CN208379557U - Crouch excavation supporting structure under a kind of shear-zone big cross section cavern - Google Patents

Crouch excavation supporting structure under a kind of shear-zone big cross section cavern Download PDF

Info

Publication number
CN208379557U
CN208379557U CN201821007984.6U CN201821007984U CN208379557U CN 208379557 U CN208379557 U CN 208379557U CN 201821007984 U CN201821007984 U CN 201821007984U CN 208379557 U CN208379557 U CN 208379557U
Authority
CN
China
Prior art keywords
section
segment
concrete layer
row
shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821007984.6U
Other languages
Chinese (zh)
Inventor
雷厚斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guodian Dadu River Hydropower Development Co Ltd
Original Assignee
Guodian Dadu River Hydropower Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guodian Dadu River Hydropower Development Co Ltd filed Critical Guodian Dadu River Hydropower Development Co Ltd
Priority to CN201821007984.6U priority Critical patent/CN208379557U/en
Application granted granted Critical
Publication of CN208379557U publication Critical patent/CN208379557U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The utility model discloses the excavation supporting structures that crouches under a kind of shear-zone big cross section cavern, including arch, left and right abutment wall section and supporting construction, arch springing to pass through changeover portion respectively and be connected as one with left and right abutment wall section;Left and right abutment wall Duan Jun includes that the first segment being arranged from top to down, second segment, third section and the 4th section and leftwall section and RightWall section correspond, supporting construction includes the prestress anchorage cable of the row being separately connected with changeover portion upper end and first segment upper end or more, further includes the prestress anchorage cable or prestressed anchor of the row being separately connected with second segment upper end and third section upper end or more;Supporting construction further includes the advance anchor bolt of the row being separately connected with changeover portion lower end, first segment lower end, second segment lower end and third section lower end or more.The comprehensive treatment mode that the utility model uses and carry out deep support reinforcement based on prestress anchorage cable, carries out supplemented by self-advancing type prestressed anchor superficial part support reinforcement carries out supporting, ensure that construction reliability, construction quality and construction safety.

Description

Crouch excavation supporting structure under a kind of shear-zone big cross section cavern
Technical field
The utility model belongs to hydraulic engineering tunnel construction field, and in particular to crouches and opens under a kind of shear-zone big cross section cavern Dig supporting construction.
Background technique
At present in hydraulic engineering tunnel construction field, big cross section cavern excavation process is usually excavated, cavern from top to bottom Each layer of excavation is all that a face continuously promotes in the horizontal direction, this space characteristic excavated determines large ratio of height to width Surrounding rock of chamber displacement model there are bigger differences with common Method of Tunnel Displacement mode.
During big cross section cavern excavation, fault belt can be encountered, country rock instability problem is prominent, excavates and supporting is difficult Spend larger, existing technological means is it is difficult to ensure that safety during big cross section cavern excavation, sleeping work progress under being especially layered In, supporting how is carried out in advance, guarantees construction safety, without more effective measures.
Utility model content
In order to solve the above problems existing in the present technology, the utility model aim is to provide a kind of shear-zone big cross section Crouch excavation supporting structure under cavern.
The technology employed by the present utility model is
Crouch excavation supporting structure under a kind of shear-zone big cross section cavern, including arch, left and right abutment wall section and supporting construction, Arch springing passes through changeover portion respectively and is connected as one with left and right abutment wall section;
The left and right abutment wall Duan Jun includes the first segment being arranged from top to down, second segment, third section and the 4th section and the left side Wall section and RightWall section correspond, and the first segment, second segment, third section and the 4th section of height are no more than 5m;
The supporting construction includes and changeover portion upper end and a row that is that first segment upper end is separately connected and stretching to subjacent bed Above prestress anchorage cable, supporting construction are separately connected with second segment upper end and third section upper end and stretch to subjacent bed A row more than prestress anchorage cable or prestressed anchor;
The supporting construction further includes distinguishing with changeover portion lower end, first segment lower end, second segment lower end and third section lower end An advance anchor bolt more than row that is connecting and stretching to subjacent bed.
It uses and carries out deep support reinforcement based on prestress anchorage cable, carries out superficial part reinforcing supplemented by self-advancing type prestressed anchor The comprehensive treatment mode of supporting carries out supporting, ensure that construction reliability, construction quality and construction safety.
In order to fix supporting construction, the arch includes the steel arch-shelf set gradually from cavern surface along ground direction and spraying Concrete layer;
The changeover portion and left and right abutment wall Duan Jun include the perpendicular concrete layer set gradually from cavern surface along ground direction, Steel arch-shelf and gunning concrete layer;
Steel arch-shelf is wrapped up inside the perpendicular concrete layer, gunning concrete layer is sprayed at basement rock layer surface.
For the ease of fixed supporting construction, the perpendicular concrete layer is reserved with multiple rows of joint grouting hole, every row from top to down In joint grouting hole longitudinal direction array pitch be 2.5m, the aperture in joint grouting hole is 50mm.
When changeover portion upper end, first segment upper end, second segment upper end and third section upper end be respectively provided be prestress anchorage cable when, Prestress anchorage cable longitudinal direction array pitch is 4m, and the length of prestress anchorage cable is 20m-50m, prestress anchorage cable 1500KN;
When changeover portion upper end and first segment upper end are provided that prestress anchorage cable and second segment upper end and third section upper end are set When what is set is prestressed anchor, prestress anchorage cable longitudinal direction array pitch is 4m, and the length of prestress anchorage cable is 20m-30m, prestressed anchor Rope is 1500KN, and prestressed anchor longitudinal direction array pitch is 3m, and the length of prestressed anchor is 12m-24m, and prestressed anchor is 450KN。
The prestress anchorage cable passes through gunning concrete layer, steel arch-shelf and perpendicular concrete layer and is fixed and exposes perpendicular coagulation Soil layer;
When second segment upper end and third section upper end are provided that prestressed anchor, the prestressed anchor of second segment upper end is worn It crosses gunning concrete layer, steel arch-shelf and perpendicular concrete layer and is fixed and exposes perpendicular concrete layer, the prestressing force of third section upper end Anchor pole passes through gunning concrete layer and is connected and fixed with steel arch-shelf.
Cavern is further reinforced, the supporting construction further includes the row set gradually from vault two sides lower end to arch springing The above first dowel beam, the first dowel beam are connect with steel arch-shelf, and longitudinal array pitch of the first dowel beam is 1.5m, the first dowel beam Length be 12m.
Further reinforce cavern, the supporting construction further include set gradually from changeover portion to the 4th section and under stretching to Multiple rows of second dowel beam of sleeping layer, the second dowel beam are connect with steel arch-shelf, and the second dowel beam longitudinal direction array pitch in every row is 1.5m, the second dowel Shu Changdu are 12m.
Further reinforce cavern, the supporting construction further include set gradually from vault to vault two sides lower end it is multiple rows of System anchor bolt, the system anchor bolt longitudinal direction array pitch in every row are 0.75m, and the vertical array pitch of every row is 1.5m, each short interval of platoon leader Interlaced arrangement.
Further reinforce cavern, the supporting construction further include under changeover portion lower end, first segment lower end, second segment An advance anchor bolt more than row that is that end, third section lower end are separately connected and stretching to subjacent bed, longitudinal array pitch of advance anchor bolt are 1.5m, the advance anchor bolt of each installation point include long advance anchor bolt and short advance anchor bolt.
One end of the advance anchor bolt extends into the joint grouting hole advanced consolidation grouting of progress and fixes.
The utility model has the following beneficial effects:
The utility model implements depth feature in view of construction effect and prestressing force, deep using carrying out based on prestress anchorage cable Portion's support reinforcement, the comprehensive treatment mode that superficial part support reinforcement is carried out supplemented by self-advancing type prestressed anchor carry out supporting, guarantee Construction reliability, construction quality and construction safety reduce the shakinesses such as landslide, chip off-falling during the excavation that crouches under unfavorable geology Pledge love condition, ensure that cavern's Forming Quality, improve construction efficiency, is very suitable to large-scale promotion use.
Detailed description of the invention
Fig. 1 be the utility model-embodiment 1 A class shear-zone big cross section cavern under crouch excavation supporting structure section show It is intended to.
Fig. 2 is the C portion enlarged drawing of Fig. 1.
Fig. 3 be the utility model-embodiment 2 B class shear-zone big cross section cavern under crouch excavation supporting structure section show It is intended to.
Fig. 4 be the utility model-embodiment tunnel-spillway F3 shear-zone and influence band big cross section cavern under crouch excavate The top cross-sectional view of supporting construction.
In figure: 1- arch;201- erects concrete layer;202- steel arch-shelf;203- gunning concrete layer;204- joint grouting hole; 3- changeover portion;4- prestress anchorage cable;5- the first dowel beam;6- the second dowel beam;7- system anchor bolt;8- advance anchor bolt;9- is answered in advance Power anchor pole.
Specific embodiment
With reference to the accompanying drawing and specific embodiment is further elaborated the utility model.
Embodiment 1
As illustrated in fig. 1 and 2, crouch excavation supporting structure under a kind of shear-zone big cross section cavern of the present embodiment, including arch 1, Left and right abutment wall section and supporting construction, arch springing pass through changeover portion 3 respectively and are connected as one with left and right abutment wall section, and arch includes from hole The steel arch-shelf 202 and gunning concrete layer 203 that chamber surface is set gradually along ground direction.Changeover portion 3 and left and right abutment wall section are wrapped The perpendicular concrete layer 201, steel arch-shelf 202 and gunning concrete layer 203 set gradually from cavern surface along ground direction is included, In, it erects and wraps up steel arch-shelf 202 inside concrete layer 201, gunning concrete layer 201 is sprayed at basement rock layer surface.
Perpendicular concrete layer 201 uses C30 concrete, erects concrete layer 201 and is used as pedestal, when construction, in changeover portion 3 and a left side RightWall Duan Jun pours the C30 concrete of thick 50CM as pedestal, which has wrapped up steel arch-shelf 202.
When construction, it is laid with steel mesh in the basement rock layer surface of arch, changeover portion 3 and left and right abutment wall section, then sprays C25 coagulation Soil forms the gunning concrete layer 203 of thickness 15cm;
Steel arch-shelf 202 is laid on 203 surface of gunning concrete layer;
Perpendicular concrete layer is formed in the C30 concrete that the steel arch-shelf surface of changeover portion 3 and left and right abutment wall section pours thick 50CM 201.Perpendicular concrete layer 201 carries out single layer arrangement of reinforcement, and reinforcing steel bars exposed length is 0.5m and 1.5m and length interlaced arrangement, so as to it is rear The arrangement of reinforcement of continuous concrete sidewall lining cutting effectively connects.
For the ease of fixed supporting construction, it is reserved with multiple rows of joint grouting hole 204 from top to down in perpendicular concrete layer 201, When practical application, the aperture in joint grouting hole is 50mm, and the joint grouting hole longitudinal direction array pitch in every row is 2.5m.
Illustrate: the present embodiment longitudinal direction above and described below is along cavern's axis direction, and longitudinal array pitch is i.e. along hole The spacing in chamber axis direction, vertical array pitch are the spacing from vault to left and right abutment wall section lower end from top to bottom or from top to bottom.
During big cross section cavern excavation, fault belt can be encountered, country rock instability problem is prominent, excavates and supporting is difficult Spend larger, existing technological means is it is difficult to ensure that safety during big cross section cavern excavation, sleeping work progress under being especially layered In, supporting how is carried out in advance, guarantees construction safety, without more effective measures.
To solve the above-mentioned problems, supporting construction is made following improvement by the utility model, first will left and right before improving Abutment wall Duan Jun is divided into four sections of regions from top to down, i.e. left and right abutment wall Duan Jun includes the first segment being arranged from top to down, second segment, Three sections and the 4th section, and the sectional area of leftwall section and RightWall section corresponds.The height in every section of region is no more than 5m. In the present embodiment, first segment, second segment, third section and the 4th section of height are respectively 3.41m, 5m, 5m and 5m.
Supporting construction includes being separately connected with 3 upper end of changeover portion, first segment upper end, second segment upper end and third section upper end And the prestress anchorage cable 4 of a row of subjacent bed or more is stretched to, the longitudinal array pitch of the prestress anchorage cable 4 in every row is 4m, prestressed anchor The length of rope 4 is 20m-50m, the preferred 1500KN of prestress anchorage cable, and in practical applications, the grouted part of prestress anchorage cable needs Positioned at III class surrounding rock.
Be briefly described to surrounding rock category: the stable structure degree of country rock is successively deteriorated from I-V class, wherein I class is enclosed The stabilized structure of rock, surrounding rock structure is best, and the structure of V class surrounding rock is least firm, and surrounding rock structure is worst.
Supporting construction further includes the first dowel beam 5 of the row set gradually from vault two sides lower end to arch springing or more, this reality Applying example is six rows, and longitudinal array pitch of the first dowel beam 5 in every row is 1.5m, and the vertical array pitch of every row is 1.5m, the first dowel The length of beam 5 is 12m.
Supporting construction further includes multiple rows of second dowel beam that is setting gradually from changeover portion 3 to the 4th section and stretching to subjacent bed 6, the longitudinal array pitch of the second dowel beam 6 in every row is 1.5m, and 6 length of the second dowel beam is 12m.
Supporting construction further includes the multiple rows of system anchor bolt 7 set gradually from vault to vault two sides lower end, and in every row is The longitudinal array pitch of anchor pole 7 of uniting is 0.75m, and the vertical array pitch of every row is 1.5m, and each platoon leader is short interval-staggered, and the present embodiment is 14 rows, preferably long system anchor bolt 7 are 9m, and short system anchor bolt is 6m, system anchor bolt 7 in practical application, exposed 0.5m, And the system anchor bolt 7 of vault two sides lower end and the first dowel beam 5 are interval-staggered.
Supporting construction further includes being separately connected with 3 lower end of changeover portion, first segment lower end, second segment lower end, third section lower end And stretch to subjacent bed a row more than advance anchor bolt 8, longitudinal array pitch of advance anchor bolt 8 is 1.5m, each installation point it is super Preceding anchor pole 8 includes long advance anchor bolt and short advance anchor bolt, and the present embodiment is a row, and long advance anchor bolt is 9m, short advance anchor bolt For 6m, each installation point includes 3 root long advance anchor bolts and 2 short advance anchor bolts, is successively set from top to down from installation point Set 3 root long advance anchor bolts and 2 short advance anchor bolts.
Prestress anchorage cable 4 passes through gunning concrete layer 203, steel arch-shelf 202 and perpendicular concrete layer 201 and is fixed and exposes Perpendicular concrete layer 201.
One end of advance anchor bolt 8 extends into the joint grouting hole advanced consolidation grouting of progress and fixes.
First dowel beam 5, the second dowel beam 6 and system anchor bolt 7 are effectively connect with steel arch-shelf.
Crouch the shear-zone big cross section that excavation supporting structure is A class hole section under a kind of shear-zone big cross section cavern of the present embodiment Crouch excavation supporting structure under cavern, and the present embodiment is suitable for V class surrounding rock.
Embodiment 2
As shown in figure 3, the excavation supporting structure that crouches under a kind of shear-zone big cross section cavern of the present embodiment is the disconnected of B class hole section Crouch excavation supporting structure under layer band big cross section cavern, and the present embodiment is suitable for IV class surrounding rock.
The present embodiment place different from embodiment 1 is:
Supporting construction include with it is more than 3 upper end of changeover portion and a row that is that first segment upper end is separately connected and stretching to subjacent bed Prestress anchorage cable 4, the longitudinal array pitch of prestress anchorage cable 4 in every row is 4m, and the length of prestress anchorage cable 4 is 20m-30m, is answered in advance The preferred 1500KN of power anchor cable, and in practical applications, the grouted part of prestress anchorage cable need to be located at III class surrounding rock.
Supporting construction further include with second segment upper end and a row that is that third section upper end is separately connected and stretching to subjacent bed with On prestressed anchor 9, the longitudinal array pitch of prestressed anchor 9 in every row is 3m, and the length of prestressed anchor 9 is 12m-24m, in advance The preferred 450KN of stress anchor pole.
It can be seen that compared with the excavation supporting structure that crouches under the shear-zone big cross section cavern of A class hole section, the second of the present embodiment Duan Shangduan and third section upper end are all made of prestressed anchor 9 and replace prestress anchorage cable 4, are arranged closeer than prestress anchorage cable 4, long Spend that shorter, prestressing force is smaller.
In practical application, prestress anchorage cable 4 pass through gunning concrete layer 203, steel arch-shelf 202 and perpendicular concrete layer 201 into Row is fixed and exposes perpendicular concrete layer 201.
The prestressed anchor 9 of second segment upper end pass through gunning concrete layer 203, steel arch-shelf 202 and perpendicular concrete layer 201 into Row is fixed and exposes perpendicular concrete layer 201.
The prestressed anchor 9 of third section upper end passes through gunning concrete layer 203 and is connected and fixed with steel arch-shelf 202.
As shown in figure 4, Fig. 3 is the excavation supporting structure that crouches under the big cross section cavern of tunnel-spillway F3 shear-zone and influence band Top cross-sectional view.In figure, the excavation supporting structure that crouches under the shear-zone big cross section cavern of A class hole section is indicated with A, indicates B class with B Crouch excavation supporting structure under the shear-zone big cross section cavern of hole section.
III, IV and V III class surrounding rock, IV class surrounding rock and V class surrounding rock are respectively indicated.
The shear-zone big cross section cavern for choosing B class hole section is respectively corresponded according to actual IV class surrounding rock and V class surrounding rock structure Crouch under the shear-zone big cross section cavern of sleeping excavation supporting structure and A class hole section down excavation supporting structure.
The utility model is not limited to above-mentioned optional embodiment, anyone can obtain under the enlightenment of the utility model Other various forms of products, however, making any variation in its shape or structure, all the utility model rights that falls into are wanted The technical solution in confining spectrum is sought, is all fallen within the protection scope of the utility model.

Claims (10)

1. crouch excavation supporting structure under a kind of shear-zone big cross section cavern, it is characterised in that: including arch (1), left and right abutment wall section, with And supporting construction, arch springing pass through changeover portion (3) respectively and are connected as one with left and right abutment wall section;
The left and right abutment wall Duan Jun includes the first segment being arranged from top to down, second segment, third section and the 4th section and leftwall section It is corresponded with RightWall section, the first segment, second segment, third section and the 4th section of height are no more than 5m;
The supporting construction include with it is more than changeover portion upper end and a row that is that first segment upper end is separately connected and stretching to subjacent bed Prestress anchorage cable (4), supporting construction is separately connected with second segment upper end and third section upper end and stretches to subjacent bed A row more than prestress anchorage cable (4) or prestressed anchor (9);
The supporting construction further includes being separately connected with changeover portion lower end, first segment lower end, second segment lower end and third section lower end And stretch to subjacent bed a row more than advance anchor bolt (8).
2. crouch excavation supporting structure under a kind of shear-zone big cross section cavern according to claim 1, it is characterised in that: described Arch includes the steel arch-shelf (202) and gunning concrete layer (203) set gradually from cavern surface along ground direction;
The changeover portion and left and right abutment wall Duan Jun include the perpendicular concrete layer set gradually from cavern surface along ground direction (201), steel arch-shelf and gunning concrete layer;
Steel arch-shelf is wrapped up inside the perpendicular concrete layer, gunning concrete layer is sprayed at basement rock layer surface.
3. crouch excavation supporting structure under a kind of shear-zone big cross section cavern according to claim 2, it is characterised in that: described Perpendicular concrete layer is reserved with multiple rows of joint grouting hole (204) from top to down, and the joint grouting hole longitudinal direction array pitch in every row is 2.5m, The aperture in joint grouting hole is 50mm.
4. crouch excavation supporting structure under a kind of shear-zone big cross section cavern according to claim 1, it is characterised in that: served as When cross that a section upper end, first segment upper end, second segment upper end and third section upper end be respectively provided with is prestress anchorage cable, prestress anchorage cable is vertical It is 4m to array pitch, the length of prestress anchorage cable is 20m-50m, prestress anchorage cable 1500KN;
When changeover portion upper end and first segment upper end be provided that prestress anchorage cable and second segment upper end and third section upper end setting When being prestressed anchor, prestress anchorage cable longitudinal direction array pitch is 4m, and the length of prestress anchorage cable is 20m-30m, and prestress anchorage cable is 1500KN, prestressed anchor longitudinal direction array pitch are 3m, and the length of prestressed anchor is 12m-24m, prestressed anchor 450KN.
5. crouch excavation supporting structure under a kind of shear-zone big cross section cavern according to claim 2, it is characterised in that: described Prestress anchorage cable passes through gunning concrete layer, steel arch-shelf and perpendicular concrete layer and is fixed and exposes perpendicular concrete layer;
When second segment upper end and third section upper end are provided that prestressed anchor, the prestressed anchor of second segment upper end passes through spray It applies concrete layer, steel arch-shelf and perpendicular concrete layer and is fixed and exposes perpendicular concrete layer, the prestressed anchor of third section upper end It is connected and fixed across gunning concrete layer with steel arch-shelf.
6. special according to the excavation supporting structure that crouches under a kind of shear-zone big cross section cavern described in claim 2-5 any one Sign is: the supporting construction further includes the first dowel beam of the row set gradually from vault two sides lower end to arch springing or more (5), The first dowel beam is connect with steel arch-shelf, and longitudinal array pitch of the first dowel beam is 1.5m, and the length of the first dowel beam is 12m.
7. special according to the excavation supporting structure that crouches under a kind of shear-zone big cross section cavern described in claim 2-5 any one Sign is: the supporting construction further includes multiple rows of second dowel that is setting gradually from changeover portion to the 4th section and stretching to subjacent bed Beam (6), the second dowel beam are connect with steel arch-shelf, and the second dowel beam longitudinal direction array pitch in every row is 1.5m, and the second dowel beam is long Degree is 12m.
8. crouch under a kind of shear-zone big cross section cavern described in -5 any one excavation supporting structure according to claim 1, special Sign is: the supporting construction further includes the multiple rows of system anchor bolt (7) set gradually from vault to vault two sides lower end, in every row System anchor bolt longitudinal direction array pitch be 0.75m, the vertical array pitch of every row is 1.5m, and each platoon leader is short interval-staggered.
9. crouch excavation supporting structure under a kind of shear-zone big cross section cavern according to claim 3, it is characterised in that: described Supporting construction further include be separately connected with changeover portion lower end, first segment lower end, second segment lower end, third section lower end and under stretching to Longitudinal array pitch of advance anchor bolt (8) more than one row of sleeping layer, advance anchor bolt is 1.5m, and the advance anchor bolt of each installation point wraps Include long advance anchor bolt and short advance anchor bolt.
10. crouch excavation supporting structure under a kind of shear-zone big cross section cavern according to claim 9, it is characterised in that: institute The one end for stating advance anchor bolt extends into the joint grouting hole advanced consolidation grouting of progress and fixes.
CN201821007984.6U 2018-06-27 2018-06-27 Crouch excavation supporting structure under a kind of shear-zone big cross section cavern Expired - Fee Related CN208379557U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821007984.6U CN208379557U (en) 2018-06-27 2018-06-27 Crouch excavation supporting structure under a kind of shear-zone big cross section cavern

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821007984.6U CN208379557U (en) 2018-06-27 2018-06-27 Crouch excavation supporting structure under a kind of shear-zone big cross section cavern

Publications (1)

Publication Number Publication Date
CN208379557U true CN208379557U (en) 2019-01-15

Family

ID=64964762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821007984.6U Expired - Fee Related CN208379557U (en) 2018-06-27 2018-06-27 Crouch excavation supporting structure under a kind of shear-zone big cross section cavern

Country Status (1)

Country Link
CN (1) CN208379557U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112228132A (en) * 2020-09-17 2021-01-15 中国矿业大学(北京) Flexible isolation structure of cross-section tunnel and rock mass large deformation control method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112228132A (en) * 2020-09-17 2021-01-15 中国矿业大学(北京) Flexible isolation structure of cross-section tunnel and rock mass large deformation control method

Similar Documents

Publication Publication Date Title
CN102021911B (en) Side slope reinforcing method and structure
CN105178981B (en) The closed depth coupling of broken soft rock roadway full-fracture-surfacanchoring-rod, which allows, presses bolt-grouting support method
CN107288653A (en) A kind of the benching tunnelling method excavation supporting structure of weak surrounding rock large cross-section tunnel double -side approach three and construction method
CN104533446A (en) Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel
CN108798702B (en) Supporting method for large-section soft rock large-deformation tunnel
CN103205976B (en) The multistage Vierendeel girder protective slope structure of slope body pressure self-adjusting formula
CN205617353U (en) Miniature compound soil nail wall that intercepts water by force
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN106522236B (en) The structure and construction method of pattern foundation pit supporting structure
CN108979667B (en) Penetrating ground crushed zone tunnel top bar interval wall construction method
CN104989421A (en) Support structure for preventing settlement deformation of tunnels and construction method thereof
CN209114482U (en) A kind of recyclable composite soil nailing wall of assembled flexible surface layer
CN108104821A (en) Large section open*.off is constructed and its method for protecting support
CN109944619A (en) A kind of Support Method for high ground stress soft rock stress tunnel
CN109235451A (en) Composite soil nailing wall and construction method can be recycled in assembled flexible surface layer
CN112176952A (en) Anchor cable support system for tunnel top soil high slope and construction method
CN202194129U (en) Composite prestress soil-blocking pile
CN208379557U (en) Crouch excavation supporting structure under a kind of shear-zone big cross section cavern
CN205805574U (en) A kind of super-span pile foundation joist carrying arch tunnel recombination liner structure
CN205954638U (en) Half semi -rigid flexible supporting construction of deep basal pit lateral wall
CN206972268U (en) A kind of extrusion pressing type weak surrounding rock large section tunnel support system
CN109083660A (en) Soft Rock Roadway (tunnel) road pucking based on armored concrete bottom beam administers supporting construction and method
CN211174126U (en) Open cut tunnel structure
CN110513129B (en) Advanced roof-protecting supporting structure and method for roadway of soft and thick coal seam working face
CN201908313U (en) Side slope reinforcement structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No.7 Tianyun Road, high tech Zone, Chengdu, Sichuan 610000

Patentee after: Guoneng Dadu River Basin Hydropower Development Co.,Ltd.

Address before: No.7 Tianyun Road, high tech Zone, Chengdu, Sichuan 610000

Patentee before: DADU RIVER HYDROPOWER DEVELOPMENT Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190115

Termination date: 20210627

CF01 Termination of patent right due to non-payment of annual fee