CN209144186U - A kind of cooling equipment of Iron Works - Google Patents
A kind of cooling equipment of Iron Works Download PDFInfo
- Publication number
- CN209144186U CN209144186U CN201822052253.XU CN201822052253U CN209144186U CN 209144186 U CN209144186 U CN 209144186U CN 201822052253 U CN201822052253 U CN 201822052253U CN 209144186 U CN209144186 U CN 209144186U
- Authority
- CN
- China
- Prior art keywords
- water
- pipe
- main body
- storage box
- water storage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
The utility model discloses a kind of cooling equipment of Iron Works, including high furnace main body, the high furnace main body right is provided with water storage box, vertically fixed connection is equipped with water injection pipe to the water storage box top right side, the water storage box left lower is fixedly installed with suction pump, the drinking-water pipe of the suction pump is connected to water storage box sealing, and the water storage box left is fixedly installed with fixed frame.The utility model increases by two groups of circle pipes for having hole for water spraying by the lower part in the middle part of high furnace main body, guarantees the cooling and cooling effect in the middle part of high furnace main body with lower part, more practical, is suitble to be widely popularized and use.
Description
Technical field
The utility model relates to the field of smelting iron, in particular to the cooling equipment of a kind of Iron Works.
Background technique
Currently, blast furnace is to make furnace shell with steel plate, fireproof brick inner lining is built in shell.Blast-furnace body is divided into furnace throat, furnace from top to bottom
Body, furnace bosh, bosh and cupola well.Since blast furnace technology economic indicator is good, simple process, output is big, labour production effect
Rate is high, low power consumption and other advantages, therefore the iron of this method production accounts for the overwhelming majority of world iron total output.The cooling purpose of furnace is
Increase the temperature gradient in furnace lining, causes 1150 DEG C of isothermal levels far from last furnace shell, to protect certain metal structures and coagulation
Native component is allowed to not lose intensity.Furnace lining is set to congeal into slag crust, protection even replaces furnace lining to work, to obtain reasonable furnace, prolongs
Long furnace lining ability to work and blast furnace service life blast furnace it is cooling and formed protectiveness slag crust, iron-clad, graphite linings essential condition.It is high
The common cooling medium of furnace has: water, wind, steam water interface.
It is that CN201721713898.2 discloses a kind of Iron Works cooling body, the refining by retrieval China Patent No.
Ironworks blast furnace cold but mechanism, is wound with branch water pipe, branch water pipe is mounted on high stove outer covering on the outer surface of high stove outer covering
Outer surface on, the water storage tray is connected with water-main, and spray head is equipped on the lower surface of water storage tray, and branch water pipe
Inside contain the water flowed into from reservoir, the water of low temperature can adsorb a large amount of heat to reducing blast furnace outer surface of outer cover
Temperature plays cooling effect, but a water storage tray and spray head only is arranged in blast furnace shell upper, due to blast furnace skin temperature
Higher, the water source of the injection of water storage tray is just evaporated when not flowing to bottom house, leads to the cooling effect of blast furnace middle and lower part position
Fruit reduces.Therefore, it is proposed that a kind of cooling equipment of Iron Works.
Utility model content
The main purpose of the utility model is to provide a kind of cooling equipment of Iron Works, can effectively solve background
The problems in technology.
To achieve the above object, the technical solution that the utility model is taken are as follows:
A kind of cooling equipment of Iron Works use, including high furnace main body, the high furnace main body right are provided with water storage box, institute
Stating water storage box top right side, vertically fixed connection is equipped with water injection pipe, and the water storage box left lower is fixedly installed with suction pump,
The drinking-water pipe of the suction pump is connected to water storage box sealing, and the water storage box left is fixedly installed with fixed frame, the fixed frame
Left side level is fixedly connected with two groups of connecting rods disposed in parallel, and connecting rod left end described in two groups is fixedly connected with water pipe, described
Horizontal fixed connection is equipped with three groups of connection water pipes being equally spaced, upper, the neutralization lower portion of the high furnace main body on the left of water pipe
Be socketed with circle pipe, circle pipe described in three groups respectively be connected to water pipe described in three groups and be fixedly connected.
Further, blast furnace bottom part body periphery is fixedly connected with water guide slotted disk, and the guiding gutter is faced left side bottom
Fixed connection is equipped with return pipe, and return pipe is connected to external sewage disposal device.
Further, high furnace main body middle part position fixing sleeve on the lower side is connected to ring oven hot air pipe, the ring oven hot air pipe
Pass through the fixed connection of hot blast nozzle at left and right sides of high furnace main body at left and right sides of bottom respectively.
Further, the circle bottom of the tube offers the hole for water spraying that multiple groups are equally spaced.
Compared with prior art, the utility model has the following beneficial effects:
1. the cooling equipment of the Iron Works of the utility model, increases by two groups of bands by the lower part in the middle part of high furnace main body
There is the circle pipe of hole for water spraying, guarantees the cooling and cooling effect in the middle part of high furnace main body with lower part.
2. the cooling equipment of the Iron Works of the utility model, leads due to being fixedly connected in blast furnace bottom part body periphery
Water-trough plate, the guiding gutter fixed connection of side bottom of facing left is equipped with return pipe, and return pipe and external sewage disposal device connect
Logical, water guide slotted disk can will enclose the water source that pipe sprays and be collected and carry out being recovered to external sewage treatment by return pipe
Equipment is filtered purification.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the cooling equipment of the utility model Iron Works;
Fig. 2 is the hole for water spraying of the cooling equipment of the utility model Iron Works in circle bottom of the tube distributed architecture schematic diagram.
In figure: 1, high furnace main body;2, water guide slotted disk;3, suction pump;4, drinking-water pipe;5, water storage box;6, water injection pipe;7, fixed
Frame;8, connecting rod;9, water pipe;10, it is connected to water pipe;11, circle pipe;12, ring oven hot air pipe;13, hot blast nozzle;14, return pipe;15,
Hole for water spraying.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below
In conjunction with specific embodiment, the utility model is further described.
As shown in Figs. 1-2, a kind of Iron Works cooling equipment, including high furnace main body 1, high 1 right of furnace main body
It is provided with water storage box 5, vertically fixed be connected to is equipped with water injection pipe 6 to 5 top right side of water storage box, under 5 left side of water storage box
Portion is fixedly installed with suction pump 3, and the drinking-water pipe 4 of the suction pump 3 is connected to the sealing of water storage box 5, and 5 left of water storage box is fixed
Fixed frame 7 is installed, the 7 left side level of fixed frame is fixedly connected with two groups of connecting rods 8 disposed in parallel, connects described in two groups
8 left end of bar is fixedly connected with water pipe 9, and the horizontal fixed connection in 9 left side of water pipe is equipped with three groups of connection water pipes being equally spaced
10, the high furnace main body 1 it is upper, neutralize lower portion be socketed with circle pipe 11, described in three groups circle pipe 11 respectively with connect described in three groups
Water service pipe 10 is fixedly connected.
Hole for water spraying 15 is had by increasing by two groups in the lower part at high 1 middle part of furnace main body as depicted in figs. 1 and 2 in the present embodiment
Circle pipe 11, guarantee the cooling and cooling effect at 1 middle part and lower part of high furnace main body.
Wherein, 1 bottom periphery of high furnace main body is fixedly connected with water guide slotted disk 2, and 2 left bottom of water guide slotted disk is solid
Fixed connection is equipped with return pipe 14, and return pipe 14 is connected to external sewage disposal device.
As shown in Figure 1, water guide slotted disk 2 can will enclose the water source that sprays of pipe 11 is collected and passes through back in the present embodiment
The sewage disposal device that flow tube 14 be recovered to outside is filtered purification.
Wherein, the 1 middle part position fixing sleeve on the lower side of high furnace main body is connected to ring oven hot air pipe 12, the ring oven hot air pipe 12
Pass through the fixed connection of hot blast nozzle 13 of high 1 left and right sides of furnace main body at left and right sides of bottom respectively.
As shown in Figure 1, guaranteeing the heat stability of high 1 inner cavity of furnace main body in the present embodiment.
Wherein, circle 11 bottom of pipe offers the hole for water spraying 15 that multiple groups are equally spaced.
In the present embodiment as shown in Fig. 2, guarantee circle pipe 11 by equally distributed hole for water spraying 15 can be to high furnace main body 1 outside
Wall surrounding carries out spray cooling cooling.
Working principle: in use, the work of suction pump 3 is conveyed at the water source in water storage box 5 by water pipe 9 by drinking-water pipe 4
To three groups of connection water pipes 10, connection water pipe 10 is transported in three groups of circle pipes 11, and passes through several hole for water sprayings of circle 11 bottom of pipe
The outer wall of 15 pairs high furnace main body 1 carries out spraying cooling heat dissipation, and water guide slotted disk 2 can will enclose the water source that pipe 11 sprays and be collected simultaneously
And purification is filtered by the sewage disposal device that return pipe 14 be recovered to outside.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above.Current row
The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments
Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also
It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model
Claimed range is defined by the appending claims and its equivalent thereof.
Claims (4)
1. a kind of Iron Works cooling equipment, including high furnace main body (1), it is characterised in that: high furnace main body (1) right
It is provided with water storage box (5), vertically fixed connection is equipped with water injection pipe (6), the water storage box to water storage box (5) top right side
(5) left lower is fixedly installed with suction pump (3), and the drinking-water pipe (4) of the suction pump (3) is connected to water storage box (5) sealing, institute
It states water storage box (5) left to be fixedly installed with fixed frame (7), level is fixedly connected with two groups and sets in parallel on the left of the fixed frame (7)
The connecting rod (8) set, (8) left end of connecting rod described in two groups are fixedly connected with water pipe (9), horizontal fixed on the left of the water pipe (9)
Connection is equipped with three groups of connection water pipes (10) being equally spaced, and upper, the neutralization lower portion of the high furnace main body (1) are socketed with circle
Manage (11), circle pipe (11) described in three groups respectively be connected to water pipe (10) described in three groups and be fixedly connected.
2. the cooling equipment of Iron Works according to claim 1, it is characterised in that: high furnace main body (1) bottom
Periphery is fixedly connected with water guide slotted disk (2), and the fixed connection of water guide slotted disk (2) left bottom is equipped with return pipe (14), and
Return pipe (14) is connected to external sewage disposal device.
3. the cooling equipment of Iron Works according to claim 1, it is characterised in that: in the middle part of the high furnace main body (1)
Position fixing sleeve on the lower side is connected to ring oven hot air pipe (12), passes through blast furnace master at left and right sides of ring oven hot air pipe (12) bottom respectively
The fixed connection of hot blast nozzle (13) at left and right sides of body (1).
4. the cooling equipment of Iron Works according to claim 1, it is characterised in that: the circle pipe (11) bottom opens up
The hole for water spraying (15) for thering are multiple groups to be equally spaced.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822052253.XU CN209144186U (en) | 2018-12-07 | 2018-12-07 | A kind of cooling equipment of Iron Works |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822052253.XU CN209144186U (en) | 2018-12-07 | 2018-12-07 | A kind of cooling equipment of Iron Works |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209144186U true CN209144186U (en) | 2019-07-23 |
Family
ID=67289496
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822052253.XU Expired - Fee Related CN209144186U (en) | 2018-12-07 | 2018-12-07 | A kind of cooling equipment of Iron Works |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209144186U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111790256A (en) * | 2020-05-28 | 2020-10-20 | 辽宁科技大学 | Cooling system for ADA desulfurization and salt extraction in non-blast furnace iron making |
-
2018
- 2018-12-07 CN CN201822052253.XU patent/CN209144186U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111790256A (en) * | 2020-05-28 | 2020-10-20 | 辽宁科技大学 | Cooling system for ADA desulfurization and salt extraction in non-blast furnace iron making |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104152618B (en) | Blast-furnace soft water cooling line control method | |
CN204154124U (en) | A kind of water cooled wall type magnesium fusing lump afterheat retracting device | |
CN209144186U (en) | A kind of cooling equipment of Iron Works | |
CN101709221A (en) | Novel coke powder cooling device | |
CN105779672B (en) | It is a kind of for controlling the stopper of molten slag flow | |
CN207552356U (en) | A kind of Iron Works cooling body | |
CN111486717A (en) | Spent steam whitening treatment and water saving system and method for blast furnace slag flushing water | |
CN108796155B (en) | Blast furnace cast house slag iron Shui Yu sensible heat recovery energy-saving power generation system and power generation method | |
CN204211490U (en) | A kind of Of Yellow Phosphorus Plants | |
CN207050506U (en) | A kind of modified counterflow cooling tower | |
CN201665685U (en) | Cooling system for steel brick soft water of blast furnace throat | |
CN204987938U (en) | Cooling arrangement of controllable speed with water purification function | |
CN209147742U (en) | Ferronickel electric furnace furnace bottom water cooling plant | |
CN207065542U (en) | A kind of afterheat of slags utilizes device | |
CN206504107U (en) | A kind of safety durable type groundwater supply pipeline | |
CN206399201U (en) | A kind of smelting furnace cooling device for ferroalloy production line | |
CN212620072U (en) | Intermediate frequency electric furnace crucible | |
CN206875939U (en) | A kind of environmentally friendly furnace cupola | |
CN205748055U (en) | A kind of liquid nitrogen off gas energy recovery device | |
CN205576012U (en) | Intermetallic compound high temperature coal gas waste heat recovery device | |
CN220887572U (en) | Molten steel slag treatment and heat recovery system | |
CN208965005U (en) | A kind of efficient Mn-rich slag processing pond | |
CN210826220U (en) | Energy-saving and environment-friendly device for iron-making blast furnace coal | |
CN215481050U (en) | Oxygen supply oxygen lance structure for installing steel converter | |
CN204198652U (en) | A kind of heat exchanger of riser of coke oven |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190723 Termination date: 20211207 |