CN203961349U - Between a kind of integral bathroom of unitization dismounting - Google Patents

Between a kind of integral bathroom of unitization dismounting Download PDF

Info

Publication number
CN203961349U
CN203961349U CN201420394675.4U CN201420394675U CN203961349U CN 203961349 U CN203961349 U CN 203961349U CN 201420394675 U CN201420394675 U CN 201420394675U CN 203961349 U CN203961349 U CN 203961349U
Authority
CN
China
Prior art keywords
boss
backboard
screw
layer
unitization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420394675.4U
Other languages
Chinese (zh)
Inventor
赵宗尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan LONCIN Bathroom Equipment Co., Ltd.
Original Assignee
赵宗尧
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 赵宗尧 filed Critical 赵宗尧
Priority to CN201420394675.4U priority Critical patent/CN203961349U/en
Application granted granted Critical
Publication of CN203961349U publication Critical patent/CN203961349U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Residential Or Office Buildings (AREA)
  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model discloses between a kind of integral bathroom of unitization dismounting, comprise chassis, some backboards unit and top cover, backboard unit comprises the first backboard and the second backboard, the both sides of the first backboard are extended with the first boss, the second boss with the first boss complementary fit is extended in the both sides of the second backboard, and the first boss is further fixedly connected with by screw with after the second boss complementary fit again; Chassis comprises skid resistant course, PMMA layer, crystal steel layer, supporting layer and the pipe layers setting gradually from top to bottom, between crystal steel layer and supporting layer, is provided with Compress Spring.The utility model is by backboard unit is rationally set, to coupling and the installation flexibly of each backboard unit, not only easy for installation quick, and saves installing space, is applicable to the washroom of all size size; In addition, by chassis is rationally arranged to composite bed, and Compress Spring adjustment chassis whole levelness is set in relevant position, thereby guarantees the smooth high accuracy installation that realizes monolithic bathroom in chassis.

Description

Between a kind of integral bathroom of unitization dismounting
Technical field
The utility model relates to a kind of sanitaryware, is specifically related between a kind of integral bathroom of unitization dismounting.
Background technology
At present, along with people's living standard is more and more higher, also more and more higher to the requirement of quality of the life, be desirable to provide the product of various hommizations.Bathroom is generally used in people's life, and especially monolithic bathroom is progressively becoming main flow.But existing monolithic bathroom is installed complicated, assembles between each backboard by connecting band or other complicated syndeton.When mounted, need to install in the outside of bathroom, comparatively strict to the requirement of sanitary and balneal room, run into compare little washroom, space, constant operation.Having restricted monolithic bathroom uses in the washroom of miniaturization.
In addition, monolithic bathroom has higher requirement to the planeness on chassis: if chassis level degree is higher, the installation accuracy of monolithic bathroom and quality also can be higher so; If levelness is lower, there is slight inclination, the installation accuracy of monolithic bathroom and quality also can decrease so.There is following problem in existing monolithic bathroom: chassis installation level not high when mounted, is difficult to lay smooth; The ducted water capacity easily occurs to reflux or flows backwards and causes the problem such as leak.
So, the integral installation and the chassis planeness problem that provide a kind of new technical scheme to solve monolithic bathroom are provided badly.
Utility model content
Goal of the invention: in order to overcome the deficiencies in the prior art, the utility model provides between a kind of integral bathroom of unitization dismounting, by backboard unit is rationally set, to coupling and the installation flexibly of each backboard unit, not only easy for installation quick, and saving installing space, be not only applicable to large-scale washroom but also be applicable to the washroom of miniaturization; In addition, by chassis is rationally arranged to composite bed, and Compress Spring adjustment chassis whole levelness is set in relevant position, thereby guarantees the smooth high accuracy installation that realizes monolithic bathroom in chassis.
Technical scheme: for solving the problems of the technologies described above, between the integral bathroom of a kind of unitization dismounting of the present utility model, comprise chassis, some backboards unit and top cover, described backboard unit comprises the first backboard and the second backboard, the both sides of the first backboard are extended with the first boss, the second boss with the first boss complementary fit is extended in the both sides of the second backboard, and the first boss is further fixedly connected with by screw with after the second boss complementary fit again; Described chassis comprises skid resistant course, PMMA layer, crystal steel layer, supporting layer and the pipe layers setting gradually from top to bottom, between described crystal steel layer and supporting layer, be provided with Compress Spring, four drift angle places of supporting layer are equipped with screwed hole, and steel-wire screw-socket is installed in screwed hole; Crystal steel layer is provided with support, and support is provided with shoulder hole, and the screw for connection bracket and supporting layer is installed in shoulder hole, and the nut head of screw is arranged on shoulder hole place, and the double-screw bolt of screw is between supporting layer and support, and spring housing is located on double-screw bolt; By the degree of depth that regulates the double-screw bolt of each screw to screw in steel-wire screw-socket, regulate the levelness of crystal steel layer.
As preferably, described the first backboard is glass epoxy, and glass epoxy one side is plane, and the center of glass epoxy opposite side is inwardly provided with groove.
As preferably, in described pipe layers, be equipped with the pipeline being connected with floor drain, described pipeline is provided with one way valve, avoids occurring the problems such as the backflow of bathroom water route, refluence.
For further sealing and fixing, in described shoulder hole, on the nut head of screw, be coated with fixing glue and fluid sealant.
Described the first boss is " L " shape, and described the second boss is the inverted "L" shaped with the first boss complementary fit; Or described the first boss is " protruding " font, described the second boss is " recessed " font with the first boss complementary fit.
Between the skid resistant course on chassis, PMMA layer, crystal steel layer, between supporting layer and pipe layers, all by adhesive, connect.
Beneficial effect: between the integral bathroom of a kind of unitization dismounting of the present utility model, by backboard unit is rationally set, to coupling and the installation flexibly of each backboard unit, not only easy for installation quick, and saving installing space, not only be applicable to large-scale washroom but also be applicable to the washroom of miniaturization, be widely used in the washroom of all size size; In addition, by chassis is rationally arranged to composite bed, and Compress Spring adjustment chassis whole levelness is set in relevant position, thereby guarantees the smooth high accuracy installation that realizes monolithic bathroom in chassis.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the main TV structure schematic diagram on chassis in Fig. 1;
Fig. 3 is the structural representation of supporting layer and crystal steel layer in Fig. 2.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further described.
As shown in Figure 1 to Figure 3, between the integral bathroom of a kind of unitization dismounting of the present utility model, comprise chassis 10, backboard unit and top cover 8, backboard unit comprises the first backboard 9 and the second backboard 11, the first backboard 9 is glass epoxy, glass epoxy one side is plane, and the center of glass epoxy opposite side is inwardly provided with groove.The both sides that the both sides of the first backboard 9 are extended with the first boss 13, the second backboards 11 are extended the second boss 12, the first boss 13 and by screw, are further fixedly connected with after the second boss 12 complementary fit again.For example, when the first boss is " L " shape, when the second boss is the inverted "L" shaped with the first boss complementary fit, after two boss complementary fit, in junction, screw in screw further fixing.
Comprise the skid resistant course 5, PMMA layer 4, crystal steel layer 3, supporting layer 2 and the pipe layers 1 that set gradually from top to bottom, between crystal steel layer 3 and supporting layer 2, be provided with Compress Spring 7,2 four drift angle places of supporting layer are equipped with screwed hole, and steel-wire screw-socket 6 is installed in screwed hole; Crystal steel layer 3 is provided with support, support is provided with shoulder hole, screw for connection bracket and supporting layer 2 is installed in shoulder hole, screw comprises nut head and double-screw bolt, the nut head of screw is arranged on shoulder hole place, the double-screw bolt of screw is between supporting layer 3 and the support of crystal steel layer 3, and Compress Spring 7 is set on the double-screw bolt of screw; Steel-wire screw-socket 6 inside are provided with the screw thread suitable with this double-screw bolt, regulate the levelness of crystal steel layer 3 by the degree of depth that regulates each double-screw bolt to screw in steel-wire screw-socket 6.
Wherein, be equipped with the pipeline being connected with floor drain in pipe layers 1, pipeline is provided with one way valve.For further sealing and fixing, in shoulder hole, on the nut head of screw, be coated with fixing glue and fluid sealant.
When mounted, first pipe laying layer 1 for the utility model, in pipe layers 1, the pipeline being connected with floor drain is installed, and this pipeline is provided with one way valve, avoids occurring the problems such as the backflow of bathroom water route, refluence; Then lay supporting layer 2, supporting layer 2 selects the square steel welding fabrication of 304# to be laid on the top of pipe layers 1, at four drift angle places of supporting layer 2, is equipped with screwed hole, and steel-wire screw-socket 6 is installed in screwed hole, in steel-wire screw-socket 6, is provided with screw thread; Between crystal steel layer 3 and supporting layer 2, be provided with spring 7, spring 7 is corresponding with the position of screwed hole; Shoulder hole at crystal steel layer 3 inserts screw, on crystal steel layer 3, place spirit level, thereby by adjustment screw, adjust crystal steel layer 3 and make its state that is up to the standard: the double-screw bolt of certain position screws in the degree of depth of steel-wire screw-socket 6 when darker, and spring 7 compression degrees are larger, and crystal steel layer 3 position are lower; When the double-screw bolt of certain position screws in the degree of depth of steel-wire screw-socket 6 when more shallow, spring 7 compression degrees are less, and spring supporting crystal steel layer 3 is positioned at higher position.By the degree of depth that regulates the swivel nut of each screw to screw in steel-wire screw-socket 6, realize the adjusting of levelness.When crystal steel layer 3 is adjusted into after level, in shoulder hole, first apply fixing glue, shut screw, screw is completely fixed and avoids fine rotation; Then in shoulder hole, apply fluid sealant, further sealing; Finally, lay PMMA layer 4 and skid resistant course 5 on crystal steel layer 3, skid resistant course 5 is selected high purity carbon crystalline substance and rubber composite.
Afterwards, the first backboard 9 is placed on to the relevant position on chassis 10, in the groove of the first backboard 9, install each pipeline, and check whether leak, the first backboard 9 use screws are connected and are fixed on chassis 10, the second backboard 11 is placed on to corresponding position, chassis 10, make to be screwed, to after the first boss 13 of the first backboard 9 and the second backboard 11 and the second boss 12 complementary fit, be connected by screw, top cover 8 is fixed by screws in to the top of the first backboard 9 and the second backboard 11, installation between the integral bathroom of unitization dismounting.Whole installation process is efficient and convenient, can greatly improve installation accuracy and efficiency.
The above is only preferred embodiment of the present utility model; be noted that for those skilled in the art; do not departing under the prerequisite of the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (6)

1. between the integral bathroom of a unitization dismounting, it is characterized in that: comprise chassis, some backboards unit and top cover, described backboard unit comprises the first backboard and the second backboard, the both sides of the first backboard are extended with the first boss, the second boss with the first boss complementary fit is extended in the both sides of the second backboard, and the first boss is further fixedly connected with by screw with after the second boss complementary fit again; Described chassis comprises skid resistant course, PMMA layer, crystal steel layer, supporting layer and the pipe layers setting gradually from top to bottom, between described crystal steel layer and supporting layer, be provided with Compress Spring, four drift angle places of supporting layer are equipped with screwed hole, and steel-wire screw-socket is installed in screwed hole; Crystal steel layer is provided with support, and support is provided with shoulder hole, and the screw for connection bracket and supporting layer is installed in shoulder hole, and the nut head of screw is arranged on shoulder hole place, and the double-screw bolt of screw is between supporting layer and support, and spring housing is located on double-screw bolt; By the degree of depth that regulates the double-screw bolt of each screw to screw in steel-wire screw-socket, regulate the levelness of crystal steel layer.
2. between the integral bathroom of unitization dismounting according to claim 1, it is characterized in that: described the first backboard is glass epoxy, glass epoxy one side is plane, and the center of glass epoxy opposite side is inwardly provided with groove.
3. between the integral bathroom of unitization dismounting according to claim 1, it is characterized in that: in described pipe layers, be equipped with the pipeline being connected with floor drain, described pipeline is provided with one way valve; The groove structure low centered by described skid resistant course, edge is high.
4. between the integral bathroom of unitization dismounting according to claim 1, it is characterized in that: in described shoulder hole, on the nut head of screw, be coated with fixing glue and fluid sealant.
5. between the integral bathroom of unitization dismounting according to claim 1, it is characterized in that: described the first boss is for " L " shape, described the second boss is the inverted "L" shaped with the first boss complementary fit.
6. between the integral bathroom of unitization dismounting according to claim 1, it is characterized in that: described the first boss is " protruding " font, described the second boss is " recessed " font with the first boss complementary fit.
CN201420394675.4U 2014-07-16 2014-07-16 Between a kind of integral bathroom of unitization dismounting Expired - Fee Related CN203961349U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420394675.4U CN203961349U (en) 2014-07-16 2014-07-16 Between a kind of integral bathroom of unitization dismounting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420394675.4U CN203961349U (en) 2014-07-16 2014-07-16 Between a kind of integral bathroom of unitization dismounting

Publications (1)

Publication Number Publication Date
CN203961349U true CN203961349U (en) 2014-11-26

Family

ID=51921950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420394675.4U Expired - Fee Related CN203961349U (en) 2014-07-16 2014-07-16 Between a kind of integral bathroom of unitization dismounting

Country Status (1)

Country Link
CN (1) CN203961349U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2581994A (en) * 2019-03-06 2020-09-09 Trieste Group One Ltd A booth
US11846099B2 (en) 2019-10-18 2023-12-19 Trieste Group One Ltd Acoustic seal and a sound proof booth comprising the same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2581994A (en) * 2019-03-06 2020-09-09 Trieste Group One Ltd A booth
GB2581994B (en) * 2019-03-06 2021-07-28 Trieste Group One Ltd A booth
US11846099B2 (en) 2019-10-18 2023-12-19 Trieste Group One Ltd Acoustic seal and a sound proof booth comprising the same

Similar Documents

Publication Publication Date Title
CN203961349U (en) Between a kind of integral bathroom of unitization dismounting
CN204202227U (en) A kind of flat-plate solar collector building element
CN205935275U (en) High -efficient safe fire proof board for building protection
CN202990154U (en) Wall level adjusting device
CN203129375U (en) Curtain wall T-shaped hanging piece installation device
CN205781873U (en) A kind of adjustable vehicle-mounted camera mounting bracket
CN204611273U (en) A kind of suspension type projector bracket connected with direction flexible
CN203953461U (en) The multiple layer of a kind of carbon steel chassis
CN204592739U (en) Cart type liquid crystal support
CN202248423U (en) Hanging curtain wall
CN213575960U (en) Pipeline positioning support for water supply and drainage engineering
CN203516342U (en) Connecting structure for screen frame
CN202299008U (en) Unit curtain wall three-dimensional adjusting rotationally connecting system
AU2016102084A4 (en) An Adjustable Glass Spigot
CN206503466U (en) Land wheel stops pendulum device
CN209414771U (en) The adjustable water pipe wooden block of setting angle
CN219710847U (en) Metal assembly part convenient to install and fix
CN205162905U (en) Novel massage bathtub
CN208431462U (en) The integrated assembling constructing structure of high residential building piping shaft subfeeder
CN204772241U (en) Cross before automobile on wallboard and braking oil pipe's partial shipment frock
CN204538895U (en) A kind of combination mounting structure of Pump and Electromotor
CN204084807U (en) Air-conditioner outdoor unit
CN202809946U (en) Daylighting roof system available for adjustment on glass angle
CN201621341U (en) Tap water constant pressure water-saving valve
CN203488946U (en) Easily mounted rocker arm type television stand

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180706

Address after: 410000 the third floor of Jinlan Jinyuan Industrial Workshop, lotus leaf village, Donghong Town, Changsha high tech Development Zone, Hunan, China, 101

Patentee after: Hunan LONCIN Bathroom Equipment Co., Ltd.

Address before: 223300 Jiangsu Huaian Huaiyin District Wang Yang Road 8, Huaian City, the United States as a whole bathroom Co., Ltd.

Patentee before: Zhao Zongyao

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141126

Termination date: 20180716

CF01 Termination of patent right due to non-payment of annual fee