CN208432669U - A kind of test macro - Google Patents

A kind of test macro Download PDF

Info

Publication number
CN208432669U
CN208432669U CN201820987629.3U CN201820987629U CN208432669U CN 208432669 U CN208432669 U CN 208432669U CN 201820987629 U CN201820987629 U CN 201820987629U CN 208432669 U CN208432669 U CN 208432669U
Authority
CN
China
Prior art keywords
test
master control
control borad
measured
connect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820987629.3U
Other languages
Chinese (zh)
Inventor
毛德世
陈飞
李永坤
唐本新
李红玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO SKYWISE TECHNOLOGY Co Ltd
Original Assignee
QINGDAO SKYWISE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO SKYWISE TECHNOLOGY Co Ltd filed Critical QINGDAO SKYWISE TECHNOLOGY Co Ltd
Priority to CN201820987629.3U priority Critical patent/CN208432669U/en
Application granted granted Critical
Publication of CN208432669U publication Critical patent/CN208432669U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of test macros, including master control borad, it further include power supply change-over device and information feedback device, the input terminal of power supply change-over device is connect with master control borad, output end is connect with test product to be measured, information feedback device is connect with the data acquisition interface of test product to be measured and master control borad, when the related function of needing to treat test article is tested, power supply change-over device can provide default electric signal accordingly according to the control of master control borad for test product to be measured, the test data of the available test product to be measured of information feedback device, and test data is sent to master control borad to obtain test result, and then realize the test for treating test article correlation function, the test macro, test product to be measured needs how many electric signal, master control borad just can control power supply change-over device provides how many electric signal;It is compared with when the work electric signal difference of test product to be measured, battery is needed replacing in the prior art with the electric signal for being adapted to current test product to be measured, simplifies test process, improve testing efficiency.

Description

A kind of test macro
Technical field
The utility model relates to electronic product testing field, in particular to a kind of test macro.
Background technique
Solar recharging system is generally made of solar charging discharging controller, solar panel, battery and load. Solar charging discharging controller is responsible for coordinating solar panel, battery and the work of load, is very heavy in photovoltaic system One of component wanted can make entire solar energy photovoltaic system efficient, safe running.Therefore, it dispatches from the factory in solar controller When, property to solar controller is needed in order to improve the reliability, accuracy and production efficiency of solar controller It can be carried out test.
It is mainly realized at present by main control computer, Switching Power Supply, battery, load and test needle bed to solar energy control The performance test of device processed.But battery used at present is actual battery, when the operating voltage of solar controller is different When, battery is needed replacing to be adapted to the voltage of current solar controller, that is to say, that solar controller needs several volts Voltage value, it is necessary to select the voltage value of several volts to power, test process is cumbersome.
It can be seen that how to overcome when the test performance for treating test article is tested, test process is cumbersome, test effect The low problem of rate is those skilled in the art's urgent problem to be solved.
Utility model content
The embodiment of the present application provides a kind of test macro, to solve in the prior art in the test performance for treating test article When being tested, test process is cumbersome, the low problem of testing efficiency.
In order to solve the above technical problems, the utility model provides a kind of test macro, including master control borad, further includes:
For providing the power supply change-over device of default electric signal, institute according to the control of the master control borad for the test product to be measured The input terminal for stating power supply change-over device is connect with the master control borad, the output end of the power supply change-over device and the test product to be measured Connection;
It is connect with the data acquisition interface of the test product to be measured and the master control borad, for obtaining the survey of the test product to be measured Data are tried, and the test data is sent to the master control borad to obtain the information feedback device of test result.
Preferably, further includes:
It is connect with the master control borad, for placing the test needle bed of the test product to be measured, wherein the test needle bed passes through Probe is connect with the test point of the test product to be measured.
Preferably, the information feedback device specifically includes lighting device and multimeter, and the lighting device is for testing Whether the voltage of the discharging function of the test product to be measured, the test point that the multimeter is used to test the test product to be measured conforms to It asks.
Preferably, when the information feedback device is multimeter, further includes:
It is connect with the master control borad, the test needle bed and the multimeter, for being incited somebody to action according to the control of the master control borad The test point switches to the target detection point of the test product to be measured to connect between the target detection point and the multimeter Connection switch matrix.
Preferably, the switch matrix is specially relay matrix.
Preferably, the multimeter is connect especially by USB or gpib interface with the master control borad.
Preferably, further includes:
It is connect with the master control borad and the information feedback device, for showing the test data and the test result Display device.
Preferably, further includes:
It is connect with the master control borad, for when the electric signal and the default electricity for detecting that the power supply change-over device provides When signal mismatches, the warning device of warning note;
Accordingly, the master control borad is also used to control the power supply change-over device and stops working.
Preferably, the warning device is specially buzzer.
Preferably, the test product to be measured is solar controller.
Compared with the prior art, a kind of test macro provided by the utility model, including master control borad further include that power supply turns The input terminal of changing device and information feedback device, power supply change-over device is connect with master control borad, and output end is connect with test product to be measured, letter Breath feedback device is connect with the data acquisition interface of test product to be measured and master control borad, when the related function of needing to treat test article carries out When test, power supply change-over device will provide default electric signal accordingly according to the control of master control borad for test product to be measured, meanwhile, letter The test data of the available test product to be measured of feedback device is ceased, and the test data can be sent to master control borad to obtain test As a result, realizing the test for treating test article correlation function in turn, it can be seen that, the test macro, test product to be measured needs great Electric signal, master control borad can control the power supply change-over device and provide great electric signal;With in the prior art when test product to be measured Work electric signal difference when, need replacing battery to be adapted to the electric signal of current test product to be measured and compare, simplify and tested Journey improves testing efficiency.
Detailed description of the invention
Fig. 1 is a kind of test system structure composition schematic diagram provided by the utility model embodiment;
Fig. 2 is a kind of test macro overall structure composition schematic diagram provided by the utility model embodiment.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete Site preparation description, it is clear that the described embodiments are only a part of the embodiments of the utility model, instead of all the embodiments. Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work All other embodiment, fall within the protection scope of the utility model.
The core of the utility model is to provide a kind of test macro, can solve in the prior art in the survey for treating test article When examination performance is tested, the cumbersome problem of test process.
It is with reference to the accompanying drawing and specific real in order to make those skilled in the art more fully understand the embodiment of the utility model Applying mode, the utility model is described in further detail.
Fig. 1 is a kind of test system structure composition schematic diagram provided by the utility model embodiment, as shown in Figure 1, should Test macro includes master control borad 101, further includes:
For being that test product 102 to be measured provides the power supply change-over device 103 of default electric signal according to the control of master control borad 101, The input terminal of power supply change-over device 103 is connect with master control borad 101, and the output end of power supply change-over device 103 and test product 102 to be measured connect It connects;It is connect with the data acquisition interface of test product 102 to be measured and master control borad 101, for obtaining the test data of test product 102 to be measured, And test data is sent to master control borad 101 to obtain the information feedback device 104 of test result.
In order to this programme is described in detail, be hereafter illustrated by taking the performance test to solar controller as an example, i.e., it is to be measured Test product 102 is solar controller, in the prior art, when the performance to solar controller is tested, it usually needs root According to the type of solar controller, battery is replaced to be adapted to current solar controller to be tested, not only test process is numerous It is trivial, and testing efficiency is low.
Test macro provided by the embodiment of the present application replaces battery in the prior art with power supply change-over device 103 For solar controller power supply, the input terminal of power supply change-over device 103 connect with master control borad 101, power supply change-over device 103 it is defeated Outlet is connect with solar controller;Power supply change-over device 103 can be mentioned according to the control of master control borad 101 for solar controller For presetting electric signal, that is to say, that power supply change-over device 103 can be according to the difference of the type of solar controller or type etc. Different electric signals is provided, to be adapted to current solar controller to be tested;Default electric signal can shift to an earlier date according to the actual situation Setting, electric signal includes voltage signal and current signal;Then it recycles and is adopted with the data of solar controller and master control borad 101 The information feedback device 104 for collecting interface connection obtains the test data of solar controller, and the test data is sent to master Plate 101 is controlled to obtain test result, can simplify test process and improves testing efficiency;In practical applications, solar energy mould Quasi- device is the work of analog solar solar panel, for whether just to test the charge function of test product 102 (solar controller) to be measured Often.Various electronic components (including test product 102 to be measured) are integrated on pcb board (printed circuit board), this integrated electronic member The pcb board of device is referred to as PCBA board, and PCBA board is placed in the property realized on test needle bed to solar controller to be tested It can test.Master control borad 101 controls each device and cooperates, and is the core of entire test macro, controls each device according to setting Process work, and can determine whether the test result of solar controller is correct.
For whether charge function to test solar controller is normal, the embodiment of the present application is illustrated, first Master control borad 101 controls power supply change-over device 103 and powers to test product 102 to be measured, and the voltage of test product 102 to be measured reaches preset voltage value Later, i.e. the voltage value of 103 final output of power supply change-over device to solar controller is master control borad after preset voltage value 101 control again solar simulator export give test product 102 (solar controller) to be measured charging, then recycle signal feedback dress The actual voltage value for the solar controller to be tested that 104 (multimeters) acquire is set, and the actual voltage value is sent to master Plate 101 is controlled, the actual voltage value that information feedback device 104 is sent is compared by master control borad 101 with preset voltage value again, if Difference between actual voltage value and preset voltage value is in allowable range of error, then it is believed that solar controller to be tested Charge function is normal, if the difference between actual voltage value and preset voltage value illustrates not in allowable range of error The charge function of the solar controller to be tested is abnormal, for example, preset voltage value is 5V, allowable range of error 0V-0.2V, The actual voltage value measured is 4.2V, because the difference between actual voltage value and preset voltage value is 0.8V, not in error In allowed band 0V-0.2V, so illustrating that the charge function of the solar controller to be tested is abnormal, if the practical electricity measured Pressure value is 4.9V, then the difference between actual voltage value and preset voltage value is 0.1V, is in allowable range of error 0V-0.2V It is interior, so illustrating that the charge function of the solar controller to be tested is normal.This only determines the charging function of solar controller Whether normally a kind of mode the charging function of solar controller can also can be determined otherwise in practical applications Can whether normal, details are not described herein.
A kind of test macro provided by the utility model, including master control borad further include that power supply change-over device and information are anti- Present device, the input terminal of power supply change-over device connect with master control borad, and output end is connect with test product to be measured, information feedback device and to Test article is connected with the data acquisition interface of master control borad, and when the related function of needing to treat test article is tested, power supply turns Changing device will provide default electric signal accordingly according to the control of master control borad for test product to be measured, meanwhile, information feedback device can To obtain the test data of test product to be measured, and the test data can be sent to master control borad to obtain test result, Jin Ershi Now treat the test of test article correlation function, it can be seen that, the test macro, test product to be measured needs how many electric signal, master control borad It can control the power supply change-over device provides how many electric signal;It is different from the work electric signal in the prior art when test product to be measured When, battery is needed replacing to be adapted to the electric signal of current test product to be measured and compare, and is simplified test process, is improved test effect Rate.
In order to improve convenient test and practicability, on the basis of the above embodiments, preferably embodiment, is gone back Include:
It is connect with master control borad 101 and power supply change-over device 103, for placing the test needle bed of test product 102 to be measured, wherein Test needle bed is connect by probe with the test point of test product 102 to be measured.
Specifically, the output end of power supply change-over device 103 is connect with the PCBA board on test needle bed, is integrated in PCBA board Each electronic component (including the devices such as solar controller and solar simulator), test needle bed pass through on probe and PCBA board The test point of test product 102 (solar controller) to be measured connects, and can be used to test key point voltage.It tests on needle bed with spy Needle, test process is convenient, and simply, practicability is high.
On the basis of the above embodiments, preferably embodiment, information feedback device 104 specifically include multiple photographs Bright device and multimeter, multiple lighting devices are used to test the discharging function of test product 102 to be measured, and multimeter is to be tested for testing Whether the voltage of the test point of product 102 meets the requirements.
It is using the discharging function that the lighting device in information feedback device 104 can detecte solar controller to be tested No to meet the requirements, solar controller is divided into boosting, decompression and three kinds of constant pressure according to applicable cases, three kinds of solar controllers Output voltage is all different, and the voltage that corresponding power supply change-over device 103 provides is not also identical, when test solar controller When whether discharging function is normal, it is necessary to connect multiple lighting devices to complete the test of solar controller discharging function, lead Control plate 101 can automatically switch to corresponding lighting device according to the type of solar controller to be tested.Specifically, be exactly After solar controller power supply, whether lighting device corresponding with solar controller type is detected by master control borad 101 It works normally, that is, the electric signal and power supply change-over device 103 for corresponding to the output end of lighting device are supplied to solar controller Whether the difference of electric signal is in defined threshold range, if it is, illustrating the discharging function of corresponding solar controller just Often, if it is not, then illustrating that the discharging function of corresponding solar controller is abnormal, the detection process and detection in the prior art Process is identical, can specifically be realized by program, more details can be found in the prior art.Preferably, each lighting device by LAN or GPIB communication interface is communicated with master control borad 101.
It can detecte the voltage of the test point of solar controller to be tested by the multimeter in information feedback device 104 Whether meet the requirements, it in practical applications, can be with after power supply change-over device 103 is solar controller power supply to be tested Multimeter is connected to corresponding test point on test needle bed, and the data that multimeter is measured are sent to master control borad 101, then Judge whether the difference of electric signal that the data that multimeter measures are provided with power supply change-over device 103 meets by master control borad 101 again It is required that and then realize test to the voltage of the test point of solar controller to be tested, specific test process can pass through program It realizes, identical as test process in the prior art, details are not described herein;Preferably embodiment, multimeter specifically lead to USB or gpib interface is crossed to connect with master control borad 101.Just whether discharging function and charge function to solar controller to be tested Whether normal test in defined threshold range judges that corresponding function is using difference in addition to provided by the embodiments of the present application It is no it is normal except, can also realize that the utility model is without limitation using other way.Preferably embodiment, the survey Test system further include: connect with master control borad 101, the electric signal and default electric signal for providing when power supply change-over device 103 are not When matching, the warning device of warning note;Accordingly, master control borad 101 is also used to control power supply change-over device 103 and stops working. Specifically, be exactly master control borad 101 judge power supply change-over device 103 provide electric signal and preset electric signal mismatch when, For example, preset electric signal is 3V, and the electric signal that actually measured power supply change-over device 103 exports is 3.5V, illustrates power supply Conversion equipment 103 is possible to break down, and at this moment just needs master control borad 101 to control the warning device warning note relevant personnel and checks Questions and prospect, and control power supply change-over device 103 and stop working, it is burned to prevent solar controller to be tested.As preferred Ground embodiment, warning device are specially buzzer.Certainly, warning device can also select other than it can select buzzer With other satisfactory warning devices, details are not described herein.
In order to improve the degree of automation and convenience of test process, on the basis of the above embodiments, preferably Embodiment, when information feedback device 104 is multimeter, further includes: it is connect with master control borad 101, test needle bed and multimeter, For test point to be switched to the target detection point of test product 102 to be measured to connect target detection point according to the control of master control borad 101 The switch matrix connected between multimeter.
Each test point on switch matrix connecting test needle bed, it is logical by LAN or GPIB communication interface and master control borad 101 Letter, master control borad 101 is according to the target detection point of the switch of testing procedure automatic transfer switch matrix to test product 102 to be measured, by mesh Mapping pilot is connected on multimeter, and multimeter measures the voltage of each test point, then sends measured data to master control borad 101, master control borad 101 judges whether the test point voltage is normal.Preferably embodiment, switch matrix are specially relay Matrix controls the disconnection and conducting of corresponding relay by master control borad 101 according to the actual situation.
Test case is checked in order to facilitate the operation of personnel, on the basis of the above embodiments, preferably embodiment, Further include: it is connect with master control borad 101 and information feedback device 104, for showing the display device of test data and test result.
In entire test process, can use the display device connecting with master control borad 101 and information feedback device 104 will The test result that the test data or master control borad 101 that information feedback device 104 obtains obtain is shown, operator is facilitated It checks, in practical applications, relevant test data and test result can also be stored, the later period is facilitated to search.
Fig. 2 is a kind of test macro overall structure composition schematic diagram provided by the utility model embodiment, such as Fig. 2 institute Show, which includes: master control borad 101, power supply change-over device 103, test needle bed 201, lighting device 202, multimeter 204 And switch matrix 203, lighting device 202 and multimeter 204 form information feedback device 104, test product 102 to be measured is located at test Needle bed 201;Master control borad 101 respectively with power supply change-over device 103, test needle bed 201, lighting device 202, multimeter 204 and Switch matrix 203 connects, for controlling the work of each device, and the data for being obtained to lighting device 202 and multimeter 204 into Row judges that realize the performance test for treating test article 102, in practical applications, master control borad 101 can select main control computer; Test needle bed 201 connect respectively with power supply change-over device 103, lighting device 202 and switch matrix 203, switch matrix 203 and The connection of multimeter 204 is corresponding to be measured multimeter 204 is automatically switched to test needle bed 201 according to the control of master control borad 101 The target detection point of test product 102, and then realize the test for treating the charge function of test article 102, lighting device 202 is exactly in fact The whether normal electronic load of discharging function for testing test product 102 to be measured is tested on needle bed 201 and is put in practical applications It is equipped with pcb board, test product 102 to be measured and other related devices are integrated on pcb board.It is not drawn into warning device in Fig. 2 and shows Showing device, but do not represent no warning device and display device.
Below by taking solar controller is tested as an example, entire test process is introduced, 101 (master control of master control borad first Computer) the pneumatic compression bar pressure for testing needle bed 201 of control, if master control borad 101 detects that the compression bar of test needle bed 201 is pressed onto Latched position then starts entire testing process, and then controlling power supply change-over device 103 is test product 102 (solar controller) to be measured Power supply, exports different voltage, and solar controller is started to work.If first being examined to the drain conditions of solar controller It surveys, master control borad 101 controls power supply change-over device 103 and provides different quiescent voltage and dynamic electric voltage for solar controller, so Multimeter 204 and the target detection of corresponding solar controller point are connected by switch matrix 203 afterwards, multimeter 204 obtains To the data of related objective test point, and master control borad 101 is sent the data to, master control borad 101 judges corresponding solar control Device is with the presence or absence of short circuit or overcurrent condition, and specific deterministic process sees above described, and details are not described herein, which can also be right The voltage of each target detection point is calibrated, and influence of the component deviation to solar controller is effectively reduced;It can control simultaneously The display device connecting with master control borad 101 shows relevant test data or ought show fault message in the event of failure, passes through display Device shows dependent failure information, and ought in the event of failure can be by the warning device (buzzer) that connect with master control borad 101 Warning note operator, and control power supply change-over device 103 and stop working, remind operator to check fault message, so as to Timely handling failure.In practical applications, master control borad 101 by LAN or GPIB communication interface and tests the PCB on needle bed 201 Board communications and the software version number and type information for obtaining solar controller are controlled according to different solar controller models Related device work.Discharging function detection: solar controller on the market all has constant current output function at present, exports electric current Required precision controls within ± 2%, it is therefore desirable to which whether the discharge current for testing solar controller meets the requirements, if put Electric current is unsatisfactory for requiring, then needs to carry out discharge current calibration.Master control borad 101 is electric by the output for calculating solar controller Flow curve generates one group of calibration array, issues solar controller by communication ports such as LAN or UART or ISP, realizes that electric current is inclined Difference calibration.One group of preset electric current is provided particularly as being the control power supply change-over device 103 of master control borad 101 for solar controller Then value is obtaining corresponding one group of actual value using the lighting device 202 in information feedback device 104, and by the actual value It is sent to master control borad 101, master control borad 101 generates current curve according to preset current value and corresponding actual value, and then realizes Current deviation calibration to solar controller.Similarly, the voltage of solar controller can also be calibrated, it is entire to test After process is completed, all devices are returned to original state.
A kind of test macro provided by the utility model is described in detail above.Several examples are used herein The principles of the present invention and embodiment are expounded, the explanation of above embodiments is merely used to help understand this reality With novel technical solution and its core concept;At the same time, for those skilled in the art, the think of according to the utility model Think, there will be changes in the specific implementation manner and application range, in conclusion the content of the present specification should not be construed as pair The limitation of the utility model, those skilled in the art make the utility model under the premise of no creative work Modification, equivalent replacement, improvement etc., should be included in the application.
It should also be noted that, in the present specification, relational terms such as first and second and the like be used merely to by One operation is distinguished with another operation, without necessarily requiring or implying there are any between these entities or operation This actual relationship or sequence.Moreover, the similar word such as term " includes ", so that including the unit of a series of elements, equipment Or system not only includes those elements, but also including other elements that are not explicitly listed, or further includes for this list Member, equipment or the intrinsic element of system.

Claims (10)

1. a kind of test macro, including master control borad, which is characterized in that further include:
For providing the power supply change-over device of default electric signal according to the control of the master control borad for test product to be measured, the power supply turns The input terminal of changing device is connect with the master control borad, and the output end of the power supply change-over device is connect with the test product to be measured;
It is connect with the data acquisition interface of the test product to be measured and the master control borad, for obtaining the test number of the test product to be measured According to, and the test data is sent to the master control borad to obtain the information feedback device of test result.
2. test macro according to claim 1, which is characterized in that further include:
It is connect with the master control borad, for placing the test needle bed of the test product to be measured, wherein the test needle bed passes through probe It is connect with the test point of the test product to be measured.
3. test macro according to claim 1, which is characterized in that the information feedback device specifically includes multiple illuminations Device and multimeter, multiple lighting devices are used to test the discharging function of the test product to be measured, and the multimeter is for surveying Whether the voltage for trying the test point of the test product to be measured meets the requirements.
4. test macro according to claim 2, which is characterized in that when the information feedback device is multimeter, also Include:
It is connect with the master control borad, the test needle bed and the multimeter, for will be described according to the control of the master control borad Test point switches to company of the target detection point of the test product to be measured to connect between the target detection point and the multimeter The switch matrix connect.
5. test macro according to claim 4, which is characterized in that the switch matrix is specially relay matrix.
6. test macro according to claim 4, which is characterized in that the multimeter is especially by USB or gpib interface It is connect with the master control borad.
7. test macro according to claim 1, which is characterized in that further include:
It is connect with the master control borad and the information feedback device, for showing the aobvious of the test data and the test result Showing device.
8. test macro according to claim 1, which is characterized in that further include:
It is connect with the master control borad, for when the electric signal and the default electric signal for detecting that the power supply change-over device provides When mismatch, the warning device of warning note;
Accordingly, the master control borad is also used to control the power supply change-over device and stops working.
9. test macro according to claim 8, which is characterized in that the warning device is specially buzzer.
10. test macro according to claim 1, which is characterized in that the test product to be measured is solar controller.
CN201820987629.3U 2018-06-25 2018-06-25 A kind of test macro Active CN208432669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820987629.3U CN208432669U (en) 2018-06-25 2018-06-25 A kind of test macro

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820987629.3U CN208432669U (en) 2018-06-25 2018-06-25 A kind of test macro

Publications (1)

Publication Number Publication Date
CN208432669U true CN208432669U (en) 2019-01-25

Family

ID=65097946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820987629.3U Active CN208432669U (en) 2018-06-25 2018-06-25 A kind of test macro

Country Status (1)

Country Link
CN (1) CN208432669U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113917308A (en) * 2020-10-16 2022-01-11 北京精密机电控制设备研究所 Automatic test platform of printed circuit board
CN115201529A (en) * 2022-07-29 2022-10-18 海宁理万集成电路有限公司 Novel parallel semiconductor parameter testing system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113917308A (en) * 2020-10-16 2022-01-11 北京精密机电控制设备研究所 Automatic test platform of printed circuit board
CN115201529A (en) * 2022-07-29 2022-10-18 海宁理万集成电路有限公司 Novel parallel semiconductor parameter testing system

Similar Documents

Publication Publication Date Title
CN104849579B (en) Overcurrent protection and voltage monitor sensitive components test system and method
CN206301014U (en) Portable thread cable test device
CN106019002A (en) Verification testing platform for battery management system and testing method thereof
CN106526457A (en) Circuit board detection instrument and system
CN208432669U (en) A kind of test macro
CN108333448A (en) Transformer routine test comprehensive test device
CN202676832U (en) Distribution network feeder line monitoring terminal integrated testing device
CN108445293A (en) A kind of quantum chip port impedance test device and measurement method
CN206161810U (en) Intelligent control box relay test appearance
CN203705602U (en) Automatic detection and calibration device for bridge board of electric vehicle
CN203630318U (en) Test system for power system switching power supply module
CN105182270A (en) Device and method of electric energy meter voltage-withstand test
CN108061867A (en) The adjusting, measuring method of integrated drive generator monitoring unit
CN210038541U (en) Function test system of motor controller PCBA board
CN204882853U (en) Electric energy meter pressure resistance test installation
CN218240380U (en) Battery internal resistance instrument point inspection device
CN107356882B (en) A kind of PD power supply product ageing testing method
CN102284886B (en) Portable intelligent installation-debugging guidance and fault diagnosis device
CN104316863A (en) Artificial intelligence-based universal circuit debugging and troubleshooting interaction system and method
CN206400061U (en) A kind of circuit board detecting instrument and system
CN204256118U (en) Universal circuit debugging and fault maintenance interactive system
CN202994940U (en) PLC automation single board test platform
CN203224587U (en) Cable testing device
CN102269976B (en) Multifunctional precise control testing platform
CN203072169U (en) Wireless communication module performance evaluation tool with high reliability

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A test system and test method

Effective date of registration: 20190819

Granted publication date: 20190125

Pledgee: Qingdao high technology financing Company limited by guarantee

Pledgor: Qingdao Skywise Technology Co., Ltd.

Registration number: Y2019370010005

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200708

Granted publication date: 20190125

Pledgee: Qingdao high technology financing Company limited by guarantee

Pledgor: QINGDAO SKYWISE TECHNOLOGY Co.,Ltd.

Registration number: Y2019370010005

PC01 Cancellation of the registration of the contract for pledge of patent right