CN206376274U - A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure - Google Patents

A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure Download PDF

Info

Publication number
CN206376274U
CN206376274U CN201720011287.7U CN201720011287U CN206376274U CN 206376274 U CN206376274 U CN 206376274U CN 201720011287 U CN201720011287 U CN 201720011287U CN 206376274 U CN206376274 U CN 206376274U
Authority
CN
China
Prior art keywords
pile
reinforced concrete
tower
anchor cable
concrete pile
Prior art date
Application number
CN201720011287.7U
Other languages
Chinese (zh)
Inventor
王其洋
毛江峰
吴敏
高荣荣
何朝
潘志乾
Original Assignee
中建三局第二建设工程有限责任公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中建三局第二建设工程有限责任公司 filed Critical 中建三局第二建设工程有限责任公司
Priority to CN201720011287.7U priority Critical patent/CN206376274U/en
Application granted granted Critical
Publication of CN206376274U publication Critical patent/CN206376274U/en

Links

Abstract

The utility model discloses a kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure, deposited reinforced concrete pile is arranged on below excavation face, in described deposited reinforced concrete pile upper end anchoring and reinforced concrete pile cap;Pre-buried tower crane section in reinforced concrete pile cap;Tower crane section is affixed integral with tower body;Twice anchor cable is set in also pre-buried two sleeve pipes in reinforced concrete pile cap, sleeve pipe;Tensioning termination is fixedly installed in tower body side on reinforced concrete pile cap, and anchor cable one end is fixed on gooseneck through tensioning termination, and gooseneck is fixed on tensioning termination.The utility model, which solves existing tower crane, can not ensure the problem of high stability and high efficiency positioning peace are torn open simultaneously, can meet tower body antidumping, resistant slide power, good integrity, it is to avoid later stage expense and potential safety hazard.

Description

A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure
Technical field
The utility model is related to a kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure, belongs to the realm of building construction.
Background technology
Existing tower crane form is:Independent cushion cap foundation, rood beam basis, Pile-supported stand foundation and lattice column are high-order Cushion cap foundation.Independent cushion cap foundation and rood beam basis is typically disposed in below foundation excavation face, and basic earthwork is constructed after excavating, It has the disadvantage that foundation ditch needs slope shoveling, security protection and backfilling of earthwork, and operation side is big, requires high to subsoil.Pile Stylobate plinth be solve natural foundation bearing capacity it is not enough in the case of and a kind of tower crane form for using, usually 1-4 roots irrigate Stake, it has the disadvantage that foundation ditch needs slope to cut the earth, and security protection and the backfill earthwork, construction working face are larger, and cost is higher.Lattice pillar height Position cushion cap foundation is used in deep basal pit, passes through in basement architectural engineering, the base form saves earth excavation, bank protection, Backfilling of earthwork, but cost itself is high.
Existing tower crane form though be applicable the architectural engineering of different characteristics, exist be not be exactly cost height more than process Problem, and site condition there are certain requirements.Narrow and small to construction area site condition, foundation pit supporting pile has been constructed, basement Exterior wall is nearer with support pile, and require cost it is low be factor that each building enterprise considers, current tower crane form is difficult to The requirement of condition of compatibility change.
Utility model content
The purpose of this utility model is to overcome the problem of above-mentioned prior art is present and shortcoming high-order there is provided a kind of single pile Cushion cap and anchor cable tower-crane foundation structure.The utility model greatly reduces construction costs using single pile, cushion cap and anchorage cable design;It is logical Crossing single pile, cushion cap and anchorage cable design is realized after foundation pit supporting pile excavated, and height can not be ensured simultaneously by solving existing tower crane The problem of stability and high efficiency positioning peace are torn open, can meet tower body antidumping, resistant slide power, good integrity, it is to avoid later stage expense And potential safety hazard;Solve small in operation side, it is adaptable to which different soil properties, foundation pit supporting pile have been excavated, and face side tower crane base at it Plinth is constructed;Its structure and its construction method are simple, and technology is easy to grasp and implemented.
Scheme of the present utility model is as follows:A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure, including a reinforcing bar Cast-in-place concrete pile, reinforced concrete pile cap and tower crane section;
Described deposited reinforced concrete pile is arranged on below excavation face, described deposited reinforced concrete pile upper end anchoring In reinforced concrete pile cap;
Pre-buried tower crane section in described reinforced concrete pile cap;Described tower crane section and tower body are affixed into one Body;
Anchor cable is passed through in also pre-buried two sleeve pipes in described reinforced concrete pile cap, described sleeve pipe;
Tensioning termination is fixedly installed in tower body side on described reinforced concrete pile cap, and anchor cable one end is solid through tensioning termination It is scheduled on gooseneck, described gooseneck is fixed on tensioning termination;The anchor cable other end is embedded in the earthwork.
Further, it is provided with steel reinforcement cage, described reinforced concrete pile cap and sets in described deposited reinforced concrete pile Cushion cap reinforcing bar is equipped with, by concrete-placing reinforcing steel bar cage, cushion cap reinforcing bar, deposited reinforced concrete pile, armored concrete is formed and holds Platform simultaneously anchors both.
Further, described sleeve pipe is obliquely installed, and slip casting in sleeve pipe so that anchor cable is fixed.
Further, in addition to the hat fine strain of millet for being arranged on the support pile of earthwork side, being arranged on support pile upper end has been excavated.
Further, described support pile is locked by anchorage cable stretching.
Further, plain concrete load transfering strip is set under basement bottom board.
The utility model compared with the prior art, has the following advantages that and beneficial effect:
(1)Clearly, the utility model solves ground endurance not enough using pile foundation, mainly improves its bearing capacity, profit for power transmission With anchorage cable stretching, tower crane resistance to capsizing, good integrity are improved;
(2)Consider compared to tower crane or building beyond the region of objective existence slope installation tower crane in basement is installed, including tear open Unload, backfilling of earthwork and the envelope expense such as floor have its good comprehensive benefit.
Brief description of the drawings
Fig. 1 is the side diagram of the utility model foundation structure.
Embodiment
The utility model is described further with reference to embodiment.
A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure, including deposited reinforced concrete pile 1, a reinforced concrete Native cushion cap 2 and tower crane section 3;Deposited reinforced concrete pile 1 is arranged on below excavation face, deposited reinforced concrete pile upper end anchor Gu and in reinforced concrete pile cap 2;Pre-buried tower crane section 3 in reinforced concrete pile cap 2;Tower crane section 3 and tower body 8 are affixed Integrally;Anchor cable 5 is passed through in also pre-buried two sleeve pipes 4 in reinforced concrete pile cap 2, sleeve pipe 4;Tower on reinforced concrete pile cap 2 Tensioning termination 6 is fixedly installed in body side, and the one end of anchor cable 5 is fixed on gooseneck 7 through tensioning termination 6, and gooseneck, which is fixed on, to be opened On pull end head;The rope other end of anchor 5 is embedded in the earthwork.
The utility model is provided with steel reinforcement cage, reinforced concrete pile cap in deposited reinforced concrete pile and is provided with cushion cap Reinforcing bar, by concrete-placing reinforcing steel bar cage, cushion cap reinforcing bar, forms deposited reinforced concrete pile, reinforced concrete pile cap and by two Person anchors.Sleeve pipe tilts 20 degree of settings, and slip casting in sleeve pipe so that anchor cable is fixed.The utility model is also in earth excavation side Face sets some support piles 11, each support pile surface spray anchor armored concrete face, and is locked by twice anchorage cable stretching.Supporting Stake upper end has poured hat fine strain of millet.
The utility model deposited reinforced concrete pile diameter avoids original support pile anchor cable, and same twice anchor cable avoids original Support pile anchor cable position.If under the premise of twice anchor cable anchorage is unappeasable, one of anchor cable can be increased on support pile, really Protect its safety.To ensure to set plain concrete load transfering strip 10, resistance soil under the stability of original stake of excavation supporting, the bottom plate of basement 9 Pressure and power of toppling.
In the utility model single-pile elevated bearing-platform and anchor cable tower-crane foundation structure, tower crane section and bolt use Q235- B, anchor cable is prestress anchorage cable, and welding rod uses E43 types, and weld seam reaches second-order weld quality requirement.
Although detailed description is given to embodiment of the present utility model above and is illustrated, it should be noted that It is that we can carry out various equivalent changes and modification according to conception of the present utility model to above-mentioned embodiment, produced by it Function still covered without departing from specification spirit when, all should be within protection domain of the present utility model.

Claims (6)

1. a kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure, it is characterised in that including a deposited reinforced concrete pile, Reinforced concrete pile cap and tower crane section;
Described deposited reinforced concrete pile is arranged on below excavation face, described deposited reinforced concrete pile upper end anchoring and steel In reinforced concrete cushion cap;
Pre-buried tower crane section in described reinforced concrete pile cap;Described tower crane section is affixed integral with tower body;
Anchor cable is passed through in also pre-buried two sleeve pipes in described reinforced concrete pile cap, described sleeve pipe;
Tensioning termination is fixedly installed in tower body side on described reinforced concrete pile cap, and anchor cable one end is fixed on through tensioning termination On gooseneck, described gooseneck is fixed on tensioning termination;The anchor cable other end is embedded in the earthwork.
2. a kind of single-pile elevated bearing-platform according to claim 1 and anchor cable tower-crane foundation structure, it is characterised in that
It is provided with described deposited reinforced concrete pile in steel reinforcement cage, described reinforced concrete pile cap and is provided with pile cap steel Muscle, by concrete-placing reinforcing steel bar cage, cushion cap reinforcing bar, forms deposited reinforced concrete pile, reinforced concrete pile cap and incite somebody to action both Anchoring.
3. a kind of single-pile elevated bearing-platform according to claim 1 and anchor cable tower-crane foundation structure, it is characterised in that described Sleeve pipe is obliquely installed, and slip casting in sleeve pipe so that anchor cable is fixed.
4. a kind of single-pile elevated bearing-platform according to claim 1 and anchor cable tower-crane foundation structure, it is characterised in that also include The hat fine strain of millet for excavated and be arranged on the support pile of earthwork side, being arranged on support pile upper end.
5. a kind of single-pile elevated bearing-platform according to claim 4 and anchor cable tower-crane foundation structure, it is characterised in that described Support pile is locked by anchorage cable stretching.
6. a kind of single-pile elevated bearing-platform according to claim 1 and anchor cable tower-crane foundation structure, it is characterised in that basement Plain concrete load transfering strip is set under bottom plate.
CN201720011287.7U 2017-01-05 2017-01-05 A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure CN206376274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720011287.7U CN206376274U (en) 2017-01-05 2017-01-05 A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720011287.7U CN206376274U (en) 2017-01-05 2017-01-05 A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure

Publications (1)

Publication Number Publication Date
CN206376274U true CN206376274U (en) 2017-08-04

Family

ID=59404497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720011287.7U CN206376274U (en) 2017-01-05 2017-01-05 A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure

Country Status (1)

Country Link
CN (1) CN206376274U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759442A (en) * 2017-01-05 2017-05-31 中建三局第二建设工程有限责任公司 A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759442A (en) * 2017-01-05 2017-05-31 中建三局第二建设工程有限责任公司 A kind of single-pile elevated bearing-platform and anchor cable tower-crane foundation structure and its construction method

Similar Documents

Publication Publication Date Title
US20200071903A1 (en) Earth retaining system such as a sheet pile wall with integral soil anchors
CN104179178B (en) A kind of flexible umbrella support anchor rod and the method for supporting soil level sideslope
CN201125354Y (en) Steep hill road bed branch block reinforced structure
CN101666081B (en) Abrupt slope bare rock drilling platform and technology in huge reservoir
CN1167857C (en) Foundation pit side-wall flexible support method
CN103031839B (en) Construction method of hand-dug piles
CN105239586B (en) Method for supporting foundation pit by adopting support structure
CN101487355B (en) Telegraph pole and its mounting and fixing method
CN100501011C (en) Hole drilling mudjack pile construction method
US20100183378A1 (en) Spiral steel pile
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN102011401B (en) High-intensity prestressed concrete tubular pile lead hole hammering construction method for soft soil layer
CN203741868U (en) Reinforced concrete retaining wall structure with combined anchor wire
US7708502B2 (en) System and method for stabilizing landslides and steep slopes
CN106088120B (en) A kind of cofferdam decentralization construction method
CN102644275A (en) Rotary-digging combined pile-forming construction method in complicated geological conditions
CN100564700C (en) The job practices of lattice type steel column tower crane pedestal
CN206233258U (en) A kind of Pear-Shaped diaphram wall Anchor Foundation for being applied to suspension bridge
CN206800412U (en) The foundation pit enclosure structure that a kind of steel-pipe pile is combined with Larsen steel sheet pile fore shaft
CN202559361U (en) Precast high strength concrete thin-wall steel pipe pile foundation pit supporting structure
CN108487231B (en) Snowflake type steel sheet pile and processing method thereof
CN106400813B (en) A kind of foundation pit support system and its construction method
CN104727324B (en) Irregular basement construction method for supporting
CN202689031U (en) Deep foundation pit retaining and protecting retaining wall
CN203654303U (en) Side slope reinforcing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant