CN208441502U CN201820125469.1U CN201820125469U CN208441502U CN 208441502 U CN208441502 U CN 208441502U CN 201820125469 U CN201820125469 U CN 201820125469U CN 208441502 U CN208441502 U CN 208441502U
Authority
CN
China
Prior art keywords
repairing
metope
channel
hollowing
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820125469.1U
Other languages
Chinese (zh)
Inventor
霍海龙
王文珏
刘刚
林裕
文俊杰
田泽辉
肖登全
尹超
张敏
石伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU SECOND CONSTRUCTION ENGINEERING Co.,Ltd. OF CDCEG
Original Assignee
No2 Construction Engineering Co Of Chengdu
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No2 Construction Engineering Co Of Chengdu filed Critical No2 Construction Engineering Co Of Chengdu
Priority to CN201820125469.1U priority Critical patent/CN208441502U/en
Application granted granted Critical
Publication of CN208441502U publication Critical patent/CN208441502U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model provides a kind of repairing structure at metope hollowing position.The repairing structure at the metope hollowing position includes repairing channel, filling and repairing slurry and drawknot device in the repairing channel positioned at hollowing position and at least two of metope internal stretch.The structure of the repairing structure at the metope hollowing position of the utility model is simple, infiltration and solidification by repairing slurry at hollowing position achieve the purpose that reparation, it can solve the strength reduction problem generated because increasing channel newly by the way that drawknot device is arranged, guarantee the safety of metope after repairing.Plastering and dope layer of the utility model without rejecting entire entire hollowing region can reach extraordinary repair efficiency only with the repairing structure that structure is simple and convenient to operate, more environmentally protective and significantly save human and material resources.

Description

The repairing structure at metope hollowing position
Technical field
The utility model relates to the technical fields of metope hollowing position repairing, in particular to metope hollowing position Repair structure.
Background technique
With the fast development of Building Trade in China, plastering on inner walls and coating application are largely used in all kinds of architectural engineerings, with Wall plastering and while coating large-area construction, building wall part hollowing becomes common quality defect, not only reprocess it is loaded down with trivial details, and And increase many building wastes.Also, building is in use for some time, and hollowing, to flake be common phenomenon.
Traditional metope hollowing processing reparation construction technique be first by the whole region of metope hollowing plastering and coating After layer is rejected completely, then re-start plastering and the construction of coating.The construction cost of this construction technology is high and construction efficiency is low, The construction concept of green, low-carbon and environmental protection is not met.
Utility model content
The main purpose of the utility model is to provide the repairing structures at metope hollowing position, to solve to deposit in the prior art Construction cost is high and problem that construction efficiency is low.
To achieve the goals above, one aspect according to the present utility model provides a kind of repairing for metope hollowing position Mend structure.The repairing structure at the metope hollowing position includes being located at hollowing position and at least two repairings to metope internal stretch Channel, filling and repairing slurry and drawknot device in the repairing channel.
The structure of the repairing structure at the metope hollowing position of the utility model is simple, by repairing slurry at hollowing position Infiltration and solidification can solve by the way that drawknot device is arranged because the strength reduction that newly-increased channel generates is asked to achieve the purpose that reparation Topic guarantees the safety of metope after repairing.Plastering and dope layer of the utility model without rejecting entire hollowing region, only The repairing structure being simple and convenient to operate only with structure can reach extraordinary repair efficiency, more environmentally protective and significant It saves human and material resources.
Further, the repairing channel is perpendicular to metope;The distance between two neighboring repairing channel≤300mm.By This, it is ensured that entire hollowing position, which is all permeated, the repairing slurry, and the effect for making repairing more fully, reduces repair rate.
Further, the diameter in the repairing channel is 0.5-1.5cm;If the diameter in the repairing channel is too small, can Cause grouting pressure big, time of penetration is long;If the diameter in the repairing channel is excessive, the condensation time of repairing slurry will lead to It is long;Therefore, when the diameter in the repairing channel is 0.5-1.5cm, it can be ensured that higher repairing efficiency and repair efficiency.Institute State the length >=18mm in repairing channel.So that the repairing channel is passed through coat of plaster as a result, and go deep into coat of plaster rear 5mm or more, Further ensure that repair efficiency.
Further, the cement mortar that the repairing slurry contains building glue and viscosity is 90-130mm.If described The viscosity of cement mortar is higher than above-mentioned numberical range, then the osmotic pressure that will lead to repairing slurry is high, it is difficult to make entire hollowing Repaired or obtained Rapid-Repair in position;It, can be because of repairing if the viscosity of the cement mortar is less than above-mentioned numberical range The mobility of slurry is very good and leads to repair that slurry filling is uneven and setting rate is slow in hollowing position.The effect of building glue It is the binding force promoted between cement mortar and the internal structure at hollowing position, promotes repair efficiency.The viscosity refers to water Cement mortar under gravity or external force whether readily flowed performance.
Further, the usage amount of the building glue is the 5-10% of the repairing slurry quality.If the building adhesive The usage amount of water is higher than above-mentioned numberical range, then will lead to cement mortar and quickly combined with the internal structure at hollowing position, so that Cement mortar has little time overall permeation or blocking infiltration pore;If the usage amount of the building glue is less than above-mentioned numberical range, Ideal effect is not achieved in the binding force that then will lead between cement mortar and the internal structure at hollowing position.
Further, the drawknot device is the matched tied silk of length with the repairing channel;The diameter of the tied silk is 0.7-0.9mm.If the diameter of the tied silk is higher than above-mentioned numberical range, waste of material will lead to, if the diameter of the tied silk Less than above-mentioned numberical range, then it is ineffective to will lead to drawknot.
Further, the tied silk is the tied silk that tail portion carries out bending process.Drawknot effect is promoted as a result,.
To achieve the goals above, other side according to the present utility model additionally provides a kind of metope hollowing position Method for repairing and mending.The method for repairing and mending at the metope hollowing position the following steps are included:
1) it is hammered into shape using detection and determines hollowing position;
2) at least two repairing channels are drilled out in hollowing position using electric drill;
3) the repairing channel is soaked;
4) the injection repairing slurry into the repairing channel;
5) drawknot device is inserted into the repairing slurry having been injected into.
The method for repairing and mending at the metope hollowing position of the utility model avoids plastering and painting in the whole region by hollowing The bed of material re-starts the construction technology of plastering and coating again after rejecting completely, by being drilled at metope hollowing position, slip casting It is repaired, it is convenient not only to construct, and it is significant to save duration and manpower and material resources, and also repair efficiency is good, and construction efficiency is high, is constructing In accomplished green, low-carbon, environmental protection, create good social and economic benefit.
Further, the repairing channel is perpendicular to metope;The distance between two neighboring repairing channel≤300mm;Institute The diameter for stating repairing channel is 0.5-1.5cm;Length >=the 18mm in the repairing channel.
Further, the number of the wetting is at least 2 times, and the adjacent time interval soaked twice is 4-10min.By This may cause injected repairing slurry and be unable to fully and structure within the walls if wetting number is very few to be caused to soak insufficient In conjunction with;If it is excessive to soak number, it may cause in repairing channel and generate ponding, influence the viscosity of the repairing slurry of injection, And then reduce filling and adhesive effect.
As it can be seen that the structure of the repairing structure at the metope hollowing position of the utility model is simple, by repairing slurry in hollowing The infiltration and solidification at position achievees the purpose that reparation, can solve the intensity generated because increasing channel newly by the way that drawknot device is arranged Reduction problem guarantees the safety of metope after repairing.The method for repairing and mending at the metope hollowing position of the utility model avoids will be empty Plastering and dope layer in bulging whole region re-start the construction technology of plastering and coating again after rejecting completely, by wall Face hollowing position is drilled, slip casting is repaired, and it is convenient not only to construct, significant to save duration and manpower and material resources, and is repaired Effect is good, and construction efficiency is high, has accomplished green, low-carbon, environmental protection in construction, has created good social and economic benefit.
The utility model is described further with reference to the accompanying drawings and detailed description.The utility model is additional Aspect and advantage will be set forth in part in the description, and partially will become apparent from the description below, or practical by this Novel practice is recognized.
Detailed description of the invention
The attached drawing for constituting a part of the utility model is used to assist understanding to the utility model, provided in attached drawing Content and its related explanation can be used for explaining the utility model in the present invention, but is not constituted to the utility model not Work as restriction.In the accompanying drawings:
Fig. 1 is the front view of the repairing structure at the metope hollowing position of the utility model embodiment 1.
Fig. 2 is the sectional view along A-A of Fig. 1.
Fig. 3 is the front view of the repairing structure at the metope hollowing position of the utility model embodiment 2.
Fig. 4 is the B-B direction cross-sectional view of Fig. 3.
Fig. 5 is the front view of the repairing structure at the metope hollowing position of the utility model embodiment 3.
Fig. 6 is the C-C of Fig. 5 to cross-sectional view.
Related label in above-mentioned attached drawing are as follows:
1: repairing channel;
2: repairing slurry;
3: drawknot device;
4: coat of plaster.
Specific embodiment
Clear, complete explanation is carried out to the utility model with reference to the accompanying drawing.Those of ordinary skill in the art are being based on The utility model will be realized in the case where these explanations.Before being illustrated in conjunction with attached drawing to the utility model, spy is needed It is not pointed out that:
The technical solution provided in each section including following the description and technical characteristic in the utility model, In the case where not conflicting, these technical solutions and technical characteristic be can be combined with each other.
In addition, the embodiments of the present invention being related in following the description are generally only the reality of the utility model a part Example is applied, instead of all the embodiments.Therefore, based on the embodiments of the present invention, those of ordinary skill in the art are not having Every other embodiment obtained under the premise of creative work is made, the model of the utility model protection all should belong to It encloses.
About term in the utility model and unit.The specification and claims of the utility model and related part In term " includes ", " having " and their any deformation, it is intended that cover and non-exclusive include.
Embodiment 1
The repairing structure at metope hollowing position as shown in Figs. 1-2, including it is located at hollowing position and to metope internal stretch Two repairing channels 1, the repairing channel 1 is perpendicular to metope, filling and repairing slurry 2 in the repairing channel 1.
The distance between described two repairing channels 1 are 100mm.
The diameter in the repairing channel 1 is 0.5cm;The length in the repairing channel 1 is 18mm.
The repairing slurry 2 is the cement mortar for being 90mm containing building glue and viscosity.
The usage amount of the building glue is the 5% of repairing 2 mass of slurry.
Using the method for repairing and mending at the metope hollowing position of above-mentioned repairing structure, comprising the following steps:
1) the hollowing position is determined using detection hammer;
2) described two repairings for being uniformly distributed in the hollowing position are drilled out in the hollowing position using electric drill to lead to Road 1;The power of electric drill is 500W;
3) the repairing channel 1 is soaked using pressure water flooding, wetting number is 2 times, it is adjacent soak twice when Between between be divided into 5min;
4) the repairing slurry 2 is injected into the repairing channel 1 using slip casing by pressure;
5) after to the repairing slurry 2 solidification, putty is brushed outside the repairing slurry 2 of solidification and is brushed with a thickness of 13mm Coat of plaster 4, that is, complete repairing.
Embodiment 2
The repairing structure at metope hollowing position as shown in Figure 3-4, including it is located at hollowing position and to metope internal stretch Three repairing channels 1, the repairing channel 1 is perpendicular to metope, filling and repairing slurry 2 and drawknot device in the repairing channel 1 3。
The distance between two neighboring repairing channel 1 is 300mm.
The diameter in the repairing channel 1 is 1.5cm;The length in the repairing channel 1 is 25mm.
The repairing slurry 2 is the cement mortar for being 130mm containing building glue and viscosity.
The usage amount of the building glue is the 10% of repairing 2 mass of slurry.
The drawknot device 3 is the matched tied silk of length with the repairing channel 1;The diameter of the tied silk is 0.7mm.
Using the method for repairing and mending at the metope hollowing position of above-mentioned repairing structure, comprising the following steps:
1) the hollowing position is determined using detection hammer;
2) repairing that described three are uniformly distributed in the hollowing position is drilled out in the hollowing position using electric drill to lead to Road 1;The power of electric drill is 800W;
3) the repairing channel 1 is soaked using pressure water flooding, wetting number is 5 times, it is adjacent soak twice when Between between be divided into 8min;
4) repairing slurry 2 is injected into the repairing channel 1 using slip casing by pressure;
5) the drawknot device 3 is inserted into the repairing slurry 2 having been injected into;
6) after to the repairing slurry 2 solidification, putty is brushed outside the repairing slurry 2 of solidification and is brushed with a thickness of 20mm Coat of plaster 4, that is, complete repairing.
Compared with Example 1, drawknot device 3 is also contained in the repairing structure of the present embodiment, drawing can be generated to repairing slurry 2 Knot effect, therefore, the repair efficiency of the repairing structure of the present embodiment is more preferable.
Embodiment 3
The repairing structure at metope hollowing position as seen in figs. 5-6, including it is located at hollowing position and to metope internal stretch Four repairing channels 1, the repairing channel 1 is perpendicular to metope, filling and repairing slurry 2 and drawknot device in the repairing channel 1 3。
The distance between two neighboring repairing channel 1 is 200mm.
The diameter in the repairing channel 1 is 1cm;The length in the repairing channel 1 is 21mm.
The repairing slurry 2 is the cement mortar for being 110mm containing building glue and viscosity.
The usage amount of the building glue is the 7% of repairing 2 mass of slurry.
The drawknot device 3 is the matched tied silk of length with the repairing channel 1;The diameter of the tied silk is 0.9mm.
The tied silk is the tied silk that tail portion carries out bending process.
Using the method for repairing and mending at the metope hollowing position of above-mentioned repairing structure, comprising the following steps:
1) the hollowing position is determined using detection hammer;
2) repairing that described four are uniformly distributed in the hollowing position is drilled out in the hollowing position using electric drill to lead to Road 1;The power of electric drill is 600W;
3) the repairing channel 1 is soaked using pressure water flooding, wetting number is 4 times, it is adjacent soak twice when Between between be divided into 6min;
4) repairing slurry 2 is injected into the repairing channel 1 using slip casing by pressure;
5) drawknot device 3 is inserted into the repairing slurry 2 having been injected into;
6) after to the repairing slurry 2 solidification, putty is brushed outside the repairing slurry 2 of solidification and is brushed with a thickness of 16mm Coat of plaster 4, that is, complete repairing.
Compared with Example 2, the drawknot device 3 of the repairing structure of the present embodiment is the tied silk that tail portion carries out bending process, can It is acted on generating better drawknot to repairing slurry 2, therefore, the repair efficiency of the repairing structure of the present embodiment is more preferable.
The related content of the utility model is illustrated above.Those of ordinary skill in the art are being based on these explanations In the case where will realize the utility model.Above content based on the utility model, those of ordinary skill in the art are not having Every other embodiment obtained under the premise of creative work is made, the model of the utility model protection all should belong to It encloses.

Claims (7)

1. the repairing structure at metope hollowing position, it is characterised in that: including be located at hollowing position and to metope internal stretch extremely Few two repairing channels (1), the interior filling and repairing slurry (2) of the repairing channel (1) and drawknot device (3).
2. the repairing structure at metope hollowing as described in claim 1 position, it is characterised in that: the repairing channel (1) is vertical In metope;The distance between two neighboring repairing channel (1)≤300mm.
3. the repairing structure at metope hollowing as described in claim 1 position, it is characterised in that: described to repair the straight of channel (1) Diameter is 0.5-1.5cm;Length >=18mm of repairing channel (1).
4. the repairing structure at metope hollowing as described in claim 1 position, it is characterised in that: the repairing slurry (2) is contained The cement mortar that building glue and viscosity are 90-130mm.
5. the repairing structure at metope hollowing as claimed in claim 4 position, it is characterised in that: the usage amount of the building glue For the 5-10% of described repairing slurry (2) quality.
6. the repairing structure at metope hollowing as described in claim 1 position, it is characterised in that: the drawknot device (3) for institute State the matched tied silk of length of repairing channel (1);The diameter of the tied silk is 0.7-0.9mm.
7. the repairing structure at metope hollowing as claimed in claim 6 position, it is characterised in that: the tied silk is that tail portion progress is curved Roll over the tied silk of processing.
CN201820125469.1U 2018-01-25 2018-01-25 The repairing structure at metope hollowing position Active CN208441502U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820125469.1U CN208441502U (en) 2018-01-25 2018-01-25 The repairing structure at metope hollowing position

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820125469.1U CN208441502U (en) 2018-01-25 2018-01-25 The repairing structure at metope hollowing position

Publications (1)

Publication Number Publication Date
CN208441502U true CN208441502U (en) 2019-01-29

Family

ID=65094956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820125469.1U Active CN208441502U (en) 2018-01-25 2018-01-25 The repairing structure at metope hollowing position

Country Status (1)

Country Link
CN (1) CN208441502U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108166776A (en) * 2018-01-25 2018-06-15 成都市第二建筑工程公司 The repairing structure and method for repairing and mending at metope hollowing position
CN110821198A (en) * 2019-10-23 2020-02-21 浙江勤业建工集团有限公司 High-rise building external wall thermal insulation mortar falling prevention method
CN112177262A (en) * 2020-09-30 2021-01-05 西北永新涂料有限公司 Method for repairing cracking of latex paint

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108166776A (en) * 2018-01-25 2018-06-15 成都市第二建筑工程公司 The repairing structure and method for repairing and mending at metope hollowing position
CN110821198A (en) * 2019-10-23 2020-02-21 浙江勤业建工集团有限公司 High-rise building external wall thermal insulation mortar falling prevention method
CN112177262A (en) * 2020-09-30 2021-01-05 西北永新涂料有限公司 Method for repairing cracking of latex paint
CN112177262B (en) * 2020-09-30 2022-05-17 西北永新涂料有限公司 Method for repairing cracking of latex paint

Similar Documents

Publication Publication Date Title
CN108166776A (en) The repairing structure and method for repairing and mending at metope hollowing position
CN208441502U (en) The repairing structure at metope hollowing position
CN204983391U (en) Exempt from to tear open precast concrete beam mold board
CN106480993B (en) Administration structure and construction method in a kind of construction exterior wall leak repairing reinforcement
CN204826614U (en) Exempt from to tear open precast concrete wall form
KR101577558B1 (en) Reparing and Water Proofing Method for Concrete Structure
CN104975617A (en) Waterproof construction method of basement foundation cast-in-place pile head
CN109610700A (en) The reinforced composite shuttering of cast-in-place concrete exterior wall heat-preserving and its application method
CN110778331B (en) Pipe for grouting and grouting construction method thereof
CN207513190U (en) A kind of wall pouring can
CN207686338U (en) A kind of simple injecting glue tool of building structure bar planting
CN105019599A (en) Disassembly-free precast concrete beam insulation template
CN110607881A (en) Whitewash mortar hollowing bonding regeneration technology
CN210508459U (en) Anti-pollution protection device for reinforcing steel bar
CN204826403U (en) Exempt from to tear open precast concrete roof beam heat preservation template
CN103556822A (en) Construction method of large hollowed-out characters of cast-in-place concrete wall
CN204804372U (en) Fibre cloth is consolidated to evaporate and is pressed aerated concrete wall body door and window entrance to a cave
CN106337449A (en) Crack repairing structure for underground engineering and construction method of crack repairing structure
CN217204695U (en) Outer wall bolt hole plugging structure
CN111254830A (en) Rapid treatment method for bridge pier pull rod hole
CN215368888U (en) Structure is restoreed to wall hollowing
CN208396102U (en) A kind of prefabricated assembled superimposed sheet node processing construction
CN204282822U (en) A kind of pre-buried extra high building combined floors plate muscle fastening devices
CN207228477U (en) Anti-buckling thin-wall steel tube steel fiber reinforced concrete coupled column
CN109488338B (en) Seepage-proofing method for rock gap

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No.30, Section 1, Fuqing Road, Jinniu District, Chengdu, Sichuan 610081

Patentee after: CHENGDU SECOND CONSTRUCTION ENGINEERING Co.,Ltd. OF CDCEG

Address before: No.30, Section 1, Fuqing Road, Jinniu District, Chengdu, Sichuan 610081

Patentee before: CHENGDU NO.2 CONSTRUCTION ENGINEERING Co.