CN208431462U - The integrated assembling constructing structure of high residential building piping shaft subfeeder - Google Patents

The integrated assembling constructing structure of high residential building piping shaft subfeeder Download PDF

Info

Publication number
CN208431462U
CN208431462U CN201820839327.1U CN201820839327U CN208431462U CN 208431462 U CN208431462 U CN 208431462U CN 201820839327 U CN201820839327 U CN 201820839327U CN 208431462 U CN208431462 U CN 208431462U
Authority
CN
China
Prior art keywords
fixed frame
pedestal
hole
snap
gauge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820839327.1U
Other languages
Chinese (zh)
Inventor
裘孙江
高翔
倪仁磊
夏亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201820839327.1U priority Critical patent/CN208431462U/en
Application granted granted Critical
Publication of CN208431462U publication Critical patent/CN208431462U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Branch Pipes, Bends, And The Like (AREA)

Abstract

The utility model relates to the integrated assembling constructing structures of high residential building piping shaft subfeeder, including the first fixed frame and the second fixed frame, second fixed frame is fixed at the first fixed frame left and right ends, first fixed frame lower end surface lower end is provided with mounting box, first fixed frame lower end surface is evenly distributed with multiple mounting holes, mounting hole is connected to mounting box, branch pipe fixation kit is provided in mounting hole, branch pipe fixation kit includes snap ring and pedestal, pedestal is fixed at snap ring lower end, snap ring bottom is provided with the through-hole of perforation pedestal, the first bolt is provided in through-hole, pedestal lower end is provided with installation snap-gauge, installation snap-gauge is at least two pieces and is circumferentially evenly distributed on pedestal lower end surface along through-bore axis, it is inclined surface that snap-gauge, which is installed, close to through-hole side, the utility model be able to carry out position adjust and it is easy to disassemble.

Description

The integrated assembling constructing structure of high residential building piping shaft subfeeder
Technical field
The utility model relates to high residential building feed pipe technical field of construction, and in particular to high residential building piping shaft water supply branch Manage integrated assembling constructing structure.
Background technique
High residential building refers to ten layers and ten layers or more of house, as the number of plies of high residential building is more and more and single layer face The increase of house amount, causes the pipeline (referring mainly to subfeeder) of high residential building piping shaft (specifically to water pipe manhole) to be arranged in product Cloth is more intensive, simultaneously because piping shaft is not of uniform size, narrow space, built-in water supply system are various, further increases Pipe installing Difficulty of construction, it is difficult to guarantee construction quality, traditional water supply pipe construction is that water pipe fixed mechanism is fixed on metope, is being applied The problems such as working hour inevitably has operation arbitrarily, lack of standardization, once there are these problems, traditional fixed mechanism cannot It is adjusted, needs to reinstall fixed mechanism at this time, the duration certainly will be influenced.
Utility model content
Technical problem to be solved in the utility model are as follows: provide one kind can carry out position adjusting and it is easy-to-dismount to Water pipe constructing structure.
In order to solve the above-mentioned technical problem, the utility model adopts the following technical solution:
The integrated assembling constructing structure of high residential building piping shaft subfeeder, including the first fixed frame and the second fixed frame, Second fixed frame is fixed at the first fixed frame left and right ends, and the first fixed frame lower end surface lower end is provided with mounting box, and first Fixed frame lower end surface is evenly distributed with multiple mounting holes, and mounting hole is connected to mounting box, and the fixed group of branch pipe is provided in mounting hole Part, branch pipe fixation kit include snap ring and pedestal, and pedestal is fixed at snap ring lower end, and snap ring bottom is provided with perforation pedestal Through-hole is provided with the first bolt in through-hole, and pedestal lower end is provided with installation snap-gauge, and installation snap-gauge is at least two pieces and along through-hole axis Line is circumferentially evenly distributed on pedestal lower end surface, and installation snap-gauge is inclined surface close to through-hole side, installation card backboard to through-hole one Secondary is arc surface, and the first bolt lower end is equipped with sliding block, and sliding block lateral surface is adapted with the inclined surface of installation snap-gauge, sets on metope It is equipped with accommodation groove, the size of accommodation groove is adapted with mounting box size, and the second fixed frame lower end surface is bonded with metope.
Snap ring inner wall is provided with rubber layer.
Pedestal and snap ring are integrally formed.
First fixed frame is U-typed fixed frame.
Second fixed frame is " L " type fixed frame.
Compared with the existing technology, the utility model has the following beneficial effects: the utility model by setting the first fixed frame and Mounting box, the mounting hole and mounting box of the first fixed frame lower end surface match, the installation site of adjustable branch pipe fixation kit, When installing appearance position error convenient for adjusting;Rubber layer further is set in snap ring inner wall, snap ring can be made more to fasten It is bonded water supply pipe outer wall, while protection can be played the role of to feed pipe;Further setting installation snap-gauge and the first bolt, will Installation card board enters in mounting hole, tightens the first bolt, moves up sliding block, and sliding block makes installation card outwardly against installation snap-gauge The tight mounting hole of board, fixation is stronger, is convenient for recycling and reusing compared with traditional fixed mechanism is by expansion bolt.This reality With it is novel be able to carry out position adjust and it is easy to disassemble.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of the utility model installation condition;
Fig. 3 is the structural schematic diagram of branch pipe fixation kit in the utility model;
Fig. 4 is the top view of the first fixed frame in the utility model.
In figure: 1, the first fixed frame 2, the second fixed frame 3, mounting box 4, metope 5, snap ring 6, rubber layer 7, through-hole 8, first Bolt 9, installation snap-gauge 10, sliding block 11, mounting hole 12, expansion bolt.
Specific embodiment
Embodiment: as shown in Figures 1 to 4, the integrated assembling constructing structure of high residential building piping shaft subfeeder, including the One fixed frame 1 and the second fixed frame 2, the second fixed frame 2 are fixed at 1 left and right ends of the first fixed frame, under the first fixed frame 1 End face lower end is provided with mounting box 3, and 1 lower end surface of the first fixed frame is evenly distributed with multiple mounting holes 11, mounting hole 11 and installation Box 3 is connected to, and branch pipe fixation kit is provided in mounting hole 11, and branch pipe fixation kit includes snap ring 5 and pedestal, pedestal fixed setting In 5 lower end of snap ring, 5 bottom of snap ring is provided with the through-hole 7 of perforation pedestal, is provided with the first bolt 8 in through-hole 7, pedestal lower end is set It is equipped with installation snap-gauge 9, installation snap-gauge 9 is at least two pieces and is circumferentially evenly distributed on pedestal lower end surface, installation card along 7 axis of through-hole Plate 9 is inclined surface close to 7 side of through-hole, and installation snap-gauge 9 is once arc surface back to through-hole 7, and 8 lower end of the first bolt is equipped with Sliding block 10,10 lateral surface of sliding block are adapted with the inclined surface of installation snap-gauge 9, and accommodation groove, the size of accommodation groove are provided on metope 4 It is adapted with 3 size of mounting box, 2 lower end surface of the second fixed frame is bonded with metope 4, and 5 inner wall of snap ring is provided with rubber layer 6, pedestal It is integrally formed with snap ring 5, the first fixed frame 1 is U-typed fixed frame, and the second fixed frame 2 is " L " type fixed frame.
The utility model is reserved with accommodation groove on metope 4, the second fixed frame 2 is passed through expansion bolt first when implementing 12 are fixed on external margin, and 2 vertical end of the second fixed frame and accommodation groove or so wall surface are concordant, will consolidate with the first of mounting box 3 To determine frame 1 to be placed between the second fixed frame 2, mounting box 3 is placed in accommodation groove, installation snap-gauge 9 is placed in mounting hole 11, The first bolt 8 is tightened, sliding block 10 is moved upwards, sliding block 10 squeezes 9 inside of installation snap-gauge, makes to install the outside deformation of snap-gauge 9 simultaneously Mounting hole 11 is blocked, installation is completed and fixes, feed pipe is stuck in snap ring 5, and the fixation of feed pipe is realized with this.Under first fixed plate End face is uniformly distributed multiple mounting holes 11, and the mounting hole 11 of different location can be selected to place the fixed group of branch pipe according to actual needs Part.

Claims (5)

1. the integrated assembling constructing structure of high residential building piping shaft subfeeder, it is characterised in that: including the first fixed frame and Two fixed frames, the second fixed frame are fixed at the first fixed frame left and right ends, and the first fixed frame lower end surface lower end is provided with peace Mounted box, the first fixed frame lower end surface are evenly distributed with multiple mounting holes, and mounting hole is connected to mounting box, and branch is provided in mounting hole Pipe fixation kit, branch pipe fixation kit include snap ring and pedestal, and pedestal is fixed at snap ring lower end, and snap ring bottom, which is provided with, to be passed through The through-hole of logical pedestal, is provided with the first bolt in through-hole, and pedestal lower end is provided with installation snap-gauge, installation snap-gauge be at least two pieces and Pedestal lower end surface is circumferentially evenly distributed on along through-bore axis, installation snap-gauge is inclined surface, installation card backboard pair close to through-hole side Through-hole is once arc surface, and the first bolt lower end is equipped with sliding block, and sliding block lateral surface is adapted with the inclined surface of installation snap-gauge, Accommodation groove is provided on metope, the size of accommodation groove is adapted with mounting box size, and the second fixed frame lower end surface is bonded with metope.
2. the integrated assembling constructing structure of high residential building piping shaft subfeeder according to claim 1, it is characterised in that: The snap ring inner wall is provided with rubber layer.
3. the integrated assembling constructing structure of high residential building piping shaft subfeeder according to claim 1, it is characterised in that: The pedestal and snap ring is integrally formed.
4. the integrated assembling constructing structure of high residential building piping shaft subfeeder according to claim 1, it is characterised in that: First fixed frame is U-typed fixed frame.
5. the integrated assembling constructing structure of high residential building piping shaft subfeeder according to claim 1, it is characterised in that: Second fixed frame is " L " type fixed frame.
CN201820839327.1U 2018-06-01 2018-06-01 The integrated assembling constructing structure of high residential building piping shaft subfeeder Expired - Fee Related CN208431462U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820839327.1U CN208431462U (en) 2018-06-01 2018-06-01 The integrated assembling constructing structure of high residential building piping shaft subfeeder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820839327.1U CN208431462U (en) 2018-06-01 2018-06-01 The integrated assembling constructing structure of high residential building piping shaft subfeeder

Publications (1)

Publication Number Publication Date
CN208431462U true CN208431462U (en) 2019-01-25

Family

ID=65100674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820839327.1U Expired - Fee Related CN208431462U (en) 2018-06-01 2018-06-01 The integrated assembling constructing structure of high residential building piping shaft subfeeder

Country Status (1)

Country Link
CN (1) CN208431462U (en)

Similar Documents

Publication Publication Date Title
CN102258341B (en) Device for digital shower system and installation method and structure of device
CN105971167A (en) Curtain wall and mounting adjustment device
CN202132612U (en) Multi-pipeline water-proof sleeve
CN208431462U (en) The integrated assembling constructing structure of high residential building piping shaft subfeeder
CN201487519U (en) Wall hanging frame of plat panel television
CN205399892U (en) Thermal insulation decorates wall body board system
CN207499310U (en) Indoor glass facing mounting assembly
CN206233500U (en) Heat-preserving wall balustrade exterior panelling mounting structure
CN206625609U (en) Quick decoration system
CN202500296U (en) Embedded prearranged pipe locking pin used for fixing veneer
CN203961349U (en) Between a kind of integral bathroom of unitization dismounting
CN103276872A (en) Double-layer point-connection glass curtain wall connecting component and connecting structure thereof
CN210421539U (en) Waterproof hyperboloid curtain
CN208620160U (en) A kind of wall lamp angle adjustment mechanism
CN208633264U (en) A kind of adjustable floating screed keel
CN207079781U (en) A kind of Combined marble frame curtain wall
CN201818836U (en) Novel tap
CN209653171U (en) A kind of detachable metope vertical baffle attachment device
CN206233504U (en) A kind of back hanging type inner wall crystalline substance calcium board mounting structure
CN209568584U (en) Can free installing and dismounting wooden frame cell curtain wall
CN205669781U (en) A kind of New LED face lamp support
CN209244292U (en) A kind of cladding panel installation bottom levelling device
CN208816926U (en) A kind of fixed device of rubber soft joint
CN205333293U (en) Test chart
CN208223142U (en) A kind of liner and the separately installed structure of tuyere

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190125

Termination date: 20190601