CN208455607U - A kind of ruggedized construction of steel reinforcement cage handling, installation in deposited reinforced concrete pile - Google Patents

A kind of ruggedized construction of steel reinforcement cage handling, installation in deposited reinforced concrete pile Download PDF

Info

Publication number
CN208455607U
CN208455607U CN201820623739.1U CN201820623739U CN208455607U CN 208455607 U CN208455607 U CN 208455607U CN 201820623739 U CN201820623739 U CN 201820623739U CN 208455607 U CN208455607 U CN 208455607U
Authority
CN
China
Prior art keywords
reinforcement cage
steel reinforcement
installation
steel
handling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820623739.1U
Other languages
Chinese (zh)
Inventor
王笃礼
袁野
车东
吉晓朋
陈默
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AVIC GEOTECHNICAL ENGINEERING INSTITUTE Co Ltd
Original Assignee
AVIC GEOTECHNICAL ENGINEERING INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AVIC GEOTECHNICAL ENGINEERING INSTITUTE Co Ltd filed Critical AVIC GEOTECHNICAL ENGINEERING INSTITUTE Co Ltd
Priority to CN201820623739.1U priority Critical patent/CN208455607U/en
Application granted granted Critical
Publication of CN208455607U publication Critical patent/CN208455607U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model is the ruggedized construction of a kind of steel reinforcement cage handling, installation in deposited reinforced concrete pile; the structure is to weld the symmetrical reinforced steel of twice (4) on the inside of steel reinforcement cage main reinforcement (1); the lower end of reinforced steel (4) is withstood on the upper surface of first of steel reinforcement cage top reinforcing rib (2), forms constraint and protection to first of reinforcing rib (2) in steel reinforcement cage handling, installation.Suspension centre when installation is set to the junction of reinforced steel (4) Yu first of reinforcing rib of steel reinforcement cage (2), forms constraint and protection to first of reinforcing rib (2), prevents steel reinforcement cage from damaging.

Description

A kind of ruggedized construction of steel reinforcement cage handling, installation in deposited reinforced concrete pile
Technical field
The utility model is the ruggedized construction of a kind of steel reinforcement cage handling, installation in deposited reinforced concrete pile, belongs to rock Piling Technology field in geotechnological journey.
Background technique
Deposited reinforced concrete pile is a kind of method most commonly seen in China's pile foundation construction, will necessarily pass through steel in construction The links such as the production of muscle cage, handling, installation.The steel reinforcement cage made of common process, first of reinforcing rib and the spot welding of steel reinforcement cage main reinforcement Connection, joint face is few, connecting node is fragile, steel reinforcement cage it is heavier or need handling repeatedly when frequent occurrence node damage phenomenon, Unnecessary repairing is caused to do over again.
Summary of the invention
The utility model is exactly directed to above-mentioned disadvantage existing in the prior art and designs and provide one kind in reinforced concrete The ruggedized construction of steel reinforcement cage handling, installation in native bored concrete pile, the purpose is to first of reinforcing ribs of stiffener cage and steel reinforcement cage master The connecting node of muscle, the effective damage for reducing steel reinforcement cage in handling, installation process, does over again to reduce, saves material, subtracts Few duration.
The purpose of this utility model is achieved through the following technical solutions:
The ruggedized construction of this kind steel reinforcement cage handling, installation in deposited reinforced concrete pile, it is characterised in that: the structure is The symmetrical reinforced steel 4 of twice is welded on the inside of steel reinforcement cage main reinforcement 1, the lower end of reinforced steel 4 withstands on steel reinforcement cage top first On the upper surface of reinforcing rib 2, constraint and protection are formed to first of reinforcing rib 2 in steel reinforcement cage handling, installation.
Suspension centre when steel reinforcement cage handling, installation is set to the junction of reinforced steel 4 Yu first of reinforcing rib of steel reinforcement cage 2.
The engineering problem that technical solutions of the utility model solve is as follows:
One, stiffener 4 is only 10cm~15cm reinforcing bar, is welded in main reinforcement 1, more compared with other steel reinforcement cage reinforcement means Convenient for operation, the construction time is shorter, and cost is lower.
Two, this method is confirmed by engineering practice, is greatly reduced steel reinforcement cage handling, is damaged in installation process Situation reduces steel reinforcement cage repairing and does over again, while ensure that the construction quality of cast-in-place concrete pile.
Three, this kind of method is saved material, is shortened the construction period, using success rate height, while lifting construction efficiency, also obtains Good economic benefit.
Detailed description of the invention
Fig. 1 is the schematic diagram of structure described in the utility model
Specific embodiment
Technical solutions of the utility model are further described below with reference to drawings and examples:
Referring to figure 1, the ruggedized construction of this kind steel reinforcement cage handling, installation in deposited reinforced concrete pile, it is special Sign is: the structure is the welding symmetrical reinforced steel 4 of twice on the inside of steel reinforcement cage main reinforcement 1, and the lower end of reinforced steel 4 withstands on steel On the upper surface of first of top of muscle cage reinforcing rib 2, in steel reinforcement cage handling, installation to first reinforcing rib 2 formed constraint and Protection.Suspension centre when steel reinforcement cage handling, installation is set to the junction of reinforced steel 4 Yu first of reinforcing rib of steel reinforcement cage 2, to the One of reinforcing rib 2 forms constraint and protection, prevents steel reinforcement cage from damaging.

Claims (2)

1. a kind of ruggedized construction of steel reinforcement cage handling, installation in deposited reinforced concrete pile, it is characterised in that: the structure be The symmetrical reinforced steel of twice (4) are welded on the inside of steel reinforcement cage main reinforcement (1), the lower end of reinforced steel (4) withstands on steel reinforcement cage top the On the upper surface of one of reinforcing rib (2), constraint and protection are formed to first of reinforcing rib (2) in steel reinforcement cage handling, installation.
2. the ruggedized construction of steel reinforcement cage handling, installation, feature exist in deposited reinforced concrete pile according to claim 1 In: suspension centre when steel reinforcement cage handling, installation is set to the junction of reinforced steel (4) Yu first of reinforcing rib of steel reinforcement cage (2).
CN201820623739.1U 2018-04-27 2018-04-27 A kind of ruggedized construction of steel reinforcement cage handling, installation in deposited reinforced concrete pile Active CN208455607U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820623739.1U CN208455607U (en) 2018-04-27 2018-04-27 A kind of ruggedized construction of steel reinforcement cage handling, installation in deposited reinforced concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820623739.1U CN208455607U (en) 2018-04-27 2018-04-27 A kind of ruggedized construction of steel reinforcement cage handling, installation in deposited reinforced concrete pile

Publications (1)

Publication Number Publication Date
CN208455607U true CN208455607U (en) 2019-02-01

Family

ID=65150791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820623739.1U Active CN208455607U (en) 2018-04-27 2018-04-27 A kind of ruggedized construction of steel reinforcement cage handling, installation in deposited reinforced concrete pile

Country Status (1)

Country Link
CN (1) CN208455607U (en)

Similar Documents

Publication Publication Date Title
CN106761769A (en) A kind of construction technology of big cross section large-deformation tunnel in soft rock
CN203654299U (en) Steel support loose end
CN106014446B (en) A kind of reinforcement means of enhancing high ground stress soft rock stress tunnel inverted arch structural stability
CN204266193U (en) Pile foundation steel bar cage locator
CN104294769B (en) A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement
CN102864788A (en) Method for underpinning reinforced bridge pile foundation by bear-type static pressure cluster pile
CN104947681A (en) Super large super deep basement ground pit construction method
CN208219631U (en) A kind of borehole filling pile cage of reinforcement protection structure
CN102926504A (en) Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof
CN204491640U (en) A kind of circular single-arm steel hanging box being applicable to strong tidal bore district
CN109706950A (en) The construction method of diaphram wall in a kind of tunnel
CN202073100U (en) Temporary vertical steel support structure for compensating displacement or missed piling of steel lattice columns
CN208455607U (en) A kind of ruggedized construction of steel reinforcement cage handling, installation in deposited reinforced concrete pile
CN204436407U (en) The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN203320703U (en) Connecting node of reinforced concrete column and newly added steel beam
CN210049234U (en) Static pressure square pile splicing and reinforcing structure
CN209838429U (en) Back anchor shield constructs lining cutting supporting construction
CN204456070U (en) Diaphragm wall shutoff stopping means
CN204385747U (en) Prevent the device of tunnel upward floating
CN203113320U (en) H-shaped supporting pile
CN104818710A (en) Precast concrete expanding head pile tip and method for improving foundation pile bearing capacity by using same
CN205443835U (en) Pin -connected panel steel sheet road surface of mating formation
CN105200984A (en) Novel ocean engineering pile foundation capable of reducing pile body deflection and manufacturing method thereof
CN201172825Y (en) Beam column joint in base pit engineering for reverse method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant