CN208415081U - A kind of bridgehead structures - Google Patents

A kind of bridgehead structures Download PDF

Info

Publication number
CN208415081U
CN208415081U CN201820691844.9U CN201820691844U CN208415081U CN 208415081 U CN208415081 U CN 208415081U CN 201820691844 U CN201820691844 U CN 201820691844U CN 208415081 U CN208415081 U CN 208415081U
Authority
CN
China
Prior art keywords
attachment strap
bracket
base course
structures according
fill stratum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820691844.9U
Other languages
Chinese (zh)
Inventor
王忠军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820691844.9U priority Critical patent/CN208415081U/en
Application granted granted Critical
Publication of CN208415081U publication Critical patent/CN208415081U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of bridgehead structures, including abutment, the first attachment strap, the second attachment strap, fill stratum and base course, the rear side of abutment is equipped with the first bracket and the second bracket, first bracket is located at the top of the second bracket, one end of first attachment strap is fixed on the upside of the first bracket, the other end connects base course, the downside of the first attachment strap and base course is arranged in fill stratum, second attachment strap is horizontally set in the fill stratum on the downside of the first attachment strap, one end of first attachment strap is fixed on the upside of the second bracket, and the length of the second attachment strap is greater than the length of the first attachment strap.The utility model can effectively prevent the sedimentation of fill stratum using the second attachment strap, even if the fill stratum on the downside of the second attachment strap settles, but since the length of the second attachment strap is longer, it can reduce or even avoid the fill stratum between the first attachment strap and the second attachment strap to settle, effectively prevent that there is a phenomenon where bumping at bridge-head generations.

Description

A kind of bridgehead structures
Technical field
The utility model relates to technical field of bridge construction, and in particular to a kind of bridgehead structures.
Background technique
With gradually going deep into for highway in China construction, highway construction also enters the climax of construction, but end of the bridge is jumped at present Vehicle phenomenon is a relatively common phenomenon, and effective attachment strap is arranged after abutment, is arranging again for a solution bumping at bridge-head It applies, attachment strap can rotate between being shelved on abutment or cantilever beam slab end and banketing with the sedimentation banketed.When vehicle driving Buffer function can be played, even if platform back banket sedimentation be unlikely to generate it is uneven, if however the backfill on the downside of attachment strap Occur big sedimentation, lacking after support on the downside of attachment strap still can there is a phenomenon where bumping at bridge-head.
Summary of the invention
The purpose of this utility model is to provide a kind of bridgehead structures, to cause after solving existing end of the bridge backfill sedimentation The problem of bumping at bridge-head.
To achieve the above object, specifically, which includes abutment, the first attachment strap, the second attachment strap, fill stratum and road Base, the rear side of abutment are equipped with the first bracket and the second bracket, and the first bracket is located at the top of the second bracket, and the one of the first attachment strap End is fixed on the upside of the first bracket, and the other end connects base course, and the downside of the first attachment strap and base course is arranged in fill stratum, the Two attachment straps are horizontally set in the fill stratum on the downside of the first attachment strap, and one end of the first attachment strap is fixed on the upside of the second bracket, and The length of second attachment strap is greater than the length of the first attachment strap.
First attachment strap is equipped with a L-shaped stepped plate far from one end of abutment, and stepped plate and the first attachment strap are one Body structure is equipped with multiple waterproof platforms protruded into base course in the upside of stepped plate.
Coal tar carpet veneer is equipped on the downside of the stepped plate.
The upside of first bracket is equipped with embedded bar, and the end of the first attachment strap offers reinforcing bar connecting hole, pre-buried Reinforcing bar upper end is inserted into reinforcing bar connecting hole, has poured concrete in reinforcing bar connecting hole.
Length in the embedded bar insertion reinforcing bar connecting hole is the 40%~55% of the first attachment strap thickness.
The length that the embedded bar is inserted into the first bracket is 150~200mm.
Rubber interlayer is equipped between first attachment strap and the first bracket.
The downside of first attachment strap is equipped with a downward waterproof every platform, and the one of the first bracket is arranged in every platform in waterproof Side.
The upside of first attachment strap and base course is equipped with bitumen layer.
The utility model has the advantages that the utility model can effectively prevent the heavy of fill stratum using the second attachment strap Drop can reduce or even avoid the even if the fill stratum on the downside of the second attachment strap settles, but since the length of the second attachment strap is longer Fill stratum sedimentation between one attachment strap and the second attachment strap, effectively prevent that there is a phenomenon where bumping at bridge-head generations.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model embodiment 1.
Fig. 2 is the partial enlarged view in Fig. 1 at A.
In figure: 1- abutment 2- the first bracket 3- the second bracket 4- the first attachment strap 5- stepped plate 6- waterproof platform 7- pitch Malthoid layer 8- base course 9- bitumen layer 10- waterproof is mixed every platform 11- the second attachment strap 12- fill stratum 13- rubber interlayer 14- Solidifying soil 15- embedded bar.
Specific embodiment
The following examples illustrate the utility model, but is not intended to limit the scope of the present invention.
Embodiment 1
Referring to Fig. 1, which includes abutment 1, the first attachment strap 4, the second attachment strap 11, fill stratum 12 and base course 8, bridge The rear side of platform 1 is equipped with the first bracket 2 and the second bracket 3, and the first bracket 2 is located at the top of the second bracket 3, and the one of the first attachment strap 4 End is fixed on the upside of the first bracket 2, and the other end connects base course 8, and the upside of the first attachment strap 4 and base course 8 is equipped with bitumen layer 9, the downside of the first attachment strap 4 and base course 8 is arranged in fill stratum 12, and the second attachment strap 11 is horizontally set on 4 downside of the first attachment strap In fill stratum 12, one end of the first attachment strap 4 is fixed on the upside of the second bracket 3, and the length of the second attachment strap 11 is greater than first and takes The length of plate 4.
The downside of first attachment strap 4 is equipped with a downward waterproof every platform 10, and the one of the first bracket 2 is arranged in every platform 10 in waterproof Side, waterproof can prevent the first attachment strap 4 and the water of 1 junction of abutment from penetrating down into fill stratum 12 every platform 10, and it is heavy to avoid occurring Drop.
First attachment strap 4 is equipped with a L-shaped stepped plate 5 far from one end of abutment 1, and stepped plate 5 is integrated with the first attachment strap 4 Structure, the utility model are connect by stepped plate 5 with base course 8, can effectively improve the first attachment strap 4 in this way far from abutment 1 one The rigidity at end, and prevent surface gathered water from penetrating down into fill stratum 12 using stepped plate 5, prevent the generation of sedimentation.In step The upside of plate 5 be equipped with multiple waterproof platforms 6 protruded into base course 8, waterproof platform 6 can further effectively prevent surface gathered water to In lower infiltration fill stratum 12, and waterproof platform 6 can also enhance the bonding strength of the first attachment strap 4 and base course 8, prevent out It splits, improves pavement quality.Coal tar carpet veneer 7 is equipped on the downside of stepped plate 5.
Referring to fig. 2, the upside of the first bracket 2 is equipped with embedded bar 15, and the end of the first attachment strap 4 offers reinforcing bar connection Hole, 15 upper end of embedded bar are inserted into reinforcing bar connecting hole, and concrete 14 has been poured in reinforcing bar connecting hole.Occur in fill stratum 12 After sedimentation, embedded bar 15 will not prevent the first attachment strap 4 from rotating, but can slow down the speed of its rotation, and then can be effective Delay the generation of vehicle bump at bridge ends.The length that embedded bar 15 in the present embodiment is inserted into the first bracket 2 is 180mm.In advance Burying the length that reinforcing bar 15 is inserted into reinforcing bar connecting hole is the 50% of 4 thickness of the first attachment strap.Between first attachment strap 4 and the first bracket 2 Equipped with rubber interlayer 13, ponding is further prevented to penetrate down into fill stratum 12.
Embodiment 2
The length that embedded bar 15 in the present embodiment is inserted into the first bracket 2 is 150mm, and embedded bar 15 is inserted into reinforcing bar Length in connecting hole is the 45% of 4 thickness of the first attachment strap.
Embodiment 3
The length that embedded bar 15 in the present embodiment is inserted into the first bracket 2 is 200mm, and embedded bar 15 is inserted into reinforcing bar Length in connecting hole is the 55% of 4 thickness of the first attachment strap.
Although above having made detailed description to the utility model with generality explanation and specific embodiment, On the basis of the utility model, it can be made some modifications or improvements, this is apparent to those skilled in the art 's.Therefore, these modifications or improvements on the basis of without departing from the spirit of the present invention, belong to the utility model and want Seek the range of protection.

Claims (9)

1. a kind of bridgehead structures, it is characterised in that: the bridgehead structures include abutment, the first attachment strap, the second attachment strap, fill stratum And base course, the rear side of abutment are equipped with the first bracket and the second bracket, the first bracket is located at the top of the second bracket, the first attachment strap One end be fixed on the upside of the first bracket, the other end connects base course, and fill stratum is arranged under the first attachment strap and base course Side, the second attachment strap are horizontally set in the fill stratum on the downside of the first attachment strap, and one end of the first attachment strap is fixed on the upper of the second bracket Side, and the length of the second attachment strap is greater than the length of the first attachment strap.
2. bridgehead structures according to claim 1, it is characterised in that: first attachment strap is equipped with far from one end of abutment One L-shaped stepped plate, stepped plate are structure as a whole with the first attachment strap, are equipped with multiple protrude into base course in the upside of stepped plate Waterproof platform.
3. bridgehead structures according to claim 2, it is characterised in that: be equipped with coal tar carpet veneer on the downside of the stepped plate.
4. bridgehead structures according to claim 1, it is characterised in that: the upside of first bracket is equipped with pre-buried steel Muscle, the end of the first attachment strap offer reinforcing bar connecting hole, and embedded bar upper end is inserted into reinforcing bar connecting hole, in reinforcing bar connecting hole Concrete is poured.
5. bridgehead structures according to claim 4, it is characterised in that: in the embedded bar insertion reinforcing bar connecting hole Length is the 40%~55% of the first attachment strap thickness.
6. bridgehead structures according to claim 4 or 5, it is characterised in that: the embedded bar is inserted into the first bracket Length be 150~200mm.
7. bridgehead structures according to claim 1, it is characterised in that: be equipped between first attachment strap and the first bracket Rubber interlayer.
8. bridgehead structures according to claim 1 or claim 7, it is characterised in that: the downside of first attachment strap is equipped with one The side of the first bracket is arranged in every platform every platform, waterproof for downward waterproof.
9. bridgehead structures according to claim 1, it is characterised in that: the upside of first attachment strap and base course is equipped with Bitumen layer.
CN201820691844.9U 2018-05-10 2018-05-10 A kind of bridgehead structures Expired - Fee Related CN208415081U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820691844.9U CN208415081U (en) 2018-05-10 2018-05-10 A kind of bridgehead structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820691844.9U CN208415081U (en) 2018-05-10 2018-05-10 A kind of bridgehead structures

Publications (1)

Publication Number Publication Date
CN208415081U true CN208415081U (en) 2019-01-22

Family

ID=65113746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820691844.9U Expired - Fee Related CN208415081U (en) 2018-05-10 2018-05-10 A kind of bridgehead structures

Country Status (1)

Country Link
CN (1) CN208415081U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778660A (en) * 2019-03-18 2019-05-21 浙江兴土桥梁专用装备制造有限公司 The Steel Bridge installed using assembled abutment
CN111041919A (en) * 2019-12-30 2020-04-21 河北建太工程设计有限公司 Bridge head pavement anti-settlement structure and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778660A (en) * 2019-03-18 2019-05-21 浙江兴土桥梁专用装备制造有限公司 The Steel Bridge installed using assembled abutment
CN111041919A (en) * 2019-12-30 2020-04-21 河北建太工程设计有限公司 Bridge head pavement anti-settlement structure and construction method
CN111041919B (en) * 2019-12-30 2021-06-29 河北建太工程设计有限公司 Bridge head pavement anti-settlement structure and construction method

Similar Documents

Publication Publication Date Title
CN207828770U (en) A kind of support construction for preventing bumping at bridge-head
CN204401447U (en) A kind of structure preventing bumping at bridge-head
CN204418003U (en) A kind of bridge platform post processing combined system
CN208415081U (en) A kind of bridgehead structures
CN202718084U (en) Composite foundation with flexible piles and drain boards combined
CN106087628B (en) Without the cast-in-place baffle plate foam concrete light road bank structure of conical slope and construction method
CN204401444U (en) A kind of high embankment filled soil end of the bridge anti-settling structure
CN209584839U (en) A kind of transition structure preventing and treating bumping at bridge-head
CN214882909U (en) Lightweight concrete abutment structure
CN207295358U (en) A kind of platform back of the body for preventing bumping at bridge-head and road surface drainage structure
CN209307882U (en) It is a kind of for improving the cushion cap device on pile foundation reinforcement basis
CN207017093U (en) New-old concrete bond widens seam-line removal structure
CN104499399B (en) A kind of Reflection Cracking ultra-thin composite construction layer and its preparation method
CN109537440A (en) A kind of abutment approach structure
CN105735151B (en) A kind of method for repairing road surface
CN105220620A (en) The bumping at bridge-head processing method of darker mud soft soil foundation after platform
CN210341519U (en) Soft soil roadbed reinforcing device
CN101363209A (en) Technology for preventing bumping at bridge-head
CN207452688U (en) The multistage abutment construction of soil sedimentation after improvement bridge platform
CN105862560B (en) The method repaired at the Bridge back wall of environmentally safe road pavement
CN210946453U (en) Pavement structure of CA mortar treatment bridgehead bumping
CN202007382U (en) Novel wedge-shaped butt strap
CN214529999U (en) Anti-crack road with gradient structure
CN205934628U (en) Cast -in -place baffle foam concrete light embankment structure of no conical slope
CN201704670U (en) Bank protection structure for caisson wharf

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190122

Termination date: 20210510

CF01 Termination of patent right due to non-payment of annual fee