CN208379596U - Foundation pit supporting construction - Google Patents
Foundation pit supporting construction Download PDFInfo
- Publication number
- CN208379596U CN208379596U CN201820459354.6U CN201820459354U CN208379596U CN 208379596 U CN208379596 U CN 208379596U CN 201820459354 U CN201820459354 U CN 201820459354U CN 208379596 U CN208379596 U CN 208379596U
- Authority
- CN
- China
- Prior art keywords
- hound
- plate
- retaining
- cushion cap
- foundation pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 23
- 239000002689 soil Substances 0.000 claims abstract description 4
- 239000002699 waste material Substances 0.000 abstract description 6
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 239000004035 construction material Substances 0.000 description 2
- 230000002950 deficient Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 230000000007 visual effect Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Retaining Walls (AREA)
Abstract
The utility model relates to architectural engineering construction fields, disclose a kind of foundation pit supporting construction, including the cushion cap being embedded in the soil body and the retaining-plate being fixed on foundation pit side-wall, retaining-plate is equipped with the hound supported, hound by it is several be in charge of splicing fixation formed, set platform is nested and fixed on cushion cap, hound one end is connect with set platform, the other end is connect with retaining-plate, vertical rails are provided on retaining-plate, horizontal slide rail is provided on set platform, the vertically vertical sliding block of sliding rail sliding and the horizontal slider along horizontal slide rail sliding are provided on hound, hound one end and vertical sliding block are hinged, the other end is hinged with horizontal slider.Hound is easy to loading and unloading, reusable, save the cost, reduces the generation of construction waste, more environmentally-friendly, reduces and pollutes to environment bring.
Description
Technical field
The utility model relates to architectural engineering construction fields, more specifically, it relates to a kind of foundation pit supporting construction.
Background technique
Pattern foundation pit supporting structure is the safety to guarantee Underground Construction and foundation pit surrounding environment, to foundation pit side-wall and surrounding enviroment
Supporting and retaining system, reinforcing and the safeguard measure of use.
The diagonal brace of building construction internal support of foundation pit mostly uses monolithic reinforced concrete structure at present, cast-in-situ steel reinforced concrete into
Row is generally used the mode of explosion when removing, can not only bring environmental pollution, can also generate a large amount of building waste.
Utility model content
The purpose of the utility model is to provide a kind of foundation pit supporting constructions, reduce the generation of building waste.
The above-mentioned technical purpose of the utility model has the technical scheme that
A kind of foundation pit supporting construction, including the cushion cap being embedded in the soil body and the supporting being fixed on foundation pit side-wall
Plate, retaining-plate are equipped with the hound supported, and the hound is in charge of splicing fixation and is formed by several, the cushion cap
On be nested and fixed set platform, described hound one end is connect with set platform, and the other end is connect with retaining-plate, is arranged on the retaining-plate
There are vertical rails, horizontal slide rail is provided on the set platform, the vertical cunning of vertically sliding rail sliding is provided on the hound
Block and the horizontal slider slided along horizontal slide rail, described hound one end and vertical sliding block are hinged, and the other end and horizontal slider are cut with scissors
It connects.
By using above-mentioned technical proposal, processing welding is carried out to form diagonal brace to the remaining steel pipe defective material in construction site
Hound connect by bar by set platform with cushion cap, easy to loading and unloading fast while to reuse to construction material, saving at
This, reduces the generation of construction waste, is slid vertically by vertical sliding block and is slided with horizontal slider level, thus to the branch of hound
Support point is adjusted, and after adjusting, is passed through threaded hole by bolt to fix horizontal slider and vertical sliding block, is played more preferable
Supporting role, hound can Reusability, it is more environmentally-friendly, reduce give environment bring pollution.
Preferably, the retaining-plate lower part is provided with horizontal support bar, and described horizontal support bar one end is fixed with retaining-plate
Connection, the other end are fixedly connected with cushion cap.
By using above-mentioned technical proposal, better supporting role is played to retaining-plate by horizontal support bar.
Preferably, it is socketed with lantern ring on the hound, auxiliary support plate, the Auxiliary support are hinged on the lantern ring
Plate is fixedly connected with cushion cap.
By using above-mentioned technical proposal, hound is supported by auxiliary support plate, so that hound be made to install
It is more firm.
Preferably, the through hole passed through for horizontal support bar is provided on the cushion cap, the horizontal support bar is far from branch
One end of backplate sequentially passes through auxiliary support plate, set platform and cushion cap, and the horizontal support bar is equipped itself and cushion cap fixation
Fixing piece.
By using above-mentioned technical proposal, auxiliary support plate, set platform and cushion cap are fixed by horizontal support bar, an object is more
With convenient and efficient.
Preferably, the fixing piece includes the dead ring for being socketed on horizontal support bar and being threadedly coupled with it, described tight
Gu ring is between auxiliary support plate and retaining-plate and dead ring and horizontal support bar contradict.
By using above-mentioned technical proposal, by rotation dead ring thus by horizontal support bar and auxiliary support plate and cushion cap
It is fixed, it is easy to loading and unloading quick.
Preferably, the lantern ring is in axial sliding connection along hound in hound.
By using above-mentioned technical proposal, can by adjusting the position of lantern ring, so as to adjust the position of auxiliary support plate, from
And adapt to the adjustment of hound.
In conclusion the utility model has the following beneficial effects:
1, hound is easy to loading and unloading, reusable, save the cost, reduces the generation of construction waste, more environmentally-friendly, reduces
It is polluted to environment bring;
2, the gradient of hound and supporting point can be adjusted, and while convenient for hound installation, be suitable for constructing
The actual needs at scene;
3, better supporting role is played to retaining-plate by horizontal support bar, while branch will be assisted by horizontal support bar
Fagging, set platform and cushion cap are fixed, to keep entire foundation pit support system stronger.
Detailed description of the invention
Fig. 1 is the schematic diagram at first visual angle of the present embodiment;
Fig. 2 is the schematic diagram at second visual angle of the present embodiment.
Appended drawing reference: 1, cushion cap;2, retaining-plate;3, hound;31, it is in charge of;4, platform is covered;5, vertical rails;6, horizontal sliding
Rail;7, vertical sliding block;8, horizontal slider;9, threaded hole;10, lantern ring;11, auxiliary support plate;12, horizontal support bar;13, run through
Hole;14, dead ring.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but
As long as all by the protection of Patent Law in the scope of the claims of the utility model.
A kind of foundation pit supporting construction, as shown in Figure 1, including the cushion cap 1 being embedded in the soil body and being fixed at foundation pit side
Retaining-plate 2 on wall;Retaining-plate 2 is equipped with the hound 3 supported;Hound 3 is in charge of 31 splicings and is fixed by several
It is formed, platform 4 is nested and fixed on cushion cap 1,3 one end of hound is connect with set platform 4, and the other end is connect with retaining-plate 2.To construction
The remaining steel pipe defective material in scene carries out processing welding to form hound 3, connect hound 3 with cushion cap 1 by set platform 4, fills
It unloads convenient and efficient, while construction material is reused, save the cost, reduce the generation of construction waste, hound 3 can be anti-
It is multiple to use, it is more environmentally-friendly, it reduces and is polluted to environment bring.
It is provided with vertical rails 5 on retaining-plate 2, covers and is provided with horizontal slide rail 6 on platform 4, be provided with vertically on hound 3
The vertical sliding block 7 that sliding rail 5 slides and the horizontal slider 8 slided along horizontal slide rail 6, are respectively provided on vertical sliding block 7 and horizontal slider 8
There is threaded hole 9;3 one end of hound and vertical sliding block 7 are hinged, and the other end and horizontal slider 8 are hinged.It is vertical by vertical sliding block 7
Sliding and the horizontal sliding of horizontal slider 8 after adjusting, pass through spiral shell by bolt to be adjusted to the supporting point of hound 3
Pit 9 is to fixed by horizontal slider 8 and vertical sliding block 7, to play better supporting role.
As depicted in figs. 1 and 2, lantern ring 10 is socketed on hound 3, lantern ring 10 is in axial sliding connection along hound 3 in oblique
Strut 3;Auxiliary support plate 11 is hinged on lantern ring 10, auxiliary support plate 11 is fixedly connected with cushion cap 1.Pass through auxiliary support plate 11
Hound 3 is supported, so that it is more firm to install hound 3.
2 lower part of retaining-plate is provided with horizontal support bar 12, and the through hole passed through for horizontal support bar 12 is provided on cushion cap 1
13,12 one end of horizontal support bar is fixedly connected with retaining-plate 2, and the other end sequentially passes through auxiliary support plate 11, set platform 4 and cushion cap 1;
Horizontal support bar 12 is equipped its fixing piece fixed with cushion cap 1.Retaining-plate 2 is played preferably by horizontal support bar 12
Supporting role, while being fixed auxiliary support plate 11, set platform 4 and cushion cap 1 by horizontal support bar 12, multi-purpose content is convenient fast
It is prompt.
Fixing piece includes the dead ring 14 for being socketed on horizontal support bar 12 and being threadedly coupled with it, and dead ring 14 is located at auxiliary
It helps between support plate 11 and retaining-plate 2 and dead ring 14 and horizontal support bar 12 contradicts.By rotation dead ring 14 thus by water
Flat support rod 12 and auxiliary support plate 11 and cushion cap 1 are fixed, easy to loading and unloading quick.
Specific work process: after installation fixes retaining-plate 2, diagonal brace is welded into using the remaining steel pipe assembly in construction site
3 both ends of hound are slidably connected with vertical sliding block 7 and level by bar 3 respectively after covering female connector platform 4 on cushion cap 1, and sliding is vertical
After sliding block 7 and horizontal slider 8 adjust the position of hound 3, it is bolted vertical sliding block 7 and horizontal slider 8, then
After slip collar 10 is bonded auxiliary support plate 11 with set platform 4,12 one end of horizontal support bar is sequentially passed through into set platform 4,1 and of cushion cap
Auxiliary support plate 11, after dead ring 14 is inserted on horizontal support bar 12, horizontal support bar 12 and retaining-plate 2 is fixed, rotation
Dead ring 14 is fixed by horizontal support bar 12, auxiliary support plate 11 and set platform 4 and cushion cap 1.
Claims (6)
- Cushion cap (1) and the supporting that is fixed on foundation pit side-wall including what is be embedded in the soil body 1. a kind of foundation pit supporting construction Plate (2), retaining-plate (2) is equipped with the hound (3) supported, it is characterized in that: the hound (3) is in charge of by several (31) splicing is fixed forms, and is nested and fixed platform (4) on the cushion cap (1), described hound (3) one end and set platform (4) are even It connects, the other end is connect with retaining-plate (2), is provided with vertical rails (5) on the retaining-plate (2), is provided on the set platform (4) Horizontal slide rail (6) is provided with the vertically vertical sliding block (7) of sliding rail (5) sliding on the hound (3) and along horizontal slide rail (6) horizontal slider (8) slided, hingedly, the other end and horizontal slider (8) are cut with scissors for described hound (3) one end and vertical sliding block (7) It connects.
- 2. foundation pit supporting construction according to claim 1, it is characterized in that: the retaining-plate (2) lower part is provided with horizontal branch Strut (12), described horizontal support bar (12) one end are fixedly connected with retaining-plate (2), and the other end is fixedly connected with cushion cap (1).
- 3. foundation pit supporting construction according to claim 2, it is characterized in that: lantern ring (10) are socketed on the hound (3), It is hinged with auxiliary support plate (11) on the lantern ring (10), the auxiliary support plate (11) is fixedly connected with cushion cap (1).
- 4. foundation pit supporting construction according to claim 3, it is characterized in that: being provided on the cushion cap (1) for horizontally-supported The through hole (13) that bar (12) passes through, the horizontal support bar (12) sequentially pass through Auxiliary support far from the one end of retaining-plate (2) Plate (11), set platform (4) and cushion cap (1), the horizontal support bar (12) are equipped its fixing piece fixed with cushion cap (1).
- 5. foundation pit supporting construction according to claim 4, it is characterized in that: the fixing piece includes being socketed in horizontal support bar (12) dead ring (14) being threadedly coupled on and with it, the dead ring (14) are located at auxiliary support plate (11) and retaining-plate (2) Between and dead ring (14) and horizontal support bar (12) contradict.
- 6. foundation pit supporting construction according to claim 3, it is characterized in that: the lantern ring (10) is axially sliding along hound (3) It is dynamic to be connected to hound (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820459354.6U CN208379596U (en) | 2018-04-02 | 2018-04-02 | Foundation pit supporting construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820459354.6U CN208379596U (en) | 2018-04-02 | 2018-04-02 | Foundation pit supporting construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208379596U true CN208379596U (en) | 2019-01-15 |
Family
ID=64974935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820459354.6U Expired - Fee Related CN208379596U (en) | 2018-04-02 | 2018-04-02 | Foundation pit supporting construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208379596U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109678079A (en) * | 2018-12-27 | 2019-04-26 | 国家电网有限公司 | Can rapid deployment lifting device and wireless relay emergency communication equipment |
CN111681512A (en) * | 2020-07-01 | 2020-09-18 | 南昌三寸辉信息技术有限公司 | Circuit connection experiment table for professional learning of electronic information engineering |
CN111827299A (en) * | 2020-06-23 | 2020-10-27 | 北京住总第一开发建设有限公司 | Foundation pit supporting structure and construction method thereof |
CN115199068A (en) * | 2022-08-26 | 2022-10-18 | 江苏环盛建设工程有限公司 | Built-in positioning prefabricated member reinforced concrete shear wall and construction method |
-
2018
- 2018-04-02 CN CN201820459354.6U patent/CN208379596U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109678079A (en) * | 2018-12-27 | 2019-04-26 | 国家电网有限公司 | Can rapid deployment lifting device and wireless relay emergency communication equipment |
CN109678079B (en) * | 2018-12-27 | 2023-08-25 | 国家电网有限公司 | Lifting device capable of being rapidly deployed and wireless relay emergency communication equipment |
CN111827299A (en) * | 2020-06-23 | 2020-10-27 | 北京住总第一开发建设有限公司 | Foundation pit supporting structure and construction method thereof |
CN111681512A (en) * | 2020-07-01 | 2020-09-18 | 南昌三寸辉信息技术有限公司 | Circuit connection experiment table for professional learning of electronic information engineering |
CN115199068A (en) * | 2022-08-26 | 2022-10-18 | 江苏环盛建设工程有限公司 | Built-in positioning prefabricated member reinforced concrete shear wall and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208379596U (en) | Foundation pit supporting construction | |
CN107119715B (en) | A kind of application method of pipe gallery entirety mould bases | |
CN102877418B (en) | Stentless urban bridge anti-collision guardrail construction method and cradle vehicle and gun carrier thereof | |
CN108149706B (en) | Prefabricated assembled comprehensive pipe gallery spliced by cast-in-place hidden beams and laminated slabs and construction method thereof | |
CN105604185B (en) | A kind of earthquake-resistant structure support connection structure and attaching method thereof | |
CN107060075A (en) | A kind of supporting construction connected for fabricated construction beam slab and installation method | |
CN206971268U (en) | The working top plate mobile formwork body of underground pipe gallery | |
CN204098918U (en) | Dimensional parameters multiple degrees of freedom is adjustable uses shield launching bracket repeatedly | |
CN205063331U (en) | Slipform architecture | |
CN109487814A (en) | Cast-in-place piping lane integrated moveable formwork jumbo construction method | |
CN205479706U (en) | Push pipe work jing ding advances structure | |
CN209799969U (en) | A integrally lift up cantilever formwork device for quick construction shaft lining cutting | |
CN103184794A (en) | Quick formwork construction method for cylindrical strap type butt splicing wooden template | |
CN104343086A (en) | Small-spatial construction method for steel anchor beam anchoring zone of cable-stayed bridge upper pylon | |
CN102303369A (en) | Process for prefabricating square culvert | |
CN107460889A (en) | Integral movable type rack template and its construction method in underground pipe gallery construction | |
CN109869153B (en) | Integral lifting cantilever formwork device for rapidly constructing shaft lining and construction method | |
CN215857846U (en) | A template braced system for circular shaft reverse construction method | |
CN104180658A (en) | Mounting method for dedusting system of sintering machine | |
CN102146492A (en) | Method for installing converter body equipment and tooling platform | |
CN104775606A (en) | Operation platform for prefabricated assembled residential building wall plate construction and construction method thereof | |
CN202139255U (en) | Tooling platform for assembling converter body equipment | |
CN106013784A (en) | Angle iron frame template and construction method | |
CN209469875U (en) | A kind of concrete pump pipe bending place support device | |
CN202865996U (en) | Room modular structure for nuclear power plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191128 Address after: 110000 2-32-2, No. 358, Shifu Road, Shenhe District, Shenyang City, Liaoning Province Patentee after: Liaoning Shengtai Geotechnical Engineering Co., Ltd Address before: 510030 Guangzhou City, Guangdong Province, Yuexiu District Shuiyin Road 119 Starlight 1903 Patentee before: Wei Qihui |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190115 Termination date: 20210402 |