CN110306537A - Filling pile head construction method - Google Patents
Filling pile head construction method Download PDFInfo
- Publication number
- CN110306537A CN110306537A CN201910664068.2A CN201910664068A CN110306537A CN 110306537 A CN110306537 A CN 110306537A CN 201910664068 A CN201910664068 A CN 201910664068A CN 110306537 A CN110306537 A CN 110306537A
- Authority
- CN
- China
- Prior art keywords
- splitting
- ring
- steel reinforcement
- pile
- reinforcement cage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The present invention relates to a kind of filling pile head construction methods, the following steps are included: S1, steel reinforcement cage main reinforcement upper end weld lower part positioning bar, ring set will be divided in steel reinforcement cage main reinforcement, then top positioning bar is welded in the steel reinforcement cage main reinforcement above splitting ring and clamp splitting ring;S2, the fixed splitting pipe on splitting ring;S3, upper disrance sleeve is covered at the top of every steel reinforcement cage main reinforcement;S4, foamed glue is filled in splitting pipe, disrance sleeve respectively;S5, the reinforcing bar hanging ring that a pair of of ellipse is set on the disrance sleeve in the middle part of pile crown;S6, molding steel reinforcement cage is transferred into design position, then pours cast-in-place pile concrete;S7, Hydraulic splitter is inserted into splitting pipe, starting Hydraulic splitter is by pile crown along splitting pipe in division anchor ring fracture;S8, vertically pile crown integrally hung out;S9, splitting pipe, disrance sleeve and splitting ring are cleaned up.For solving the problems, such as that it is difficult that pile crown in the prior art and pile body disconnect.
Description
Technical field
The invention belongs to building construction fields, specifically design a kind of filling pile head construction method.
Background technique
Currently, bored concrete pile is commonly used to the every field of engineering construction, it is the pile body type being most widely used.To avoid
In concrete perfusion, the impurity precipitated in mud in the sediment and filling process at stake bottom can form certain thickness in concrete surface
Degree, guarantees the quality of pile crown, wherein taking a superfilled segment length to bored concrete pile, and becomes in the mode that the later period abolishes superfilled pile head
Guarantee one of important measures of pile driving construction quality.
It is due to concrete intensity height itself and big with bonding strength, cause pile crown and pile body to disconnect difficult.Pole in disconnection process
The problems such as easily causing pile body vertical and oblique crackle, pile crown absolute altitude error and flatness, or even cause pile crown too low, it influences to carry
Power.Also the investment for virtually increasing equipment and manpower, reduces construction and business efficiency;Pneumatic pick long working simultaneously, makes an uproar
Sound is big, and dust is more, seriously polluted to the shadow of environment.In addition, bending deformation reduces tensile strength, pile body when main reinforcement pulls out
Junction between cushion cap is weakened, and is hidden some dangers for construction quality.It carves the pile crown lifting removed and transport is also extremely difficult, due to stake
Leader is high and flatness is unable to control, and finally also needs manually to divide exactly pile crown.In order to increase Bar Anchorage, last pile crown reinforcing bar needs curved
45 degree bent, the artificial bending in scene is difficult.
Current existing construction technology not can solve pile crown in the prior art and pile body disconnection is difficult, in disconnection process easily
Cause pile body vertical and oblique crackle, pile crown absolute altitude error and flatness, the problems such as pile crown lifting is difficult, and bar bending is difficult.
Summary of the invention
In view of the above technical problems, the purpose of the present invention is to provide a kind of filling pile head construction methods, for solving
Pile crown and pile body disconnect difficult problem in the prior art.
To achieve the above object, the technical solution used in the present invention is:
A kind of filling pile head construction method, it is characterised in that the following steps are included:
S1, it after first processing, binding filling pile cage of reinforcement to designed elevation position, is welded three or more steel reinforcement cage main reinforcement upper ends
Lower part positioning bar, will division ring set in steel reinforcement cage main reinforcement, then in the steel reinforcement cage main reinforcement above splitting ring weld three with
On top positioning bar splitting ring is clamped;
S2, more than four splitting pipes are fixed on splitting ring, more than four splitting pipes are arranged along stake radial symmetric;
S3, upper disrance sleeve is covered at the top of every steel reinforcement cage main reinforcement;
S4, foamed glue is filled in splitting pipe, disrance sleeve respectively, sleeve cap is covered in disrance sleeve upper end;
Pile crown is exposed at S5, the reinforcing bar hanging ring that a pair of of ellipse is arranged on the disrance sleeve in the middle part of pile crown, hanging ring both ends, and a pair is hung
Ring is arranged symmetrically;
S6, molding steel reinforcement cage is transferred into design position, then pours cast-in-place pile concrete;
After S7, cast-in-place pile concrete reach design strength, Hydraulic splitter is inserted into splitting pipe, starts Hydraulic splitter for stake
Head is along splitting pipe in division anchor ring fracture;
S8, vertically pile crown is integrally hung out using hanging ring as suspension centre;
S9, splitting pipe, disrance sleeve and splitting ring are cleaned up;
S10, exposed steel reinforcement cage main reinforcement are bent outwardly 45 degree.
Further, the disrance sleeve uses pvc pipe.
Further, the splitting pipe is made of closed at one end, other end setting nut cap pvc pipe, every splitting pipe
Length 20cm.
Further, tongue and groove, the disrance sleeve lower end are equipped at each steel reinforcement cage main reinforcement in the splitting ring upper surface
It is inserted in tongue and groove, the tongue and groove is covered in steel reinforcement cage main reinforcement.
The invention has the benefit that
1, the present invention sets disrance sleeve in the main reinforcement of steel reinforcement cage, guarantees the separation of pile crown concrete and rebar, without repeatedly disturbance
Main reinforcement solves the multiple bending deformation of live main reinforcement, or even the phenomenon that fracture, while can be easily pile crown concrete from main reinforcement
In be stripped out, use manpower and material resources sparingly, while saving the duration.
2, the present invention injects foamed glue in splitting pipe and disrance sleeve, and concrete and main reinforcement can further be isolated, and prevents
Only since pressure flows into disrance sleeve in concreting process.
3, the present invention is equipped with the splitting ring of an annular in design stake top elevation location (position for needing to abolish fracture) in advance,
Make to be formed slight crack annular together between pile crown and pile body;The radial symmetric above splitting ring along stake sets 4 division holes simultaneously, side
Just Hydraulic splitter is to pile head breaking, in combination with splitting ring from fracture mechanics, it is ensured that pile crown from division ring position
Fracture, to effectively control stake top absolute altitude and flatness.
4, splitting ring is equipped with one of tongue and groove around main reinforcement, it can fixed disrance sleeve, while seepage flow can also be increased
Approach prevents concrete from entering disrance sleeve.
5,4 positioning bars are respectively set above and below splitting ring, can prevent in solidifying native casting process due to concrete pressure
Cause splitting ring displacement, inclination.
6, the oval reinforcing bar of setting one, both ends expose stake, a pair of of hanging ring are formd, after later period pile crown is abolished in the middle part of pile crown
It is convenient that pile crown concrete is lifted by crane.
7, disrance sleeve, division hole, splitting ring, positioning bar etc. are all made of live material and are process, and gather materials on the spot, construct
Convenient, stock utilization is high.
8, steel reinforcement cage main reinforcement 1 is isolated with concrete, and along with splitting ring is provided with, entire pile crown, which is abolished, only needs four dividing
It splits pipe and abolishes and pile crown can be separated with pile body, cut without entire pile crown in the previous construction of picture, reduce the later period and abolish workload,
Reduce noise pollution when pile crown is abolished, time saving and energy saving.
Detailed description of the invention
Fig. 1 is the schematic diagram of steel reinforcement cage main reinforcement.
Fig. 2 is that bored concrete pile pours the schematic diagram that rear pile crown is abolished.
In figure: steel reinforcement cage main reinforcement 1, lower part positioning bar 2, top positioning bar 3, splitting pipe 4, disrance sleeve 5, splitting ring 6, enterprise
Mouth 7, sleeve cap 8, foamed glue 9, hanging ring 10, Hydraulic splitter 11.
Specific embodiment
For a better understanding of the present invention, technical solution of the present invention is done further below with reference to embodiment and attached drawing
Explanation.
A kind of filling pile head construction method, it is characterised in that the following steps are included:
S1, it after first processing, binding filling pile cage of reinforcement to designed elevation position, is welded three or more 1 upper ends of steel reinforcement cage main reinforcement
Lower part positioning bar 2(preferably four are connect, four lower part positioning bars 2 are uniformly distributed), 6 sets of splitting ring (are divided in steel reinforcement cage main reinforcement 1
The template that scene can be used in driffractive ring 6 is process), three or more are then welded in the steel reinforcement cage main reinforcement 1 above splitting ring 6
Top positioning bar 3 splitting ring 6 is clamped (be clipped in lower part positioning bar 2 and top positioning bar 3, top positioning bar 3 preferably four,
Four top positioning bars 3 are uniformly distributed).
S2, more than four splitting pipes 4 are fixed on splitting ring 6, more than four splitting pipes 4 are along stake radial symmetric cloth
It sets;The splitting pipe 4 is made of closed at one end, other end setting nut cap pvc pipe, and every 4 length 20cm(of splitting pipe guarantees
Splitting pipe depth reaches 20cm).
S3, the correspondence that upper 5 bottom of disrance sleeve 5(disrance sleeve insertion splitting ring 6 is covered at the top of every steel reinforcement cage main reinforcement 1
In tongue and groove 7);The disrance sleeve 5 uses pvc pipe.Tongue and groove is equipped at each steel reinforcement cage main reinforcement 1 in 6 upper surface of splitting ring
7,5 lower end of disrance sleeve is inserted in tongue and groove 7, and 7 sets of the tongue and groove is in steel reinforcement cage main reinforcement 1.
S4, foamed glue 9 is filled in splitting pipe 4, disrance sleeve 5 respectively, sleeve cap 8 is covered in 5 upper end of disrance sleeve.
The reinforcing bar hanging ring 10 of a pair of of ellipse is set on S5, the disrance sleeve 5 in the middle part of pile crown, and stake is exposed at 10 both ends of hanging ring
Head, a pair of of hanging ring 10 are arranged symmetrically.
S6, molding steel reinforcement cage is transferred into design position, then pours cast-in-place pile concrete.
S7, cast-in-place pile concrete (when broken pile head is constructed, first excavate the earthwork around bored concrete pile, expose after reaching design strength
After pile crown), Hydraulic splitter 11 is inserted into splitting pipe 4, starting Hydraulic splitter 11 is by pile crown along splitting pipe 4 in splitting ring
The fracture of 6 faces.
S8, use tower crane that vertically pile crown is integrally hung out using hanging ring 10 as suspension centre.
S9, splitting pipe 4, disrance sleeve 5 and splitting ring 6 are cleaned up.
S10, exposed steel reinforcement cage main reinforcement 1 is quickly bent outwardly 45 degree with hydraulic steel bar bender.
Described above is only Application Example of the invention, cannot limit the right model of the present invention with this certainly
It encloses, therefore according to equivalence changes made by scope of the present invention patent, still belongs to protection scope of the present invention.
Claims (4)
1. a kind of filling pile head construction method, it is characterised in that the following steps are included:
S1, it first processes, after binding filling pile cage of reinforcement to designed elevation position, three or more steel reinforcement cage main reinforcement (1) upper end
It welds lower part positioning bar (2), splitting ring (6) is covered on steel reinforcement cage main reinforcement (1), then the steel reinforcement cage above splitting ring (6)
The top positioning bar (3) for welding three or more in main reinforcement (1) clamps splitting ring (6);
S2, more than four splitting pipes (4) are fixed on splitting ring (6), more than four splitting pipes (4) are along stake radial symmetric
Arrangement;
S3, disrance sleeve (5) are put at the top of every steel reinforcement cage main reinforcement (1);
S4, foamed glue (9) are filled in splitting pipe (4), disrance sleeve (5) respectively, in disrance sleeve (5) upper end sleeve cap
(8) it covers;
The reinforcing bar hanging ring (10) of a pair of of ellipse is set on S5, the disrance sleeve (5) in the middle part of pile crown, and hanging ring (10) both ends are exposed
Pile crown, a pair of of hanging ring (10) are arranged symmetrically;
S6, molding steel reinforcement cage is transferred into design position, then pours cast-in-place pile concrete;
After S7, cast-in-place pile concrete reach design strength, Hydraulic splitter (11) are inserted into splitting pipe (4), start hydraulic separate
It splits machine (11) and is broken pile crown in splitting ring (6) face along splitting pipe (4);
S8, vertically pile crown is integrally hung out using hanging ring (10) as suspension centre;
S9, splitting pipe (4), disrance sleeve (5) and splitting ring (6) are cleaned up;
S10, exposed steel reinforcement cage main reinforcement (1) are bent outwardly 45 degree.
2. filling pile head construction method according to claim 1, which is characterized in that the disrance sleeve (5) uses PVC
Pipe.
3. filling pile head construction method according to claim 1, which is characterized in that the splitting pipe (4) uses one end
The pvc pipe that nut cap is arranged in closing, the other end is made, every splitting pipe (4) length 20cm.
4. filling pile head construction method according to claim 1, which is characterized in that splitting ring (6) upper surface is every
It is equipped with tongue and groove (7) at a steel reinforcement cage main reinforcement (1), disrance sleeve (5) lower end is inserted in tongue and groove (7), tongue and groove (7) set
In steel reinforcement cage main reinforcement (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910664068.2A CN110306537A (en) | 2019-07-23 | 2019-07-23 | Filling pile head construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910664068.2A CN110306537A (en) | 2019-07-23 | 2019-07-23 | Filling pile head construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110306537A true CN110306537A (en) | 2019-10-08 |
Family
ID=68080364
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910664068.2A Pending CN110306537A (en) | 2019-07-23 | 2019-07-23 | Filling pile head construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110306537A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111287185A (en) * | 2020-04-03 | 2020-06-16 | 中国十七冶集团有限公司 | Cast-in-place pile head breaking method based on BIM |
CN112112593A (en) * | 2020-09-28 | 2020-12-22 | 中国十七冶集团有限公司 | Method for processing percussion drill hole-forming buried drill |
CN113089669A (en) * | 2021-03-29 | 2021-07-09 | 中国十九冶集团有限公司 | Pile head breaking device for large-diameter cast-in-place pile and using method thereof |
CN113123339A (en) * | 2021-04-30 | 2021-07-16 | 南京农业大学 | Quick breaking structure for super-grouting part of pile top of cast-in-place pile |
CN113174953A (en) * | 2021-04-30 | 2021-07-27 | 珠海君豪岩土科技有限公司 | Pretreatment structure of super-grouting part of pile top of cast-in-place pile |
CN114086555A (en) * | 2021-11-25 | 2022-02-25 | 中铁三局集团有限公司 | Combined device for breaking pile head of bored pile foundation and pile head breaking construction method |
CN114108606A (en) * | 2020-08-31 | 2022-03-01 | 兰代根 | Bored concrete pile cuts stake and reserves reinforcing bar protection device fast |
WO2022052437A1 (en) * | 2020-09-09 | 2022-03-17 | 中国五冶集团有限公司 | Informatization technology-based pile pouring structure and pile structure |
CN114808941A (en) * | 2022-06-06 | 2022-07-29 | 新疆北新路桥集团股份有限公司 | Construction method of engineering pile |
CN115059075A (en) * | 2022-06-27 | 2022-09-16 | 中国电建集团河南工程有限公司 | Pile head breaking structure of cast-in-place pile and construction method thereof |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN208251097U (en) * | 2018-05-18 | 2018-12-18 | 东宏建设股份有限公司 | Tooling is abolished in pile crown failure in a kind of filling pile construction |
-
2019
- 2019-07-23 CN CN201910664068.2A patent/CN110306537A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN208251097U (en) * | 2018-05-18 | 2018-12-18 | 东宏建设股份有限公司 | Tooling is abolished in pile crown failure in a kind of filling pile construction |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111287185A (en) * | 2020-04-03 | 2020-06-16 | 中国十七冶集团有限公司 | Cast-in-place pile head breaking method based on BIM |
CN114108606A (en) * | 2020-08-31 | 2022-03-01 | 兰代根 | Bored concrete pile cuts stake and reserves reinforcing bar protection device fast |
WO2022052437A1 (en) * | 2020-09-09 | 2022-03-17 | 中国五冶集团有限公司 | Informatization technology-based pile pouring structure and pile structure |
US12006650B2 (en) | 2020-09-09 | 2024-06-11 | China Mcc5 Group Corp. Ltd | Pile pouring structure based on informatization technology and pile structure |
CN112112593A (en) * | 2020-09-28 | 2020-12-22 | 中国十七冶集团有限公司 | Method for processing percussion drill hole-forming buried drill |
CN113089669A (en) * | 2021-03-29 | 2021-07-09 | 中国十九冶集团有限公司 | Pile head breaking device for large-diameter cast-in-place pile and using method thereof |
CN113123339A (en) * | 2021-04-30 | 2021-07-16 | 南京农业大学 | Quick breaking structure for super-grouting part of pile top of cast-in-place pile |
CN113174953A (en) * | 2021-04-30 | 2021-07-27 | 珠海君豪岩土科技有限公司 | Pretreatment structure of super-grouting part of pile top of cast-in-place pile |
CN113123339B (en) * | 2021-04-30 | 2022-05-31 | 南京农业大学 | Quick breaking structure for super-grouting part of pile top of cast-in-place pile |
CN114086555A (en) * | 2021-11-25 | 2022-02-25 | 中铁三局集团有限公司 | Combined device for breaking pile head of bored pile foundation and pile head breaking construction method |
CN114808941A (en) * | 2022-06-06 | 2022-07-29 | 新疆北新路桥集团股份有限公司 | Construction method of engineering pile |
CN115059075A (en) * | 2022-06-27 | 2022-09-16 | 中国电建集团河南工程有限公司 | Pile head breaking structure of cast-in-place pile and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110306537A (en) | Filling pile head construction method | |
CN109083167A (en) | A kind of construction method of cofferdam of base slab for high peg | |
CN206091299U (en) | A floor buried sleeve fixing device for aluminum alloy template | |
CN109371963A (en) | Back taper steel jacket box and its construction method in water in the prefabricated constructing tie beam of pier foundation | |
CN107620485A (en) | Building cylinder reparation template framework and construction method | |
CN208844565U (en) | One kind cutting pile section point structure | |
CN213204093U (en) | Structure for preventing reinforcement cage from floating upwards in concrete pouring process | |
CN202530444U (en) | Bayonet pin type pile foundation reinforcing cage positioning lock | |
CN206319319U (en) | Steel pipe Larsen steel plate combination fender post constructing structure | |
CN206385532U (en) | It is a kind of to be used for the piling template of CFG | |
CN202577599U (en) | Anchor structure of tie bar | |
CN210368947U (en) | Prefabricated reinforced concrete foundation | |
CN209099351U (en) | Back taper steel jacket box in water in the prefabricated constructing tie beam of pier foundation | |
CN215715279U (en) | Pile head breaking device for concrete cast-in-place pile | |
CN211948382U (en) | Bored concrete pile steel reinforcement cage fixing device | |
CN213709492U (en) | Novel concrete pipe pile structure | |
CN112267486B (en) | Steel pipe concrete anti-seismic bridge pile foundation and pile foundation construction method | |
CN210134420U (en) | Composite hoop for trestle steel pipe pile parallel connection | |
CN203924040U (en) | A kind of filling pile head is processed structure | |
CN204023579U (en) | Reverse construction method post dowel bar tool holder | |
CN221167761U (en) | Impervious structure of underground diaphragm wall seam of deep thick soft soil layer of rich water | |
CN217500177U (en) | Steel reinforcement cage structure convenient to cut stake | |
CN214497507U (en) | Construction node is handled to pile head | |
CN111254935B (en) | Foundation injection sleeve and construction method | |
CN212450248U (en) | Steel reinforcement cage hoisting frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191008 |
|
RJ01 | Rejection of invention patent application after publication |