Prior art keywords
pile
fashioned iron
cement mixing
mixing method
prestressed pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820602003.6U
Other languages
Chinese (zh)
Inventor
黄振波
王超峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Changkai Geotechnical Engineering Co Ltd
Original Assignee
Shanghai Changkai Geotechnical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Changkai Geotechnical Engineering Co Ltd filed Critical Shanghai Changkai Geotechnical Engineering Co Ltd
Priority to CN201820602003.6U priority Critical patent/CN208441117U/en
Application granted granted Critical
Publication of CN208441117U publication Critical patent/CN208441117U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to the built pile supporting construction of a kind of cement mixing method interplantation tubular pole and fashioned iron, including cement mixing method, pile for prestressed pipe, fashioned iron and armored concrete crown beam, the cement mixing method continuous arrangement forms water-stop curtain, the interval implantation pile for prestressed pipe in the cement mixing method, fashioned iron is inserted perpendicularly at pile for prestressed pipe pile body center, the structure of cement mixing method, pile for prestressed pipe and the compound arrangement of fashioned iron is formed, armored concrete crown beam is arranged in the top of the cement mixing method, pile for prestressed pipe and fashioned iron.The utility model construction efficiency is high, reliable in quality, the advantages of combining SMW, PCMW engineering method stake, Deformation control is more preferably, increase bending resistance, the shear behavior of pile body structure, in the case where the moment of flexure and shearing for meeting tubular pole receiving are no more than its design value, fashioned iron can pull out recycling and reusing, thus more economy.

Description

A kind of built pile supporting construction of cement mixing method interplantation tubular pole and fashioned iron
Technical field
The utility model relates to civil construction technical fields, and in particular to a kind of cement mixing method interplantation tubular pole and fashioned iron Built pile supporting construction.
Background technique
For the safety of main structure construction under protecting field and foundation pit surrounding environment, generally require temporarily to prop up foundation pit Shield, according to the cutting depth of foundation pit, geological conditions and local environmental conditions, the form of pattern foundation pit supporting structure has slope excavation, composite earth Wall, cement-soil mixing wall and campshed formula supporting are followed closely, for campshed formula supporting, what is be most widely used is cast-in-situ bored pile, But cast-in-situ bored pile supporting cost is higher, the construction period is longer, and mud off easily causes the pollution to environment.
SMW and PCMW engineering method stake is newly introduced and develops currently on the market, SMW engineering method stake is in cement mixing method interpolation Enter fashioned iron, PCMW engineering method stake is that pile for prestressed pipe is inserted into cement mixing method, and compared with traditional bored concrete pile supporting, this two Planting support form has many advantages, such as that stress and sealing are integrated, speed of application is fast, good economy performance, but there are also problems, SMW work The cross sectional moment of inertia of method Shaped Steel is smaller, so that the rigidity of entire supporting construction is limited, it is poor to the Deformation control of foundation pit; Tubular pile body bending resistance and shear resistance are weaker in PCMW engineering method, and tubular pole easily destroys in Excavation Process, to limit Use of the tubular pole in foundation pit supporting project.
In view of the problem present on, it is badly in need of developing a kind of new construction method, can effectively integrates SMW, PCMW engineering method The advantages of construction, reduces the cost of foundation pit supporting project, accelerates foundation pit support under the premise of meeting quality and safety requirements The construction speed of journey.
Utility model content
The purpose of this utility model is to provide the built pile supporting knots of a kind of cement mixing method interplantation tubular pole and fashioned iron Structure, it is weaker to solve poor existing SMW engineering method stake rigidity, PCMW engineering method stake bending resistance and shear resistance, so that SMW engineering method The problems such as application of stake and the stake of PCMW engineering method is limited.
To achieve the above object, the technical solution of the utility model are as follows:
A kind of built pile supporting construction of cement mixing method interplantation tubular pole and fashioned iron, including cement mixing method, answer in advance Solenoid stake, fashioned iron and armored concrete crown beam, the pile for prestressed pipe are prestressed concrete pipe pile (PC) or prestressed high-strength Concrete tubular pile (PHC), the cement mixing method continuous arrangement form water-stop curtain, are spaced in the cement mixing method It is implanted into pile for prestressed pipe, fashioned iron is inserted perpendicularly at pile for prestressed pipe pile body center, forms cement mixing method, prestressing force Reinforced concrete is arranged in the top of the structure of tubular pole and the compound arrangement of fashioned iron, the cement mixing method, pile for prestressed pipe and fashioned iron Native crown beam, the fashioned iron, can be in sole plates in the case where the moment of flexure and shearing for meeting tubular pole receiving are no more than its design value And its concrete load transfering strip between support pile reach design strength after can pull out recycling and reusing in advance, without equal bases It is pulled out again after the backfill of hole;
Further, the cement mixing method is triaxial cement mixing pile or the dual spindle soil-cement stirring of an at least row Stake;
Further, the fashioned iron is one of I-steel, H profile steel, channel steel, angle steel, steel pipe, square steel;
Further, it is evenly coated with release agent coating on the inside and outside wall of the fashioned iron or is isolated using malthoid;
Further, the positional relationship of the bottom end of the bottom end and pile for prestressed pipe of the fashioned iron are as follows: the bottom end of the fashioned iron The bottom end of the bottom end, the fashioned iron that are shallower than the pile for prestressed pipe is deeper than the bottom end of the pile for prestressed pipe or the bottom of the fashioned iron It holds concordant with the bottom end of the pile for prestressed pipe;
Further, when the fashioned iron bottom end is deeper than the bottom end of the pile for prestressed pipe, the pile for prestressed pipe is single Save tubular pole, non junction;
Further, the fashioned iron top is higher than the top surface of the pile for prestressed pipe;
Further, the fashioned iron top is higher than at least 0.6 meter of the top surface of the pile for prestressed pipe;
Further, the fashioned iron is at least 1, symmetrically arranges using the center of the pile for prestressed pipe as basic point, The selection (shape, quantity, size) of the fashioned iron is determined according to the internal diameter of the pile for prestressed pipe, it is ensured that the smooth insertion of fashioned iron And extraction;
Further, the top of the pile for prestressed pipe is protruded into not less than 0.5 meter in the armored concrete crown beam, described Fashioned iron top is higher by 0.5 meter of armored concrete crown beam top surface.
The utility model has the advantages that
The built pile supporting construction of a kind of cement mixing method interplantation tubular pole of the utility model and fashioned iron combine SMW, The advantages of PCMW engineering method stake, construction efficiency is high, and reliable in quality, Deformation control more preferably, increases bending resistance, the shear resistance of pile body structure Can, meet tubular pole receiving moment of flexure and shearing be no more than its design value in the case where, fashioned iron can sole plate and its with branch Concrete load transfering strip between fender pile can pull out recycling and reusing after reaching design strength in advance, thus more economy.
Detailed description of the invention
The built pile supporting construction cross-sectional structure schematic diagram of a kind of cement mixing method interplantation tubular pole of Fig. 1 and fashioned iron.
The built pile supporting construction vertical section structure schematic diagram of a kind of cement mixing method interplantation tubular pole of Fig. 2 and fashioned iron.
Wherein, 1. cement mixing methods, 2. pile for prestressed pipe, 3. fashioned iron, 4. armored concrete crown beams.
Specific embodiment
The following examples illustrate the utility model, but is not intended to limit the scope of the present invention.
Embodiment 1
As shown in Fig. 1~2, a kind of built pile supporting construction of cement mixing method interplantation tubular pole and fashioned iron, including cement Native mixing pile 1, pile for prestressed pipe 2, fashioned iron 3 and armored concrete crown beam 4, the cement mixing method 1 are three axis cement of a row Native mixing pile, the fashioned iron 3 are the H profile steel that inside and outside wall is coated with release agent coating, and the pile for prestressed pipe 2 is single-unit, non junction Prestressed concrete pipe pile (PC), 1 continuous arrangement of triaxial cement mixing pile forms water-stop curtain, in the three axis water Interval implantation pile for prestressed pipe 2, is inserted perpendicularly into H profile steel 3, shape at the 2 pile body center of pile for prestressed pipe in soil mixing pile 1 At the structure of triaxial cement mixing pile 1 and pile for prestressed pipe 2 and the compound arrangement of fashioned iron 3, the H profile steel 3 is 1, the H 3 bottom end of fashioned iron is deeper than the bottom end of the pile for prestressed pipe 2, and 3 top of H profile steel is higher than the top surface of the pile for prestressed pipe 2 0.6 meter, armored concrete crown beam 4 is arranged in the top of the triaxial cement mixing pile 1, pile for prestressed pipe 2 and H profile steel 3, described The top of pile for prestressed pipe 2 protrudes into the armored concrete crown beam 4 0.5 meter, and it is mixed that 3 top of H profile steel is higher by the reinforcing bar 0.5 meter of 4 top surface of solidifying soil crown beam.
Embodiment 2
As shown in Fig. 1~2, a kind of built pile supporting construction of cement mixing method interplantation tubular pole and fashioned iron, including cement Native mixing pile 1, pile for prestressed pipe 2, fashioned iron 3 and armored concrete crown beam 4, the cement mixing method 1 are two rows of twin shaft cement Native mixing pile, the fashioned iron 3 are channel steel, and inside and outside wall is isolated using malthoid, and the pile for prestressed pipe is prestress high intensity concrete Tubular pole (PHC), 1 continuous arrangement of dual spindle soil-cement mixing pile forms water-stop curtain, in the dual spindle soil-cement mixing pile 1 Interval implantation pile for prestressed pipe 2, channel steel 3 is inserted perpendicularly at the 2 pile body center of pile for prestressed pipe, forms dual spindle soil-cement The structure of mixing pile 1, pile for prestressed pipe 2 and the compound arrangement of channel steel 3, the channel steel 3 are 2, in the pile for prestressed pipe 2 The heart is that basic point or so symmetrically arranges that 3 bottom end of channel steel is concordant with the bottom end of the pile for prestressed pipe 2, and the channel steel 3 pushes up End is higher than 0.8 meter of the top surface of the pile for prestressed pipe 2, the dual spindle soil-cement mixing pile 1, pile for prestressed pipe 2 and channel steel 3 Armored concrete crown beam 4 is arranged in top, and the top of the pile for prestressed pipe 2 protrudes into the armored concrete crown beam 4 0.6 meter, 3 top of channel steel is higher by 0.5 meter of 4 top surface of armored concrete crown beam.
Embodiment 3
As shown in Fig. 1~2, a kind of built pile supporting construction of cement mixing method interplantation tubular pole and fashioned iron, including cement Native mixing pile 1, pile for prestressed pipe 2, fashioned iron 3 and armored concrete crown beam 4, the cement mixing method 1 are two rows of three axis cement Native mixing pile, the fashioned iron 3 are the angle steel for being coated with release agent coating, and the pile for prestressed pipe is prestressed concrete pipe pile (PC), 1 continuous arrangement of triaxial cement mixing pile forms water-stop curtain, is spaced in the triaxial cement mixing pile 1 It is implanted into pile for prestressed pipe 2, angle steel 3 is inserted perpendicularly at the 2 pile body center of pile for prestressed pipe, forms triaxial cement mixing pile 1, the structure of pile for prestressed pipe 2 and the compound arrangement of angle steel 3, the angle steel 3 are 3, and the center with the pile for prestressed pipe 2 is Basic point is mutually in 120 ° of arrangements, and 3 bottom end of angle steel is shallower than the bottom end of the pile for prestressed pipe 2, and 3 top of angle steel is higher than institute 0.6 meter of the top surface of pile for prestressed pipe 2 is stated, steel is arranged in the top of the triaxial cement mixing pile 1, pile for prestressed pipe 2 and angle steel 3 Reinforced concrete crown beam 4, the top of the pile for prestressed pipe 2 protrude into the armored concrete crown beam 4 0.6 meter, the angle steel 3 Top is higher by 0.5 meter of 4 top surface of armored concrete crown beam.
Although above having made detailed description to the utility model with generality explanation and specific embodiment, On the basis of the utility model, it can be made some modifications or improvements, this is apparent to those skilled in the art 's.Therefore, these modifications or improvements on the basis of without departing from the spirit of the present invention, belong to the utility model and want Seek the range of protection.

Claims (10)

1. the built pile supporting construction of a kind of cement mixing method interplantation tubular pole and fashioned iron, it is characterised in that: the soil cement stirs Mix an interplantation tubular pole and fashioned iron built pile supporting construction include cement mixing method (1), pile for prestressed pipe (2), fashioned iron (3) and Armored concrete crown beam (4), cement mixing method (1) continuous arrangement forms water-stop curtain, in the cement mixing method (1) interval implantation pile for prestressed pipe (2), is inserted perpendicularly into fashioned iron (3) at the pile for prestressed pipe (2) pile body center in, is formed The structure of cement mixing method (1), pile for prestressed pipe (2) and fashioned iron (3) compound arrangement, the cement mixing method (1) are answered in advance Armored concrete crown beam (4) are arranged in the top of solenoid stake (2) and fashioned iron (3).
2. the built pile supporting construction of cement mixing method interplantation tubular pole according to claim 1 and fashioned iron, feature exist In: the cement mixing method (1) be at least triaxial cement mixing pile of a row or dual spindle soil-cement mixing pile.
3. the built pile supporting construction of cement mixing method interplantation tubular pole according to claim 1 and fashioned iron, feature exist In: the fashioned iron (3) is one of I-steel, H profile steel, channel steel, angle steel, steel pipe, square steel.
4. the built pile supporting construction of cement mixing method interplantation tubular pole according to claim 1 and fashioned iron, feature exist In: it is evenly coated with release agent coating on the inside and outside wall of the fashioned iron (3) or is isolated using malthoid.
5. the built pile supporting construction of cement mixing method interplantation tubular pole according to claim 1 and fashioned iron, feature exist In: the positional relationship of the bottom end of the bottom end and pile for prestressed pipe (2) of the fashioned iron (3) are as follows: the bottom end of the fashioned iron (3) is shallower than institute The bottom end of the bottom end, the fashioned iron (3) of stating pile for prestressed pipe (2) be deeper than the pile for prestressed pipe (2) bottom end or the fashioned iron (3) bottom end is concordant with the bottom end of the pile for prestressed pipe (2).
6. the built pile supporting construction of cement mixing method interplantation tubular pole according to claim 5 and fashioned iron, feature exist In: when the fashioned iron (3) bottom end is deeper than the bottom end of the pile for prestressed pipe (2), the pile for prestressed pipe (2) is single-unit pipe Stake, non junction.
7. the built pile supporting construction of cement mixing method interplantation tubular pole according to claim 1 and fashioned iron, feature exist In: fashioned iron (3) top is higher than the top surface of the pile for prestressed pipe (2).
8. the built pile supporting construction of cement mixing method interplantation tubular pole according to claim 7 and fashioned iron, feature exist In: fashioned iron (3) top is higher than at least 0.6 meter of the top surface of the pile for prestressed pipe (2).
9. the built pile supporting construction of cement mixing method interplantation tubular pole according to claim 3 and fashioned iron, feature exist In: the fashioned iron (3) is at least 1, is symmetrically arranged using the center of the pile for prestressed pipe (2) as basic point.
10. the built pile supporting construction of cement mixing method interplantation tubular pole according to claim 1 and fashioned iron, feature exist In: the top of the pile for prestressed pipe (2) is protruded into not less than 0.5 meter in the armored concrete crown beam (4), the fashioned iron (3) Top is higher by 0.5 meter of armored concrete crown beam (4) top surface.
CN201820602003.6U 2018-04-25 2018-04-25 A kind of built pile supporting construction of cement mixing method interplantation tubular pole and fashioned iron Active CN208441117U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820602003.6U CN208441117U (en) 2018-04-25 2018-04-25 A kind of built pile supporting construction of cement mixing method interplantation tubular pole and fashioned iron

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820602003.6U CN208441117U (en) 2018-04-25 2018-04-25 A kind of built pile supporting construction of cement mixing method interplantation tubular pole and fashioned iron

Publications (1)

Publication Number Publication Date
CN208441117U true CN208441117U (en) 2019-01-29

Family

ID=65093025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820602003.6U Active CN208441117U (en) 2018-04-25 2018-04-25 A kind of built pile supporting construction of cement mixing method interplantation tubular pole and fashioned iron

Country Status (1)

Country Link
CN (1) CN208441117U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111172972A (en) * 2019-12-13 2020-05-19 中铁二院工程集团有限责任公司 Steel-concrete combined shear pile of long-span arch bridge
CN112227346A (en) * 2020-09-24 2021-01-15 上海市浦东新区建设(集团)有限公司 SMW worker method stake shaped steel construction equipment
CN115478808A (en) * 2022-10-28 2022-12-16 中国二十二冶集团有限公司 Construction method for isolating H-shaped steel and concrete crown beam of SMW (soil mixing wall) construction method pile

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111172972A (en) * 2019-12-13 2020-05-19 中铁二院工程集团有限责任公司 Steel-concrete combined shear pile of long-span arch bridge
CN112227346A (en) * 2020-09-24 2021-01-15 上海市浦东新区建设(集团)有限公司 SMW worker method stake shaped steel construction equipment
CN115478808A (en) * 2022-10-28 2022-12-16 中国二十二冶集团有限公司 Construction method for isolating H-shaped steel and concrete crown beam of SMW (soil mixing wall) construction method pile
CN115478808B (en) * 2022-10-28 2024-03-15 中国二十二冶集团有限公司 Construction method for H-shaped steel and concrete crown beam isolation of SMW construction method pile

Similar Documents

Publication Publication Date Title
CN101122131B (en) Foundation pit supporting pile using pipe casting pile embedding in rock
CN208441117U (en) A kind of built pile supporting construction of cement mixing method interplantation tubular pole and fashioned iron
CN103306289B (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN207597395U (en) The foundation pit enclosure structure system of steel pipe and the compound diagonal brace combination campshed of PHC pile piles
CN108532586A (en) A kind of construction method of garage parking diaphram wall
CN108035362A (en) Mixing pile inner sleeve beats the foundation pit enclosure structure and construction method of quincunx bored concrete pile
CN109680682B (en) Construction method of manual hole digging pile structure of soft soil foundation
CN104074197A (en) Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof
CN112609705A (en) Steel sheet pile supporting system and method suitable for shallow soft soil foundation pit
CN207862945U (en) Mixing pile inner sleeve beats the foundation pit enclosure structure of quincunx bored concrete pile
CN109681212B (en) Excavation construction method of small-section loess tunnel
CN207959202U (en) A kind of CFG bracing means
CN202194127U (en) Reducing high-pressure jet-grouting rigid pile
CN202139604U (en) Cast-in-situ abnormal reinforced concrete pile core cement soil underground continuous wall for retaining and protection for foundation excavation
CN109736295A (en) A kind of building structure vertical supporting system and its construction method
CN210288408U (en) Foundation pit supporting structure
CN204401602U (en) A kind of rigid-flexible composite support water stop RCP stake
CN209989803U (en) Mixing pile supporting construction
CN208201886U (en) A kind of supporting construction of foundation pit composite pile wall
CN103603356A (en) Annular post-grouting device for lower pile tips under sandstone geological conditions
CN209162840U (en) A kind of more anchor disk jet mixing stiffening piles
CN112942377A (en) Novel support shear-resistant structure and construction method thereof
CN102677679A (en) Cement-soil diaphragm wall with cast-in-situ special-shaped reinforced concrete pile cores for construction of foundation pits
CN108442385A (en) A kind of supporting construction of foundation pit composite pile wall
CN210031840U (en) Foundation pit support structure