CN208419758U - A kind of blasting cartridge - Google Patents
A kind of blasting cartridge Download PDFInfo
- Publication number
- CN208419758U CN208419758U CN201821015842.4U CN201821015842U CN208419758U CN 208419758 U CN208419758 U CN 208419758U CN 201821015842 U CN201821015842 U CN 201821015842U CN 208419758 U CN208419758 U CN 208419758U
- Authority
- CN
- China
- Prior art keywords
- shear thickening
- explosion
- thickening liquid
- top plate
- blasting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of blasting cartridges, including tube body, bottom plate, and top plate, the tube body, bottom plate and top plate form lumen;The explosion accumulator of the intracavitary setting of shear thickening liquid cage walls, the utility model blasting cartridge is placed in blasting hole, top plate is inwardly pushed by push rod, the promotion of top plate causes shear thickening liquid to be squeezed, and the thickness of the shear thickening liquid between top plate inner wall and explosion accumulator is adjustable;And can open cover board at this time, a part of shear thickening liquid will flow out lumen, be filled into the rock stratum gap of blasting hole;Shear thickening liquid blocks blasting hole, and blasting hole is tightly blocked, and blasting process reduces noise of blasting significantly.The utility model structure is simple, using blast working work conveniently, is reduced, improves blast working efficiency.And it is suitable for the blast working environment containing water.
Description
Technical field
The utility model relates to a kind of demolition set more particularly to a kind of directional blasting tubes.
Background technique
Directional blasting utilizes the effect of explosive, the cubic metre of earth and stone throwing in a certain area to the area specified, and substantially accumulates
At a kind of blasting technique of required shape, it is mainly used for repairing dam, builds the road, levels land.For labour lack, have inconvenient traffic with
And the work point without construction site is especially suitable for.
Before explosion, first it is placed in fried by some key positions of explosion object, after having buried explosive, electronic ignition
Conducting wire connects, and thus can almost ignite the explosive at each position simultaneously.When detonation, explosive reaction acutely, is discharged in a flash
Huge energy can make local temperature quickly rise to 2000C or more, cause the fusing, rupture rapidly such as masonry.But such explosion
Journey will lead to the blasting direction extension of directional blasting, influence the rock for being not required to explosion, cannot play the work of complete directional blasting
With.And blasting process can generate a large amount of silt flying dust, noise of blasting is big.
Commonly used in blast hole stemming stemming due under the great force of detonation gas, tamper (stemming) may be because
Lose barrier effect for following reasons: (1) intensity is too low, is sheared and is dispelled by detonation pressure;(2) resistance between hole wall is too
Small, entire tamper releases blasthole by detonation pressure.For example, general-purpose cement, though it is able to satisfy the general requirement of multiple-row blasting material,
It is not able to satisfy the requirement detonated in time, it, can not be small 3~5 even if participating in accelerator and early strength agent because its setting rate is slow
When interior reach higher intensity;Waterglass and certain synthesis high molecular materials, though the characteristic with rapid hardening high-strength, using not
And higher cost just,.
Therefore, designing a kind of blasting direction can accurately control, and the few directional blasting device of the flying dust silt that explosion generates is
Problem in the urgent need to address at present.
Utility model content
The main purpose of the utility model is to provide a kind of blasting cartridge, and the work before simplifying blast working, blast working is more
It is easy.
The utility model proposes blasting cartridge, be achieved through the following technical solutions:
A kind of blasting cartridge, including tube body, bottom plate, top plate, the tube body, bottom plate and top plate form lumen;It is described to cut
Cut the explosion accumulator of the intracavitary setting of thickening liquid cage walls, the shear thickening liquid between the top plate inner wall and explosion accumulator
The thickness of body is at least 20cm;The explosion accumulator is not close to the thickness of the side cladding shear thickening liquid of tube body inner wall
At least 20cm;
Vertical first sliding groove is provided on tube body, first sliding groove two sides are symmetrical arranged multiple first positioning tooths;
Vertical second sliding slot is provided on tube body, second sliding slot two sides are symmetrical arranged multiple second positioning tooths
The second sliding slot and first sliding groove are symmetrical arranged;
The second limited block and the first limited block is respectively set in the top plate both ends, and the second limited block and the first limited block can
Engage or separate with the second positioning tooth and the first positioning tooth respectively.
Further, push rod is provided on the outside of the top plate;
Further, fluid inlet is provided on the top plate, the first support plate is respectively set in the fluid inlet two sides
With the second support plate;First support plate and the second support plate are fixedly connected with top plate respectively;The first support plate setting
There is bolt, second support plate is provided with pinboard, and the groove of corresponding bolt, second support plate are provided in pinboard
It is hinged with pinboard;The pinboard is rotated by axle center of the second support plate to fluid inlet upper end, for blocking fluid inlet,
In the groove of the mobile bolt insertion pinboard, the pinboard is fixed;
Further, the tube body bottom end is provided with fluid outlet, is provided with cover board, the cover board on the outside of fluid outlet
For blocking fluid outlet.
Further, the shear thickening liquid is water-starch, mud, concrete grout, pitch, calcium carbonate/polyethylene glycol
Suspension or silica/polyethylene glycol suspensoid.
Further, the shear thickening liquid between the top plate and explosion accumulator with a thickness of 25-500cm.
Further, the explosion accumulator be not close to tube body inner wall side covering shear thickening liquid with a thickness of
20—500cm。
Further, the top plate is elastic plate.
Further, the shear thickening liquid is water-starch, calcium carbonate/polyethylene glycol suspensoid or silica/poly-
Glycolic suspension;Stemming is filled in the outside of the shear thickening liquid covered at the top of the explosion accumulator, the stemming
With a thickness of 5~10cm;Spacer is set between the shear thickening liquid and stemming, for shear thickening liquid and big gun to be isolated
Mud.
The utility model has the advantages that
The utility model blasting cartridge is after the completion of the shear thickening liquid is filled, by the pinboard using support plate as axis
The heart is rotated to fluid inlet upper end, and for blocking fluid inlet, the mobile bolt is inserted into the groove of pinboard, the bolt
Plate is fixed;The utility model blasting cartridge is placed in blasting hole, top plate is inwardly pushed by push rod, the promotion of top plate causes
Shear thickening liquid is squeezed, and the thickness of the shear thickening liquid between top plate inner wall and explosion accumulator is adjustable;And
Cover board can be opened at this time, a part of shear thickening liquid will flow out lumen, be filled into the rock stratum gap of blasting hole;
When carrying out explosion, the strong compression energy that explosion generates will not overflow scattered, and plasting damage effect is bigger;Shear thickening liquid blocks Loose Blasting
Hole, blasting hole are tightly blocked, and blasting process reduces noise of blasting significantly.
The utility model structure is simple, using blast working work conveniently, is reduced, improves blast working efficiency.And it is suitable
For the blast working environment containing water.
The utility model is provided with shear thickening liquid in lumen, and the shearing between the top plate and explosion accumulator increases
Thick liquid with a thickness of 20-50cm;After igniting explosion accumulator, shear thickening liquid is in the strong compression energy generated by explosion
While, shear thickening liquid will not go out blasting hole, and the thickness of 20-50cm, which can give, reacts on explosion accumulator, give
With explosion accumulator recoil, the energy that explosion accumulator releases is reinforced, and the degree being around destroyed by explosion object is deepened,
Blasting efficiency is high, and surrounding be destroyed by explosion object after lumpiness uniformity is high, boulder yield is low, blasting efficiency is not by by explosion object
In the planes of weakness factor such as tomography, fold, stratification, joint influence;It is also not limited to the arrangement of blasting hole, that is, is not only restricted to
The freedom degree of the position of blasting hole, angle, the arrangement of depth, blasting hole arrangement is bigger.In the strong compression energy pair of second stage
Shear thickening liquid acting, the high speed impact of the strongly compressed energy of shear thickening liquid, apparent viscosity increase sharply, shear thickening
Liquid is class solid phase by flowable liquid phase, and class solid phase shows as hard and flexible, the state change of shear thickening liquid
Change fast response time, shows very strong shock resistance, after the high speed impact power of strong compression energy is eliminated, and it is solid from class rapidly
For phase transition at liquid phase, process is reversible.
The present invention, the outside of the shear thickening liquid covered at the top of the explosion accumulator are filled stemming, are further increased
Strong plugging effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is another structural schematic diagram of the utility model;
Fig. 3 is that Fig. 1 fills the status diagram after shear thickening liquid;
Fig. 4 is another status diagram of Fig. 3;
Fig. 5 is the A of Fig. 1 to structural schematic diagram;
Fig. 6 is the B of Fig. 1 to structural schematic diagram;
Fig. 7 is the C of Fig. 1 to structural schematic diagram.
In figure, 1, bolt;2 first support plates;3 fluid inlets;4 second support plates;5 pinboards;6 push rods;7 top plates;11
Tube body;12 fluid outlets;15 explosion accumulators;17 bottom plates;19 cover boards;20 lumens;22 shear thickening liquid;23 second is sliding
Slot;24 second limited blocks;25 second positioning tooths;29 first sliding grooves;30 first limited blocks;31 first positioning tooths.
Specific embodiment
The technical scheme in the utility model embodiment is clearly and completely described with reference to the accompanying drawing, it is clear that institute
The embodiment that the embodiment of description is not all of.Based on the embodiments of the present invention, those of ordinary skill in the art are not having
Every other embodiment obtained under the premise of creative work is made, is fallen within the protection scope of the utility model.
As shown in Fig. 1 to 7, a kind of blasting cartridge, including tube body 11, bottom plate 17, top plate 7, the tube body 11, bottom plate 17
Lumen 20 is formed with top plate 7;The shear thickening liquid 22 coats the explosion accumulator 15 being arranged in lumen 20, the top plate 7
The thickness of shear thickening liquid 22 between explosion accumulator 15 is at least 20cm;The explosion accumulator 15 is not close to pipe sheet
The thickness of the side cladding shear thickening liquid 22 of 11 inner wall of body is at least 20cm;
Vertical first sliding groove 29 is provided on tube body 11,29 two sides of first sliding groove are symmetrical arranged multiple first positioning tooths
31;
Vertical second sliding slot 23 is provided on tube body 11,23 two sides of second sliding slot are symmetrical arranged multiple second positioning tooths
25;
The second sliding slot 23 and first sliding groove 29 are symmetrical arranged;
The second limited block 24 and the first limited block 30, the second limited block 24 and the first limit is respectively set in 7 both ends of top plate
Position block 30 can engage or separate with the second positioning tooth 25 and the first positioning tooth 31 respectively.
Further, push rod 6 is provided on the outside of the top plate 7;Push rod 6 can inwardly push extrusion shearing thickening liquid 22,
Adjust the thickness of the shear thickening liquid 22 between 7 inner wall of top plate and explosion accumulator 15;
Further, fluid inlet 3 is provided on the top plate 7, the first support is respectively set in 3 two sides of fluid inlet
Plate 2 and the second support plate 4;First support plate 2 and the second support plate 4 are fixedly connected with top plate 7 respectively;First support
Plate 2 is provided with bolt 1, and second support plate 4 is provided with pinboard 5, and the groove of corresponding bolt 1, institute are provided in pinboard 5
It is hinged with pinboard 5 to state the second support plate 4;The pinboard 5 is that axle center is rotated to 3 upper end of fluid inlet with the second support plate 4,
For blocking fluid inlet 3, the mobile bolt 1 is inserted into the groove of pinboard 5, and the pinboard 5 is fixed;The pipe sheet
11 bottom end of body is provided with fluid outlet 12, and cover board 19 is provided on the outside of fluid outlet 12, and the cover board 19 goes out for blocking fluid
Mouth 12.
Further, the shear thickening liquid 22 is water-starch, mud, concrete grout, pitch, calcium carbonate/poly- second two
Alcohol suspension or silica/polyethylene glycol suspensoid.
Further, the shear thickening liquid 22 between the top plate 7 and explosion accumulator 15 with a thickness of 25-
500cm。
Further, the explosion accumulator 15 is not close to the side covering shear thickening liquid 22 of 11 inner wall of tube body
With a thickness of 20-500cm.
Further, the top plate 7 is elastic plate.
Further, the shear thickening liquid 22 be water-starch, calcium carbonate/polyethylene glycol suspensoid or silica/
Polyethylene glycol suspensoid;Stemming is filled in the outside of the shear thickening liquid 22 covered at the top of the explosion accumulator 15, described
Stemming with a thickness of 5~10cm;Spacer is set between the shear thickening liquid 22 and stemming, for shear thickening liquid to be isolated
Body 22 and stemming.The spacer can be film or cardboard, for shear thickening liquid 3 and stemming to be isolated, prevent stemming from leaking
Into shear thickening liquid 3.The stemming further increases plugging effect.
Further, the top plate 7 is elastic plate, and the elastic plate can be one of rubber slab, plastic plate, is being pushed away
During bar 6 inwardly pushes top plate 7, top plate 7 is by compressive deformation.
Further, the explosion accumulator 15 is not close to the side covering shear thickening liquid 22 of 11 inner wall of tube body
With a thickness of 25-50cm;
Further, the explosion accumulator 15 is not close to the side covering shear thickening liquid 22 of 11 inner wall of tube body
With a thickness of 30-45cm;
Further, the explosion accumulator 15 is not close to the side covering shear thickening liquid 22 of 11 inner wall of tube body
With a thickness of 35-40cm.
Further, the shear thickening liquid 22 between the top plate 7 and explosion accumulator 15 with a thickness of 25-
50cm;
Further, the shear thickening liquid 22 between the top plate 7 and explosion accumulator 15 with a thickness of 30-
45cm;
Further, the shear thickening liquid 22 between the top plate 7 and explosion accumulator 15 with a thickness of 35-
40cm。
The utility model can be used following manner and carry out explosion:
Explosion accumulator 15 is placed in lumen 20 by one way in which before carrying out explosion, then by shear thickening
Liquid 22 is filled in lumen 20;Then the utility model blasting cartridge is placed in blasting hole, ignites the explosion accumulator
15.The thickness of shear thickening liquid 22 between the top plate 7 and explosion accumulator 15 is at least 20cm;The explosion energy storage
The thickness that device 15 is not close to the side covering shear thickening liquid 22 of 11 inner wall of tube body is at least 20cm;Explosion accumulator 15 is released
The energy put acts on 15 top of explosion amplitude transformer and explosion accumulator 15 is not close to the side of 11 inner wall of tube body, due to shearing
Thickening liquid 22 gives explosion accumulator 15 with reaction force, and the force of explosion of the two blasting directions is caused to be cancelled;Force of explosion
The side of 11 inner wall of tube body is close in the bottom and explosion accumulator 15 that concentrate on explosion accumulator 15, and demolition set plays
The effect of directional blasting, and do not interfere with the rock in other directions.
Explosion accumulator 15 is placed in lumen 20 by another way before carrying out explosion, then by shear thickening liquid
Body 22 is filled in lumen 20;Then the utility model blasting cartridge is placed in blasting hole, top plate is inwardly pushed by push rod 6
7, the promotion of top plate 7 causes shear thickening liquid 22 to be squeezed, and can open cover board 19 at this time, shear thickening liquid 22
A part will flow out lumen 20, be filled into the rock stratum gap of blasting hole;When carrying out explosion, the strong compression energy that explosion generates is not
It can overflow scattered, plasting damage effect is bigger.Shear thickening liquid 22 between the top plate 7 and explosion accumulator 15 with a thickness of 20-
500cm;The explosion accumulator 15 be not close to 11 inner wall of tube body side covering shear thickening liquid 22 with a thickness of 20-
500cm;The energy that explosion accumulator 15 discharges acts on 15 top of explosion accumulator and explosion accumulator 15 is not close to tube body
The side of 11 inner walls leads to the two blasting directions since shear thickening liquid 22 gives explosion accumulator 15 with reaction force
Force of explosion be cancelled;Force of explosion concentrates on the bottom of explosion accumulator 15 and explosion accumulator 15 is close in tube body 11
The side of wall, demolition set play the role of directional blasting, and do not interfere with the rock in other directions.
The shear thickening liquid 22 is injected lumen 20 by fluid inlet 3 before carrying out explosion by another way
Interior, shear thickening liquid 22 coats explosion accumulator 15;After the completion of the shear thickening liquid 22 is injected, by the pinboard 5
It is that axle center is rotated to 3 upper end of fluid inlet with the second support plate 4, for blocking fluid inlet 3, the mobile insertion of bolt 1 is inserted
In the groove of pin plate 5, the pinboard 5 is fixed;The utility model blasting cartridge is placed in blasting hole, the mobile cover board
19, so that shear thickening liquid 22 flows out lumen 20, shear thickening liquid 22 flows into blasting hole, blocks blasting hole;It ignites
The explosion accumulator 15.Shear thickening liquid 22 between the top plate 7 and explosion accumulator 15 with a thickness of 20-
100cm;The explosion accumulator 15 be not close to 11 inner wall of tube body side covering shear thickening liquid 22 with a thickness of 20-
100cm;The energy that explosion accumulator 15 discharges acts on 15 top of explosion accumulator and explosion amplitude transformer 15 is not close to tube body
The side of 11 inner walls leads to the two blasting directions since shear thickening liquid 22 gives explosion accumulator 15 with reaction force
Force of explosion be cancelled;Force of explosion concentrates on the bottom of explosion amplitude transformer 15 and explosion accumulator 15 is close in tube body 11
The side of wall, demolition set play the role of directional blasting, and do not interfere with the rock in other directions.
Blasting hole is tightly blocked, and also reduces noise of blasting significantly.Compared to current waterinfusion blasting, in demolition set
Overlying water bag, although can noise reduction to a certain extent, it is dust-proof, it is contemplated that water cannot directly be contacted with demolition set, need
It is independently arranged water seal arrangement, and the gap in shot rock is more, water flow is lost more in rock in blasting process, weakens
Noise-reducing and dustproof effect.
The utility model simplifies blast working process, using more convenient.And since explosion accumulator is placed on this reality
In novel, so the utility model is also directly applicable to aqueous blasting environment.
Explosion accumulator 15 described in the utility model refers to the existing explosive for explosion or for explosion
Equipment.The explosive for explosion is that explosive is often sold in market, can be AN-TNT containing explosive, ammonium nitrate-fuel oil mixture, aqueous gels, emulsification
One of explosive, black powder or nitroglycerine explosive, but be not limited only to above-mentioned explosive type, can be suitable for mine,
Any one explosive in the engineering explosions such as metallurgical, geotechnical engineering and road, traffic.
The equipment for explosion can be gas blast equipment, but be not limited only to above-mentioned blasting gear, can be
Any one blasting gear suitable for the engineering explosions such as mine, metallurgy, geotechnical engineering and road, traffic.
The explosion accumulator 15 selects gas blast equipment, for example, can select in one optionally embodiment
Entitled " a kind of Aerated lock gas one of utility model filed in CN106643314A, applicant Guo Yuanjun on December 21st, 2016
Body formula blaster ", which has many advantages, such as that power is big, while directionality is controllable.
The shear thickening liquid 22 selects water-starch;The water-starch is the mixing suspension of starch and water, by following
Step preparation: starch is added in water, stirs evenly, water-starch is prepared.
The starch is existing starch, can be wheaten starch, cornstarch, Cornstarch, starch from sweet potato, in tapioca starch
Any one or more of mixture, but above-mentioned Starches are not limited to, can be can form shear thickening liquid shape with water
Any starch of state.
Claims (9)
1. a kind of blasting cartridge, which is characterized in that including tube body (11), bottom plate (17), top plate (7), the tube body (11), bottom
Plate (17) and top plate (7) form lumen (20);The explosion energy storage being arranged in shear thickening liquid (22) cladding lumen (20)
The thickness of device (15), the shear thickening liquid (22) between top plate (7) inner wall and explosion accumulator (15) is at least 20cm;
The thickness that the explosion accumulator (15) is not close to side cladding shear thickening liquid (22) of tube body (11) inner wall is at least
20cm;
It is provided with vertical first sliding groove (29) on tube body (11) inner wall, first sliding groove (29) two sides are symmetrical arranged multiple
First positioning tooth (31);
It is provided with vertical second sliding slot (23) on tube body (11) inner wall, second sliding slot (23) two sides are symmetrical arranged multiple
Second positioning tooth (25);
The second sliding slot (23) and first sliding groove (29) are symmetrical arranged;
The second limited block (24) and the first limited block (30), the second limited block (24) and is respectively set in top plate (7) both ends
One limited block (30) can engage or separate with the second positioning tooth (25) and the first positioning tooth (31) respectively.
2. blasting cartridge according to claim 1, which is characterized in that be provided with push rod (6) on the outside of the top plate (7).
3. blasting cartridge according to claim 1, which is characterized in that be provided with fluid inlet (3), institute on the top plate (7)
It states fluid inlet (3) two sides and the first support plate (2) and the second support plate (4) is respectively set;First support plate (2) and second
Support plate (4) is fixedly connected with top plate (7) respectively;First support plate (2) is provided with bolt (1), second support plate
(4) it is provided with pinboard (5), the groove of corresponding bolt (1), second support plate (4) and bolt is provided in pinboard (5)
Plate (5) is hinged;The pinboard (5) is that axle center is rotated to fluid inlet (3) upper end with the second support plate (4), for blocking stream
Body entrance (3), the mobile bolt (1) are inserted into the groove of pinboard (5), and the pinboard (5) is fixed.
4. blasting cartridge according to claim 1, which is characterized in that tube body (11) bottom end is provided with fluid outlet
(12), it is provided with cover board (19) on the outside of fluid outlet (12), the cover board (19) is for blocking fluid outlet (12).
5. blasting cartridge according to claim 1, which is characterized in that the shear thickening liquid (22) be water-starch, mud,
Concrete grout, pitch, calcium carbonate/polyethylene glycol suspensoid or silica/polyethylene glycol suspensoid.
6. blasting cartridge according to claim 1, which is characterized in that between the top plate (7) and explosion accumulator (15)
Shear thickening liquid (22) with a thickness of 25-500cm.
7. blasting cartridge according to claim 1, which is characterized in that the explosion accumulator (15) is not close to tube body (11)
Inner wall side covering shear thickening liquid (22) with a thickness of 20-500cm.
8. blasting cartridge according to claim 1, which is characterized in that the top plate (7) is elastic plate.
9. blasting cartridge described in -8 any claims according to claim 1, which is characterized in that the shear thickening liquid (22)
For water-starch, calcium carbonate/polyethylene glycol suspensoid or silica/polyethylene glycol suspensoid;In the explosion accumulator (15)
Top covering shear thickening liquid (22) outside fill stemming, the stemming with a thickness of 5~10cm;The shear thickening
Spacer is set between liquid (22) and stemming, for shear thickening liquid (22) and stemming to be isolated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821015842.4U CN208419758U (en) | 2018-06-28 | 2018-06-28 | A kind of blasting cartridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821015842.4U CN208419758U (en) | 2018-06-28 | 2018-06-28 | A kind of blasting cartridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208419758U true CN208419758U (en) | 2019-01-22 |
Family
ID=65105895
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821015842.4U Active CN208419758U (en) | 2018-06-28 | 2018-06-28 | A kind of blasting cartridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208419758U (en) |
-
2018
- 2018-06-28 CN CN201821015842.4U patent/CN208419758U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105874299B (en) | It is provided with the charge tube of air gap and the rock blasting construction method using this charge tube | |
CN108286920A (en) | A kind of implementation of Tunnel Blasting and excavation | |
US3791255A (en) | Method of filling boreholes with viscous slurried explosives | |
CN103148748B (en) | Bearing pressure adjustable plastic expansion pipe deep hole blasting control method | |
CN105737697A (en) | Contour blasting method for joint development rock masses | |
CN108915694B (en) | Construction method for tunnel lower-layer step full-section protective-layer-free extrusion blasting and road repairing and access protection | |
RU2694664C2 (en) | Systems and methods for performing blasting operations | |
CN105890477B (en) | A kind of compound rapid blocking method of hydraulic pressure for drillhole blasting | |
CN208419758U (en) | A kind of blasting cartridge | |
CN111780633B (en) | Step-type rapid excavation method for IV-V-level surrounding rock lower step of double-track tunnel | |
CN104215136B (en) | Reinforced beam demolition blasting blast hole projectile filling, blocking and pressure slag structure and demolition blasting method | |
CN114353609B (en) | Structure and method for sectional charging in downward blast hole | |
CN215810502U (en) | Blast hole charging structure for energy-gathered water pressure blasting | |
CN209263807U (en) | Micro-vibration rock and soil blasting structure | |
CN110940242A (en) | Blasting excavation method for deep crack containing slope rock mass | |
CN114935290B (en) | Pre-splitting blasting method for cutting single roadway and cutting deep hole on two sides of top-cutting retained roadway | |
CN208833100U (en) | A kind of demolition set | |
CN107228608B (en) | The blasting method of rock directional splitting | |
CN115307501A (en) | Blasting construction method for mountain earthwork | |
CN109900175A (en) | The low damage blasting method of underground mine tunnelling | |
CN106813540A (en) | The method of Shaft Freezing rock section deep hole blasting under ultra low temperature state | |
CN206311013U (en) | A kind of ore body hydraulic pressure demolition system | |
CN110274528A (en) | A kind of fluidic compartment blasting method | |
CN102749001A (en) | Method for filling blast holes | |
KR102496073B1 (en) | Charge tube for blasting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |