CN208366088U - A kind of circulating water pool - Google Patents

A kind of circulating water pool Download PDF

Info

Publication number
CN208366088U
CN208366088U CN201721517910.2U CN201721517910U CN208366088U CN 208366088 U CN208366088 U CN 208366088U CN 201721517910 U CN201721517910 U CN 201721517910U CN 208366088 U CN208366088 U CN 208366088U
Authority
CN
China
Prior art keywords
water
return
pipe
recovery tank
branch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721517910.2U
Other languages
Chinese (zh)
Inventor
刘玉波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fushun Deheng Mine Machinery Co Ltd
Original Assignee
Fushun Deheng Mine Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fushun Deheng Mine Machinery Co Ltd filed Critical Fushun Deheng Mine Machinery Co Ltd
Priority to CN201721517910.2U priority Critical patent/CN208366088U/en
Application granted granted Critical
Publication of CN208366088U publication Critical patent/CN208366088U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The utility model provides a kind of circulating water pool, is related to a kind of cooling equipment technical field of boiler.The utility model includes water supplying pipe, water cooling tube, return pipe, recovery tank, cooling tower and feed cistern, one end of water cooling tube is connected to return pipe, the other end is connected to water supplying pipe, water supplying pipe is connected to feed cistern, return pipe successively with recovery tank, cooling tower and feed cistern concatenation, water supply branch pipe is provided on water supplying pipe, water supply branch pipe includes the first water supply branch pipe and the second water supply branch pipe, recovery tank upper end is provided with return branch, return branch includes the first return branch and the second return branch, electronic flowmeter and return water temperature meter are provided in return branch, end seal is equipped with return water case lid on recovery tank.The utility model structure is simple, resource-effective, investment cost is relatively fewer.

Description

A kind of circulating water pool
Technical field
The utility model relates to a kind of cooling equipment technical fields of boiler, more particularly to a kind of circulating water pool.
Background technique
Boiler body equipment is in during hyperthermia radiation in smelting process, it is necessary to using water-cooling system to mineral hot furnace Cooling processing is carried out, specifically the cold water in feed cistern is extracted on stove through each of the cooling mineral hot furnace of each branch using water supply pump The return water at a position, each road returns in recovery tank, then flows in back pool through recovery tank, and the water in back pool is using water Pumping is radiated to cooling tower and returns to feed cistern, such circulating cooling, but this method will be chosen larger-diameter time Water pipe, therefore invest greatly, it is unfavorable for energy conservation.
Utility model content
Aiming at the shortcomings existing in the above problems, the utility model provides a kind of circulating water pool, make its structure it is simple, It is resource-effective, investment cost is relatively fewer.
To solve the above-mentioned problems, the utility model provides a kind of circulating water pool, wherein including water supplying pipe, water cooling tube, returns Water pipe, recovery tank, cooling tower and feed cistern, one end of the water cooling tube are connected to the return pipe, the other end and the water supply Pipe connection, the water supplying pipe is connected to the feed cistern, the return pipe successively with the recovery tank, the cooling tower and described Feed cistern concatenates, and water supply branch pipe is provided on the water supplying pipe, and the water supply branch pipe includes that the first water supply branch pipe and second are supplied water Branch pipe, the recovery tank upper end are provided with return branch, and the return branch includes the first return branch and the second return branch, Electronic flowmeter and return water temperature meter are provided in the return branch, end seal is equipped with return water case lid on the recovery tank;Also Including furnace body, the water cooling tube, the following ramming high-strength refractory casting of water cooling tube hub line are laid on the furnace bottom of the furnace body Expect, more than the water cooling tube hub line fills carbon ramming mass, building above the carbon ramming mass has high thermal conductivity graphite block, institute It states and is provided with supply flume outside the furnace wall of furnace body, the water cooling tube is connected to by the supply flume with the water supplying pipe;The cooling Control device is provided on tower in short-term, is provided with acoustic-optic alarm on the control device, the control device is respectively with One adjustable valve, the electronic flowmeter, the return water temperature meter are connected with the acoustic-optic alarm.
Preferably, the recovery tank lower end is provided with the second adjustable valve, and second adjustable valve and the control fill Set connection.
Preferably, the first adjustable valve is provided on the water supplying pipe.
Compared with prior art, the utility model has the advantage that
The utility model structure is simple, resource-effective, investment cost is relatively fewer.
Detailed description of the invention
Fig. 1 is the embodiments of the present invention structural schematic diagram;
Fig. 2 is the another structural schematic diagram of the embodiments of the present invention.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, with reference to the accompanying drawing with example The utility model is described in further detail, but example is not as the restriction to the utility model.
As depicted in figs. 1 and 2, the embodiments of the present invention include water supplying pipe 5, water cooling tube 2, return pipe 6, recovery tank 15, one end of cooling tower 16 and feed cistern 17, water cooling tube 2 is connected to return pipe 6, and the other end is connected to water supplying pipe 5, water supplying pipe 5 It is connected to feed cistern 17, return pipe 6 is successively concatenated with recovery tank 15, cooling tower 16 and feed cistern 17, is provided with confession on water supplying pipe 5 Water branch pipe, water supply branch pipe include the first water supply branch pipe 8 and the second water supply branch pipe 12, and 15 upper end of recovery tank is provided with return branch, Return branch includes the first return branch 11 and the second return branch 13, and electronic flowmeter 9 is provided in return branch and is returned Coolant-temperature gage meter 10, end seal is equipped with return water case lid 14 on recovery tank 15.Further include furnace body, be laid with water cooling tube 2 on the furnace bottom 1 of furnace body, The following ramming high-strength refractory castable of 2 center line of water cooling tube more than 2 center line of water cooling tube fills carbon ramming mass, charcoal element ramming Material is built above high thermal conductivity graphite block 3, supply flume 4 is provided with outside the furnace wall of furnace body, water cooling tube 2 is by supply flume 4 and supplies water Pipe 5 is connected to.The first adjustable valve 7 is provided on water supplying pipe 5.Control device 18, control device are provided on cooling tower 16 in short-term Be provided with acoustic-optic alarm on 18, control device 18 respectively with the first adjustable valve 7, electronic flowmeter 10, return water temperature meter 9 are connected with acoustic-optic alarm.15 lower end of recovery tank is provided with the second adjustable valve 19, the second adjustable valve 19 and control Device 18 connects.
In the present embodiment, the high temperature of inner lining material is water cooled the cooling water band of pipe 2 by high thermal conductivity carbonaceous material in furnace It walks, to reach good cooling effect;According to cooling requirement, the first adjustable valve 7 is installed in 2 entrance of water cooling tube to adjust Water-saving flow control intensity of cooling, each position of the cold water Jing Guo mineral hot furnace in water supply branch pipe, cools down to mineral hot furnace, Then it is returned in recovery tank 15 by return branch, since recovery tank 15 is closed by return water case lid 14, generated siphon effect Fruit enters the hydraulic pressure in recovery tank 15 in cooling tower 16, and water after cooling is flowed into feed cistern 17 by pipeline, and feed cistern 17 is again It is connected with water supplying pipe 5, thereby realizes the circulating cooling to mineral hot furnace.
The foregoing description of the disclosed embodiments can be realized professional and technical personnel in the field or using originally practical new Type.Various modifications to these embodiments will be readily apparent to those skilled in the art, and determine herein The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause This, the present invention will not be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The widest scope consistent with features of novelty.

Claims (3)

1. a kind of circulating water pool, which is characterized in that including water supplying pipe, water cooling tube, return pipe, recovery tank, cooling tower and feed cistern, One end of the water cooling tube is connected to the return pipe, and the other end is connected to the water supplying pipe, the water supplying pipe and the water supply Pond connection, the return pipe successively concatenate with the recovery tank, the cooling tower and the feed cistern, are arranged on the water supplying pipe There is water supply branch pipe, the water supply branch pipe includes the first water supply branch pipe and the second water supply branch pipe, and the recovery tank upper end is provided with back Water branch pipe, the return branch include the first return branch and the second return branch, are provided with electronics in the return branch Flowmeter and return water temperature meter, end seal is equipped with return water case lid on the recovery tank;It further include furnace body, the furnace bottom upper berth of the furnace body If the water cooling tube, the following ramming high-strength refractory castable of water cooling tube hub line more than the water cooling tube hub line is filled Carbon ramming mass, building above the carbon ramming mass has high thermal conductivity graphite block, is provided with supply flume outside the furnace wall of the furnace body, The water cooling tube is connected to by the supply flume with the water supplying pipe;Control device is provided on the cooling tower in short-term, it is described Be provided with acoustic-optic alarm on control device, the control device respectively with the first adjustable valve, the electronic flowmeter, institute Return water temperature meter is stated to be connected with the acoustic-optic alarm.
2. circulating water pool as described in claim 1, which is characterized in that the recovery tank lower end is provided with the second adjustable valve, Second adjustable valve is connect with the control device.
3. circulating water pool as claimed in claim 2, which is characterized in that be provided with the first adjustable valve on the water supplying pipe.
CN201721517910.2U 2017-11-13 2017-11-13 A kind of circulating water pool Active CN208366088U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721517910.2U CN208366088U (en) 2017-11-13 2017-11-13 A kind of circulating water pool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721517910.2U CN208366088U (en) 2017-11-13 2017-11-13 A kind of circulating water pool

Publications (1)

Publication Number Publication Date
CN208366088U true CN208366088U (en) 2019-01-11

Family

ID=64913512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721517910.2U Active CN208366088U (en) 2017-11-13 2017-11-13 A kind of circulating water pool

Country Status (1)

Country Link
CN (1) CN208366088U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113063296A (en) * 2021-04-22 2021-07-02 山东钢铁集团日照有限公司 Double-station LF refining furnace water-cooled furnace cover water quantity control system and control method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113063296A (en) * 2021-04-22 2021-07-02 山东钢铁集团日照有限公司 Double-station LF refining furnace water-cooled furnace cover water quantity control system and control method

Similar Documents

Publication Publication Date Title
WO2020077967A1 (en) Multilevel deep well cooling and geothermal utilization system and process
CN104563514B (en) Large-volume concrete circulation cooling system
CN203550609U (en) Water cooling plant for submerged arc furnace
CN104152618A (en) Soft-water cooling pipeline control method for blast furnace
CN208366088U (en) A kind of circulating water pool
CN205154229U (en) Attached water film board heat exchanger heat sink of high temperature mine tunnel wall
CN201755493U (en) Circulation cooling system for reaction kettle
CN203518569U (en) Vault type rapid cooling safe water tank of tunnel kiln
CN103206866B (en) Method and device for cooling and waste heat recovery of flash smelting furnace body
CN215103348U (en) Blast furnace slag waste heat recovery system
CN201653124U (en) Radiation heat utilizing device of rotary kiln
CN205376503U (en) Water -cooling circulating device
CN209906817U (en) Automatic lead discharging device at bottom of blast furnace
CN208818008U (en) The abundant water-cooling circulating system of blue bricks kiln
CN204924502U (en) Calorimeter calibrating installation heat transfer constant temperature water tank
CN204478583U (en) A kind of cold-hot integral thermostat machine
CN203731855U (en) Coreless gas-pressure thermal insulating pouring furnace
CN207468904U (en) A kind of reuse hydrologic cycle cooling system
CN203754743U (en) Semi-closed high pressure water cooling system used for material distributing device
CN209144186U (en) A kind of cooling equipment of Iron Works
CN202849455U (en) Water supply device for cooling single blast furnace hearth
CN205875163U (en) Temperature control device suitable for reservoir dam body in cold region
CN207501697U (en) A kind of ferronickel electric furnace furnace bottom water cooling plant
CN207622105U (en) A kind of solar energy and gas fired-boiler combining heating system
CN207035642U (en) Tunnel anchorage massive concrete temperature cracks prevention and control water circulation system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant