CN208396338U - Load bearing wall underground construction underpins support system - Google Patents
Load bearing wall underground construction underpins support system Download PDFInfo
- Publication number
- CN208396338U CN208396338U CN201820716859.6U CN201820716859U CN208396338U CN 208396338 U CN208396338 U CN 208396338U CN 201820716859 U CN201820716859 U CN 201820716859U CN 208396338 U CN208396338 U CN 208396338U
- Authority
- CN
- China
- Prior art keywords
- support
- bearing wall
- load bearing
- supporting leg
- support system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 11
- 239000010959 steel Substances 0.000 claims abstract description 11
- 239000000463 material Substances 0.000 claims description 10
- 239000002184 metal Substances 0.000 claims description 4
- 230000005540 biological transmission Effects 0.000 abstract description 2
- 230000008859 change Effects 0.000 abstract description 2
- 230000000694 effects Effects 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000009424 underpinning Methods 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- 239000011449 brick Substances 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000004064 recycling Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
Abstract
The utility model discloses a kind of load bearing wall underground constructions to underpin support system, is used to support between the support beam of top bearing wall and supporting leg and is fixedly connected, and supporting leg is fixedly connected with the support raft plate of the stake holes two sides below pre-demolition wall.The technical effect of the utility model are as follows: the support system is the underpinning structure of an Iterim Change superstructure load transmission path, it may be implemented to form working space under masonry load bearing wall, shape-designing does not interfere to construct and there are enough operating spaces to construction.It is bolted easy for assemble or unload, using structure steel fabrication high-strength light, can recycle entirely.
Description
Technical field
The utility model relates to a kind of load bearing wall support construction, in particular to a kind of load bearing wall underground construction underpins supporter
System.
Background technique
In recent years, old residential area is transformed into the emphasis of city integrated transformation, and the house in old residential area is mostly last century
The 80s and 90s builds earlier, and based on multistory brick-and-concrete structure, the underground space is not developed.And in the transformation of old residential area
Old residential area value can most be promoted is exactly to add the underground space, solves the problems, such as that land utilization ratio is low with " parking difficulty ".It will be
It is exactly that slab is applied to add artificial digging pile transformational structure that the optimal method of the underground space is added under brick mix structure, and wherein stake can be with
Also serve as the use of basement column.Since the load bearing wall of multistory brick-and-concrete structure is densely distributed, and underground parking needs Large Column Spacing, often
There is the case where top load bearing wall and stake bit swiping.For this problem, previous solution is as follows:
(1) load bearing wall is avoided when laying out pile, etc. the underground spaces formed after pull out the unreasonable column in position, and be displaced to conjunction
Suitable position.Do so that design difficulty is big, construction risk is high, at high cost, although realizing the reasonable of the underground space under building
It utilizes, but great number cost impact original building value promotion space.
(2) space directly under inhering architecture is only used as storage not as parking stall.Underground space utilization rate
It is low, then it is substantially nonsensical to building functions and value promotion to add the underground space.
Utility model content
The utility model is used primarily in the stake raft transformational structure work progress for adding the underground space under brick mix structure, is one
A temporary support structure mainly solves the problems, such as that artificial digging pile stake position conflicts and can not construct with masonry load-bearing wall displacement, for
The deficiency of existing solution proposes a kind of method that assembling type steel structure support is added under masonry load bearing wall, this support
Load bearing wall is temporarily held up, the operating space of construction stake under wall is formed in, realizes the requirement flexibly to lay out pile.
The technical solution adopted in the utility model is: load bearing wall underground construction underpins support system, is used to support top and holds
It is fixedly connected between the support beam and supporting leg of weight wall, the support raft of the stake holes two sides below supporting leg and pre-demolition wall
Plate is fixedly connected.
It is bolted between the support beam and supporting leg, is connected between supporting leg and support raft plate by bolt
It connects.
Main view is in " n " shape after the support beam is connect with supporting leg, and overlooking is in " x " shape.
The support beam material is metal, and the supporting leg material is metal.
The support beam material is steel, and the supporting leg material is steel.
The technical effect of the utility model are as follows: the support system is an Iterim Change superstructure load transmission path
Underpinning structure may be implemented to form working space under masonry load bearing wall, and shape-designing does not interfere to construct and to construction
There are enough operating spaces.It is bolted entirely easy for assemble or unload, using structure steel fabrication high-strength light, benefit can be recycled
With.
Detailed description of the invention
Fig. 1 is that load bearing wall underground construction underpins support system structural schematic diagram;
Fig. 2 is the A-A view of Fig. 1;
Fig. 3 is the B-B view of Fig. 1.
Appended drawing reference is as follows: the top 1- bearing wall;2- pre-demolition wall;3- support beam;4- supporting leg;5- supports raft
Plate;6- stake holes
Specific embodiment
Support system is underpined to load bearing wall underground construction with reference to the accompanying drawing to be further described.
This load bearing wall underground construction underpins support system, and load bearing wall underground construction underpins support system, is used to support
It is bolted to connection between the support beam 3 and supporting leg 4 of portion's bearing wall 1,2 lower section of supporting leg 4 and pre-demolition wall
The support raft plates 5 of 6 two sides of stake holes be bolted to connection.Main view is in " n " shape after support beam 3 is connect with supporting leg 4, is bowed
Depending on being in " x " shape.In order to increase the rigidity of support system, 3 material of support beam is steel, and 4 material of supporting leg is steel.
This steel structure support is fabricated, it can the support system under the masonry load bearing wall of recycling.Specially
It is existing masonry structure house under the premise of retaining original superstructure, the basic components such as local excavation's underground artificial digging pile
The temporary support of setting.It can guarantee that the load of top masonry structure is passed by the facility when excavating local underground installation
To ground, guarantee the safety and stability of superstructure.
Installation process is as follows:
1, it first drills on former masonry wall, then the support beam 3 of the device is installed, support beam is installed in the two sides Yuan Qiang
After 3, two support beams 3 are fixed on original wall body with bolt, are used to support top bearing wall 1.
2, it drills on support raft plate 5, bar planting bolt is installed, then the supporting leg 4 of four steel is installed in the two sides of former wall,
Four supporting legs 4 are fixed on support raft plate 5 with bolt after positioning.
3, four supporting legs 4 and two installations of support beam 3 are linked together with installation bolt, such as Fig. 3.Thus shape
At a complete force transfer system between stable wall and support raft plate 5, such as Fig. 1.
4, the device after the installation is completed, both can be in its lower construction for excavating the underground installations such as pile foundation.Underground pile driving construction is complete
Cheng Hou, i.e., the detachable covering device, carries out repeated recycling utilize.
Claims (5)
1. load bearing wall underground construction underpins support system, it is characterised in that: be used to support the support beam of top bearing wall with
It is fixedly connected between supporting leg, supporting leg is fixedly connected with the support raft plate of the stake holes two sides below pre-demolition wall.
2. load bearing wall underground construction according to claim 1 underpins support system, it is characterised in that: the support beam
It is bolted between supporting leg, is bolted between supporting leg and support raft plate.
3. load bearing wall underground construction according to claim 1 underpins support system, it is characterised in that: the support beam
Main view is in " n " shape after connecting with supporting leg, and overlooking is in " x " shape.
4. load bearing wall underground construction according to claim 1 underpins support system, it is characterised in that: the support beam
Material is metal, and the supporting leg material is metal.
5. load bearing wall underground construction according to claim 4 underpins support system, it is characterised in that: the support beam
Material is steel, and the supporting leg material is steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820716859.6U CN208396338U (en) | 2018-05-15 | 2018-05-15 | Load bearing wall underground construction underpins support system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820716859.6U CN208396338U (en) | 2018-05-15 | 2018-05-15 | Load bearing wall underground construction underpins support system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208396338U true CN208396338U (en) | 2019-01-18 |
Family
ID=65136570
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820716859.6U Active CN208396338U (en) | 2018-05-15 | 2018-05-15 | Load bearing wall underground construction underpins support system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208396338U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113863714A (en) * | 2021-11-08 | 2021-12-31 | 中铁上海工程局集团有限公司 | Memorial archway in-situ protection foundation underpinning structure and construction method |
-
2018
- 2018-05-15 CN CN201820716859.6U patent/CN208396338U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113863714A (en) * | 2021-11-08 | 2021-12-31 | 中铁上海工程局集团有限公司 | Memorial archway in-situ protection foundation underpinning structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101914925B (en) | Basement by using optimized composite prefabricated arch wall as external wall | |
CN105735325B (en) | A kind of intensive permanent support assembled basement structure system and construction method | |
CN106088650B (en) | A kind of method and building suitable for building with brick-concrete structure underground increasing layer | |
CN102477781A (en) | Integrally assembled steel-concrete superposed component and manufacturing method thereof | |
CN101418569A (en) | Optimization complex arch wall combining prefabricated arch leaf, support and major structure | |
CN104179249A (en) | Assembled composite-structure earthquake-resistant wall and assembly method thereof | |
CN106869567A (en) | A kind of energy-dissipating type cold-formed thin-walled steel pipe concrete Lateral Resistant System | |
CN103397695B (en) | The concrete filled steel tube coupled column high-position conjoined structure of two-way steel truss is set | |
CN100362200C (en) | Supporting displacement method for lifting component and supporting system thereof | |
CN110387889B (en) | Multi-arch foundation pit supporting method for strip-shaped deep foundation pit | |
CN208396338U (en) | Load bearing wall underground construction underpins support system | |
CN205636751U (en) | Assembled forming structures system towards secret building of multilayer | |
CN112575789A (en) | Diagonal space truss foundation pit inner support system | |
CN102003030A (en) | Prefabricated coal gangue concrete hollow shear wallboard | |
WO2017024844A1 (en) | Bolt connection structure between column and beam in aluminum alloy house | |
CN207211869U (en) | A kind of basic digging-free assembled tower-type space garage | |
CN201133089Y (en) | Loading transferring device for roof beam changing to floor joist | |
CN103469892B (en) | The primary and secondary modular unit combining structure in high-rise building module space and method of attachment | |
CN102392417A (en) | Dual-cantilever bearing support structure for large steel pipe and installation method | |
CN207121922U (en) | A kind of foundation structure in digging-free assembled stereoscopic garage | |
CN211172365U (en) | Assembled low-rise residential structure system | |
CN210395394U (en) | Steel structure foundation for long-distance construction of large modular structure | |
CN201883422U (en) | Fabricated steel guide wall for underground continuous wall | |
CN204960366U (en) | Tunnel passes through device that underpins of existing large diameter pile building | |
Pujadas Gispert | Prefabricated foundations for housing applied to room modules |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: Room 815, Free Trade Building, Dalian Free Trade Zone, Liaoning Province, 116023 Patentee after: Jiuding Sanli Construction Group Co.,Ltd. Address before: Room 2818, Chenxi Xinghai International Building, No. 692 Zhongshan Road, Shahekou District, Dalian City, Liaoning Province, 116023 Patentee before: DALIAN JIUDING SPECIAL CONSTRUCTION ENGINEERING CO.,LTD. |
|
CP03 | Change of name, title or address |