CN208379369U - A kind of road edge drainage system structure - Google Patents
A kind of road edge drainage system structure Download PDFInfo
- Publication number
- CN208379369U CN208379369U CN201820726850.3U CN201820726850U CN208379369U CN 208379369 U CN208379369 U CN 208379369U CN 201820726850 U CN201820726850 U CN 201820726850U CN 208379369 U CN208379369 U CN 208379369U
- Authority
- CN
- China
- Prior art keywords
- road
- collecting gutter
- basis
- embankment
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000008595 infiltration Effects 0.000 claims abstract description 5
- 238000001764 infiltration Methods 0.000 claims abstract description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 239000004745 nonwoven fabric Substances 0.000 claims description 3
- 239000010410 layer Substances 0.000 description 11
- 238000010276 construction Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Road Paving Structures (AREA)
- Sewage (AREA)
Abstract
The utility model provides a kind of road edge drainage system structure, includes blinding layer, road basis, road deck, collecting gutter, embankment, road shoulder, collector pipe, outlet pipe;Building on the blinding layer has road basic;The road basis is impermeable stratum concrete foundation layer;Building on the basis of the road has road deck;The collecting gutter is that ditch, collecting gutter bottom surface fitting and blinding layer top surface are collected in the infiltration built in road basis and road deck two sides;The embankment is the trapezoidal concrete component built in collecting gutter two sides, which flushes with collecting gutter;The road shoulder is the concrete block piece built on the embankment top surface of road deck two sides;The collecting gutter is provided with collector pipe in bottom centre, which is perforated plastic pipe;The collector pipe builds lateral outlet pipe together every a distance, and the outlet pipe is through embankment out.
Description
Technical field
The utility model relates to road drainage technical field more particularly to a kind of road edge drainage system structures.
Background technique
With the rapid development of our national economy, car ownership in the quickening of urbanization process and China's city scope
Increase, requirement of the people to indexs such as the grades, speed, width of urban road is higher and higher, outside city expressway or city
The roads such as loop wire have more strict requirements to these indexs, and higher standard path proposes the draining of urban road
Higher requirement.Previous road drainage system is asked since the problem of construction and material all can't resolve further serious draining
Topic, needs a large amount of cost to be safeguarded and repaired.
Utility model content
The purpose of this utility model is that it is in view of the drawbacks of the prior art and insufficient, a kind of road edge drainage system is provided
Structure, the structure can drain rapidly the Free water of road delay, be suitable for the small road of base's water penetration, and structure is simple, construction
It is convenient.
A kind of road edge drainage system structure that in order to achieve the above purposes, the technical solution adopted by the utility model is:, packet
Blinding layer, road basis, road deck, collecting gutter, embankment, road shoulder, collector pipe, outlet pipe are included;On the blinding layer
Build has road basic;The road basis is impermeable stratum concrete foundation layer;Building on the basis of the road has road surface
Layer;The collecting gutter is that ditch, collecting gutter bottom surface fitting and base are collected in the infiltration built in road basis and road deck two sides
Plinth bed course top surface;The embankment is the trapezoidal concrete component built in collecting gutter two sides, which flushes with collecting gutter;
The road shoulder is the concrete block piece built on the embankment top surface of road deck two sides;The collecting gutter is arranged in bottom centre
There is collector pipe, which is perforated plastic pipe;The collector pipe builds lateral outlet pipe together, the water outlet every a distance
Pipe is through embankment out.
Preferably, the road basis and road deck are tilted down from road-center to two side directions, slope is
3%.
Preferably, the collecting gutter and collector pipe are all outer to wrap up in one layer of anti-filter nonwoven fabric layer.
The beneficial effects of the utility model are: the structure can rapidly drainage pavement surface infiltration, be suitable for level of ground water compared with
Height has spring or has the road of interim backwater, and structure is simple, easy for construction.
Detailed description of the invention
Attached drawing described herein is to be used to provide a further understanding of the present invention, and constitutes one of the application
Point, but do not constitute the restriction to the utility model.
Fig. 1 is road edge drainage system structural schematic diagram.
Wherein: 1 is basic bed course, and 2 be road basis, and 3 be road deck, and 4 be collecting gutter, and 5 be embankment, and 6 be road shoulder, 7
It is outlet pipe for collector pipe, 8.
Specific embodiment
In conjunction with attached drawing, the utility model is described in further detail.
As shown, a kind of road edge drainage system structure, includes blinding layer 1, road basis 2, road deck
3, collecting gutter 4, embankment 5, road shoulder 6, collector pipe 7, outlet pipe 8;Building on the blinding layer 1 has road basis 2;The road
Basis 2 is impermeable stratum concrete foundation layer;Building on the road basis 2 has road deck 3;The collecting gutter 4 is to build
Ditch, 4 bottom surface of collecting gutter fitting and 1 top surface of blinding layer are collected in infiltration in road basis 2 and 3 two sides of road deck;It is described
Embankment 5 is the trapezoidal concrete component built in 4 two sides of collecting gutter, which flushes with collecting gutter 4;The road shoulder 6 is
Build the concrete block piece on 5 top surface of embankment of 3 two sides of road deck;The collecting gutter 4 is provided in bottom centre to catchment
Pipe 7, the collector pipe 7 are perforated plastic pipe;The collector pipe 7 builds lateral outlet pipe 8 together, the outlet pipe every a distance
8 through embankment 5 out.
When it is implemented, the road basis 2 and road deck 3 are tilted down from road-center to two side directions, slope
It is 3%.
When it is implemented, the collecting gutter 4 and collector pipe 7 are all outer to wrap up in one layer of anti-filter nonwoven fabric layer.
When practice of construction, the moisture in pavement structure is penetrated into, vertical seepage flow is first passed through and enters porous base course 2, then by cross
Enter the collector pipe with holes 7 in trackside collecting gutter 4 to seepage flow, then is led to by 8 row of lateral outlet pipe of laying spaced apart
Neighbouring catch-basin or rainwater inspection shaft, is discharged by subgrade drainage system.
Claims (3)
1. a kind of road edge drainage system structure, it is characterised in that: include blinding layer, road basis, road deck, collection
Ditch, embankment, road shoulder, collector pipe, outlet pipe;Building on the blinding layer has road basic;The road basis is impermeable
Water layer concrete foundation layer;Building on the basis of the road has road deck;The collecting gutter is to build in road basis and road
Ditch, collecting gutter bottom surface fitting and blinding layer top surface are collected in the infiltration of supercrust two sides;The embankment is to build in collecting gutter
The trapezoidal concrete component of two sides, the embankment top surface are flushed with collecting gutter;The road shoulder is to build on the road of road deck two sides
Concrete block piece on levee crown face;The collecting gutter is provided with collector pipe in bottom centre, which is perforated plastic pipe;Institute
It states collector pipe and builds lateral outlet pipe together every a distance, the outlet pipe is through embankment out.
2. a kind of road edge drainage system structure according to claim 1, it is characterised in that: the road basis and road
Supercrust is tilted down from road-center to two side directions, slope 3%.
3. a kind of road edge drainage system structure according to claim 1, it is characterised in that: the collecting gutter and catchment
Pipe is all outer to wrap up in one layer of anti-filter nonwoven fabric layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820726850.3U CN208379369U (en) | 2018-05-14 | 2018-05-14 | A kind of road edge drainage system structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820726850.3U CN208379369U (en) | 2018-05-14 | 2018-05-14 | A kind of road edge drainage system structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208379369U true CN208379369U (en) | 2019-01-15 |
Family
ID=64971216
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820726850.3U Expired - Fee Related CN208379369U (en) | 2018-05-14 | 2018-05-14 | A kind of road edge drainage system structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208379369U (en) |
-
2018
- 2018-05-14 CN CN201820726850.3U patent/CN208379369U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103103905B (en) | Road pavement draining method and drainage structure system | |
CN202298405U (en) | Road pavement dewatering structure system | |
CN205420945U (en) | Concrete road permeates water | |
CN205348354U (en) | System that utilizes is handled to regional low rainwater that influences | |
CN206219935U (en) | A kind of permeable pavement structure of high intensity, high osmosis | |
CN111042293A (en) | Construction process of road central green belt seepage-proofing drainage structure | |
CN106087648B (en) | A kind of special Quick drainage of urban road and irrigation system | |
CN109338839B (en) | Urban seepage storage system for recycling construction waste | |
CN207176440U (en) | A kind of discharge structure for the water-permeable pavement of pavement half | |
CN210507029U (en) | Road drainage structure | |
CN206581137U (en) | A kind of drainage system device for Highway in Loess Area bridge | |
CN203475267U (en) | Curb for water-permeable asphalt greenway pavement | |
CN210561533U (en) | Water collecting and draining roadbed capable of preventing water from accumulating on road surface | |
CN210263098U (en) | Mattress drainage system | |
CN208379369U (en) | A kind of road edge drainage system structure | |
CN111535098A (en) | Rainwater drainage system for green belts and sidewalks of town roads and construction method | |
CN214116117U (en) | Sponge city permeable pavement | |
CN212865490U (en) | Be applied to municipal road's ecological area of being detained | |
CN204690894U (en) | Road drainage structure | |
CN209923727U (en) | Plastic track with water seepage function | |
CN208685362U (en) | The arragement construction of city non-motorized lane | |
CN208486146U (en) | A kind of novel filter infiltration garden road step and sunk type square laying structure | |
CN208762819U (en) | Wisdom reservoir catchment system is descended in a kind of city on a large scale | |
CN208152219U (en) | A kind of dry depression for sponge city | |
CN209010891U (en) | A kind of multi-functional lobby drainage facility |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200706 Address after: 510430, 100, Qinglong Road, Shijing street, Baiyun District, Guangdong, Guangzhou Patentee after: GUANGZHOU RAILWAY POLYTECHNIC (GUANGZHOU RAILWAY MACHINERY SCHOOL) Address before: 510460 Guangzhou Railway Vocational and Technical College, No. 100 Qinglong Middle Road, Shijing Street, Baiyun District, Guangzhou City, Guangdong Province Patentee before: Shen Fulin |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190115 |
|
CF01 | Termination of patent right due to non-payment of annual fee |