CN208430503U - A kind of opening and closing device for sinking tube compacted broken stone pile discharge port - Google Patents

A kind of opening and closing device for sinking tube compacted broken stone pile discharge port Download PDF

Info

Publication number
CN208430503U
CN208430503U CN201821033453.4U CN201821033453U CN208430503U CN 208430503 U CN208430503 U CN 208430503U CN 201821033453 U CN201821033453 U CN 201821033453U CN 208430503 U CN208430503 U CN 208430503U
Authority
CN
China
Prior art keywords
tube
pipe
hinge
pieces
opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821033453.4U
Other languages
Chinese (zh)
Inventor
刘海啸
厉建华
王鹏书
蒋小玲
代喜成
沈兴东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201821033453.4U priority Critical patent/CN208430503U/en
Application granted granted Critical
Publication of CN208430503U publication Critical patent/CN208430503U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of opening and closing device for sinking tube compacted broken stone pile discharge port, including cylindrical end pipe, it is characterised in that: the top of the end pipe is provided with end pipe closing in, and bottom is provided with shutter device;The shutter device includes pin rod and two pieces of hinge plates being articulated on pin rod, the hinge plate is spliced into circle, two pieces of hinge plate splicing diameter of a circles are greater than the outer diameter of the end pipe, the pin rod is fixed on the central axis of the end bottom of the tube, two pieces of hinge plates form the closure plate of the end bottom of the tube being spliced into bowlder, two pieces of hinge plates open the heavy connection of pipe of the end bottom of the tube when flipping outward, and metaling is discharged by the heavy connection of pipe of the end bottom of the tube.The utility model is opened during immersed tube is extracted upwards using earth lateral pressure auxiliary opening and closing combination, guarantees that metaling can be smoothly from immersed tube discharge hole for discharge.

Description

A kind of opening and closing device for sinking tube compacted broken stone pile discharge port
Technical field
The utility model relates to the realm of building construction, and in particular to a kind of opening and closing for sinking tube compacted broken stone pile discharge port Device.
Background technique
Crushed stone pile be by formation of pile to sand around, the compacted of powder soil horizon, vibration densification and by rubble Indentation obtains foundation stabilization effect, increases the compactness of sand, silt foundation;The Dense Broken Stone Peg reinforcement of setting simultaneously, Itself is again a good drainage channel, its presence not only contribute to sand, in silt foundation super gap hydraulic pressure dissipation, The anti-liquefying ability of the effective enhancing soil body, and under the action of load, crushed stone pile reinforcement again with sand, silt Base shared load action, that is, form Dense Broken Stone Peg composite foundation.
Sinking tube compacted broken stone pile method is added when immersed tube reaches specified depth into immersed tube using vibration sinking tube pore-forming Metaling, the tube drawing that immersed tube is carried out after adding metaling vibrate and wash opening for immersed tube discharge port open using metaling own wt Close device, the close formation broken stone pile of anti-plug vibration.When broken stone pile needs squeeze into deeper depth from original ground, gone out using traditional immersed tube When the opening and closing device of material mouth, often because the pressure of soil and underground water around immersed tube leads to opening for traditional immersed tube discharge port Closing device can not normally open, and rubble in immersed tube is caused to can not be successfully discharging.
Summary of the invention
Goal of the invention: the utility model aim is in view of the deficiencies of the prior art, to provide a kind of guarantee metaling heavy During the tube drawing of pipe, smoothly from the opening and closing device of immersed tube discharge hole for discharge, the utility model is avoided because of metaling itself weight The problem of insufficient reason of amount causes discharge port not open normally.
Technical solution: a kind of opening and closing device for sinking tube compacted broken stone pile discharge port described in the utility model, including circle Cylindrical end pipe, the top of the end pipe are provided with end pipe closing in, and bottom is provided with shutter device;The shutter device Including pin rod and two pieces of hinge plates being articulated on pin rod, the hinge plate is spliced into circle, and two pieces of hinge plates splice circle Diameter is greater than the outer diameter of the end pipe, and the pin rod is fixed on the central axis of the end bottom of the tube, two pieces of conjunctions Page board forms the closure plate of the end bottom of the tube being spliced into bowlder, and two pieces of hinge plates are when flipping outward described in opening The heavy connection of pipe of end bottom of the tube, metaling are discharged by the heavy connection of pipe of the end bottom of the tube.
In order to flip outward the hinge plate can successfully during immersed tube, the pin rod and the end pipe Junction is installed with card side plate straight down respectively.
Further, the hinge plate is respectively flat side with the side of being close to of the card side plate, and two hinge plates are straight The distance between side is identical as the diameter of the end pipe.
Further, the length of the hinge plate arc section diameter is 20cm longer than the diameter of the end pipe.
Further, by being integrally connected with the vertically disposed hinge baffle of the card side plate between the two card side plates.
The utility model has the advantages that the utility model is by the shutter device that is arranged in end bottom of the tube, shutter device include pin rod and Two pieces of hinge plates being articulated on pin rod, hinge plate are spliced into circle, and two pieces of hinge plate splicing diameter of a circles are greater than the outer of end pipe Diameter, two pieces of hinge plates form the closure plate of end bottom of the tube being spliced into bowlder, and two pieces of hinge plates open end when flipping outward The heavy connection of pipe of head tube bottom, metaling are discharged by the heavy connection of pipe of end bottom of the tube.Hinge described in the utility model The diameter of plate is greater than the diameter of end pipe, and the design of such structure can make metaling during the tube drawing of immersed tube, using heavy Pipe side soil pressure pushes the part that hinge plate exceeds end pipe, can promote the smooth opening of hinge plate, and then help broken The smooth blanking of building stones.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of opening and closing device described in the utility model;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the combined top view of opening and closing described in the utility model;
Fig. 4 is the structural schematic diagram in opening and closing combination opening procedure described in the utility model.
Wherein 1- end pipe closes up;2- end pipe;3- hinge plate;4- pin rod;5- hinge baffle;6- card side plate.
Specific embodiment
Technical solutions of the utility model are described in detail below by attached drawing, but the protection scope of the utility model It is not limited to the embodiment.
Embodiment: a kind of opening and closing device for sinking tube compacted broken stone pile discharge port, 1 to attached drawing 4 it is found that originally with reference to the accompanying drawings Utility model includes the cylindrical end pipe 2 of immersed tube, and the size of 2 diameter of end pipe is designed according to broken stone pile diameter,
The top of end pipe 2 is provided with the end pipe closing in 1 connecting with immersed tube, and the bottom of end pipe 2 is provided with opening and closing group Part, end pipe 2 are made of fished pipe, and the end pipe on 2 top of end pipe closes up 1 to be welded using trapezoidal steel plate splicing, and heavy Pipe connection, the diameter of the bottom of end pipe 2 are identical as the diameter of broken stone pile diameter;
Shutter device includes that two pieces of round hinge plates 3 are spliced into pin rod 4, and hinge plate 3 is close to side difference with card side plate 6 For flat side, the distance between two hinge plates, 3 flat side is identical as the outer diameter of end pipe 2, the length of 3 arc section diameter of hinge plate Than the outer path length 20cm of end pipe 2, i.e. 3 arc section jag head tube of hinge plate, 2 outer diameter direction 10mm, hinge plate uses 8 ~ 10mm Steel plate production;Pin rod 4 is fixed on the central axis of 2 bottom of end pipe, and pin rod 4 and the junction of end pipe 2 are respectively arranged with Card side plate 6 straight down, card side plate 6 are made of 8 ~ 10mm steel plate, and card side plate 6 is welded on 2 central axis of end pipe, and It is stayed at both ends and wears pin rod hole, card side plate 6 is used to fix pin rod 4, and pin rod 4 uses diameter to make for the round steel of 20mm, both ends and card Side plate 6 welds;By being integrally connected with the vertically disposed hinge baffle 5 of card side plate 6 between two card side plates 6, hinge baffle 5 is used 8 ~ 10mm steel plate production, with 6 firm welding of card side plate;Two pieces of hinge plates 3 flip outward under the support of pin rod 4, two pieces of hinges Plate 3 forms the closure plate of 2 bottom of end pipe being spliced into bowlder, and two pieces of hinge plates 3 open 2 bottom of end pipe when flipping outward Heavy connection of pipe, metaling discharged by the heavy connection of pipe of the end bottom of the tube.
The 3 arc section jag of flip-over and hinge plate of two pieces of hinge plates 3 is utilized when the basic principle of the utility model 2 outer diameter direction 10mm of head tube, such structure design can make metaling during the tube drawing of immersed tube, utilize immersed tube side soil Pressure pushes the part that hinge plate 3 exceeds end pipe 2, and under the action of the soil pressure of immersed tube side two pieces of block hinge plates 3 It is flipped outward, and then the smooth opening of hinge plate can be promoted, the heavy connection of pipe of 2 bottom of end pipe thus can be opened, into And metaling is made to discharge by the heavy connection of pipe of 2 bottom of end pipe.
As described above, although the utility model has been indicated and described referring to specific preferred embodiment, it must not It is construed to the limitation to the utility model itself.In the spirit and scope for not departing from the utility model that appended claims define Under the premise of, it can various changes can be made in the form and details to it.

Claims (5)

1. a kind of opening and closing device for sinking tube compacted broken stone pile discharge port, including cylindrical end pipe, it is characterised in that: institute The top for stating end pipe is provided with end pipe closing in, and bottom is provided with shutter device;The shutter device includes pin rod and two pieces The hinge plate being articulated on pin rod, the hinge plate are spliced into circle, and two pieces of hinge plate splicing diameter of a circles are greater than the end The outer diameter of head tube, the pin rod are fixed on the central axis of the end bottom of the tube, and two pieces of hinge plates are being spliced into circle When form the closure plate of the end bottom of the tube, two pieces of hinge plates open the pipe of the end bottom of the tube when flipping outward Road channel, metaling are discharged by the heavy connection of pipe of the end bottom of the tube.
2. a kind of opening and closing device for sinking tube compacted broken stone pile discharge port according to claim 1, it is characterised in that: institute The junction for stating pin rod and the end pipe is installed with card side plate straight down respectively.
3. a kind of opening and closing device for sinking tube compacted broken stone pile discharge port according to claim 2, it is characterised in that: institute It is respectively flat side, the distance between two described hinge plate flat sides and the end that hinge plate, which is stated, with the side of being close to of the card side plate The diameter of head tube is identical.
4. a kind of opening and closing device for sinking tube compacted broken stone pile discharge port according to claim 3, it is characterised in that: institute The length for stating hinge plate arc section diameter is 20cm longer than the diameter of the end pipe.
5. a kind of opening and closing device for sinking tube compacted broken stone pile discharge port according to claim 2, it is characterised in that: two By being integrally connected with the vertically disposed hinge baffle of the card side plate between the card side plate.
CN201821033453.4U 2018-07-02 2018-07-02 A kind of opening and closing device for sinking tube compacted broken stone pile discharge port Active CN208430503U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821033453.4U CN208430503U (en) 2018-07-02 2018-07-02 A kind of opening and closing device for sinking tube compacted broken stone pile discharge port

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821033453.4U CN208430503U (en) 2018-07-02 2018-07-02 A kind of opening and closing device for sinking tube compacted broken stone pile discharge port

Publications (1)

Publication Number Publication Date
CN208430503U true CN208430503U (en) 2019-01-25

Family

ID=65098281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821033453.4U Active CN208430503U (en) 2018-07-02 2018-07-02 A kind of opening and closing device for sinking tube compacted broken stone pile discharge port

Country Status (1)

Country Link
CN (1) CN208430503U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114916525A (en) * 2022-05-30 2022-08-19 山东省农业科学院 Portable pesticide applicator for fertilizing flower roots

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114916525A (en) * 2022-05-30 2022-08-19 山东省农业科学院 Portable pesticide applicator for fertilizing flower roots
CN114916525B (en) * 2022-05-30 2024-02-20 山东省农业科学院 Portable pesticide applicator for fertilizing peanut roots

Similar Documents

Publication Publication Date Title
US8079780B2 (en) Slotted mandrel for lateral displacement pier and method of use
US10941534B2 (en) Methods and apparatuses for compacting soil and granular materials
CN102409598A (en) Method for processing vehicle bump at bridge head of existing highway
CN206376891U (en) A kind of concertina type grouted anchor bar
CN102926400A (en) Combined earth retaining wall structure and construction method thereof
CN208430503U (en) A kind of opening and closing device for sinking tube compacted broken stone pile discharge port
CN207891824U (en) A kind of safeguard structure of hydraulic and hydroelectric engineering side slope
US20210164185A1 (en) Methods and apparatuses for compacting soil and granular materials
CN106836212A (en) A kind of pile extension end plate and pile extension technology
CN204780870U (en) Complicated waters slope scar major diameter drilling bored concrete pile
CN207878198U (en) Face bank cantilever roads
CN102619215A (en) Lock catch type steel pipe pile structure and construction method thereof
CN206376274U (en) A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure
CN205676902U (en) Arched framework slope protection construction typified form
CN205475266U (en) Side slope reinforcing structure
CN211171994U (en) Occlusive pile and diaphragm wall combined foundation pit supporting structure
CN105064271B (en) A kind of harbour reconstruction structure and Wharf Renovation Construction method
CN211922599U (en) CFG pile end post-grouting device
CN204825936U (en) Lock catch type steel -pipe pile is used in cofferdam
CN208734111U (en) A kind of rotary digging stake sealing hole grid
KR101354146B1 (en) Grab device for soil excavation having auto-centering function
CN207143993U (en) Steel Wall for subway station shield hole side
CN103601141A (en) Device capable of transporting materials vertically
CN204417945U (en) A kind of road foundation depression prosthetic device
CN216194870U (en) Pile foundation structure with small masonry amount of combined rod piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant