of top edge is fallen in down In the middle part of the corresponding upper layer ditch in side, to guarantee vertical rain-proof overlapping.After outstanding valve plate 8 fully opens in described, lower edge pressure In corresponding upper layer ditch, the upright projection of top edge is fallen in the middle part of the corresponding upper layer ditch in lower section.The upper layer ditch Both ends be pierced by respectively by outer casing 2, to reduce trickling of the rainwater between three layers of flashing board, guarantee to the dredging of heavy rain, arrange It removes.
Upper edge between multiple air duct skeletons 1 arranged side by side positioned at each upper layer flashing board 4 is connected separately with ridge tiles 7, Outstanding valve plate 8 completely closes rear top edge and is stuck in corresponding ridge tiles 7 and forms ridge with corresponding adjacent upper flashing board 4 in described Type, lower edge are pressed in corresponding upper layer ditch and form V-type with corresponding adjacent upper flashing board 4, to form valve plate closing When rain and snow and drain function.
The top edge of the middle layer flashing board 5 and lower layer flashing board 6 is overlapped in vertical direction, for improving rain-proof Avenge effect.The lower edge of the middle layer flashing board 5 and lower layer's flashing board 6 is linked together with corresponding ditch respectively, with further Simplify structure.2 lower part of the outer casing at corresponding middle layer flashing board 5 and 6 both ends of lower layer's flashing board is arc-shaped, and the middle layer is anti- Rain plate 5 is inserted into the arc-shaped cavity of corresponding outer casing 2 respectively with 6 both ends of lower layer flashing board.
It hangs valve plate 8 in described to be rigidly connected with headstock gear respectively, to hang valve plate 8 in realization under the control of headstock gear Any position positioning can be opened, to adjust rain-proof, snow defence function and ventilation function.The headstock gear includes at least one It is located at the driving crossbeam 10 hanged above valve plate in multiple in the horizontal direction, the present embodiment is by taking two driving crossbeams 10 as an example, driving Crossbeam 10 with it is each in hang valve plate side and pass through connecting rod 11 respectively and connect, described 11 one end of connecting rod, which is fixed in corresponding, hangs valve plate Side simultaneously hangs that valve plate is vertical, and 11 other end of connecting rod is hinged with driving crossbeam 10 respectively in.Described 10 one end of driving crossbeam extends To 2 outside of outer casing and it is connected with driving device (not shown), for driving driving crossbeam 10 transversely to move back and forth, from And valve plate is hanged in driving and realizes switch.
When installation, multiple air duct skeletons 1 arranged side by side are separately fixed on the basis of roofing ventilation opening and by more vertical poles 9 It is connected with each other.It when work, drives driving crossbeam 10 transversely to move by driving device, is opened to hang valve plate realization in driving It closes.In hang after valve plate fully opens with upper layer flashing board close to parallel, and by the wind arranged side by side between adjacent two upper layer flashing boards Road 12 is separated into two air ducts, can realize indoor and outdoor by interconnected multiple air ducts 12 arranged side by side that three layers of flashing board is formed Ventilation.When encountering rain, snowy day gas, by driving device drive in hang valve plate close, in hang valve plate close after top edge card Ridge is formed in corresponding ridge tiles 7 and with corresponding adjacent upper flashing board, lower edge is pressed in corresponding upper layer ditch simultaneously V-type is formed with corresponding adjacent upper flashing board, thus by air duct arranged side by side 12 and the external world between adjacent two upper layer flashing boards Closing makes sleet hang valve plate in through upper layer flashing board and falls into the ditch of upper layer, is discharged by upper layer ditch one end.
It is not only in the description and the implementation although the embodiments of the present invention have been disclosed as above Listed utilization, it can be applied to various fields suitable for the present invention completely, for those skilled in the art, Other modifications may be easily implemented, therefore without departing from the general concept defined in the claims and the equivalent scope, this reality It is not limited to specific details and legend shown and described herein with novel.

Claims (10)

1. a kind of rain and snow type ventilation by air passage device arranged side by side, lattice air duct skeleton arranged side by side and fixation including multiple parallel arrangements In the outer casing of multiple skeleton surroundings in air duct arranged side by side, it is characterized in that: being connected with upper, middle and lower between multiple air duct skeletons arranged side by side Three layers are in tilted layout and the opposite flashing board of adjacent two layers inclined direction, the multiple flashing boards being located on the same floor are arranged in parallel to be formed Air duct arranged side by side, middle layer flashing board and the dislocation of lower layer's flashing board are arranged, and the neighboring edge of adjacent two middle layer flashing boards is vertically thrown Shadow is fallen in the corresponding lower layer's flashing board in lower section;
It is respectively equipped with disc support frame on each air duct skeleton arranged side by side and between adjacent two upper layer flashing boards, multiple Between adjacent two upper layer flashing boards of air duct skeleton arranged side by side respectively by disc support frame be uniformly hinged in hang valve plate, in hang Valve plate is connect with headstock gear respectively, for hanging the switch of valve plate in controlling;In hang valve plate fully open after will be on adjacent two Air duct arranged side by side between layer flashing board is separated into two air ducts;In hang valve plate completely close after by adjacent two upper layer flashing boards it Between air duct arranged side by side and extraneous close;
It is laid with upper, middle and lower-ranking ditch between multiple air duct skeletons arranged side by side, wherein upper layer ditch is respectively provided on each Valve plate lower edge is hanged in after layer flashing board and unlatching, middle layer or lower layer ditch are respectively provided at each corresponding middle layer or lower layer is anti- Rain plate lower edge.
2. rain and snow type ventilation by air passage device arranged side by side according to claim 1 is opened completely it is characterized in that: hanging valve plate in described Qi Hou, lower edge are pressed in corresponding upper layer ditch, and the upright projection of top edge is fallen in the corresponding upper layer ditch in lower section Portion.
3. rain and snow type ventilation by air passage device arranged side by side according to claim 1, it is characterized in that: under the upper layer flashing board Edge is pressed in corresponding upper layer ditch, and the upright projection of top edge is fallen in the middle part of the corresponding upper layer ditch in lower section, to guarantee Vertical rain-proof overlapping.
4. rain and snow type ventilation by air passage device arranged side by side according to claim 1-3, it is characterized in that: the upper water The both ends of ditch are pierced by by outer casing respectively, for rainwater to be immediately discharged to outside, are guaranteed to the dredging of heavy rain, are excluded.
5. rain and snow type ventilation by air passage device arranged side by side according to claim 4, it is characterized in that: in multiple air duct skeletons arranged side by side Between be located at the upper edge of each upper layer flashing board and be respectively equipped with ridge tiles, it is described in hang valve plate and completely close rear top edge and be stuck in Form ridge in corresponding ridge tiles and with corresponding adjacent upper layer flashing board, lower edge be pressed in corresponding upper layer ditch and with it is right Adjacent upper layer flashing board is answered to form V-type, to form rain and snow and drain function when valve plate is closed.
6. rain and snow type ventilation by air passage device arranged side by side according to claim 5, it is characterized in that: the upper layer ditch and lower section Middle layer and lower layer ditch be located on same vertical line, with hang in guaranteeing when valve plate opens maximum formed with three layers of flashing board it is multiple Staggeredly rain-proof is overlapped.
7. rain and snow type ventilation by air passage device arranged side by side according to claim 5 or 6, it is characterized in that: the middle layer flashing board It is overlapped in vertical direction with the top edge of lower layer flashing board, for improving rain and snow effect.
8. rain and snow type ventilation by air passage device arranged side by side according to claim 7, it is characterized in that: the middle layer flashing board is under Layer flashing board is linked together with corresponding ditch respectively, to be further simplified structure.
9. rain and snow type ventilation by air passage device arranged side by side according to claim 8, it is characterized in that: corresponding middle layer flashing board is under The outer casing lower part of layer rain-proof board ends is arc-shaped, and the middle layer flashing board and lower layer's rain-proof board ends are inserted into pair respectively It answers in the arc-shaped cavity of outer casing.
10. rain and snow type ventilation by air passage device arranged side by side according to claim 2 or 5, it is characterized in that: hanging valve plate point in described It is not rigidly connected with headstock gear, any position positioning can be opened under the control of headstock gear to hang valve plate in realization, To adjust rain-proof, snow defence function and ventilation function.
CN201821016938.2U 2018-06-29 2018-06-29 Rain and snow type ventilation by air passage device arranged side by side Withdrawn - After Issue CN208458180U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821016938.2U CN208458180U (en) 2018-06-29 2018-06-29 Rain and snow type ventilation by air passage device arranged side by side

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821016938.2U CN208458180U (en) 2018-06-29 2018-06-29 Rain and snow type ventilation by air passage device arranged side by side

Publications (1)

Publication Number Publication Date
CN208458180U true CN208458180U (en) 2019-02-01

Family

ID=65169820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821016938.2U Withdrawn - After Issue CN208458180U (en) 2018-06-29 2018-06-29 Rain and snow type ventilation by air passage device arranged side by side

Country Status (1)

Country Link
CN (1) CN208458180U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108775670A (en) * 2018-06-29 2018-11-09 单晓晴 Rain and snow type ventilation by air passage device arranged side by side

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108775670A (en) * 2018-06-29 2018-11-09 单晓晴 Rain and snow type ventilation by air passage device arranged side by side
CN108775670B (en) * 2018-06-29 2023-05-30 单晓晴 Rain and snow preventing parallel air duct type ventilator

Similar Documents

Publication Publication Date Title
CN201276799Y (en) Shutter type rainproof ventilating skylight
CN208458180U (en) Rain and snow type ventilation by air passage device arranged side by side
CN201310153Y (en) Grid-type rain-proof ventilated skylight
CN103206762A (en) Structural waterproof parallel air flue type natural ventilator
CN210976385U (en) Door type canopy structure
CN108775670A (en) Rain and snow type ventilation by air passage device arranged side by side
CN212772462U (en) Integrated assembly type comprehensive pipe gallery ventilation equipment
CN208168184U (en) roof ventilator
CN203177396U (en) Structurally waterproof type and parallel air duct type natural ventilator
CN206564951U (en) A kind of drainage system of strawberry greenhouse
CN214272603U (en) Automatic drainage clerestory for preventing rain from floating
CN211622328U (en) Side-opening clerestory
CN209855077U (en) Drainage structure of lighting roof of inclined roof
CN210508094U (en) Waterproof integrated house
CN111456493B (en) Intelligent adjusting system for microclimate of courtyard
CN108518031A (en) Roof ventilator
KR100751713B1 (en) Angle-adjustable roof with easy open system
CN109881852A (en) A kind of collection rainwater green awning
CN205475947U (en) A abat -vent that is used for formula eaves mouth structure that shields of inorganization drainage to reach including eaves mouth structure
CN206469422U (en) A kind of roof ventilator
CN205476135U (en) A flat roof that is used for formula eaves mouth that shields of gable department to reach including eaves mouth structure
CN109898407A (en) A kind of Bridges on Highway waterproof/drainage structure
CN108518030A (en) Big specification ventilation and lighting skylight
CN2504345Y (en) Splicing whole enclosed construction closure
DE102018110711A1 (en) Module for the production of solar energy at building edges

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20190201

Effective date of abandoning: 20230530

AV01 Patent right actively abandoned

Granted publication date: 20190201

Effective date of abandoning: 20230530

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned