CN208431462U - The integrated assembling constructing structure of high residential building piping shaft subfeeder - Google Patents
The integrated assembling constructing structure of high residential building piping shaft subfeeder Download PDFInfo
- Publication number
- CN208431462U CN208431462U CN201820839327.1U CN201820839327U CN208431462U CN 208431462 U CN208431462 U CN 208431462U CN 201820839327 U CN201820839327 U CN 201820839327U CN 208431462 U CN208431462 U CN 208431462U
- Authority
- CN
- China
- Prior art keywords
- fixed frame
- pedestal
- hole
- snap
- gauge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Branch Pipes, Bends, And The Like (AREA)
Abstract
The utility model relates to the integrated assembling constructing structures of high residential building piping shaft subfeeder, including the first fixed frame and the second fixed frame, second fixed frame is fixed at the first fixed frame left and right ends, first fixed frame lower end surface lower end is provided with mounting box, first fixed frame lower end surface is evenly distributed with multiple mounting holes, mounting hole is connected to mounting box, branch pipe fixation kit is provided in mounting hole, branch pipe fixation kit includes snap ring and pedestal, pedestal is fixed at snap ring lower end, snap ring bottom is provided with the through-hole of perforation pedestal, the first bolt is provided in through-hole, pedestal lower end is provided with installation snap-gauge, installation snap-gauge is at least two pieces and is circumferentially evenly distributed on pedestal lower end surface along through-bore axis, it is inclined surface that snap-gauge, which is installed, close to through-hole side, the utility model be able to carry out position adjust and it is easy to disassemble.
Description
Technical field
The utility model relates to high residential building feed pipe technical field of construction, and in particular to high residential building piping shaft water supply branch
Manage integrated assembling constructing structure.
Background technique
High residential building refers to ten layers and ten layers or more of house, as the number of plies of high residential building is more and more and single layer face
The increase of house amount, causes the pipeline (referring mainly to subfeeder) of high residential building piping shaft (specifically to water pipe manhole) to be arranged in product
Cloth is more intensive, simultaneously because piping shaft is not of uniform size, narrow space, built-in water supply system are various, further increases Pipe installing
Difficulty of construction, it is difficult to guarantee construction quality, traditional water supply pipe construction is that water pipe fixed mechanism is fixed on metope, is being applied
The problems such as working hour inevitably has operation arbitrarily, lack of standardization, once there are these problems, traditional fixed mechanism cannot
It is adjusted, needs to reinstall fixed mechanism at this time, the duration certainly will be influenced.
Utility model content
Technical problem to be solved in the utility model are as follows: provide one kind can carry out position adjusting and it is easy-to-dismount to
Water pipe constructing structure.
In order to solve the above-mentioned technical problem, the utility model adopts the following technical solution:
The integrated assembling constructing structure of high residential building piping shaft subfeeder, including the first fixed frame and the second fixed frame,
Second fixed frame is fixed at the first fixed frame left and right ends, and the first fixed frame lower end surface lower end is provided with mounting box, and first
Fixed frame lower end surface is evenly distributed with multiple mounting holes, and mounting hole is connected to mounting box, and the fixed group of branch pipe is provided in mounting hole
Part, branch pipe fixation kit include snap ring and pedestal, and pedestal is fixed at snap ring lower end, and snap ring bottom is provided with perforation pedestal
Through-hole is provided with the first bolt in through-hole, and pedestal lower end is provided with installation snap-gauge, and installation snap-gauge is at least two pieces and along through-hole axis
Line is circumferentially evenly distributed on pedestal lower end surface, and installation snap-gauge is inclined surface close to through-hole side, installation card backboard to through-hole one
Secondary is arc surface, and the first bolt lower end is equipped with sliding block, and sliding block lateral surface is adapted with the inclined surface of installation snap-gauge, sets on metope
It is equipped with accommodation groove, the size of accommodation groove is adapted with mounting box size, and the second fixed frame lower end surface is bonded with metope.
Snap ring inner wall is provided with rubber layer.
Pedestal and snap ring are integrally formed.
First fixed frame is U-typed fixed frame.
Second fixed frame is " L " type fixed frame.
Compared with the existing technology, the utility model has the following beneficial effects: the utility model by setting the first fixed frame and
Mounting box, the mounting hole and mounting box of the first fixed frame lower end surface match, the installation site of adjustable branch pipe fixation kit,
When installing appearance position error convenient for adjusting;Rubber layer further is set in snap ring inner wall, snap ring can be made more to fasten
It is bonded water supply pipe outer wall, while protection can be played the role of to feed pipe;Further setting installation snap-gauge and the first bolt, will
Installation card board enters in mounting hole, tightens the first bolt, moves up sliding block, and sliding block makes installation card outwardly against installation snap-gauge
The tight mounting hole of board, fixation is stronger, is convenient for recycling and reusing compared with traditional fixed mechanism is by expansion bolt.This reality
With it is novel be able to carry out position adjust and it is easy to disassemble.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of the utility model installation condition;
Fig. 3 is the structural schematic diagram of branch pipe fixation kit in the utility model;
Fig. 4 is the top view of the first fixed frame in the utility model.
In figure: 1, the first fixed frame 2, the second fixed frame 3, mounting box 4, metope 5, snap ring 6, rubber layer 7, through-hole 8, first
Bolt 9, installation snap-gauge 10, sliding block 11, mounting hole 12, expansion bolt.
Specific embodiment
Embodiment: as shown in Figures 1 to 4, the integrated assembling constructing structure of high residential building piping shaft subfeeder, including the
One fixed frame 1 and the second fixed frame 2, the second fixed frame 2 are fixed at 1 left and right ends of the first fixed frame, under the first fixed frame 1
End face lower end is provided with mounting box 3, and 1 lower end surface of the first fixed frame is evenly distributed with multiple mounting holes 11, mounting hole 11 and installation
Box 3 is connected to, and branch pipe fixation kit is provided in mounting hole 11, and branch pipe fixation kit includes snap ring 5 and pedestal, pedestal fixed setting
In 5 lower end of snap ring, 5 bottom of snap ring is provided with the through-hole 7 of perforation pedestal, is provided with the first bolt 8 in through-hole 7, pedestal lower end is set
It is equipped with installation snap-gauge 9, installation snap-gauge 9 is at least two pieces and is circumferentially evenly distributed on pedestal lower end surface, installation card along 7 axis of through-hole
Plate 9 is inclined surface close to 7 side of through-hole, and installation snap-gauge 9 is once arc surface back to through-hole 7, and 8 lower end of the first bolt is equipped with
Sliding block 10,10 lateral surface of sliding block are adapted with the inclined surface of installation snap-gauge 9, and accommodation groove, the size of accommodation groove are provided on metope 4
It is adapted with 3 size of mounting box, 2 lower end surface of the second fixed frame is bonded with metope 4, and 5 inner wall of snap ring is provided with rubber layer 6, pedestal
It is integrally formed with snap ring 5, the first fixed frame 1 is U-typed fixed frame, and the second fixed frame 2 is " L " type fixed frame.
The utility model is reserved with accommodation groove on metope 4, the second fixed frame 2 is passed through expansion bolt first when implementing
12 are fixed on external margin, and 2 vertical end of the second fixed frame and accommodation groove or so wall surface are concordant, will consolidate with the first of mounting box 3
To determine frame 1 to be placed between the second fixed frame 2, mounting box 3 is placed in accommodation groove, installation snap-gauge 9 is placed in mounting hole 11,
The first bolt 8 is tightened, sliding block 10 is moved upwards, sliding block 10 squeezes 9 inside of installation snap-gauge, makes to install the outside deformation of snap-gauge 9 simultaneously
Mounting hole 11 is blocked, installation is completed and fixes, feed pipe is stuck in snap ring 5, and the fixation of feed pipe is realized with this.Under first fixed plate
End face is uniformly distributed multiple mounting holes 11, and the mounting hole 11 of different location can be selected to place the fixed group of branch pipe according to actual needs
Part.
Claims (5)
1. the integrated assembling constructing structure of high residential building piping shaft subfeeder, it is characterised in that: including the first fixed frame and
Two fixed frames, the second fixed frame are fixed at the first fixed frame left and right ends, and the first fixed frame lower end surface lower end is provided with peace
Mounted box, the first fixed frame lower end surface are evenly distributed with multiple mounting holes, and mounting hole is connected to mounting box, and branch is provided in mounting hole
Pipe fixation kit, branch pipe fixation kit include snap ring and pedestal, and pedestal is fixed at snap ring lower end, and snap ring bottom, which is provided with, to be passed through
The through-hole of logical pedestal, is provided with the first bolt in through-hole, and pedestal lower end is provided with installation snap-gauge, installation snap-gauge be at least two pieces and
Pedestal lower end surface is circumferentially evenly distributed on along through-bore axis, installation snap-gauge is inclined surface, installation card backboard pair close to through-hole side
Through-hole is once arc surface, and the first bolt lower end is equipped with sliding block, and sliding block lateral surface is adapted with the inclined surface of installation snap-gauge,
Accommodation groove is provided on metope, the size of accommodation groove is adapted with mounting box size, and the second fixed frame lower end surface is bonded with metope.
2. the integrated assembling constructing structure of high residential building piping shaft subfeeder according to claim 1, it is characterised in that:
The snap ring inner wall is provided with rubber layer.
3. the integrated assembling constructing structure of high residential building piping shaft subfeeder according to claim 1, it is characterised in that:
The pedestal and snap ring is integrally formed.
4. the integrated assembling constructing structure of high residential building piping shaft subfeeder according to claim 1, it is characterised in that:
First fixed frame is U-typed fixed frame.
5. the integrated assembling constructing structure of high residential building piping shaft subfeeder according to claim 1, it is characterised in that:
Second fixed frame is " L " type fixed frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820839327.1U CN208431462U (en) | 2018-06-01 | 2018-06-01 | The integrated assembling constructing structure of high residential building piping shaft subfeeder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820839327.1U CN208431462U (en) | 2018-06-01 | 2018-06-01 | The integrated assembling constructing structure of high residential building piping shaft subfeeder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208431462U true CN208431462U (en) | 2019-01-25 |
Family
ID=65100674
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820839327.1U Expired - Fee Related CN208431462U (en) | 2018-06-01 | 2018-06-01 | The integrated assembling constructing structure of high residential building piping shaft subfeeder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208431462U (en) |
-
2018
- 2018-06-01 CN CN201820839327.1U patent/CN208431462U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102258341B (en) | Device for digital shower system and installation method and structure of device | |
CN105971167A (en) | Curtain wall and mounting adjustment device | |
CN202132612U (en) | Multi-pipeline water-proof sleeve | |
CN208431462U (en) | The integrated assembling constructing structure of high residential building piping shaft subfeeder | |
CN201487519U (en) | Wall hanging frame of plat panel television | |
CN205399892U (en) | Thermal insulation decorates wall body board system | |
CN207499310U (en) | Indoor glass facing mounting assembly | |
CN206233500U (en) | Heat-preserving wall balustrade exterior panelling mounting structure | |
CN206625609U (en) | Quick decoration system | |
CN202500296U (en) | Embedded prearranged pipe locking pin used for fixing veneer | |
CN203961349U (en) | Between a kind of integral bathroom of unitization dismounting | |
CN103276872A (en) | Double-layer point-connection glass curtain wall connecting component and connecting structure thereof | |
CN210421539U (en) | Waterproof hyperboloid curtain | |
CN208620160U (en) | A kind of wall lamp angle adjustment mechanism | |
CN208633264U (en) | A kind of adjustable floating screed keel | |
CN207079781U (en) | A kind of Combined marble frame curtain wall | |
CN201818836U (en) | Novel tap | |
CN209653171U (en) | A kind of detachable metope vertical baffle attachment device | |
CN206233504U (en) | A kind of back hanging type inner wall crystalline substance calcium board mounting structure | |
CN209568584U (en) | Can free installing and dismounting wooden frame cell curtain wall | |
CN205669781U (en) | A kind of New LED face lamp support | |
CN209244292U (en) | A kind of cladding panel installation bottom levelling device | |
CN208816926U (en) | A kind of fixed device of rubber soft joint | |
CN205333293U (en) | Test chart | |
CN208223142U (en) | A kind of liner and the separately installed structure of tuyere |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |