CN208393358U - Construction underground material conveyor - Google Patents
Construction underground material conveyor Download PDFInfo
- Publication number
- CN208393358U CN208393358U CN201821066467.6U CN201821066467U CN208393358U CN 208393358 U CN208393358 U CN 208393358U CN 201821066467 U CN201821066467 U CN 201821066467U CN 208393358 U CN208393358 U CN 208393358U
- Authority
- CN
- China
- Prior art keywords
- platform chassis
- filling place
- connector
- platform
- material conveyor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of construction underground material conveyors.Including filling place, connector, platform chassis and track, it is connected between filling place and platform chassis by connector, plane where filling place and platform chassis keeps an angle, the orbiting under the driving of power-equipment of platform chassis, track is inclination or horizontal direction, platform chassis is equipped with limit switch, and baffle is arranged in top of the rail and bottom, and power-equipment powers off after limit switch encounters baffle.Suitable for tilt or the underground materials of horizontal direction transport.
Description
Technical field
The utility model relates to construction equipment technical fields.
Background technique
The haul of underground engineering is one of difficult point of its engineering, and common haul mode is generally the machinery such as crane and sets
It is standby, then hoisting port is necessary for vertical.It but and is that not all construction sites are suitable for installation vertical lifting mouth.
Summary of the invention
The technical issues of the utility model is solved be to provide it is a kind of suitable for tilt or the construction of horizontal direction use
Underground materials transport device.
The technical solution adopted in the utility model is construction underground material conveyor, including filling place,
It is characterized in that: further including connector, platform chassis and track, be connected between filling place and platform chassis by connector, fill
Expect that plane where platform and platform chassis keeps an angle, the orbiting under the driving of power-equipment of platform chassis, rail
Road is inclination or horizontal direction, and platform chassis is equipped with limit switch, and baffle is arranged in top of the rail and bottom, and limit switch is encountered
Power-equipment powers off after baffle.
Filling place is additionally provided with filling place baffle.
It is bolted between connector and filling place, is also bolted between connector and platform chassis.
Power-equipment is hoist engine.
The utility model has the beneficial effects that just designing this conveying device, this material transportation for inclined haul mouth
Device be it is modular, horizontal transporter can also be dressed up, can extensive utilization into underground engineering.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model.
Fig. 2 is the construction underground material conveyor schematic diagram of connectionless part in the utility model.
Fig. 3 is the construction underground material conveyor use state diagram of the utility model.
In the figure, it is marked as 1- filling place, 11- filling place baffle, 2- connector, 3- platform chassis, 31- pulley spindle
It holds, 4- limit switch, 6- track.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing.
As shown in Figure 1, haul platform be it is modular, be connected with, be roughly divided into three parts: filling place 1, connection
Part 2, platform chassis 3, platform chassis 3 can be moved with pulley bearings 31 along track 6, and three parts can all connect dismounting, charging
It is connected between platform 1 and platform chassis 3 by connector 2, filling place 1 and 3 place plane of platform chassis keep an angle,
Platform chassis 3 is run under the driving of power-equipment along track 6, and track 6 is laid in haul mouth, is inclined according to haul mouth
Then track 6 is also inclined direction.It connector 2 and filling place 1 and is bolted between platform chassis 3, and
The installation site of the different connector 2 of adjustable each length, in the state that track 6 tilts, guarantee filling place 1 is water
Square to.Platform chassis 3 is equipped with limit switch 4, and baffle is arranged in top of the rail and bottom, and switch circuit breaking, i.e. power-equipment are disconnected
Electricity can be braked in beginning and end, and avoiding device is because inertia collides, as shown in Figure 3.Filling place 1 and platform bottom
Frame 3 can also be directly connected to, and be used in horizontal transport, as described in Figure 2, in this case can filling place 1 is direct
It is connected with platform chassis 3.
This material conveyor needs to be equipped with corresponding track 6, and track power device is hoist engine, is controlled by switch-box
Hoist engine, i.e., controllable transport device, transport device can be convenient and efficient with on-site assembly.
Traditional hanging apparatus applies in general to vertical transport, this device is applicable to the haul mouth of gradient, can also be with
Repack horizontal transporter into, it is easy to loading and unloading, and cost is not high, and it is time saving and energy saving, it is more efficient.
Claims (4)
1. construction underground material conveyor, including filling place, it is characterised in that: further include connector, platform bottom
Frame and track are connected between filling place and platform chassis by connector, and plane where filling place and platform chassis is kept
One angle, the orbiting under the driving of power-equipment of platform chassis, track is inclination or horizontal direction, on platform chassis
Equipped with limit switch, baffle is arranged in top of the rail and bottom, and power-equipment powers off after limit switch encounters baffle.
2. construction as described in claim 1 underground material conveyor, it is characterised in that: the filling place is also set
There is filling place baffle.
3. construction as described in claim 1 underground material conveyor, it is characterised in that: the connector and charging
It is bolted between platform, is also bolted between connector and platform chassis.
4. construction as described in claim 1 underground material conveyor, it is characterised in that: the power-equipment is volume
Raise machine.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821066467.6U CN208393358U (en) | 2018-07-06 | 2018-07-06 | Construction underground material conveyor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821066467.6U CN208393358U (en) | 2018-07-06 | 2018-07-06 | Construction underground material conveyor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208393358U true CN208393358U (en) | 2019-01-18 |
Family
ID=65131214
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821066467.6U Active CN208393358U (en) | 2018-07-06 | 2018-07-06 | Construction underground material conveyor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208393358U (en) |
-
2018
- 2018-07-06 CN CN201821066467.6U patent/CN208393358U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206842919U (en) | A kind of stable type monkey | |
CN112576273A (en) | Muck transportation system for shield tunneling machine and transportation method thereof | |
CN202358850U (en) | Light lift-type cantilever crane | |
CN205011336U (en) | Aerial working platform | |
CN208393358U (en) | Construction underground material conveyor | |
CN206050993U (en) | Material bag Palletised carry equipment | |
CN204454333U (en) | Wind-power tower manufactures special crawler belt suspension transferring machine | |
CN102602802B (en) | Automatic overturning soil discharger | |
CN206941567U (en) | The Macadam Pile Construction barge waterborne | |
CN207726239U (en) | Pump line automatic charging device | |
CN203944624U (en) | A kind of portable dredging machine | |
CN205171288U (en) | Magnetism floats section of track and moves gantry crane | |
CN204251234U (en) | For the Multifunctional aloft-work hoisting crane of wind-power electricity generation machine overhauling, maintenance | |
CN210150662U (en) | Cabinet transfer platform | |
CN107499850A (en) | A kind of conveying device for rolling stock maintenance production | |
CN205471247U (en) | Lifting machine for building engineering | |
CN206088823U (en) | Hoist for port and pier | |
WO2018032898A1 (en) | Crushing trolley for use in underground pit and crushing operation method | |
CN104355241A (en) | Multifunctional high-altitude operation crane for overhauling and maintaining wind power generator | |
CN205419582U (en) | Floor hoist | |
CN204643700U (en) | Mining girder steel hoisting device | |
CN212709383U (en) | 5M or 7M hydraulic rail flatbed | |
CN105633838B (en) | A kind of large scale electrical power unit installs transporter | |
CN209396616U (en) | A kind of vertical spin coal lifting system | |
CN216549311U (en) | Hopper elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 116083 Yuetaiwanli 16th Floor, 454 Gaoerji Road, Shahekou District, Dalian City, Liaoning Province Patentee after: China Construction Installation Group Co., Ltd. Address before: 116083 Yuetaiwanli 16th Floor, 454 Gaoerji Road, Shahekou District, Dalian City, Liaoning Province Patentee before: China Construction Installation Engineering Co., Ltd. |