CN208413600U - A kind of elevator(lift) machine room arragement construction - Google Patents

A kind of elevator(lift) machine room arragement construction Download PDF

Info

Publication number
CN208413600U
CN208413600U CN201820857282.0U CN201820857282U CN208413600U CN 208413600 U CN208413600 U CN 208413600U CN 201820857282 U CN201820857282 U CN 201820857282U CN 208413600 U CN208413600 U CN 208413600U
Authority
CN
China
Prior art keywords
spandrel girder
group
spandrel
elevator
lift
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820857282.0U
Other languages
Chinese (zh)
Inventor
张为民
梁鑫旺
张文欣
曹兆根
邱建龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xin Xi'ao Elevator Group Co.,Ltd.
Original Assignee
ZHEJIANG XIZI HEAVY INDUSTRY MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG XIZI HEAVY INDUSTRY MACHINERY Co Ltd filed Critical ZHEJIANG XIZI HEAVY INDUSTRY MACHINERY Co Ltd
Priority to CN201820857282.0U priority Critical patent/CN208413600U/en
Application granted granted Critical
Publication of CN208413600U publication Critical patent/CN208413600U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a kind of elevator(lift) machine room arragement constructions, braced frame including rectangle, traction machine is installed in the braced frame and returns rope sheave, the braced frame includes spandrel girder on spandrel girder under two groups and two groups, the wherein one side of every group of spandrel girder as rectangle;Spandrel girder is arranged side by side under each group and both ends are taken to set respectively and are fixed on bearing wall;Spandrel girder is arranged side by side in each group and both ends take set under be fixed on respective side one group on spandrel girder respectively;The traction machine is fixed therein under one group on spandrel girder, and the rope sheave that returns has multiple, is separately mounted on corresponding one group of spandrel girder.Elevator(lift) machine room arragement construction provided by the utility model, it is rationally distributed, computer room space is saved, meets big carrying demand using small traction machine.

Description

A kind of elevator(lift) machine room arragement construction
Technical field
The utility model relates to elevator technology fields, and in particular to a kind of elevator(lift) machine room arragement construction.
Background technique
For the power resources of elevator operation in traction machine, traction machine affects the speed of service and bearing capacity of elevator.At present Domestic traction machine can carry that range is smaller, and with the continuous extension of elevator use scope and occasion, large warehoused equipment is not Disconnected to update, market wishes that elevator can possess bigger bearing capacity.
The lag of growing expectation demand and traction machine technical level development to elevator, form one it is sharp Contradiction meets market to the higher requirement of elevator, becomes urgent need and solve how under conditions of the prior art, very urgent Problem.
Utility model content
The utility model provides a kind of elevator(lift) machine room arragement construction, rationally distributed, saves computer room space, utilizes small traction Machine meets big carrying demand.
A kind of elevator(lift) machine room arragement construction, the braced frame including rectangle, be equipped in the braced frame traction machine with And return rope sheave, the braced frame includes spandrel girder on spandrel girder and two groups under two groups, every group of spandrel girder as rectangle its Middle one side;
Spandrel girder is arranged side by side under each group and both ends are taken to set respectively and are fixed on bearing wall;
Spandrel girder is arranged side by side in each group and both ends take set under be fixed on respective side one group on spandrel girder respectively;
The traction machine is fixed therein under one group on spandrel girder, and the rope sheave that returns has multiple, is separately mounted to corresponding On one group of spandrel girder.
The upper spandrel girder and lower spandrel girder form double-layer structure arranged up and down, wherein lower spandrel girder and computer room wall Load-bearing pier is fixedly connected, and for bearing the weight of entire elevator, upper spandrel girder is erected above lower spandrel girder, is held for assisting Weight.
Braced frame is rectangle, is referred in a state of use, braced frame in the horizontal plane be projected as rectangle.Under two groups Spandrel girder has drop in the height direction on spandrel girder and two groups, and spandrel girder collectively forms institute on spandrel girder and two groups under two groups State braced frame.
The rope sheave that returns has multiple, realizes bigger wiring ratio by the way that multiple rope sheaves that return are arranged, realizes that small traction machine is (i.e. defeated Lower-powered traction machine out) driving heavy-duty elevator demand.
The power resources that the traction machine is operated normally as elevator, for driving carriage to move, in order to keep layout It is compact, rationally utilize space, it is preferable that wherein one jiao close to the rectangle of the traction machine.
Preferably, spandrel girder includes two carriage spandrel girders, load-bearing under second group under first group under two groups in spandrel girder Beam includes the host spandrel girder and an auxiliary spandrel girder of two carrying traction machines;
On two groups in spandrel girder, spandrel girder includes two counterweight spandrel girders on first group, and spandrel girder includes two on second group Root returns rope sheave beam;
One end of two counterweight spandrel girders, which takes to set, is fixed on auxiliary spandrel girder and avoids host spandrel girder, and evacuation position is The installation site of the traction machine.
Preferably, be equipped with lift car rope head combination on two carriage spandrel girders, it is equipped on two counterweight spandrel girders pair Weight rope end combination;The same angle of the neighbouring rectangle is combined in lift car rope head combination with counterweight rope end.
Preferably, the rope sheave that returns includes one group to rope sheave is returned to and three groups of carriages return rope sheave, it is separately mounted to correspond to One group of spandrel girder on.
The rope sheave that returns realizes biggish wiring ratio for changing the direction of wirerope.Every group has extremely to rope sheave is returned to Lack two to rope sheave is returned to, every group of carriage returns rope sheave and return rope sheave at least two carriages.
Preferably, described pair returns to rope sheave and the combination of counterweight rope end is mounted on two counterweights of spandrel girder on first group and holds Between weight beam.
Preferably, the lift car rope head combination returns rope sheave is mounted on spandrel girder under first group two with wherein one group of carriage Between root carriage spandrel girder.
Elevator(lift) machine room arragement construction provided by the utility model, structure novel, scientific arrangement is reasonable, utilizes the province of pulley blocks Power principle realizes the purpose of small traction machine driving heavy-duty carriage.
Detailed description of the invention
Fig. 1 is the schematic diagram of the utility model elevator(lift) machine room arragement construction;
Fig. 2 is the top view of the utility model elevator(lift) machine room arragement construction;
Fig. 3 is the side view of the utility model elevator(lift) machine room arragement construction;
Fig. 4 is the A direction view in Fig. 3;
Fig. 5 is the laborsaving schematic diagram of pulley blocks.
In figure: 1a, carriage spandrel girder;1b, host spandrel girder;1c, auxiliary spandrel girder;2a, rope sheave beam is returned;2b, counterweight are held Weight beam;3, counterweight rope end combines;4a, carriage return rope sheave;4b, carriage return rope sheave;4c, carriage return rope sheave;5, to returning to rope sheave;6, Lift car rope head combination;7, traction machine;8, carriage;9, counterweight;10, crosshead sheave;11, carriage returns rope sheave;12, traction sheave;13, it is oriented to Wheel;14, to roller;15, to returning to rope sheave.
Specific embodiment
With reference to the accompanying drawing, the utility model elevator(lift) machine room arragement construction is described in detail.
As shown in Figure 1 and Figure 2, a kind of elevator(lift) machine room arragement construction, the braced frame including rectangle are installed in braced frame There is traction machine 7 and returns rope sheave (including carriage returns rope sheave 4a, carriage returns rope sheave 4b, carriage returns rope sheave 4c and to return to rope sheave 5).
Braced frame include two groups under spandrel girder (including carriage spandrel girder 1a, host spandrel girder 1b and auxiliary spandrel girder Spandrel girder (including returning rope sheave beam 2a and counterweight spandrel girder 2b) 1c) and on two groups, every group of spandrel girder as rectangle wherein one Side.Spandrel girder is arranged side by side under each group and both ends are taken to set respectively and are fixed on bearing wall, in each group spandrel girder be arranged side by side and Both ends are taken respectively sets under be fixed on respective side one group on spandrel girder.
Under two groups in spandrel girder, spandrel girder includes on two carriage spandrel girders 1a, two carriage spandrel girder 1a under first group Lift car rope head combination 6 is installed, spandrel girder includes the host spandrel girder 1b and an auxiliary of two carrying traction machines 7 under second group Spandrel girder 1c.
Carriage spandrel girder 1a, host spandrel girder 1b and auxiliary spandrel girder 1c are all made of I-steel, each carriage spandrel girder 1a, master Machine spandrel girder 1b is identical with the auxiliary height of spandrel girder 1c.
On two groups in spandrel girder, spandrel girder includes two counterweight spandrel girder 2b on first group, and spandrel girder includes on second group Two are returned rope sheave beam 2a.It takes to set and is fixed on auxiliary spandrel girder 1c and avoids host spandrel girder in one end of two counterweight spandrel girder 2b 1b.Two one end for returning rope sheave beam 2a, which take to set, is fixed on carriage spandrel girder 1a, the other end take set be fixed on host spandrel girder 1b and It assists on spandrel girder 1c.
As shown in figure 4, counterweight spandrel girder 2b uses I-steel, rope sheave beam 2a is returned using channel steel, the height of counterweight spandrel girder 2b Degree slightly above returns rope sheave beam 2a.
Counterweight rope end combination 3 is installed, 3 neighbours are combined in lift car rope head combination 6 with counterweight rope end on two counterweight spandrel girder 2b The same angle of nearly rectangle.
As shown in Figure 1, Figure 2, Figure 3 shows, returning rope sheave includes one group to returning to rope sheave 5 and three groups of carriages return rope sheave, to returning to rope Wheel 5 is three, and successively arrangement is mounted between two counterweight spandrel girder 2b.Lift car rope head combination 6 and carriage return rope sheave 4a installation Between two carriage spandrel girder 1a, carriage is returned rope sheave 4c and is mounted between two host spandrel girder 1b, carriage return rope sheave 4a and It is respectively two that carriage, which returns rope sheave 4c, and is aligned along the extending direction for returning rope sheave beam 2a.Carriage returns rope sheave 4b and is mounted on two Root returns between rope sheave beam 2a, and it is two that carriage, which returns rope sheave 4b, is located at the both ends for returning rope sheave beam 2a.
Traction machine 7 is fixed on two host spandrel girder 1b, and close to wherein one jiao of rectangle, two counterweights are held traction machine 7 The position that weight beam 2b avoids host spandrel girder 1b is the installation site of traction machine 7.
As shown in figure 5, elevator includes carriage 8 and counterweight 9, it is fixed with crosshead sheave 10 at the top of carriage 8, is fixed at the top of counterweight 9 Have to roller 14, traction suspension line successively pile warp crosshead sheave 10, carriage return rope sheave 11, traction sheave 12, directive wheel 13, to roller 14 With to rope sheave 15 is returned to, realize that small traction machine drives the purpose of heavy-duty carriage by the laborsaving principle of running block.
According to the disclosure and teachings of the above specification, the utility model those skilled in the art can also be to above-mentioned reality The mode of applying carries out change and modification appropriate.Therefore, the utility model is not limited to specific implementation disclosed and described above Mode should also be as falling into the protection scope of the claims of the present utility model to some modifications and changes of the utility model. In addition, although using some specific terms in this specification, these terms are merely for convenience of description, not to this reality With novel composition any restrictions.

Claims (7)

1. a kind of elevator(lift) machine room arragement construction, the braced frame including rectangle, be equipped in the braced frame traction machine and Return rope sheave, which is characterized in that the braced frame includes spandrel girder on spandrel girder under two groups and two groups, every group of spandrel girder conduct Wherein one side of rectangle;
Spandrel girder is arranged side by side under each group and both ends are taken to set respectively and are fixed on bearing wall;
Spandrel girder is arranged side by side in each group and both ends take set under be fixed on respective side one group on spandrel girder respectively;
The traction machine is fixed therein under one group on spandrel girder, and the rope sheave that returns has multiple, is separately mounted to corresponding one group On spandrel girder.
2. elevator(lift) machine room arragement construction as described in claim 1, which is characterized in that the traction machine close to the rectangle its In one jiao.
3. elevator(lift) machine room arragement construction as described in claim 1, which is characterized in that under two groups in spandrel girder, held under first group Weight beam includes two carriage spandrel girders, and spandrel girder includes two host spandrel girders for carrying the traction machines and one under second group Assist spandrel girder;
On two groups in spandrel girder, spandrel girder includes two counterweight spandrel girders on first group, and spandrel girder is returned including two on second group Rope sheave beam;
One end of two counterweight spandrel girders, which takes to set, is fixed on auxiliary spandrel girder and avoids host spandrel girder, and evacuation position is described The installation site of traction machine.
4. elevator(lift) machine room arragement construction as claimed in claim 3, which is characterized in that be equipped with carriage on two carriage spandrel girders Rope end combines, and the combination of counterweight rope end is equipped on two counterweight spandrel girders;Neighbouring institute is combined in lift car rope head combination with counterweight rope end State the same angle of rectangle.
5. elevator(lift) machine room arragement construction as claimed in claim 4, which is characterized in that it is described return rope sheave include one group to return to rope Wheel and three groups of carriages return rope sheave, are separately mounted on corresponding one group of spandrel girder.
6. elevator(lift) machine room arragement construction as claimed in claim 5, which is characterized in that described pair returns to rope sheave and counterweight rope end group Conjunction is mounted between two counterweight spandrel girders of spandrel girder on first group.
7. elevator(lift) machine room arragement construction as claimed in claim 5, which is characterized in that the lift car rope head combination and wherein one group Carriage is returned rope sheave and is mounted between two carriage spandrel girders of spandrel girder under first group.
CN201820857282.0U 2018-06-04 2018-06-04 A kind of elevator(lift) machine room arragement construction Active CN208413600U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820857282.0U CN208413600U (en) 2018-06-04 2018-06-04 A kind of elevator(lift) machine room arragement construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820857282.0U CN208413600U (en) 2018-06-04 2018-06-04 A kind of elevator(lift) machine room arragement construction

Publications (1)

Publication Number Publication Date
CN208413600U true CN208413600U (en) 2019-01-22

Family

ID=65109631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820857282.0U Active CN208413600U (en) 2018-06-04 2018-06-04 A kind of elevator(lift) machine room arragement construction

Country Status (1)

Country Link
CN (1) CN208413600U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110510480A (en) * 2019-08-05 2019-11-29 菱王电梯股份有限公司 The Car frame structure of collet formula heavy duty elevator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110510480A (en) * 2019-08-05 2019-11-29 菱王电梯股份有限公司 The Car frame structure of collet formula heavy duty elevator

Similar Documents

Publication Publication Date Title
CN201808976U (en) One-way movement circular elevator device with independent driver element
US9102502B2 (en) Double-deck elevator
US10246310B2 (en) Large mobile crane
CN107572447A (en) A kind of transfer pallet fork lift and vehicle production line
CN100497833C (en) High-altitude framework type simple plate supporting machine
CN208413600U (en) A kind of elevator(lift) machine room arragement construction
CN102877675A (en) High-speed hoisting system for steel wire ropes on electric push rods
CN207079995U (en) A kind of modularization broach intelligent three-dimensional parking apparatus
CN106639106A (en) Steel structure flexible shed frame
CN2440893Y (en) Apparatus for unitary horizontal movement of construction
CN102323100A (en) Integrated trolley type electric hoist test stand
CN207158709U (en) Transfer pallet fork lift and vehicle production line
CN202850548U (en) High-speed lifting system of motor-driven push rod with steel wire ropes
CN202390106U (en) Lifting hook portal crane easy to maintain
CN102408052A (en) Counter-weight-free traction type passenger elevator
CN102913017A (en) Lifting appliance of subway (urban) train
CN107816237A (en) A kind of new steel structure parking lot of vertical direction parking
CN108821082B (en) Steel structure derrick for mining
CN202429913U (en) Movable crane
CN202170231U (en) Mobile pulling bar
CN110884983B (en) Space three-dimensional interactive elevator driving suspension mechanism and working method thereof
CN202465115U (en) Double main beam gantry crane
CN201106154Y (en) Upper air frame type simple racking machine
CN2827982Y (en) Elevator without machine room
CN2440891Y (en) Lower railing mechanism for horizontal movement of construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210517

Address after: Room 305-w, 3rd floor, No.11 Lane 1888, Caoyang Road, Putuo District, Shanghai 200333

Patentee after: Xin Xi'ao Elevator Group Co.,Ltd.

Address before: No.46, Qichao Road, Chang'an Town (Nongfa District), Haining City, Jiaxing City, Zhejiang Province

Patentee before: ZHEJIANG XIZI HEAVY INDUSTRY MACHINERY Co.,Ltd.